Topographical Survey Soil Investigation For Provision Of Deficient Hanger With Leans And Dispersal For Alh Mk Iii Squadron At Ins Dega Visakhapatnam => Limited, visakhapatnam-Andhra Pradesh

Military Engineer Services-MES has published Topographical Survey Soil Investigation For Provision Of Deficient Hanger With Leans And Dispersal For Alh Mk Iii Squadron At Ins Dega Visakhapatnam => Limited. Submission Date for this Tender is 10-06-2022. Soil Survey Tenders in visakhapatnam Andhra Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

32438921
Topographical Survey Soil Investigation For Provision Of Deficient Hanger With Leans And Dispersal For Alh Mk Iii Squadron At Ins Dega Visakhapatnam => Limited
Limitted
Indian
Andhra Pradesh
visakhapatnam
10-06-2022

Tender Details

Topographical Survey Soil Investigation For Provision Of Deficient Hanger With Leans And Dispersal For Alh Mk Iii Squadron At Ins Dega Visakhapatnam => Limited

Key Value

Document Fees
Refer document
EMD
Refer document
Tender Value
INR 4.93 Lakhs /-

BOQ Items

Name of Work: TOPOGRAPHICAL SURVEY & SOIL INVESTIGATION FOR PROVISION OF DEFICENT HANGER WITH LEANS AND DISPERSAL FOR ALH MK-III SQNAT INS DEGA, VISAKHAPATNAM. (BD NO AMWP 01/2022)
Sl. No. Item Description
1Topographical survey with 3m grid intervals and 0.5m contour intervals to provide with accurate base - line information data with all existing permanent infrastructure/ utilities details of the proposed site at Dega Vihar including reconnaissance to get broad view of entire area for planning (using total station), complete all as directed by Engineer-In-Charge. CAD file along with contours and benchmark, duly marked must be submitted in a CD (4 copies).
2Conduct of plate load test to determine subgrade modulus in accordance with IS 9214 at subgrade level for road with Rigid wearing course.
3Mobilization of equipment for detailed soil Investigation and shifiting them location to location of bore holes and for in-situ tests.
4Boring holes 150mm dia in any types of soil but exclding any type of rock up to a depth as directed by Engineer-in-charge for conductiong following activities: (a) Conduct of SPT at every 1.5 m interva or change of strata whicheven occur earlier. (b) Collection of undisturbed soil sample (UDS) at every 1.5 m interval or change of strata whichever occurs earlier (a minimu gap of 500mm shall be ensured between SPT and collection of UDS.
5Drilling holes in any type of rock (Soft/Hard) using hydraulic drilling machine within the bore hole for cutting core in rock and collection of cores of requites size and length as per relevant IS standards. Drilling shall continue till minimum 5m into hard rock strata.
6Conduct of following laboratory tests as per relevant indian standards IS 2720 all parts IS 1498 and IS 3025 of soil samples collected. (a)Test on disturbed/undistubed samples:-(i) Visual and engineering classification. (ii)Sieve analysis and hydrometer analysis. (iii)Atterberg limits (liquid limit, plastic limit and shrinkage limit). (iv)Specific gravity.(v) Free swell index. (b)Test as on Undisturbed samples. (i) Bulk density and moisture content. (II)Unconfined compression test (on remoulded undisturbed sample). (iii) Swelling Pressure (on remoulded undisturbed sample)(iv)Determination of C&O valvues using direct shear drained/undisturbed sample) or triaxial compression tests (on undisturbed or remoulded samples or vane shear test)
7Conduct of following laboratory tests on rock sample/cores collection from boreholes as per relevant indian standards (IS2720 (all parts) and IS 1498,IS 9143, IS13030, IS9221, IS8764, IS9179,IS 10050, IS 10082, IS 10782, IS12608, IS 13047, IS 3025) (i) Visual classification.(ii) Density.(iii)Specific gravity.(iv)Hardness.(v)Slake durability. (iv)Uniaxiai compression test(both saturated and unsaturated). (vii)Point load strength index.(viii) RQD(rock quality designation) Chemical analysis ofground water sample collected at bottom of one bore hole.
8Chemical analysis of ground water sample collected at bottom of one bore hole.
9Chemical analysis of soil samples one each from each strata in respect of one bore hole if different strata (s) encountered in any other borehole additionals soils samples to be analysed
10Note:Composition of subsurface Investigation report 1. GeneralOn completion of the in-site and laboratory tests, subsurface investigation report shall be prepared which should include geological information, procedure adopted for investigation, field observations, laboratory or test data, analysis, interpretation, recommendations etc. 1.2 Information to be provided: The report shall include but not be limited to the following: a) Dimensioned Plan showing location and depth of in-situ tests; the co-ordinates of bore hole locations with reference to prominent permanent features of the site duly signed by GE and Geo consultant; b) Geological information of the area; c) General topography of the site, duly marking RL of the location of bore holes with reference to RL of nearby permanent features available at site duly signed by GE and Geo Consultant; d) Past usage and historical data of the site, if available. Information regarding flooding of the site in the past, High flood level etc. e) Borelog and trial pit log duly signed by GE and Geo Consultant. f) In-situ test results; g) Plot of standard penetration test (N values both uncorrected and corrected) with depth for identified areas; h) Laboratory test results i) Summary of strata profile and j) Incase of pressure meter tests the following should be furnished: 1) Calibration record including, description of membrane and sheath on probes, dimension of thick walled cylinder, length of flexible tubing, calibration curves/chart, temperature, etc. 2) Drilling record including, borehole number, method of making borehole, log of soil type and condition, depth of water in borehole, weather and temperature.
113) Test Record: Type of test date and time depth of centre point of probe volume readings at 30 s and 60 s elapsed time and corresponding pressure readings notes on any deviation from standard test procedure Field pressure mater, creep and air calibration curves indicating P0, Pf and PI, corrected pressure meter and creep curves indication P0, Ff & PI along with calculation for the corrections. 1.2.1 Reporting of in situ and laboratory test results should be in accordance with relevant Indian Standrds.1.3.1 Analysis and Interpretation of Results. The following shall be included in the report.a) Analysis of test results.b) Discussion and interpretation of results analyzed including basis of adopting design parameters for the substrata, c) For shallow foundations 1) Net allowable bearing pressure considering shear, settlement criteria as well as SPT value for isolated footing, continuous strip footing and raft foundation at depth 1.5 m, 2.0 m, 2.5 m and 3.00 m. For calculations IS: 6403 shall be used. 2) Modulus of subgrade reaction and modulus of elasticity of substrata. 3) In case of UG Sumps/ Swimming pools K value from 0.5m to 5.0m depth. d) For pile foundations: Safe load carrying capacity (compression, pull out and horizontal with free head as well as supported head pile load capacities shall be worked out for 300,400,450 & 500 for under reamed piles and for 450, 500, 600, 750 dia for end bearing piles. e) If weak soil with lesser N value as specified in table-1 of IS 1893 (part-1) 2016 is encountered then evaluation of liquefaction potential shall be assessed and remedial actions to be adopted shall be specified. f) Suitability of the soil for backfilling around foundations/ filling under floors. g) Susceptibility of sub-soil strata to liquefaction, if any, in the event of dynamic loading h) Remedial measures against the presence of harmful chemicals in the sub-soil/ground water j) Remedial measures for foundation footings, plinth beams and filling under floors in case of meeting expansive soils. 2.The soil investyigation report should be vtted by any IIT/NIT/Andhra University.3. CD Containing video evidence of depth of each bore hole & machinery deployed at site by kept in record. Undisturbed samples shall also be colected @ 1.5 m interval or change of strata. However there shall be minimum gap of 500mm between SPT and collection UDS,
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail