Providing & Installation Of Pumping Machineries, Etc. Including Allied Words At Chandmari ( Kharagpur S.D. Hospital ) Pump House-2 Supply, Delivery And Storage At Site Of Horizontal Split Casing Centrifugal Pumping Machineries With Baseplate, Flexible Coupling, Coupling Guard, Foundation Bolt Etc, Having The Following Specification And As Per Nit.H-Q-P Curve Of Pumps In Test Bed Has To Be Submitted During The Delivery.A ) Discharge :- 330 M3 Per Hour, Head:- 30 Mtr ( Total 2 Nos ) 3 B ) Discharge :- 240 M3 Per Hour, Head:- 84 Mtr ( Total 3 Nos ) 4 Supply, Delivery And Storage At Site Of Horizontal Foot Mounted Induction Motor, Ie 3 Type Suitable For The Pump Duty Mentioned Above ( Item No-1 ) With Adequate Margin As Specified In The Nit.Routine Test Certificate Of Induction Motor Has To Be Submitted During Deliverya ) Motor 9.3 K W A ) Motor 45 Kw ( For Item 1 A ) 5 A ) Motor 90 Kw ( For Item 1 B ) 6 Supply, Delivery And Storage At Site Offollowing Dia Manually Operated Ci Rising Spindle Sluice Valve As Per Is : 14846 Pn-1.0 And As Per Details Given In The Nit.:- N.B. : Test Certificate To Be Produced For Each Valve A ) 300 Mm Dia ( For Both Item 1 A & 1 B ) 7 Supply, Delivery And Storage At Site Offollowing Diacast Iron Double Flanged Actuator Operated Butterfly Valve As Per Is 13095, And Disc Conforming To Is : 210, Pn-1.6, As Per Detail Given In Nit N.B ( Test Certificate, Warranty Certificate To Be Submitted For Each Valve At The Time Of Delivery ) A ) 300 Mm Dia ( Foritem 1 A ) 8 B ) 250 Mm Dia ( Foritem 1 B ) 9 Supply, Delivery And Storage At Site Offollowing Dia Ci Doble Flanged Single Door Swing Check N.R.V With By-Pass Arrangement As Per Is : 5312, Part-I Pn-1.6 And As Per Detail Given In Nit N.B : ( Test Certificate, Warranty Certificate To Be Submitted For Each Valve At The Time Of Delivery ) A ) 300 Mm Dia ( Foritem 1 A ) 10 B ) 250 Mm Dia ( Foritem 1 B ) 11 Supply, Delivery And Storage At Site Offollowing Dia. Ms Dismantling Joints With Rubber Compression Ring And Adjustable Follower Flanged Complete Assembled Unit With Galvanized Stud And Nuts Pn-1.6 And As Per Detail Given In Nit. ( Test Certificate, Warranty Certificate To Be Submitted For Each Valve At The Time Of Delivery ) A ) 300 Mm Dia ( Foritem 1 A ) 12 B ) 250 Mm Dia ( Foritem 1 B ) 13 Supply, Delivery And Storage At Site Offollowing 150 Mm Dia Glycerine Filled Diaphragm Seal Type Gagues With Syphon Tube And Three Way Cock And As Per Terchnical Specification Of Nit A ) Pressure Gauges ( 0-15 Kg / Cm2 ) Kg / Cm2 With Psi 14 Supply, Delivery And Storage At Site Of Ms Pipes, Flanges, Bends, Tees, Fittings Etc. Suitable For Pn 1.0 Rating For Individual, Suction, Delivery And Common Header Of Pumps 15 Repairing / Overhauling Of Mcc Panel And Stand Alone Ats Panel With Providing Suitable Rated Sfu / Mccb, Heavy Duty Capacitor, Capacitor Duty Contractors, On / Off Lamp, Power Terminals, Mcbs, Voltmeter, Ammeter, Motor Protection Relays Including Power Wiring, Complete By Providing Necessary Sockets, Etc As Per Direction Of Eic. 16 Chlorination For Automatic / Manual Gaseous Dozing With 2 Nos. Baby Cylinder [ 100Kg ] , 2 Nos Boosting Pump, Vacum Regulator, Auto-Change Over, Hoisting Arrangement Incluiding Supply And Installation. 17 Installation Of Items Mentioned In Sl. No. 1, 2, 3, 4, 5, 6, 7, 8, 9 &10 Including Supply Of All Erection Items, Pump Foundation Block, As Required For Instalation Of Pumping Machinery, Necessary Inter-Connection Of Motors With Earth Bus Bar Etc As Required For Completion Of Work As Per Relevant Ie Rulesand Hydraulic Standardswith The Entire Satisfactionof Eic In Compliance With Nit Specifiaction Including Hire Charges Of Welding Set, Fuel, Lubricant Etc For Completion Of Work, Painting, Testing And Commissioning Of The Installation As Per Direction & Full Satisfaction Of Eic. 18 Repairing & Rectification Of Internal Wiring And Internalillumination Arrangementafter Dismantling And Non- Functioning Item By Providing New Fixtures Etc All Complete As Per Direction Of Eic.