}

Supplying Of Materials, Tools , Plants And Skilled And Unskilled Man Power For Repairing And Maintenance Of Existing Structure And Fitting, Fixing All Works With Operation & Maintenance The Entire Works During Shrawani Mela -2022 Atnawadih Health Su, deoghar-Jharkhand

Drinking Water And Sanitation Department has published Supplying Of Materials, Tools , Plants And Skilled And Unskilled Man Power For Repairing And Maintenance Of Existing Structure And Fitting, Fixing All Works With Operation & Maintenance The Entire Works During Shrawani Mela -2022 Atnawadih Health Su. Submission Date for this Tender is 02-06-2022. Man Power Supply Tenders in deoghar Jharkhand. Bidders can get complete Tender details and download the document.




Tender Notice

32408443
Supplying Of Materials, Tools , Plants And Skilled And Unskilled Man Power For Repairing And Maintenance Of Existing Structure And Fitting, Fixing All Works With Operation & Maintenance The Entire Works During Shrawani Mela -2022 Atnawadih Health Su
Open Tender
Indian
Jharkhand
deoghar
02-06-2022

Tender Details

Supplying Of Materials, Tools , Plants And Skilled And Unskilled Man Power For Repairing And Maintenance Of Existing Structure And Fitting, Fixing All Works With Operation & Maintenance The Entire Works During Shrawani Mela -2022 Atnawadih Health Sub Center To Near Dhawaghat ( Plant No.-07 To Nearplant No.- 09 ) Under D.W & S. Division , Deoghar For The Year 2022-23Group No. Sm-D-04-2 Cleaning Of Site, Cutting Bushes Dressing And Leveling Do Etc All Complete As Per Direction Of E / I 3 Providing 25 Mm Thick First Class Patent Stone Flooring ( 1:2:4 ) With Stone Chips, In Two Layers, Bottom Layer 19 Mm Thick ( 1:2:4 ) With 12 Mm To 6 Mm Size Graded Stone Chips And Top Layer 6 Mm Thick ( 1:2 ) With 6 Mm Down Stone Chips In Panels, Including Cost Of Curing, Finishing The Surface Smooth By Rubbing With Carborun-Dum Stone, Taxes And Royalty All Complete As Per Building Specification And Direction Of E / I. 4 Providing 12 Mm, Cement Plaster ( 1:6 ) With Clean Coarse Sand Of F.M 1-5 Including Screening, Curing With All Leads And Lifts Of Water, Scaffolding Taxes And Royalty All Complete As Per Building Specification And Direction E / I. 5 Providing Designation 75 A Brick Work In C.M. ( 1:6 ) In Foundation And Plinth With Approved Quality Of Clean Coarse Sand Of F.M. 2 To 2.5 Including Providing 10Mm Think Mortar Joints, Cost Of Screening Materials, Raking Out Joints Of 15Mm Depth, Curing Taxes And Royalty All Complete As Per Building Specification And Direction Of E / I 6 Supplying All Materials, Labour, Writing Name Of Department, Male & Female Directionon The Wall After Making Box By Good Quality Of Paint As Per Direction Of E / I. 160 Mm High Letter 7 Cost Towards Painting And Writing Slogan On Board 4’ X 3’ Size With Good Quality Paint Carrying And Fitting Fixing On Each Site Including Minor Repair Of Board Taking Back After Mela As Per Direction Of E / I. ( 150 Mm High Letter ) 8 Cost Towards Transportation Ofsubmersible Pump, Pipe Fittings Etc. From Store To Work Site Including Carriage Water Tank Etc. All Complete. 9 Cost Towards Fitting & Fixing Submersible Pump With Clamp Etc. All Complete Including Lowering Of Pvc Pipe. 2 H.P To 7.5H.P And Taking Out After Ending Mela And Deposited In Departmental Store Deoghar. 10 Cost Towards Dismantling After Mela And Taking Back To Work Site From Store Including Carriage Of All Materials And Pump, Water Tank Etc. All Complete. 11 Earth Work In Excavation For Laying Of Pipe So As To Give One Meter ( Avg. ) Cover Over The Socket Of Pipe And Back Filling The Trenches After Laying Of Pipe, Again A / W In Excavation And Taking Out The Laid Pipeand Back Filling The Same After The End Ofshrawani Mela. 12 Earth Work In Back Filling The Trenches Fatter Laying Different Types And Size Of Pipes With Earth Removed During Excavation Within Initial Lead And Lift As Per Specification And Direction E / I. 13 Laying Of Pvc Pipes Of Approved Make In Trenches With Red Lead And Yarn With Socket And Screw Joints And Cutting Pipe So Size And Threading Ends Where Necessary Etc. All Complete As Per Specification And Direction E / I. ( Pipes To Be Supplied Departmentally Free Of Cost ) . ( I ) 32 Mm Dia Pvc Pipe. ( 2 X 33.00 Mtr.= 66.00 Mtr. ) 14 ( I ) 25 Mm Dia Pvc Pipe. ( 2 X 60.00 Mtr. = 120 Mtr. ) 15 Laying Of Pvc / Gi Pipes Of Approved Make On Wall Androof With Red Lead And Yarn With Socket And Screw Joints And Cutting Pipe So Size And Threading Ends Where Necessary Etc. All Complete As Per Specification And Direction E / I. ( Pipes To Be Supplied Departmentally Free Of Cost ) . ( I ) 15 Mm Dia Pvc Pipe – 16 ( I ) 20 Mm Dia Pvc Pipe – 17 ( Ii ) 25 Mm Dia Dia Pvc Pipe – 18 Cost Towards Engaging Pump Operatarcum Water Spreader On Laid Sand For Operating And Spreading Water On Sand Etc.All Complete Job. Gr.-Ii 19 Cost Towardscleaning The Rcc Water Storage Tank Over Pump House Having Size 3 M X 3 M X 2 M Including The Cost Of Bleaching Powder, Jute, Sacfolding Etc. All Complete. 20 Cost Towards Engagingplumber Andelectric Mistryduring Mela Periodincluding Contractor Profit. Plumber Gr.-Ii 21 Electrician Gr.-Ii 22 Cost Towards Extra Materials Due To Damages During Taking Out Damage Cut Pieces Including Laboaur Cost As Per Direction Of E / I. In Walls / Trenches. 32 Mm Dia Pvc Pipe . ( Rate Of Pvc Pipe + Laying Cost Charge ) 23 25 Mm Diapvc Pipe . ( Rate Of Pvc Pipe + Laying Cost Charge ) 24 15 Mm Diapvcpipe . ( Rate Of Pvc Pipe + Laying Cost Charge ) 25 32 Mm Dia Pvc Elbow 26 25 Mm Dia Pvcelbow 27 15 Mm Dia Pvc Elbow 28 32 Mm Dia U / S Pvc 29 25 Mm Dia U / S Pvc 30 25 X 25 X 15 Mm Dia Reducing Tee Pvc 31 15 Mm Dia Pvc Fta 32 15 Mm Dia Pvc Coupler 33 25 Mm Diapvc Coupler 34 32 Mm Diapvc Coupler 35 15 Mm Pvc Shower 36 15 Mm P.V.C Bib Cock 37 32 X 32 X 25 Mm Dia Tee Pvc 38 Providing Two Coats Of Snowcem Of Approved Shade And Make Over Old Surface Including Washing, Cleaning, Sand Papering The Wall, Scaffolding, Curing And Taxes All Complete As Per Building Specification & Direction Of E / I. 39 Providing Coarse Clean Sand In Filling In Foundation Trenches Or In Plinth Including Ramming And Watering In Layers Not Exceeding 150 Mm Thick With All Leads And Lifts Including Cost Of All Materials, Labour, Royalty And Taxes All Complete As Per Building Specification And Direction Of E / I. ( Mode Of Measurement-Compacted Volume ) . 40 Providing Designation 75 A One Brick Flat Soling Joints Filled With Local Sand Including Cost Of Watering, Taxes Royalty All Complete As Per Building Specification And Direction Of E / I. 41 Supplying Materials And Construction Of Brick Masonry Drain 150 Mm Width And 150Mm Depth With 250Mm Apron On Both Sides Over 50Mm Thick P.C.C ( 1:3:6 ) Over A Brick Flat Soling, Apron Laying Brick Work In C.M ( 1:6 ) . 12Mm Cement Plaster ( 1:3 ) With Punning On Exposed Surface All Complete Job As Per Specification And Direction Of E / L 42 Sanitary Installation 43 Providing 12 Mm, Cement Plaster ( 1:6 ) With Clean Coarse Sand Of F.M 1.5 Including Screening, Curing With All Leads And Lifts Of Water, Scaffolding Taxes And Royalty All Complete As Per Building Specification And Direction E / I. 44 Providing P.C.C. M-150 In Nominal Mix Of ( 1:2:4 ) In Foundation With Approved Quality Of Stone Chips 20 Mm To 6 Mm Isgraded And Clean Coarse Sand Of F.M. 2.5 To 3 Including Screening, Shuttering, Mixing Cement Concrete In Mixer And Placing In Position, Vibrating, String, Curing, Taxes And Royalty All Complete As Per Building Specification And Direction Of E / I. 45 Providing Designation 75 A Brick Work In C. M. ( 1:6 ) In Different Places In Sewer Line With Approved Quality Of Clean Coarse Sand Of F. M. 2 To 2.5 Including Do…..Do…….All Complete As Per Building Specification And Direction Of E / I. 46 Labour For Scrapping Old Paint With Paint Remoter And Below Lamp As Required On Wooden Or Steel Surface Including Cost Of All Labour And Materials And Scaffolding All Complete As Per Balding Specification And Direction Of E / I. 47 Providing One Coat Of Painting With Ready Mixed Paint Of Approved Shade And Make Over Steel Surface Including Cleaning The Surface Toughly, Scaffolding And Taxes All Complete As Per Building Specification And Direction Of E / I. 48 Providing Supplying, Fitting And Fixing Of The Followingmaterials In Connection Of Latrine Room. 25 Mm Dia Pvc Pipe . ( Rate Of Pvc Pipe + Laying Cost Charge ) 49 15 Mm Diapvc Pipe. ( Rate Of Pvc Pipe + Laying Cost Charge ) 50 25 X 25 X 15 Mm Pvc Tee 51 25 Mm Dia Pvc Coupler 52 15 Mm Dia Pvc Coupler 53 25 Mm Dia Pvc U / Socket 54 15 Mm Dia Fta 55 25 Mm Dia Pvc Elbow 56 15 Mm Diapvc Elbow 57 Providing And Fixing 15 Mm Dia Male Ended C.I. Bodybrass Spindle Valve And Seat Bib Clock Of Approved Quality ( Wt- Not Less Than 400 Gms. ) With Extra Socket All Complete As Per Specification And Direction E / I.. 58 Providingonecoats Of Oil Bound Distemper Of Approved Shade And Make Over A Coat Of Cement Primer Over New Surface Including Preparing The Plastered Surface By Rubbing Month With Pumice Stone Or Fine Sand Paper Applying Putty Wherever Required Scaffolding Washing Of Floors And Taxes All Complete As Per Building Specification Tionand Direction Of E / I. 59 Supplying Of Following Materials. Mug 60 Balti Plastic 61 Supplying, Fitting And Fixing 20 Gauge G.C.I Sheet Gate Fitted On M.S Angle Frame Of Size60*60*6 Mm Including Cost Of Fabrication, Providing Necessary Locking Arrangement With Haskal And Domny Duly Fixed In C / C ( 1:2:4 ) Blocks Of Required Size, Applying A Priming Red Lead Paint Over Steel Work, Taxes All Complete As Per Drawing Specification And Direction Of E / I 62 Indravarsha 63 Earth Work In Excavation For Laying Of Pipe So As To Give One Meter ( Avg. ) Cover Over The Socket Of Pipe And Back Filling The Trenches After Laying Of Pipe, Again A / W In Excavation And Taking Out The Laid Pipeand Back Filling The Same After The End Ofshrawani Mela 64 Earth Work In Back Filling The Trenches Fatter Laying Different Types And Size Of Pipes With Earth Removed During Excavation Within Initial Lead And Lift As Per Specification And Direction E / I. 65 Laying Of 32 Mm Dia Gi / Pvc Pipe In Trenches And Taking Out The Same. ( 2 X 20 Mtr.= 40 Mtr. ) 66 Supplying Of 32 Mm Dia Pvc Pipe With Socket In 3 M Length Do-Do All Complete. 67 Laying & Jointing Gi / Pvc Pipe In Hanging Position Ovar Support And Taking Out The Same After And Of Shrawani Mela ( Pipe Supplied Departmentally Free Of Cost ) . 32 Mm Dia. Pipe 68 25 Mm Dia. Pipe 69 Supplying And Fixing Gi Fittings Of Approved Make All Complete As Per Specification And Direction E / I. 32 Mm Nipple 70 32 Mm Elbow 71 32 Mm U / S 72 25 Mm Plug 73 25 Mm Socket 74 32 X 25 R.S. 75 32 X 25 Elbow 76 25 Mm U / S 77 32 Mm Tee 78 Electric Welding Of 15 Mm Dia X Nipple In 25 Mm Dia Pvc Pipe After Making Hole Of 20 Mm Dia Including Cost Ofnipple. In 32 Mm Dia. Pipe 79 In 15 Mm Dia. Gi Nipple 80 Cost Of 15 Mm Dia. Gi. Socket 81 Providing Pump Operator Cum Water Spreaderfor Operating Motor And Spreading Water On Laid Sand. ( 1 Nox 30 Days. 9:00Am To :00Pm ) Gr.-Ii 82 Cost Towards Fitting & Fixing Submersible Pump With Clamp Etc. All Complete Including Lowering Of Pvc Pipe. 2H.P To 7.5 H.P And Taking Out After Ending Mela And Deposited In Departmental Store Deoghar. 83 Peyaoo 84 Providing Two Coats Of Oil Bound Distemper Of Approved Shade And Make Over A Coat Of Cement Primer Over Old Surface Including Preparing The Plastered Surface By Rubbing Smooth With Pumice Stone Or Fine Sand Paper Applying Putty Wherever Required Scaffolding Washing Of Floors And Taxes All Complete As Per Building Specification Tionand Direction Of E / I. 85 Providing One Coat Of Plastic Emulsion Paint Of Approved Shade And Make Over Old Surface Including Washing, Cleaning And Preparing The Walls, Scaffolding, Washing For Floor And Taxes All Complete As Per Building Specification And Direction Of E / I. 86 Providing Two Coats Of Snowcem Of Approved Shade And Make Over Old Surface Including Washing, Cleaning, Sand Papering The Wall, Scaffolding, Curing And Taxes All Complete As Per Building Specification & Direction Of E / I. 87 Providing And F / Fixing Water Supply Arrangement From Gi / Hdpe Tank To Peyaoo Andbathing Palatform As Per Site Condition Including Required Fittings And Pipe All Complete Including Installation Of Hdpe Water Storage Tank Including Carriage Of Tank From Departmental Store To Work Site. ( Hdpe Water Storage Tank Will Be Supplied Free Of Cost Departmentally ) 88 Cost Towards Fitting & Fixing Submersible Pump With Clamp Etc. All Complete Including Lowering Of Pvc Pipe. 2H.P To 7.5 H.P And Taking Out After Ending Mela And Deposited In Departmental Store Deoghar. 89 Spreading Water Over Laid Sand 90 Providing Labour Tool And Equipmentfor Spreading Water Over Laid Sand At Kanwariya Path During Shrawani Mela. A ) Cost Of Flexible Pvc Pipe 91 B ) Labour Charge ( Unskild Labour ) 92 Carriage Ofall Materials From Store To Work Site And Return Back To Work Site To Departmental Store Within A Distance Of 15Km . 93 Cost Towards Electric Consumption Charge For To Be Paid To Electricity Board During Shrawani Mela .Payable Jseb 94 Carriage Of Materials Fromkiln Site Or Quarry Site To Work Site Including Contractor Profit, Loading, Unloading, Transportation, Etc. All Complete. Bricks Up To 15 K.M. 95 Sand Up To 15 K.M. 96 Stone Chips Up To 15 K.M. 97 Cement Up To 15 K.M. 98 Add Gst @ 12% 99 Add 1 % Labour Cess

Key Value

Document Fees
INR 750 /-
EMD
INR 7000.0 /-
Tender Value
INR 3.42 Lakhs /-

BOQ Items

Name of Work: Supplying of materials, tools , plants and skilled and unskilled man power for repairing and maintenance of existing structure and fitting, fixing all works with operation & maintenance the entire works during Shrawani Mela -2022 atNawadih Health Sub Center to near Dhawaghat (Plant No.-07 to nearPlant No.- 09) under D.W & S. division , Deoghar for the year 2022-23 Group No. SM-D-04
Sl. No. Item Description
1WATER SUPPLY
2Cleaning of site, cutting bushes dressing and leveling do etc all complete as per direction of E/I
3Providing 25 mm thick first class patent stone flooring (1:2:4) with stone chips,in two layers, bottom layer 19 mm thick (1:2:4) with 12 mm to 6 mm size graded stone chips and top layer 6 mm thick (1:2) with 6 mm down stone chips in panels,including cost of curing, finishing the surface smooth by rubbing with carborun-dum stone,taxes and royalty all complete as per building specification and direction of E/I.
4Providing 12 mm, cement plaster (1:6) with clean coarse sand of F.M 1-5 including screening, curing with all leads and lifts of water, scaffolding taxes and royalty all complete as per building specification and direction E/I.
5Providing designation 75 A brick work in C.M.(1:6) in foundation and plinth with approved quality of clean coarse sand of F.M. 2 to 2.5 including providing 10mm think mortar joints, cost of screening materials, raking out joints of 15mm depth, curing taxes and royalty all complete as per building specification and direction of E/I
6Supplying all materials, labour, writing name of department, male & female directionon the wall after making box by good quality of paint as per direction of E/I. 160 mm high letter
7Cost towards painting and writing slogan on board 4’ x 3’ size with good quality paint carrying and fitting fixing on each site including Minor repair of board taking back after Mela as per direction of E/I.(150 mm high letter)
8Cost towards transportation ofsubmersible pump, pipe fittings etc. from store to work site including carriage water tank etc. all complete.
9Cost towards fitting & fixing submersible pump with clamp etc. all complete including lowering of PVC Pipe. 2 H.P to 7.5H.P and taking out after ending mela and deposited in departmental store deoghar.
10Cost towards dismantling after mela and taking back to work site from store including carriage of all materials and pump, water tank etc. all complete.
11Earth work in excavation for laying of pipe so as to give one meter (avg.) cover over the socket of pipe and back filling the trenches after laying of pipe, again a/w in excavation and taking out the laid pipeand back filling the same after the end ofShrawani Mela.
12Earth work in back filling the trenches fatter laying different types and size of pipes with earth removed during excavation within initial lead and lift as per specification and direction E/I.
13Laying of PVC pipes of approved make in trenches with red lead and yarn with socket and screw joints and cutting pipe so size and threading ends where necessary etc. all complete as per specification and direction E/I. (Pipes to be supplied departmentally free of cost). (i) 32 mm dia PVC pipe. ( 2 x 33.00 mtr.= 66.00 Mtr.)
14(i) 25 mm dia PVC pipe. ( 2 x 60.00 Mtr. = 120 Mtr.)
15Laying of PVC /GI pipes of approved make on wall androof with red lead and yarn with socket and screw joints and cutting pipe so size and threading ends where necessary etc. all complete as per specification and direction E/I. (Pipes to be supplied departmentally free of cost) .(i) 15 mm dia PVC pipe –
16(i) 20 mm dia PVC pipe –
17(ii) 25 mm dia dia PVC pipe –
18Cost towards engaging Pump Operatarcum water spreader on laid sand for operating and spreading water on sand etc.all complete job. Gr.-II
19Cost towardscleaning the RCC water storage tank over pump house having size 3 M x 3 M x 2 M including the cost of bleaching powder, jute, sacfolding etc. all complete.
20Cost towards engagingPlumber andElectric mistryduring Mela periodincluding contractor profit. Plumber Gr.-II
21Electrician Gr.-II
22Cost towards extra materials due to damages during taking out damage cut pieces including laboaur cost as per direction of E/I. in walls/trenches. 32 mm dia PVC pipe .(Rate of PVC Pipe + Laying cost charge)
2325 mm diaPVC pipe .(Rate of PVC Pipe + Laying cost charge)
2415 mm diaPVCpipe .(Rate of PVC Pipe + Laying cost charge)
2532 mm dia PVC Elbow
2625 mm dia PVCElbow
2715 mm dia PVC Elbow
2832 mm dia U/S PVC
2925 mm dia U/S PVC
3025 x 25 x 15 mm dia Reducing Tee PVC
3115 mm dia PVC FTA
3215 mm dia PVC Coupler
3325 mm diaPVC Coupler
3432 mm diaPVC Coupler
3515 mm PVC Shower
3615 mm P.V.C Bib Cock
3732 x 32 x 25 mm dia tee PVC
38Providing two coats of snowcem of approved shade and make over old surface including washing, cleaning, sand papering the wall, scaffolding, curing and taxes all complete as per building specification & direction of E/I.
39Providing coarse clean sand in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150 mm thick with all leads and lifts including cost of all materials, labour, royalty and taxes all complete as per building specification and direction of E/I. (Mode of measurement-compacted volume).
40Providing designation 75 A one brick flat soling joints filled with local sand including cost of watering, taxes royalty all complete as per building specification and direction of E/I.
41Supplying materials and construction of brick masonry drain 150 mm width and 150mm depth with 250mm apron on both sides over 50mm thick P.C.C (1:3:6) over a brick flat soling, apron laying brick work in C.M (1:6). 12mm cement plaster (1:3) with punning on exposed surface all complete job as per specification and direction of E/l
42SANITARY INSTALLATION
43Providing 12 mm, cement plaster (1:6) with clean coarse sand of F.M 1.5 including screening, curing with all leads and lifts of water, scaffolding taxes and royalty all complete as per building specification and direction E/I.
44Providing P.C.C. M-150 in nominal mix of (1:2:4) in foundation with approved quality of stone chips 20 mm to 6 mm isgraded and clean coarse sand of F.M. 2.5 to 3 including screening, shuttering, mixing cement concrete in mixer and placing in position, vibrating, string, curing, taxes and royalty all complete as per building specification and direction of E/I.
45Providing designation 75 A Brick work in C. M. (1:6) in different places in sewer line with approved quality of clean coarse sand of F. M. 2 to 2.5 including do…..do…….all complete as per building specification and direction of E/I.
46Labour for scrapping old paint with paint remoter and below lamp as required on wooden or steel surface including cost of all labour and materials and scaffolding all complete as per balding specification and direction of E/I.
47Providing one coat of painting with ready mixed paint of approved shade and make over steel surface including cleaning the surface toughly, scaffolding and taxes all complete as per building specification and direction of E/I.
48Providing supplying,fitting and fixing of the followingmaterials in connection of latrine room. 25 mm dia PVC pipe .(Rate of PVC Pipe + Laying cost charge)
4915 mm diaPVC pipe.(Rate of PVC Pipe + Laying cost charge)
5025 x 25 x 15 mm PVC Tee
5125 mm dia PVC Coupler
5215 mm dia PVC Coupler
5325 mm dia PVC U/Socket
5415 mm dia FTA
5525 mm dia PVC Elbow
5615 mm diaPVC Elbow
57Providing and fixing 15 mm dia male ended C.I. bodybrass spindle valve and seat bib clock of approved quality (wt- Not less than 400 Gms. ) with extra socket all complete as per specification and direction E/I..
58Providingonecoats of oil bound distemper of approved shade and make over a coat of cement primer over new surface including preparing the plastered surface by rubbing month with pumice stone or fine sand paper applying putty wherever required scaffolding washing of floors and taxes all complete as per building specification tionand direction of E/I.
59Supplying of following materials. Mug
60Balti Plastic
61Supplying, fitting and fixing 20 gauge G.C.I sheet gate fitted on M.S angle frame of size60*60*6 mm including cost of fabrication, providing necessary locking arrangement with haskal and domny duly fixed in C/C(1:2:4) blocks of required size, applying a priming red lead paint over steel work, taxes all complete as per drawing specification and direction of E/I
62INDRAVARSHA
63Earth work in excavation for laying of pipe so as to give one meter (avg.) cover over the socket of pipe and back filling the trenches after laying of pipe, again a/w in excavation and taking out the laid pipeand back filling the same after the end ofShrawani Mela
64Earth work in back filling the trenches fatter laying different types and size of pipes with earth removed during excavation within initial lead and lift as per specification and direction E/I.
65Laying of 32 mm dia GI/PVC pipe in trenches and taking out the same. ( 2 x 20 Mtr.= 40 Mtr.)
66Supplying of 32 mm dia PVC pipe with socket in 3 M length do-do all complete.
67Laying & jointing GI/ PVC pipe in hanging position ovar support and taking out the same after and of Shrawani Mela ( pipe supplied departmentally free of cost). 32 mm dia. Pipe
6825 mm dia. Pipe
69Supplying and fixing GI fittings of approved make all complete as per specification and direction E/I. 32 mm Nipple
7032 mm Elbow
7132 mm U/S
7225 mm Plug
7325 mm Socket
7432 x 25 R.S.
7532 x 25 Elbow
7625 mm U/S
7732 mm Tee
78Electric welding of 15 mm dia x Nipple in 25 mm dia PVC pipe after making hole of 20 mm dia including cost ofnipple. In 32 mm dia. Pipe
79In 15 mm dia. GI Nipple
80Cost of 15 mm dia. GI. Socket
81Providing pump operator cum water spreaderfor operating motor and spreading water on laid sand.( 1 Nox 30 Days. 9:00AM to :00PM) Gr.-II
82Cost towards fitting & fixing submersible pump with clamp etc. all complete including lowering of PVC Pipe. 2H.P to 7.5 H.P and taking out after ending mela and deposited in departmental store deoghar.
83PEYAOO
84Providing two coats of oil bound distemper of approved shade and make over a coat of cement primer over old surface including preparing the plastered surface by rubbing smooth with pumice stone or fine sand paper applying putty wherever required scaffolding washing of floors and taxes all complete as per building specification tionand direction of E/I.
85Providing one coat of plastic emulsion paint of approved shade and make over old surface including washing, cleaning and preparing the walls, scaffolding, washing for floor and taxes all complete as per building specification and direction of E/I.
86Providing two coats of snowcem of approved shade and make over old surface including washing, cleaning, sand papering the wall, scaffolding, curing and taxes all complete as per building specification & direction of E/I.
87Providing and F/Fixing water supply arrangement from GI/ HDPE Tank to Peyaoo andBathing Palatform as per site condition including required fittings and pipe all complete including installation of HDPE water storage tank including carriage of tank from departmental store to work site. ( HDPE water storage tank will be supplied free of cost departmentally)
88Cost towards fitting & fixing submersible pump with clamp etc. all complete including lowering of PVC Pipe. 2H.P to 7.5 H.P and taking out after ending mela and deposited in departmental store deoghar.
89SPREADING WATER OVER LAID SAND
90Providing Labour tool and equipmentfor spreading water over laid sand at Kanwariya Path during Shrawani Mela. A) Cost of Flexible PVC pipe
91B) Labour Charge (Unskild Labour)
92Carriage ofall materials from store to work site and return back to work site to departmental store within a distance of 15KM .
93Cost towards electric consumption charge for to be paid to Electricity Board during shrawani mela .payable JSEB
94Carriage of materials fromkiln site or quarry site to work site including contractor profit, loading, unloading, transportation, etc. all complete. Bricks up to 15 K.M.
95Sand up to 15 K.M.
96Stone chips up to 15 K.M.
97Cement up to 15 K.M.
98Add GST @ 12%
99Add 1 % Labour Cess
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail