}

Supplying Of Materials, Tools , Plants And Skilled And Unskilled Man Power For Repairing And Maintenance Of Existing Structure And Fitting, Fixing All Works With Operation & Maintenance The Entire Works During Shrawani Mela Atudaypura To Nearnawadih, deoghar-Jharkhand

Drinking Water And Sanitation Department has published Supplying Of Materials, Tools , Plants And Skilled And Unskilled Man Power For Repairing And Maintenance Of Existing Structure And Fitting, Fixing All Works With Operation & Maintenance The Entire Works During Shrawani Mela Atudaypura To Nearnawadih. Submission Date for this Tender is 02-06-2022. Man Power Supply Tenders in deoghar Jharkhand. Bidders can get complete Tender details and download the document.




Tender Notice

32408447
Supplying Of Materials, Tools , Plants And Skilled And Unskilled Man Power For Repairing And Maintenance Of Existing Structure And Fitting, Fixing All Works With Operation & Maintenance The Entire Works During Shrawani Mela Atudaypura To Nearnawadih
Open Tender
Indian
Jharkhand
deoghar
02-06-2022

Tender Details

Supplying Of Materials, Tools , Plants And Skilled And Unskilled Man Power For Repairing And Maintenance Of Existing Structure And Fitting, Fixing All Works With Operation & Maintenance The Entire Works During Shrawani Mela Atudaypura To Nearnawadih Health Sub Center ( Plant No.-05 Toplant No.- 07 ) Under D.W & S. Division , Deoghar For The Year 2022-23Group No. Sm-D-03-2 Cleaning Of Site, Cutting Bushes Dressing And Leveling Do Etc. All Complete As Per Direction Of E / I. 3 Dismantling Patent Stone Flooring Including Stacking Serviceable Materials In Countable Stacks Within 15 M Lead And Disposal Of Unserviceable Materials With All Leads All Complete As Per Direction Of E / I. 4 Providing 25 Mm Thick First Class Patent Stone Flooring ( 1:2:4 ) With Stone Chips, In Two Layers, Bottom Layer 19 Mm Thick ( 1:2:4 ) With 12 Mm To 6 Mm Size Graded Stone Chips And Top Layer 6 Mm Thick ( 1:2 ) With 6 Mm Down Stone Chips In Panels, Including Cost Of Curing, Finishing The Surface Smooth By Rubbing With Carborun-Dum Stone, Taxes And Royalty All Complete As Per Building Specification And Direction Of E / I. 5 Supplying, Fitting And Fixing Vitreous White Glazed Earthen Ware I.W.C. Of Hindware Make With 100Mm.H.C.I. ‘P’ Trap 15 Liters C.I. Pull And Let Go Flushing Cistern Of Names Or Other I.S.S. Equivalent Make, Complete With All Fittings, C.I. Or C.C. Brackets 32Mm. Alkathene / P.V.C. Telescopic Flush, Pipe About 2M Long With One Brass Coupling And Clamps G.I. Chain And Pull Including Supplying And Fixing A Pair Of Vitreous White Glazed Earthenware Ware Footrest To Be Fixed In Floor 15Mm. C.I. Body Brass Spindle Stopper Cocke Of Weight Not Less Than 50Gms. 15Mm. P.V.C. Connection Pipe 450Mm. Long And The Exposed Pipe And Cistern With Two Coats Of Approved Paint Over A Coat Of Red Oxide Primer Etc. All Complete As Per Specification And Direction Of The E / I. ( 580Mm Long With 12.5 Lit Low Level Pvc Cistem ) 6 Providing Coarse Clean Sand In Filling In Foundation Trenches Or In Plinth Including Ramming And Watering In Layers Not Exceeding 150 Mm Thick With All Leads And Lifts Including Cost Of All Materials, Labour, Royalty And Taxes All Complete As Per Building Specification And Direction Of E / I. ( Mode Of Measurement-Compacted Volume ) . 7 Providing Designation 75 A One Brick Flat Soling Joints Filled With Local Sand Including Cost Of Watering, Taxes Royalty All Complete As Per Building Specification And Direction Of E / I. 8 Supplying All Materials, Labour, Writing Name Of Department, Male & Female Directionon The Wall After Making Box By Good Quality Of Paint As Per Direction Of E / I. 160 Mm High Letter 9 Cost Towards Painting And Writing Slogan On Board 4’ X 3’ Size With Good Quality Paint Carrying And Fitting Fixing On Each Site Including Minor Repair Of Board Taking Back After Mela As Per Direction Of E / I. ( 150 Mm High Letter ) 10 Cost Towards Transportation Ofsubmersible Pump, Pipe Fittings Etc. From Store To Work Site Including Carriage Water Tank Etc. All Complete. 11 Cost Towards Fitting & Fixing Submersible Pump With Clamp Etc. All Complete Including Lowering Of Pvc Pipe. 2 H.P To 7.5H.P And Taking Out After Ending Mela And Deposited In Departmental Store Deoghar. 12 Cost Towards Dismantling After Mela And Taking Back To Work Site From Store Including Carriage Of All Materials And Pump, Water Tank Etc. All Complete. 13 Earth Work In Excavation For Laying Of Pipe So As To Give One Meter ( Avg. ) Cover Over The Socket Of Pipe And Back Filling The Trenches After Laying Of Pipe, Again A / W In Excavation And Taking Out The Laid Pipeand Back Filling The Same After The End Ofshrawani Mela. 14 Earth Work In Back Filling The Trenches Fatter Laying Different Types And Size Of Pipes With Earth Removed During Excavation Within Initial Lead And Lift As Per Specification And Direction E / I. 15 Laying Of Pvc Pipes Of Approved Make In Trenches With Red Lead And Yarn With Socket And Screw Joints And Cutting Pipe So Size And Threading Ends Where Necessary Etc. All Complete As Per Specification And Direction E / I. ( Pipes To Be Supplied Departmentally Free Of Cost ) ( I ) 32 Mm Dia Pvc Pipe. 16 ( Ii ) 25 Mm Dia Pvc Pipe. 17 Laying Of Pvc Pipes Of Approved Make On Wallwith Red Lead And Yarn With Socket And Screw Joints And Cutting Pipe So Size And Threading Ends Where Necessary Etc. All Complete As Per Specification And Direction E / I. ( Pipes To Be Supplied Departmentally Free Of Cost ) ( I ) 15 Mm Dia Pvc Pipe 18 ( I ) 20 Mm Dia Pvc Pipe 19 ( Ii ) 25 Mm Dia Dia Pvc Pipe 20 Cost Towards Engaging Pump Operatar Cum Water Spreader On Laid Sand For Operating And Spreading Water On Sand Etc.All Complete Job. Gr.-Ii 21 Cost Towardscleaning The Rcc Water Storage Tank Over Pump House Having Size 3 M X 3 M X 2 M Including The Cost Of Bleaching Powder, Jute, Sacfolding Etc. All Complete. 22 Cost Towards Engagingplumber Andelectric Mistryduring Mela Periodincluding Contractor Profit. Plumber Gr.-Ii 23 Electrician Gr.-Ii 24 Cost Towards Extra Materials Due To Damages During Taking Out Damage Cut Pieces Including Laboaur Cost As Per Direction Of E / I. In Walls / Trenches. 32 Mm Dia Pvc Pipe. ( Rate Of Pvc Pipe + Laying Cost Charge ) 25 25 Mm Diapvc Pipe. ( Rate Of Pvc Pipe + Laying Cost Charge ) 26 15 Mm Diapvcpipe. ( Rate Of Pvc Pipe + Laying Cost Charge ) 27 32 Mm Dia Pvc Elbow 28 25 Mm Dia Pvcelbow 29 15 Mm Dia Pvc Elbow 30 32 Mm Dia U / S Pvc 31 25 Mm Dia U / S Pvc 32 25 X 25 X 15 Mm Dia Reducing Tee Pvc 33 32 Mm Dia Pvc Fta 34 25 Mm Dia Pvc Fta 35 15 Mm Dia Pvc Fta 36 15 Mm Dia Pvc Coupler 37 25 Mm Diapvc Coupler 38 32 Mm Diapvc Coupler 39 15 Mm Pvc Shower 40 15 Mm P.V.C Bib Cock 41 32 X 32 X 25 Mm Dia Tee Pvc 42 Providing Two Coats Of Snowcem Of Approved Shade And Make Over Old Surface Including Washing, Cleaning, Sand Papering The Wall, Scaffolding, Curing And Taxes All Complete As Per Building Specification & Direction Of E / I. 43 Providing Onecoats Of Oil Bound Distemper Of Approved Shade And Make Over A Coat Of Cement Primer Over New Surface Including Preparing The Plastered Surface By Rubbingwith Pumice Stone Or Fine Sand Paper Applying Putty Wherever Required Scaffolding Washing Of Floors And Taxes All Complete As Per Building Specification Tionand Direction Of E / I. 44 Sanitary Installation 45 Labour For Scrapping Old Paint With Paint Remoter And Below Lamp As Required On Wooden Or Steel Surface Including Cost Of All Labour And Materials And Scaffolding All Complete As Per Balding Specification And Direction Of E / I. 46 Providing One Coat Of Painting With Ready Mixed Paint Of Approved Shade And Make Over Steel Surface Including Cleaning The Surface Toughly, Scaffolding And Taxes All Complete As Per Building Specification And Direction Of E / I. 47 Providing 12 Mm, Cement Plaster ( 1:6 ) With Clean Coarse Sand Of F.M 1.5 Including Screening, Curing With All Leads And Lifts Of Water, Scaffolding Taxes And Royalty All Complete As Per Building Specification And Direction E / I. 48 Providing Supplying, Fitting And Fixing Of The Followingmaterials In Connection Oflatrine Room.25 Mm Dia Pvcpipe. ( Rate Of Pvc Pipe + Laying Cost Charge ) 49 15 Mm Diapvcpipe. ( Rate Of Pvc Pipe + Laying Cost Charge ) 50 25 X 25 X 15 Mm Pvc Tee 51 25 Mm Dia Pvc Coupler 52 15 Mm Dia Pvc Coupler 53 25 Mm Dia Pvc U / Socket 54 15 Mm Dia Fta 55 25 Mm Dia Pvc Elbow 56 15 Mm Diapvc Elbow 57 Providing And Fixing 15 Mm Dia Male Ended C.I. Bodybrass Spindle Valve And Seat Bib Clock Of Approved Quality ( Wt- Not Less Than 400 Gms. ) With Extra Socket All Complete As Per Specification And Direction E / I.. 58 Providing One Coat Of Oil Bound Distemper Of Approved Shade And Make Over A Coat Of Cement Primer Over New Surface Including Preparing The Plastered Surface By Rubbing Month With Pumice Stone Or Fine Sand Paper Applying Putty Wherever Required Scaffolding Washing Of Floors And Taxes All Complete As Per Building Specification Tionand Direction Of E / I. 59 Supplying Of Following Materials. Mug 60 Balti –Plastic 61 Providing Designation 75 A Brick Work In C.M. ( 1:6 ) In Foundation And Plinth With Approved Quality Of Clean Coarse Sand Of F.M. 2 To 2.5 Including Providing 10Mm Think Mortar Joints, Cost Of Screening Materials, Raking Out Joints Of 15Mm Depth, Curing Taxes And Royalty All Complete As Per Building Specification And Direction Of E / I 62 Supplying, Fitting And Fixing 20 Gauge G.C.I Sheet Gate Fitted On M.S Angle Frame Of Size60*60*6 Mm Including Cost Of Fabrication, Providing Necessary Locking Arrangement With Haskal And Domny Duly Fixed In C / C ( 1:2:4 ) Blocks Of Required Size, Applying A Priming Red Lead Paint Over Steel Work, Taxes All Complete As Per Drawing Specification And Direction Of E / I 63 Indravarsha 64 Earth Work In Excavation For Laying Of Pipe So As To Give One Meter ( Avg. ) Cover Over The Socket Of Pipe And Back Filling The Trenches After Laying Of Pipe, Again A / W In Excavation And Taking Out The Laid Pipeand Back Filling The Same After The End Ofshrawani Mela. 65 Earth Work In Back Filling The Trenches Fatter Laying Different Types And Size Of Pipes With Earth Removed During Excavation Within Initial Lead And Lift As Per Specification And Direction E / I. 66 Laying Of 32 Mm Dia Gi / Pvc Pipe In Trenches And Taking Out The Same. 67 Supplying Of 32 Mm Dia Pvc Pipe With Socket In 3 M Length Do-Do All Complete. 68 Laying & Jointing Pvc Pipe In Hanging Position Ovar Support And Taking Out The Same After And Of Shrawani Mela ( Pipe Supplied Departmentally Free Of Cost ) . A.32 Mm Dia. Pipe 69 B. 25 Mm Dia. Pipe 70 Supplying And Fixinggifittings Of Approved Make All Complete As Per Specification And Direction E / I. 32 Mm Nipple 71 32 Mm Elbow 72 32 Mm U / S 73 25 Mm Plug 74 25 Mm Socket 75 32 X 25 R.S. 76 32 X 25 Elbow 77 25 Mm U / S 78 32 Mm Tee 79 Electric Welding Of 15 Mm Dia X Nipple In 25 Mm Dia Pvc Pipe After Making Hole Of 20 Mm Dia Including Cost Ofnipple. In 32 Mm Dia. Pipe 80 In 15 Mm Dia. Gi Nipple 81 Cost Of 15 Mm Dia. Gi. Socket 82 Peyaoo 83 Providing Two Coats Of Oil Bound Distemper Of Approved Shade And Make Over A Coat Of Cement Primer Over Old Surface Including Preparing The Plastered Surface By Rubbing Smooth With Pumice Stone Or Fine Sand Paper Applying Putty Wherever Required Scaffolding Washing Of Floors And Taxes All Complete As Per Building Specification Tionand Direction Of E / I. 84 Providing One Coat Of Plastic Emulsion Paint Of Approved Shade And Make Over Old Surface Including Washing, Cleaning And Preparing The Walls, Scaffolding, Washing For Floor And Taxes All Complete As Per Building Specification And Direction Of E / I. 85 Providing Two Coats Of Snowcem Of Approved Shade And Make Over Old Surface Including Washing, Cleaning, Sand Papering The Wall, Scaffolding, Curing And Taxes All Complete As Per Building Specification & Direction Of E / I. 86 Providing And F / Fixing Water Supply Arrangement From Gi / Hdpe Tank To Peyaoo Andbathing Palatform As Per Site Condition Including Required Fittings And Pipe All Complete Including Installation Of Hdpe Water Storage Tank Including Carriage Of Tank From Departmental Store To Work Site. ( Hdpe Water Storage Tank Will Be Supplied Free Of Cost Departmentally ) 87 Providing Pump Operatorfor Operating Motor For Supplying Water Forpeyaoo. ( 1No.X 30 Days- Gr.-Ii 88 Cost Towards Fitting & Fixing Submersible Pump With Clamp Etc. All Complete Including Lowering Of Pvc Pipe. 2H.P To 7.5 H.P And Taking Out After Ending Mela And Deposited In Departmental Store Deoghar. 89 Spreading Water Over Laid Sand 90 Providing Labour Tool And Equipmentfor Spreading Water Over Laid Sand At Kanwariya Path During Shrawani Mela -2022. A ) Cost Of Flexible Pvc Pipe 91 B ) Labour Charge For 1Place X 30 Dasys = 30 Nos. ( Unskild Labour ) 92 Carriage Ofall Materials From Store To Work Site And Return Back To Work Site To Departmental Store Within A Distance Of 15Km . 93 Cost Towards Electric Consumption Charge For To Be Paid To Electricity Board During Shrawani Mela .Payable Jseb 94 Carriage Of Materials Fromkiln Site Or Quarry Site To Work Site Including Contractor Profit, Loading, Unloading, Transportation, Etc. All Complete. Bricks Up To 15 K.M. 95 Sand Up To 15 K.M. 96 Stone Chips Up To 15 K.M. 97 Cement Up To 15 K.M. 98 Add Gst @ 12% 99 Add 1 % Labour Cess

Key Value

Document Fees
INR 750 /-
EMD
INR 8500.0 /-
Tender Value
INR 4.09 Lakhs /-

BOQ Items

Name of Work: Supplying of materials, tools , plants and skilled and unskilled man power for repairing and maintenance of existing structure and fitting, fixing all works with operation & maintenance the entire works during Shrawani Mela atUdaypura to nearNawadih Health Sub Center ( Plant No.-05 toPlant No.- 07 ) under D.W & S. division , Deoghar for the year 2022-23 Group No. SM-D-03
Sl. No. Item Description
1WATER SUPPLY
2Cleaning of site, cutting bushes dressing and leveling do etc. all complete as per direction of E/I.
3Dismantling patent stone flooring including stacking serviceable materials in countable stacks within 15 M lead and disposal of unserviceable materials with all leads all complete as per direction of E/I.
4Providing 25 mm thick first class patent stone flooring (1:2:4) with stone chips,in two layers, bottom layer 19 mm thick (1:2:4) with 12 mm to 6 mm size graded stone chips and top layer 6 mm thick (1:2) with 6 mm down stone chips in panels,including cost of curing, finishing the surface smooth by rubbing with carborun-dum stone,taxes and royalty all complete as per building specification and direction of E/I.
5Supplying, fitting and fixing vitreous white glazed earthen ware I.W.C. of Hindware make with 100mm.H.C.I. ‘P’ trap 15 liters C.I. pull and let go flushing cistern of names or other I.S.S. equivalent make, complete with all fittings, C.I. or C.C. brackets 32mm. alkathene/P.V.C. telescopic flush, pipe about 2m long with one brass coupling and clamps G.I. chain and pull including supplying and fixing a pair of vitreous white glazed earthenware ware footrest to be fixed in floor 15mm. C.I. body brass spindle stopper cocke of weight not less than 50gms. 15mm. P.V.C. connection pipe 450mm. long and the exposed pipe and cistern with two coats of approved paint over a coat of red oxide primer etc. all complete as per specification and direction of the E/I. (580mm long with 12.5 lit low level PVC Cistem)
6Providing coarse clean sand in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150 mm thick with all leads and lifts including cost of all materials, labour, royalty and taxes all complete as per building specification and direction of E/I. (Mode of measurement-compacted volume).
7Providing designation 75 A one brick flat soling joints filled with local sand including cost of watering, taxes royalty all complete as per building specification and direction of E/I.
8Supplying all materials, labour, writing name of department, male & female directionon the wall after making box by good quality of paint as per direction of E/I. 160 mm high letter
9Cost towards painting and writing slogan on board 4’ x 3’ size with good quality paint carrying and fitting fixing on each site including Minor repair of board taking back after Mela as per direction of E/I.(150 mm high letter)
10Cost towards transportation ofsubmersible pump, pipe fittings etc. from store to work site including carriage water tank etc. all complete.
11Cost towards fitting & fixing submersible pump with clamp etc. all complete including lowering of PVC Pipe. 2 H.P to 7.5H.P and taking out after ending mela and deposited in departmental store deoghar.
12Cost towards dismantling after mela and taking back to work site from store including carriage of all materials and pump, water tank etc. all complete.
13Earth work in excavation for laying of pipe so as to give one meter (avg.) cover over the socket of pipe and back filling the trenches after laying of pipe, again a/w in excavation and taking out the laid pipeand back filling the same after the end ofShrawani Mela.
14Earth work in back filling the trenches fatter laying different types and size of pipes with earth removed during excavation within initial lead and lift as per specification and direction E/I.
15Laying of PVC pipes of approved make in trenches with red lead and yarn with socket and screw joints and cutting pipe so size and threading ends where necessary etc. all complete as per specification and direction E/I. (Pipes to be supplied departmentally free of cost) (i) 32 mm dia PVC pipe.
16(ii) 25 mm dia PVC pipe.
17Laying of PVC pipes of approved make on wallwith red lead and yarn with socket and screw joints and cutting pipe so size and threading ends where necessary etc. all complete as per specification and direction E/I. (Pipes to be supplied departmentally free of cost) (i) 15 mm dia PVC pipe
18(i) 20 mm dia PVC pipe
19(ii) 25 mm dia dia PVC pipe
20Cost towards engaging Pump Operatar cum water spreader on laid sand for operating and spreading water on sand etc.all complete job. Gr.-II
21Cost towardscleaning the RCC water storage tank over pump house having size 3 M x 3 M x 2 M including the cost of bleaching powder, jute, sacfolding etc. all complete.
22Cost towards engagingPlumber andElectric mistryduring Mela periodincluding contractor profit. Plumber Gr.-II
23Electrician Gr.-II
24Cost towards extra materials due to damages during taking out damage cut pieces including laboaur cost as per direction of E/I. in walls/trenches. 32 mm dia PVC pipe. ( Rate of PVC Pipe + Laying cost charge)
2525 mm diaPVC pipe. ( Rate of PVC Pipe + Laying cost charge)
2615 mm diaPVCpipe. ( Rate of PVC Pipe + Laying cost charge)
2732 mm dia PVC Elbow
2825 mm dia PVCElbow
2915 mm dia PVC Elbow
3032 mm dia U/S PVC
3125 mm dia U/S PVC
3225 x 25 x 15 mm dia Reducing Tee PVC
3332 mm dia PVC FTA
3425 mm dia PVC FTA
3515 mm dia PVC FTA
3615 mm dia PVC Coupler
3725 mm diaPVC Coupler
3832 mm diaPVC Coupler
3915 mm PVC Shower
4015 mm P.V.C Bib Cock
4132 x 32 x 25 mm dia tee PVC
42Providing two coats of snowcem of approved shade and make over old surface including washing, cleaning, sand papering the wall, scaffolding, curing and taxes all complete as per building specification & direction of E/I.
43Providing onecoats of oil bound distemper of approved shade and make over a coat of cement primer over new surface including preparing the plastered surface by rubbingwith pumice stone or fine sand paper applying putty wherever required scaffolding washing of floors and taxes all complete as per building specification tionand direction of E/I.
44SANITARY INSTALLATION
45Labour for scrapping old paint with paint remoter and below lamp as required on wooden or steel surface including cost of all labour and materials and scaffolding all complete as per balding specification and direction of E/I.
46Providing one coat of painting with ready mixed paint of approved shade and make over steel surface including cleaning the surface toughly, scaffolding and taxes all complete as per building specification and direction of E/I.
47Providing 12 mm, cement plaster (1:6) with clean coarse sand of F.M 1.5 including screening, curing with all leads and lifts of water, scaffolding taxes and royalty all complete as per building specification and direction E/I.
48Providing supplying, fitting and fixing of the followingmaterials in connection oflatrine room.25 mm dia PVCPipe. (Rate of PVC Pipe + Laying cost charge)
4915 mm diaPVCPipe.(Rate of PVC Pipe + Laying cost charge)
5025 x 25 x 15 mm PVC Tee
5125 mm dia PVC Coupler
5215 mm dia PVC Coupler
5325 mm dia PVC U/Socket
5415 mm dia FTA
5525 mm dia PVC Elbow
5615 mm diaPVC Elbow
57Providing and fixing 15 mm dia male ended C.I. bodybrass spindle valve and seat bib clock of approved quality (wt- Not less than 400 Gms. ) with extra socket all complete as per specification and direction E/I..
58Providing one coat of oil bound distemper of approved shade and make over a coat of cement primer over new surface including preparing the plastered surface by rubbing month with pumice stone or fine sand paper applying putty wherever required scaffolding washing of floors and taxes all complete as per building specification tionand direction of E/I.
59Supplying of following materials. Mug
60Balti –Plastic
61Providing designation 75 A brick work in C.M.(1:6) in foundation and plinth with approved quality of clean coarse sand of F.M. 2 to 2.5 including providing 10mm think mortar joints, cost of screening materials, raking out joints of 15mm depth, curing taxes and royalty all complete as per building specification and direction of E/I
62Supplying, fitting and fixing 20 gauge G.C.I sheet gate fitted on M.S angle frame of size60*60*6 mm including cost of fabrication, providing necessary locking arrangement with haskal and domny duly fixed in C/C(1:2:4) blocks of required size, applying a priming red lead paint over steel work, taxes all complete as per drawing specification and direction of E/I
63INDRAVARSHA
64Earth work in excavation for laying of pipe so as to give one meter (avg.) cover over the socket of pipe and back filling the trenches after laying of pipe, again a/w in excavation and taking out the laid pipeand back filling the same after the end ofShrawani Mela.
65Earth work in back filling the trenches fatter laying different types and size of pipes with earth removed during excavation within initial lead and lift as per specification and direction E/I.
66Laying of 32 mm dia GI/PVC pipe in trenches and taking out the same.
67Supplying of 32 mm dia PVC pipe with socket in 3 M length do-do all complete.
68Laying & jointing PVC pipe in hanging position ovar support and taking out the same after and of Shrawani Mela ( pipe supplied departmentally free of cost). a.32 mm dia. Pipe
69b. 25 mm dia. Pipe
70Supplying and fixingGIfittings of approved make all complete as per specification and direction E/I. 32 mm Nipple
7132 mm Elbow
7232 mm U/S
7325 mm Plug
7425 mm Socket
7532 x 25 R.S.
7632 x 25 Elbow
7725 mm U/S
7832 mm Tee
79Electric welding of 15 mm dia x Nipple in 25 mm dia PVC pipe after making hole of 20 mm dia including cost ofnipple. In 32 mm dia. Pipe
80In 15 mm dia. GI Nipple
81Cost of 15 mm dia. GI. Socket
82PEYAOO
83Providing two coats of oil bound distemper of approved shade and make over a coat of cement primer over old surface including preparing the plastered surface by rubbing smooth with pumice stone or fine sand paper applying putty wherever required scaffolding washing of floors and taxes all complete as per building specification tionand direction of E/I.
84Providing one coat of plastic emulsion paint of approved shade and make over old surface including washing, cleaning and preparing the walls, scaffolding, washing for floor and taxes all complete as per building specification and direction of E/I.
85Providing two coats of snowcem of approved shade and make over old surface including washing, cleaning, sand papering the wall, scaffolding, curing and taxes all complete as per building specification & direction of E/I.
86Providing and F/Fixing water supply arrangement from GI/ HDPE Tank to Peyaoo andBathing Palatform as per site condition including required fittings and pipe all complete including installation of HDPE water storage tank including carriage of tank from departmental store to work site. ( HDPE water storage tank will be supplied free of cost departmentally)
87Providing pump operatorfor operating motor for supplying water forPeyaoo. (1No.x 30 Days- Gr.-II
88Cost towards fitting & fixing submersible pump with clamp etc. all complete including lowering of PVC Pipe. 2H.P to 7.5 H.P and taking out after ending mela and deposited in departmental store deoghar.
89SPREADING WATER OVER LAID SAND
90Providing Labour tool and equipmentfor spreading water over laid sand at Kanwariya Path during Shrawani Mela -2022. A) Cost of Flexible PVC pipe
91B) Labour Charge for 1Place x 30 Dasys = 30 Nos. (Unskild Labour)
92Carriage ofall materials from store to work site and return back to work site to departmental store within a distance of 15KM .
93Cost towards electric consumption charge for to be paid to Electricity Board during shrawani mela .payable JSEB
94Carriage of materials fromkiln site or quarry site to work site including contractor profit, loading, unloading, transportation, etc. all complete. Bricks up to 15 K.M.
95Sand up to 15 K.M.
96Stone chips up to 15 K.M.
97Cement up to 15 K.M.
98Add GST @ 12%
99Add 1 % Labour Cess
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail