Power Boards / Undertakings / PSU Closing in 0 days TDR #32418493

Routine Maintenance Of Ht Lt Transformers And 6.6Kv Switchgear Routine Maintenance Of Ht Lt Transformers And 6.6Kv Switchgear Installed In Btps Ptpp, Parichha Jhansi

Issued by Boards / Undertakings / PSU · parichha, Uttar Pradesh
Tender Value
15.36 Lakhs
Estimated cost
Bid Submission
23 Jun 2022
0 days left
EMD
31000
Bank guarantee accepted
Document Fee
1180
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
parichha → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Routine Maintenance Of Ht Lt Transformers And 6.6Kv Switchgear Routine Maintenance Of Ht Lt Transformers And 6.6Kv Switchgear Installed In Btps Ptpp, Parichha Jhansi

BOQ

Name of Work: Routine maintenance of HT& LT transformers, and 6.6KV switchgear installed in BTPS, PTPP, Parichha Jhansi.
Sl. No. Item Description
1FOR ROUTINE WORK
2Routine Maintenance of HT/LT transformers including cleaning of Transformer yard of GTs & STs and T/F yards of other Transformers installed in the premises of Unit #3&4 of2x210 MW Parichha Thermal Power Project Parichha Jhansi as per scope of work Sl. No. 1 to 19.
3FOR BREAKDOWN WORKS.
4Removal & reconnection of 220/132 KV top bushing connection.
5Proper cleaning of 220/132 KV bushing with suitable cleaning agent to restore its shining as per scope of work sl no. 2.
6Draining of Transformer oil up to required level from the main tank of transformer in available Transformer oil barrels/Tank etc.
7Centrifuging of Transformer oil using filtration plant provided by the Deptt.
8Filling/topping up of Transformer oil in HT/LT transformers.
9Opening & closing of Inspection cover of HT Transformer.
10Removal & reconnection of 220 KV bushing connection with Transformer winding of GT/ST.
11Shifting of 220 KV bushing from central store to G.T./S.T. Transformer yard/shifting of damaged bushing from sideto the suitable place.
12Removal & installation of 220 KV bushing as per scope of work sl no. 2
13Replacement of worn out/damaged gasket of marshaling box cover as per the size of original gasket by applying rubber solution after removing old worn out/damaged gasket. a. HT Transformer
14Replacement of worn out/damaged gasket of marshaling box cover as per the size of original gasket by applying rubber solution after removing old worn out/damaged gasket. b. LT Transformer
15Filling of Transformer oil in 220/132 KV bushing by erecting scaffolding & removal after completion of work.
16Checking & servicing of Magnetic oil gauge as per scope of work Sl. No. 1 to 6.
17Overhauling of OLTC operating system GT/ST as per scope of work Sl. No. 1 to 9.
18Delinking & relinking Generator phase or Neutral side 15.75 KV bushing connection from IP bus duct.
19Delinking & relinking Generator transformer from IP bus duct.
20Delinking & relinking of 15.75 KV bushing of UAT from IP bus duct.
21Delinking & relinking of LAVT form IP bus duct.
22Delinking & relinking of 15.75 KV bushing connection from Transformer winding of (a) Generator Transformer
23Delinking & relinking of 15.75 KV bushing connection from Transformer winding of (b) Unit Auxiliary Transformer
24Shifting of 15.75 KV bushing from central store to G.T./S.T. Transformer yard.
25Removal & installation of 15.75 KV bushing.
26Removal & Installation of rubber bellow of IP bus duct after shifting of rubber bellow from CSD store to site.
27Opening & closing of upper manhole of size 1360mm x 590mm of SP bus duct of UAT/Station Transformer.
28Opening & closing of lower manhole of size 1360mm x 590mm of SP bus duct of UAT/ Station Transformer.
29Opening & closing of upper manhole of size 880mm x 400mm of IP bus duct.
30Opening & closing of lower manhole of size 880mm x 400mm of IP bus duct.
31Partitioning & reconnection of SP bus duct.
32Opening & closing of rubber bellow/ring of IP bus duct.
33Opening & closing of rubber bellow SP bus duct.
34Cleaning of 15.75 KV support insulator inside IP bus duct with petrol/CTC.
35Cleaning of 6.6 KV support insulator/seal of bushing inside SP bus duct with Petrol/CTC.
36Removal & installation of 6.6 KV bushing of UAT/Station T/F.
37Removal & installation of 15.75 KV support insulators inside IP bus duct.
38Removal & installation of 6.6 KV support insulators inside SP bus duct.
39Removal & installation of 6.6 KV seal of bushing inside SP bus duct.
40Delinking & relinking of 6.6 KV bushing of station Transformer or UAT from SP bus duct.
41Opening & closing of upper manhole of size 800mm x 500mm of 0.4 KV side SP bus duct of LT Transformer.
42Opening & closing of lower manhole of size 800mm x 700 mm of 0.4 KV side SP bus duct of LT Transformer.
43Cleaning of 0.4 KV support insulator inside SP bus duct of LT Transformer.
44Removal & installation of 6.6 KV bushing of L.T. Transformer.
45Removal & installation of 0.4 KV bushing of L.T. Transformer.
46Removal & installation of 0.4 KV support insulator inside bus duct of L.T. Transformers
47Cleaning & servicing of dry type transformer as per scope of work mentioned at Sl. No. 01 to 07. (a) 6.6/0.4 KV 1600 KVA Dry type Transformer
48Cleaning & servicing of dry type transformer as per scope of work mentioned at Sl. No. 01 to 07. (b) 6.6/0.4 KV 2000 KVA Dry type Transformer
49Drying out of LV Bushings / Seal off Bushings of Generator / GT/ ST/UAT and bring IR values up to the mark as per instruction of AE/JE.
50Cleaning of HT Transformers after completion of centrifuging/ overhauling work.(a) Generator Transformer
51Cleaning of HT Transformers after completion of centrifuging/ overhauling work.(b) Station Transformer
52Cleaning of HT Transformers after completion of centrifuging/ overhauling work.(c) Unit Auxiliary Transformer
53Overhauling of serviceTransformer as per scope of work mentioned at Sl. No. 01 to 15.(a) 6.6/0.4 KV 1000 KVA Transformer
54Overhauling of service Transformer as per scope of work mentioned at Sl. No. 01 to 15.(b) 6.6/0.4 KV 1500 KVA Transformer
55Overhauling of service Transformer as per scope of work mentioned at Sl. No. 01 to 15.(c) 6.6/0.4 KV 2000 KVA Transformer
56Overhauling of service Transformer as per scope of work mentioned at Sl. No. 01 to 15.(d) 6.6/0.4 KV 2500 KVA Transformer
57Overhauling of LT Transformer as per scope of work mentioned at Sl. No. 01 to 15.(e) 6.6/0.4 KV 630 KVA Transformer
58Overhauling of Marshalling Boxes of HT Transformers as per scope of work 1 to 7.
59Overhauling of Marshalling Boxes of LT Transformers as per scope of work 1 to 8.
60Cleaning & checking of C.T. & tightening of C.T. connection inside IP Bus duct.
61Checking of space Heaters inside the SP Bus duct.
62Dismantling / remounting of PRV of Generator Transformer or station Transformer or Unit Auxiliary Transformer for its checking or replacement.
63Dismantling & remounting of Buchholz Relay of Generator Transformer or station Transformer or Unit Auxiliary Transformer for checking or replacement.
64Dismantling & remounting of surge Relay of Generator Transformer or station Transformer for checking or replacement.
65Dismantling & remounting of Buchholz Relay of LT transformers.
66Shifting of filtration plant and storage tank from transformer yard of Unit No.3 to that of Unit No. 4 or vice versa.
67Cleaning of 10 KL capacity transformer oil tank.
68Filling of air in the tyres of filtration plant and oil storage tank.
69Cleaning/drying out of flexible links of Generator/GT /ST /UAT.
70Removal of top cover of L.T. Transformer & installation after completing work.
71Replacement of top cover cork sheet gasket of L.T. Transformer.
72Cleaning, checking and tightening of electrical components and PT inside LAVT as per scope of work fromSl. No. 1 to 11.
73Cleaning, checking and tightening of neutral grounding system of generator including Neutral grounding Transformer as per scope of work from Sl. No. 1 to 11.
74Shifting of new transformer oil filled drums from central store/ any site within Plant to transformer yard/shifting of old Transformer oil filled drum from site to CSD store or at the assigned site.
75Tightening of upper manhole of IP/SP bus duct.
76Tightening of lower manhole of IP/SP bus duct.
77Shifting of empty Transformer oil drums from site to CSD store.
78Disconnection & reconnection of (a)Neutral Grounding Transformer of Generator.
79Disconnection & reconnection of (b)Neutral Grounding of Generator Transformer.
80Disconnection & reconnection of (c)Neutral Grounding of station Transformer.
81Disconnection & reconnection of (d)Neutral Grounding of UAT.
82Proper cleaning and painting of various electrical equipments in Transformer yard as per scope of work.
83Preventive maintenance of 132KV bushing with suitable cleaning agent to restore its shining.
84Shifting of 132 KV bushing from central store to S.T. transformer yard and shifting of damaged bushing from site to the place to be intimated.
85Replacement of 132 KV bushing.
86Overhauling of GTs/ICTs cooling fans.
87Overhauling of GTs/ICTs cooling pumps.
88Servicing of cooling fan/pump control circuit/equipment of GTs/ICTs.
89Opening or reconnection of one phase flexible at one point of 110 MW Generator or 125 MVA Generator Transformer.
90Opening or reconnection of one phase flexible in between 11kV bus duct & UAT.
91Delinking & re linking Generator transformer from 11KV Bus duct.
92Delinking & re linking of jumpers of 11 KV bushing of11/6.6 KV UAT from Bus duct.
93Delinking & re linking of LAVT from Bus duct.
94Delinking & re linking of 11 KV bushing jumpers from11/242 KV, 125 MVA Generator transformer winding .
95Removal & Installation of rubber bellow of 11 KV Bus duct after shifting of rubber bellow fromCSD store to site
96Preventive maintenance of 11kV bus duct.
97Replacement of damaged gasket/oil seal of 11 kV CTs/ per phase of UAT.
98Replacement of damaged gasket of 11 kV Bushing / per phase of UAT.
99Cleaning & checking of C.T. & tightening of C.T. connection inside 11 KV Bus duct.
100Cleaning of 20 KL capacity transformer oil tank.
101Cleaning of 5 KL capacity transformer oil tank.
102Cleaning of transformer yard area of GT-1, GT-2, ST-1, ST-2, SST & UST of unit No. 1&2
103Cleaning of LT transformer yards of 2x110MW
104Tightening of upper manhole of 11kV bus duct.
105Tightening of lower manhole of 11kV bus duct.
106Supplying & Fencing of 8 ft. height chain link at the all broken boundaries of switchyard and all transformer yard.
107Daily cleaning of floor of EMD-I, AE/JE offices & stores.
108Providing man power for assistance in testing ofvarious transformers.
109Proper cleraning and painting of inside & outside fencing of transformer yard.
110Replacement of various electrical component like MCB, fuses, contactors etc
111Internal & external Cleaning of centrifuging machine.
112Replacement of filter by new one.
113Replacement of heaters
114rectification of control and protrection problems of starting panels of centrifuging machine
115changing of various gaskets
116Opening & tightening of cable connection (0.4KV & 6.6KV) LV & HV side of LT Transformer.
117Round the clock Maintenance of complete 6.6KV station switchgears (OCA, OCB, OCC, OCD), unit switchgears (3CA, 3CB, 4CA, 4CB) and Ash handling switchgear OCF and their control and protection system of Unit No. 3&4, 2x210 MW, PTPP, Parichha. As per scope of work

AI Tender Summary

OUR REF NO 32418493
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE 15.36 Lakhs
LAST DATE 23-06-2022
Authority
Authority Name Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited
Work Description Routine Maintenance Of Ht Lt Transformers And 6.6Kv Switchgear Routine Maintenance Of Ht Lt Transformers And 6.6Kv Switchgear Installed In Btps Ptpp, Parichha Jhansi
Basic Detail
Tender No T-02/EMD-I/ET/BTPS/PTPP/22-23
Bidding Type Tender
Location
City parichha
State Uttar Pradesh
Key Dates
Publish Date 27 May 2022
Submission Date 23 Jun 2022
Open Date 24 Jun 2022
Finance
Tender Value 15.36 Lakhs
Tender Fee 1180
EMD 31000
Exemption Not Available
Document List
46b1af4a-32fc-4778-9971-b75a8a13619b.html
BOQ_1129926.xls
Tenderdoc.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

May 27, 2022
11:30 IST

Tender Published

Tender notice published.

Completed
Jun 23, 2022
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Jun 24, 2022

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

46b1af4a-32fc-4778-9971-b75a8a13619b.html

xls

BOQ_1129926.xls

pdf

Tenderdoc.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders