}

Supply Of Mold Baking Kiln, Metal Melting Furnace And Ladle Supply Of Mold Baking Kiln, Metal Melting Furnace And Ladle , Mould Baking Kiln ----One Complete Unit A. Fuel----- Png B. Type-----Down Draft C. Working Temp------1100°C D. Burner-------- Two Uni, delhi-Delhi

Government College-GC has published Supply Of Mold Baking Kiln, Metal Melting Furnace And Ladle Supply Of Mold Baking Kiln, Metal Melting Furnace And Ladle , Mould Baking Kiln ----One Complete Unit A. Fuel----- Png B. Type-----Down Draft C. Working Temp------1100°C D. Burner-------- Two Uni. Submission Date for this Tender is 27-06-2022. Kitchen Equipment Tenders in delhi Delhi. Bidders can get complete Tender details and download the document.




Tender Notice

32444454
Supply Of Mold Baking Kiln, Metal Melting Furnace And Ladle Supply Of Mold Baking Kiln, Metal Melting Furnace And Ladle , Mould Baking Kiln ----One Complete Unit A. Fuel----- Png B. Type-----Down Draft C. Working Temp------1100°C D. Burner-------- Two Uni
Open Tender
Indian
Delhi
delhi
27-06-2022

Tender Details

Supply Of Mold Baking Kiln, Metal Melting Furnace And Ladle Supply Of Mold Baking Kiln, Metal Melting Furnace And Ladle , Mould Baking Kiln ----One Complete Unit A. Fuel----- Png B. Type-----Down Draft C. Working Temp------1100°C D. Burner-------- Two Units With One Air Single Phase Electric Blower. E. Loading Space-----Depth 7 X Width 6 X Height6 F. Trolley Size ------Length 6 X Width 56’’. G. Trolley Movement -----Automatic H. Trolley Wheels 4Nos. -----4 To 6 Dia.In Iron. Strong Enough To Bear The Weight Of Trolley And Load Of Approximate 4 To 5 Tons. I. Base Of Trolley- Insulation Bricks & Fire Brick, Fixing With Fire Cement. J. Kiln Body =. Five Sides (Including Furnace Shutter/ Gate And Top Roof) High Density Fiber Wool No.1425 (Moreguppa Brand) Furnace Frame = Angle Iron 70Mm X 70Mm X 6Mm Thick. Supported By M S Flat 70Mm X 6Mm Thick, Fire Cement , I Channel 6 X 3 X 5 To 6 Mm Thick , Covering From All Five Sides 4Mm Thick M S Sheet With Nuts And Bolts Welding . K. Chimney Design As Per Requirement, Height 2 Feet More Than Present Roof Height. L. Rail Track = Rail Track Length = 13 Feets (6Feet Inside The Furnace And 7 Feets Outside The Furnace. , Metal Melting Furnace ----One Complete Unit A. Fuel. ---+---------+------- Png B. Melting Capacity. ----2Ookg C. Working Temp. -------1400°C D. Fire Bricks, End Arc, With 70% Alumina E. Fire Cement (Acc) F. Png Burner Unit With All Accessories- Single Stage- 1Unit G. Hydraulic Tilting , Ladle A. Manual Ladle 100 Kg. (2 Units With Handle) B. Ladle Pre-Heater Gas Burner Operated. C. Including Blower And Stand.

Key Value

Document Fees
Refer document
EMD
INR 30000.0 /-
Tender Value
Refer document

BOQ Items

Name of Work: SUPPLY OF Mold Baking Kiln, Metal Melting Furnace and LadleFOR THE COLLEGE OF ART
Sl. No. Item Description
1Mould baking Kiln ----one complete unit a. Fuel----- PNG b. Type-----Down draft c. Working Temp------1100°C d. Burner-------- Two units with one air single phase electric blower. e. Loading space-----depth 7" x width 6" x height6" f. Trolley Size ------length 6" x width 5"6’’. g. Trolley movement -----Automatic h. Trolley wheels 4nos. -----4" to 6" Dia.in Iron. Strong enough to bear the Weight of trolley and load of approximate 4 To 5 Tons. i. Base of trolley- Insulation bricks & Fire Brick, fixing with fire cement. j. Kiln body =. Five Sides (including Furnace shutter/ Gate and top roof) High density Fiber Wool no.1425 (Moreguppa Brand) Furnace Frame = Angle iron 70mm x 70mm x 6mm thick. Supported by M S flat 70mm x 6mm thick, Fire cement , I channel 6" x 3" x 5 to 6 mm thick , covering from All five sides 4mm thick M S Sheet with nuts and bolts welding . k. Chimney design as per requirement, height 2 feet more than present roof Height. l. Rail track = Rail track length = 13 feet"s (6feet inside the furnace and 7 Feet"s outside the furnace.
2Metal melting furnace ----one complete unit a. Fuel. ---+---------+------- PNG b. Melting Capacity. ----2OOkg c. Working Temp. -------1400°C d. Fire bricks, End arc, with 70% Alumina e. Fire cement (ACC) f. PNG Burner unit with all accessories- Single stage- 1unit g. Hydraulic tilting
3Ladle a. Manual Ladle 100 kg. (2 Units with handle) b. Ladle pre-heater gas burner operated. c. Including blower and stand.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail