Drinking Water And Sanitation Department has published Preparation Of Detail Project Report Including Detail Topographical And Engineering Survey And Design For Four Nos. Urban Towns ( 1 ) Selakui ( Central Hope Town ) , ( 2 ) Herbertpur, ( 3 ) Gauchar, ( 4 ) And Satpuli Preparation Of Detail Proj. Submission Date for this Tender is 15-06-2022. Detail Project Report Tenders in dehradun Uttarakhand. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | PREPARATION OF DETAIL PROJECT REPORT INCLUDING DETAIL TOPOGRAPHICAL & ENGINEERING SURVEY AND DESIGN FOR FOUR NOS. URBAN TOWNS |
2 | Preparation Of Detail Project Report Including Detailed Topographical & Engineering Survey and design of water supply scheme for Four Nos. Urban Towns: (1) Selakui (Central Hope Town), (2) Herbertpur, (3) Gauchar, (4) And Satpuli including its cluster as per detailed scope of work . Broadly the scope of worksare as follows:- Detailed topographical and engineering survey including Study of Existing Water Supply System. it shall include the study of condition of infrastructure which shall lead to take the decision whether the present infrastructure can be used or have to replace. Planning for zoning of system for efficient services. Design of Water Supply Scheme for minimum 16 hours a day with minimum 12 meter Terminal Pressure. The design of water supply scheme shall be carried out as per CPHEEO/Ministry of Housing and Urban Affairs (for AMRUT 2.0) norms /department guidelines as issued time to time. The design shall be made economical with the construction and maintenance point of view. Provision for automation and SCADA has to be made. Detail D.P.R shall include the hydraulic design of proposed Water Supply, source work, Preparation of project report, Form-“J”, Economics of the project, Abstract of cost of works,and all other works as per direction of Engineer-In-charge for the preparation of DPR. ? Zone wise DPR shall be prepared by the Consultant/Firm. ? 2. Soft Data of DPR in excel (with Data links)/word/pdf format along with design and drawing in soft copy shall be provided by the Consultant/Firm. ? After Approval of DPR from competent authority, 07 Hard copy set of DPR shall be provided by the Consultant/Firm. Annual operating cost model shall be prepared from the year of commissioning and up to 10 year time frame with necessary inflation. The cost shall show the demand and connections growth, production volume, sales volume, breakup of electricity costs, staff salaries, repair and maintenance and other consumables etc. Any other work needed for completion of this task. Rates to be quoted separately for Following each urban town area. |
3 | Selakui (Central Hope Town) |
4 | Herbertpur |
5 | Gauchar |
6 | Satpuli |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail