Estimate For Installation Of 25 Kva In Village Mahuakheda Under Silwani Dc Of O And M Dn. Raisen
Tender Overview
Project Description
Estimate For Installation Of 25 Kva In Village Mahuakheda Under Silwani Dc Of O And M Dn. Raisen
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 13-Jun-2022 | Date extended 803/06 dt 26.05.2022 | Date | 16-Jun-2022 |
BOQ
| Sl. No. | Item Description |
| 1 | Back filling of poles with boulders.1 |
| 2 | Three phase Static Energy meters 20-80 Amps.with L.S. & TOD Facility with box |
| 3 | Meter cum protection box for 25 KVA DTR |
| 4 | G.I. WIRES 4.0 MM. (8 SWG)1 |
| 5 | Anti climbing Device (Barbed Wire) GS 2.24 mm Dia (14 SWG) |
| 6 | EARTHING COIL OF 115 TURNS OF 50 MM.DIA AND 2.5 MTR LEAD OF 4.0 MM G.I WIRE |
| 7 | EARTHING SET (DTR EARTHING) AS PER CIRCULAR NO 1516 DATED 17.03.08 |
| 8 | Earthing for PCC Pole 4.00 mm-8 SWG G.I wire- 0.8 Kg, per pole |
| 9 | M.S.Nuts and Bolts |
| 10 | 11 KV Strain hardware (T&C type) fittings |
| 11 | Jointing Sleeves suitable for Rabbit (55Sq.mm.Al. Eq. ) AAAC conductor |
| 12 | ALUMINIUM BINDING WIRE AND TAPE |
| 13 | TRANSFORMER BELTING SET 50X50X6 MM ANGLE WITH TWO CROSS FIXING CHANNEL |
| 14 | D.O.Mounting channel 75x40x6 mm |
| 15 | MS strain plate 65x8mm 250mm long |
| 16 | Stay set complete without Stay wire 16 mm. (Painted) |
| 17 | Bracing/Support angle of 65x65x6 mm for 8 feet (2.45 mtr ) centre DP |
| 18 | Danger Boards Enamelled 11 KV |
| 19 | Stay Insulators 90X65mm |
| 20 | 11 KV Polymer Pin Insulator |
| 21 | 11 KV Composite Polymer Disc Insulators |
| 22 | Red oxide paint |
| 23 | Aluminium paint |
| 24 | Concreting of stay (20 mm / 25 mm) @ 0.3 cmt. per stay |
| 25 | Concreting of stay (16 mm / 12 mm) @ 0.2 Cmt. per stay |
| 26 | Concreting of PCC poles @ 0.45 cmt. (Cubic Metric Ton) per pole |
| 27 | Stone Block/Pre cast block for base pedding (450X450X75MM) |
| 28 | GST on Material @ 18 % |
| 29 | Labour Charges including GST @ 18 % |
| 30 | Transportation charges including GST @ 5 % |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender