Design, Engineering, Procurement, Construction, Installation Testing, Commissioning & Trial Run For 3 Months For Sewage Treatment Plant Of 3 Mld Capacity Comprising Of The Coarse Screen, Raw Influent Sump, Pumping Machinery, Rising Main From Commo, Gurugram-Haryana
TDR : 32441646
Tender Notice
Corrigendum Details
BOQ
Expired
Gurugram
Haryana
Corrigendum : Design, Engineering, Procurement, Construction, Installation Testing, Commissioning & Trial Run For 3 Months For Sewage Treatment Plant Of 3 Mld Capacity Comprising Of The Coarse Screen, Raw Influent Sump, Pumping Machinery, Rising Main From Commo
Name of Work: Design, Engineering, Procurement, Construction, Installation Testing, Commissioning & Trial Run for 3 months for Sewage Treatment Plant of 3 MLD Capacity comprising of the Coarse Screen, Raw influent Sump, Pumping Machinery, Rising main from Common header to STP, comprising of Fine screen, Grit chamber, Sequential Batch Reactors, Secondary Treated Sewage cum Equalization tank with Pumping machinery, Automatically operated Pressure filters & Activated Carbon Filters, Automatically controlled Chlorination for Sterilization, Biological sludge sump, Sludge lifting pump house, Centrifuge/ Screw filter press, Dry sludge storage platform, Roads, Boundary walls, CCTV, Street lights, MS gate and Treated Sewage disposal/ reuse, Providing and Installation of online flow meters at inlet and out let along with online monitoring device and integration of the same with SPCB and CPCB portal. The scope of contract ends at point of Treated Sewage pipe from the outlet up to 10 meters distance from activated carbon filters outlets with Operation & Maintenance for 5 years during defect liability period including Ferric Chloride, Lime, Polyelectrolyte for Flocculation and Centrifuge / Screw Press, Chlorination during operation maintenance period and the operation maintenance shall be quoted Rs./KL for 5 years with minimum guaranteed period flow of 1.2 MLD on turnkey basis at Gwal Pahari, Municipal Corporation Gurugram.
Sl. No.
Item Description
1
Total capital cost for construction of 3 MLD STP including, boosting of treated waste water including 1 year maintenance
2
O&M cost for 3 MLD for 5 yrs Rates will be evaluated as Rate quoted per Kl for O&M x 3000 x 365 x 5
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.