Repairing Work For Restoration Of 14 Numbers Of Nonfunctional Grtspv Systems And Five Years Comprehensive Maintenance Of 55 Numbers Grtspv Systems Each Of Array Capacity 10 Kwp At Different Locations In West Bengal
Tender Overview
Project Description
Repairing Work For Restoration Of 14 Numbers Of Nonfunctional Grtspv Systems And Five Years Comprehensive Maintenance Of 55 Numbers Grtspv Systems Each Of Array Capacity 10 Kwp At Different Locations In West Bengal
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 06-Jun-2022 | Prebid meeting | Other | 22-Jun-2022 |
BOQ
| Sl. No. | Item Description |
| 1 | Repairing of Existing Rooftop Solar PV power plant |
| 2 | Supply Delivery Installation Testing Commissioning of 250Wp Solar PV Module in the existing PV Array inclusive of all taxes and duties and warranty as per tender |
| 3 | Supply Delivery Installation Testing Commissioning of 10 kVA Grid connected inverter in the existing 10 kVA GRTSPV systeminclusive of all taxes and duties and warranty for five years as per tender |
| 4 | Supply Delivery Installation Testing Commissioning of Array Juntion Box (AJB) suitable for 10 kWp GRTSPV systemin the existing 10 kVA GRTSPV systeminclusive of all taxes and duties and warranty for five years as per tender |
| 5 | Supply Delivery Installation Testing Commissioning of DC SPD of rating 1000 V (Y connection shall also be considered) 20 KA Type II. The SPDs shall be installed within the Existing Array Junction Box (AJB)systemin the existing 10 kVA GRTSPV systeminclusive of all taxes and dutiesas per tender |
| 6 | Supply Delivery Installation Testing Commissioning of AC SPD of rating 320V 20 KA Type II set matching with 3 ph 4 wire system. The SPDs shall be installed within the Existing Inverter Interfacing Panel (IIP)in the existing 10 kVA GRTSPV systeminclusive of all taxes and dutiesas per tender |
| 7 | Supply Delivery Installation Testing Commissioning of MC 4 Connectors suitable for PV System inclusive of all taxes and dutiesas per tender. The MC 4 connector shall be provided and installedin the existing 10 kVA GRTSPV systemas and where required to rectify the existing PV power plants |
| 8 | Supply Delivery, Laying , Testing andCommissioning of4 sqmm DC cable copper cable of PV Standered as and where required to rectify the existing 10 kWp GRTSPV system inclusive of all taxes and duties and five years warrenty as per tender . |
| 9 | Comprehensive Maintenance of 55 nos Grid Connected Roof Top Solar PV Power Plant each of array capacity 10 kWp at different locations of West Bengal for a period of five (05) yearsinclusive of all charges during execution period the work and other charges as applicable as per tender terms but exculding of GST as per terms of the tender in complete. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents