Upgradation Of The Road From Mrp Nagar End To Dolphin Nagar Km 0 / 0-0 / 455 H / O.Esanatham Upgradation Of The Road From Mrp Nagar End To Dolphin Nagar Km 0 / 0-0 / 455 H / O.Esanatham
Tender Overview
Project Description
Upgradation Of The Road From Mrp Nagar End To Dolphin Nagar Km 0 / 0-0 / 455 H / O.Esanatham Upgradation Of The Road From Mrp Nagar End To Dolphin Nagar Km 0 / 0-0 / 455 H / O.Esanatham
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 01-Jun-2022 | Karur District - Aravakurichi Block - Upgradation Of the road from MRP Nagar End to Dolphin Nagar Km 0/0-0/455 H/o.Esanatham | Date | 08-Jun-2022 |
BOQ
| Sl. No. | Item Description |
| 1 | Upgradation Of the road from MRP Nagar End to Dolphin Nagar Km 0/0-0/455 |
| 2 | Clearingthe Scrub jungle including all labour charges for burrying and burning etc., |
| 3 | Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting sidedrainetc, complete. as per SS20 B |
| 4 | Providing and Laying Gravel Soling tocompacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, wateringand compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete. |
| 5 | Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal@20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method). |
| 6 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. |
| 7 | Applying PRIMECOAToverWMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp. |
| 8 | Applying TACK COAToverPrimed WBM surface at 2.5Kgof RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp. |
| 9 | Providing and laying Premix Carpet with Seal Coat Type -A to 20mm thick using 0.18cum of 13.2mm, 0.09 cum of 11.20mm and.09cum of 6.70mm with 24.40 Kgs ofVG 30 Bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in Central Hot Mix Plant 20-30T capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 20mm with mechanical paver to the specified grades and cross section and consolidated by 8-10T vibratory/pneumatic roller to the required density etc., including labour for attending to paver to site, hire & fuel charges for 20-30T CMP with bitumen boiler, tipper trucks, paver finisher, vibratory/pneumatic roller and all other tools and plants required, including fuel and other incidental charges etc., complete |
| 10 | Cost of HM Stone |
| 11 | GST Amount for providing Service to Government Contract Works for the above ConstructionWorks.GST Amount is the Total GST Amount for overall quoted amount above this row in column \"BB\" for all works in this package}(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender