}

Supplying Of Materials, Tools , Plants And Skilled And Unskilled Man Power For Repairing And Maintenance Of Existing Structure And Fitting, Fixing All Works With Operation & Maintenance The Entire Works During Shrawani Mela 2022 At Dhawaghat To Near, deoghar-Jharkhand

Drinking Water And Sanitation Department has published Supplying Of Materials, Tools , Plants And Skilled And Unskilled Man Power For Repairing And Maintenance Of Existing Structure And Fitting, Fixing All Works With Operation & Maintenance The Entire Works During Shrawani Mela 2022 At Dhawaghat To Near. Submission Date for this Tender is 02-06-2022. Man Power Supply Tenders in deoghar Jharkhand. Bidders can get complete Tender details and download the document.




Tender Notice

32408422
Supplying Of Materials, Tools , Plants And Skilled And Unskilled Man Power For Repairing And Maintenance Of Existing Structure And Fitting, Fixing All Works With Operation & Maintenance The Entire Works During Shrawani Mela 2022 At Dhawaghat To Near
Open Tender
Indian
Jharkhand
deoghar
02-06-2022

Tender Details

Supplying Of Materials, Tools , Plants And Skilled And Unskilled Man Power For Repairing And Maintenance Of Existing Structure And Fitting, Fixing All Works With Operation & Maintenance The Entire Works During Shrawani Mela 2022 At Dhawaghat To Nearbank Prashashnik Bhawan ( Plant No.- 09 To Near Plant No-11 ) Under D.W & S. Division , Deoghar For The Year 2022-23Group No. Sm-D-05-2 Jungal Clearence Including Weeding Out Shrubs And Small Trees Up To 150 Mm Dia Girth And There Removalas Per Specification And Direction Of E / I. 3 Earth Work In Excavation In Foundation Trenches In Ordinary Soil ( Vide Classification Of Soil Item-B ) And Disposal Of Excavated Earth As Obtained To A Distance Up To 50 M Including All Lifts, Levelling, Ramming The Foundation Trenches, Removing Roots Of Trees Shrubs All Complete As Per Approved Design, Building Specification And Direction Of E / I. 4 Providing Coarse Clean Sand In Filling In Foundation Trenches Or In Plinth Including Ramming And Watering In Layers Not Exceeding 150Mm Thick With All Leads Including Cost Of Materials, Labours, Royalityand Taxes All Complete As Per Building Specification And Direction Of E / I. ( Mode Of Measurement-Compacted Volume ) . 5 Providing Designation 75 A One Brick Flat Soling Joints Filled With Local Sand Including Cost Of Watering, Taxes Royalty All Complete As Per Building Specification And Direction Of E / I. 6 Providing 25 Mm Thick First Class Patent Stone Flooring ( 1:2:4 ) With Stone Chips, In Two Layers, Bottom Layer 19 Mm Thick ( 1:2:4 ) With 12 Mm To 6 Mm Size Graded Stone Chips And Top Layer 6 Mm Thick ( 1:2 ) With 6 Mm Down Stone Chips In Panels, Including Cost Of Curing, Finishing The Surface Smooth By Rubbing With Carborun-Dum Stone, Taxes And Royalty All Complete As Per Building Specification And Direction Of E / I. 7 Supplying Materials And Construction Of Brick Masonry Drain 150 Mm Width And 150Mm Depth With 250Mm Apron On Both Sides Over 50Mm Thick P.C.C ( 1:3:6 ) Over A Brick Flat Soling, Apron Laying Brick Work In C.M ( 1:6 ) . 12Mm Cement Plaster ( 1:3 ) With Punning On Exposed Surface All Complete Job As Per Specification And Direction Of E / Lnear Plant No. -02 8 Dewatering The Existing Well In Kamariya Path Desilting The Rubbish Accumulate And Disposal Of Spoils To A Safe Distance Providing Alum & Bleaching Powder Etc. All Complete As Per Direction Of E / I.A. Dewatering:-5 H.P Diesel Pump 8 Hrs. Per Day 9 B.Supplying Equipment And Labour For Desilting The Well All Complete As Per Specification And Direction Of E / I. 10 Providing 12 Mm, Cement Plaster ( 1:6 ) With Clean Coarse Sand Of F.M 1-5 Including Screening, Curing With All Leads And Lifts Of Water, Scaffolding Taxes And Royalty All Complete As Per Building Specification And Direction E / I. 11 Providing Designation 75 A Brick Work In C.M. ( 1:6 ) In Foundation And Plinth With Approved Quality Of Clean Coarse Sand Of F.M. 2 To 2.5 Including Providing 10Mm Think Mortar Joints, Cost Of Screening Materials, Raking Out Joints Of 15Mm Depth, Curing Taxes And Royalty All Complete As Per Building Specification And Direction Of E / I 12 Supplying All Materials, Labour, Writing Name Of Department, Male & Female Directionon The Wall After Making Box By Good Quality Of Paint As Per Direction Of E / I. 160 Mm High Letter 13 Cost Towards Painting And Writing Slogan On Board 4’ X 3’ Size With Good Quality Paint Carrying And Fitting Fixing On Each Site Including Minor Repair Of Board Taking Back After Mela As Per Direction Of E / I. ( 150 Mm High Letter ) 14 Supplying All Materials Labour Doing Repairing Of Jet Pump Etc. All Complete Including Replacement Of Water Seal Etc. All Complete. 15 Cost Towards Fitting & Fixing Submersible Pump With Clamp Etc. All Complete Including Lowering Of Pvc Pipe. 2 H.P To 7.5H.P And Taking Out After Ending Mela And Deposited In Departmental Store Deoghar. 16 Cost Towards Dismantling After Mela And Taking Back To Work Site From Store Including Carriage Of All Materials And Pump, Water Tank Etc. All Complete. 17 Cost Towards Fittingfixing Jet Pump On Angle Fixed In Walls Of Well, Cutting And Making Good The Same As Per Direction Of E / I. ( With Clamp ) 18 Earth Work In Excavation For Laying Of Pipe So As To Give One Meter ( Avg. ) Cover Over The Socket Of Pipe And Back Filling The Trenches After Laying Of Pipe, Again A / W In Excavation And Taking Out The Laid Pipeand Back Filling The Same After The End Ofshrawani Mela. 19 Earth Work In Back Filling The Trenches Fatter Laying Different Types And Size Of Pipes With Earth Removed During Excavation Within Initial Lead And Lift As Per Specification And Direction E / I. 20 Laying Ofpvc Pipes Of Approved Make In Trenches With Red Lead And Yarn With Socket And Screw Joints And Cutting Pipe So Size And Threading Ends Where Necessary Etc. All Complete As Per Specification And Direction E / I. ( Pipes To Be Supplied Departmentally Free Of Cost ) . ( I ) 32 Mm Dia Pvc Pipe. ( 2 X 10.00 Mtr. = 20.00 Mtr. ) 21 ( Ii ) 25 Mm Dia Pvc Pipe. ( 2 X 9.00 Mtr. = 20.00 Mtr. ) 22 Laying Of Pvc Pipes Of Approved Make On Walland Roofwith Red Lead And Yarn With Socket And Screw Joints And Cutting Pipe So Size And Threading Ends Where Necessary Etc. All Complete In Wallas Per Specification And Direction E / I. ( Pipes To Be Supplied Departmentally Free Of Cost ) . ( I ) 15 Mm Dia Pvc Pipe – 23 ( I ) 20 Mm Dia Pvc Pipe – 24 ( Ii ) 25 Mm Dia Dia Pvc Pipe – 25 Cost Towards Engaging Pump Opratar Gr.Iicum Water Spreader On Laid Sand For Operating And Spreading Water On Sand Etc.All Complete Job. Gr.-Ii 26 Cost Towards Engagingplumber Andelectric Mistryduring Mela Periodincluding Contractor Profit. Plumbergr.-Ii 27 Electric Mistrygr.-Ii 28 Cost Towards Extra Materials Due To Damages During Taking Out Damage Cut Pieces Including Laboaur Cost As Per Direction Of E / I. In Walls / Trenches. 32 Mm Dia Pvc Pipe . ( Rate Of Pvc Pipe + Laying Cost Charge ) 29 25 Mm Dia Pvc Pipe ( Rate Of Pvc Pipe + Laying Cost Charge ) 30 15 Mm Dia Pvcpipe ( Rate Of Pvc Pipe + Laying Cost Charge ) 31 15 Mm Dia Pvc Elbow 32 32 Mm Dia Pvc U / S 33 25 Mm Dia Pvc U / S 34 25 X 25 X 15 Mm Dia Pvc Tee 35 15 Mm Dia Pvc Fta 36 15 Mm Dia Pvc Coupler 37 25 Mm Diapvc Coupler 38 32 Mm Diapvc Coupler 39 15 Mm Pvc Shower 40 15 Mm P.V.C Bib Cock 41 32 X 32 X 25 Mm Dia Tee Pvc 42 Sanitary Installation 43 Labour For Scrapping Old Paint With Paint Remoter And Below Lamp As Required On Wooden Or Steel Surface Including Cost Of All Labour And Materials And Scaffolding All Complete As Per Balding Specification And Direction Of E / I. 44 Providing One Coat Of Painting With Ready Mixed Paint Of Approved Shade And Make Over Steel Surface Including Cleaning The Surface Toughly, Scaffolding And Taxes All Complete As Per Building Specification And Direction Of E / I. 45 Providing 12 Mm, Cement Plaster ( 1:6 ) With Clean Coarse Sand Of F.M 1.5 Including Screening, Curing With All Leads And Lifts Of Water, Scaffolding Taxes And Royalty All Complete As Per Building Specification And Direction E / I. 46 Providing Designation 75 A Brick Work In C.M. ( 1:6 ) In Foundation And Plinth With Approved Quality Of Clean Coarse Sand Of F.M. 2 To 2.5 Including Providing 10Mm Think Mortar Joints, Cost Of Screening Materials, Raking Out Joints Of 15Mm Depth, Curing Taxes And Royalty All Complete As Per Building Specification And Direction Of E / I 47 Providing And F / Fixing Water Supply Arrangement From Gi / Hdpe Tank To Peyaoo Andbathing Palatform As Per Site Condition Including Required Fittings And Pipe All Complete Including Installation Of Hdpe Water Storage Tank Including Carriage Of Tank From Departmental Store To Work Site. ( Hdpe Water Storage Tank Will Be Supplied Free Of Cost Departmentally ) 48 Providing Supplying, Fitting And Fixing Of The Followingmaterials In Connection Of Latrine Room. 25 Mm Dia Pvc Pipe . ( Rate Of Pvc Pipe + Laying Cost Charge ) 49 15 Mm Diapvc Pipe. ( Rate Of Pvc Pipe + Laying Cost Charge ) 50 25 X 25 X 15 Mm Pvc Tee 51 25 Mm Dia Pvc Coupler 52 15 Mm Dia Pvc Coupler 53 25 Mm Dia Pvc U / Socket 54 15 Mm Dia Fta 55 25 Mm Dia Pvc Elbow 56 15 Mm Diapvc Elbow 57 Providing And Fixing 15 Mm Dia Male Ended C.I. Bodybrass Spindle Valve And Seat Bib Clock Of Approved Quality ( Wt- Not Less Than 400 Gms. ) With Extra Socket All Complete As Per Specification And Direction E / I.. 58 Providing One Coat Of Oil Bound Distemper Of Approved Shade And Make Over A Coat Of Cement Primer Over New Surface Including Preparing The Plastered Surface By Rubbing Month With Pumice Stone Or Fine Sand Paper Applying Putty Wherever Required Scaffolding Washing Of Floors And Taxes All Complete As Per Building Specification Tionand Direction Of E / I. 59 Supplying Of Following Materials. Mug 60 Plasticbucket 61 Providing Coarse Clean Sand In Filling In Foundation Trenches Or In Plinth Including Ramming And Watering In Layers Not Exceeding 150 Mm Thick With All Leads And Lifts Including Cost Of All Materials, Labour, Royalty And Taxes All Complete As Per Building Specification And Direction Of E / I. ( Mode Of Measurement-Compacted Volume ) . 62 Providing Designation 75 A One Brick Flat Soling Joints Filled With Local Sand Including Cost Of Watering, Taxes Royalty All Complete As Per Building Specification And Direction Of E / I. 63 Dismantling Pucca Brick Or Lime Work Including Stacking Serviceable Materials In Countable Stacks Within 15 M Lead And Disposal Of Unserviceable Materials With All Leads All Complete As Per Direction Of E / I. 64 Providing R.C.C. With Nominal Mix Of ( 1:1.5:3 ) In Stiffeners With Approved Quality Of Stone Chips 20 Mm To 6 Mm Size Graded And Clean Coarse Sand Of F.M. 2.5 To 3 Including Shuttering, Mixing Cement Concrete In Mixer And Placing In Position, Vibrating, Striking, Curing ( But Excluding The Cost Of Reinforcement ) , Taxes And Royalty All Complete As Per Building Specification And Direction Of E / I. 65 Providing T.M.T Steel Reinforcement Of Different Dia Rods As Per Approved Design And Drawing Including Carriage Of M.S Bars To Work Site, Cutting Bending And Binding With Annealed Wire With Cost Of Wire, Removal Of Rust, Placing The Rods In Position All Complete As Per Building Specification And Direction Of E / I. 66 Providing 12 Mm Cement Plaster ( 1:3 ) With Clean Coarse Sand Of F.M. 1.5 Including Cost Of Screening, Curing With All Leads And Lifts Of Water, Scaffolding, Taxes And Royalty All Complete As Per Building Specification And Direction Of E / I. 67 Supplying, Fitting And Fixing 20 Gauge G.C.I Sheet Gate Fitted On M.S Angle Frame Of Size60*60*6 Mm Including Cost Of Fabrication, Providing Necessary Locking Arrangement With Haskal And Domny Duly Fixed In C / C ( 1:2:4 ) Blocks Of Required Size, Applying A Priming Red Lead Paint Over Steel Work, Taxes All Complete As Per Drawing Specification And Direction Of E / I 68 Indravarsha 69 Earth Work In Excavation For Laying Of Pipe So As To Give One Meter ( Avg. ) Cover Over The Socket Of Pipe And Back Filling The Trenches After Laying Of Pipe, Again A / W In Excavation And Taking Out The Laid Pipeand Back Filling The Same After The End Ofshrawani Mela 70 Earth Work In Back Filling The Trenches Fatter Laying Different Types And Size Of Pipes With Earth Removed During Excavation Within Initial Lead And Lift As Per Specification And Direction E / I. 71 Laying Of 32 Mm Dia Gi / Pvc Pipe In Trenches And Taking Out The Same. ( 2 X 132.00 Mtr. ) 72 Supplying Of 32 Mm Dia Pvc Pipe With Socket In 3 M Length Do-Do All Complete. 73 Laying & Jointing Gi / Pvc Pipe In Hanging Position Ovar Support And Taking Out The Same After And Of Shrawani Mela ( Pipe Supplied Departmentally Free Of Cost ) . A. 32 Mm Dia.Pipe 74 B. 25 Mm Dia. Pipe 75 Supplying And Fixing Gi Fittings Of Approved Make All Complete As Per Specification And Direction E / I. 32 Mm U / S 76 25 Mm Socket 77 32 X 25 R.S. 78 32 X 25 Elbow 79 25 Mm U / S 80 32 Mm Tee 81 Electric Welding Of 15 Mm Dia X Nipple In 25 Mm Dia Gipipe After Making Hole Of 20 Mm Dia Including Cost Ofnipple.In 32 Mm Dia. Pipe 82 In 15 Mm Dia. Gi Nipple 83 Cost Of 15 Mm Dia. Gi. Socket 84 Cost Towards Fitting & Fixing Submersible Pump With Clamp Etc. All Complete Including Lowering Of Pvc Pipe. 2H.P To 7.5 H.P And Taking Out After Ending Mela And Deposited In Departmental Store Deoghar. 85 Providing Pump Operator Cum Water Spreaderfor Operating Motor And Spreading Water On Laid Sand. Gr.-Ii ( 1 No.X 30 Days ) 9:00 Am To 5:00Pm 86 Peyaoo 87 Providing Two Coats Of Oil Bound Distemper Of Approved Shade And Make Over A Coat Of Cement Primer Over Old Surface Including Preparing The Plastered Surface By Rubbing Smooth With Pumice Stone Or Fine Sand Paper Applying Putty Wherever Required Scaffolding Washing Of Floors And Taxes All Complete As Per Building Specification Tionand Direction Of E / I. 88 Providing One Coat Of Plastic Emulsion Paint Of Approved Shade And Make Over Old Surface Including Washing, Cleaning And Preparing The Walls, Scaffolding, Washing For Floor And Taxes All Complete As Per Building Specification And Direction Of E / I. 89 Providing Two Coats Of Snowcem Of Approved Shade And Make Over Old Surface Including Washing, Cleaning, Sand Papering The Wall, Scaffolding, Curing And Taxes All Complete As Per Building Specification & Direction Of E / I. 90 Providing And F / Fixing Water Supply Arrangement From Gi / Hdpe Tank To Peyaoo Andbathing Palatform As Per Site Condition Including Required Fittings And Pipe All Complete Including Installation Of Hdpe Water Storage Tank Including Carriage Of Tank From Departmental Store To Work Site. ( Hdpe Water Storage Tank Will Be Supplied Free Of Cost Departmentally ) 91 Spreading Water Over Laid Sand 92 Providing Labour Tool And Equipmentfor Spreading Water Over Laid Sand At Kanwariya Path During Shrawani Mela. A ) Cost Of Flexible Pvc Pipe 93 B ) Labour Charge For1 Place X 30 Dasys ( Unskild Labour ) 94 Carriage Ofall Materials From Store To Work Site And Return Back To Work Site To Departmental Store Within A Distance Of 15Km . 95 Cost Towards Electric Consumption Charge For To Be Paid To Electricity Board During Shrawani Mela .Payable Jseb 96 Carriage Of Materials Fromkiln Site Or Quarry Site To Work Site Including Contractor Profit, Loading, Unloading, Transportation, Etc. All Complete. Bricks Up To 15 K.M. 97 Sand Up To 15 K.M. 98 Stone Chips Up To 15 K.M. 99 Cement Up To 15 K.M. 100 Steel Up To 15 K.M. 101 Add Gst @ 12% 102 Add 1 % Labour Cess

Key Value

Document Fees
INR 750 /-
EMD
INR 9000.0 /-
Tender Value
INR 4.37 Lakhs /-

BOQ Items

Name of Work: Supplying of materials, tools , plants and skilled and unskilled man power for repairing and maintenance of existing structure and fitting, fixing all works with operation & maintenance the entire works during Shrawani Mela 2022 at Dhawaghat to nearBank Prashashnik Bhawan (Plant No.- 09 to near Plant No-11) under D.W & S. division , Deoghar for the year 2022-23 Group No. SM-D-05
Sl. No. Item Description
1WATER SUPPLY
2Jungal clearence including weeding out shrubs and small trees up to 150 mm dia girth and there removalas per specification and direction of E/I.
3Earth work in excavation in foundation trenches in ordinary soil (vide classification of soil item-B ) and disposal of excavated earth as obtained to a distance up to 50 m including all lifts,levelling,ramming the foundation trenches, removing roots of trees shrubs all complete as per approved design, building specification and direction of E/I.
4Providing coarse clean sand in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads including cost of materials,labours,royalityand taxes all complete as per building specification and direction of E/I.(Mode of measurement-compacted volume).
5Providing designation 75 A one brick flat soling joints filled with local sand including cost of watering, taxes royalty all complete as per building specification and direction of E/I.
6Providing 25 mm thick first class patent stone flooring (1:2:4) with stone chips,in two layers, bottom layer 19 mm thick (1:2:4) with 12 mm to 6 mm size graded stone chips and top layer 6 mm thick (1:2) with 6 mm down stone chips in panels,including cost of curing, finishing the surface smooth by rubbing with carborun-dum stone,taxes and royalty all complete as per building specification and direction of E/I.
7Supplying materials and construction of brick masonry drain 150 mm width and 150mm depth with 250mm apron on both sides over 50mm thick P.C.C (1:3:6) over a brick flat soling, apron laying brick work in C.M (1:6). 12mm cement plaster (1:3) with punning on exposed surface all complete job as per specification and direction of E/lNear Plant No. -02
8Dewatering the existing well in Kamariya Path desilting the rubbish accumulate and disposal of spoils to a safe distance providing alum & bleaching powder etc. all complete as per direction of E/I.A. Dewatering:-5 H.P diesel pump 8 Hrs. Per day
9B.Supplying equipment and labour for desilting the well all complete as per specification and direction of E/I.
10Providing 12 mm, cement plaster (1:6) with clean coarse sand of F.M 1-5 including screening, curing with all leads and lifts of water, scaffolding taxes and royalty all complete as per building specification and direction E/I.
11Providing designation 75 A brick work in C.M.(1:6) in foundation and plinth with approved quality of clean coarse sand of F.M. 2 to 2.5 including providing 10mm think mortar joints, cost of screening materials, raking out joints of 15mm depth, curing taxes and royalty all complete as per building specification and direction of E/I
12Supplying all materials, labour, writing name of department, male & female directionon the wall after making box by good quality of paint as per direction of E/I. 160 mm high letter
13Cost towards painting and writing slogan on board 4’ x 3’ size with good quality paint carrying and fitting fixing on each site including Minor repair of board taking back after Mela as per direction of E/I.(150 mm high letter)
14Supplying all materials labour doing repairing of jet pump etc. all complete including replacement of water seal etc. all complete.
15Cost towards fitting & fixing submersible pump with clamp etc. all complete including lowering of PVC Pipe. 2 H.P to 7.5H.P and taking out after ending mela and deposited in departmental store deoghar.
16Cost towards dismantling after mela and taking back to work site from store including carriage of all materials and pump, water tank etc. all complete.
17Cost towards fittingfixing jet pump on angle fixed in walls of well, cutting and making good the same as per direction of E/I. (with clamp)
18Earth work in excavation for laying of pipe so as to give one meter (avg.) cover over the socket of pipe and back filling the trenches after laying of pipe, again a/w in excavation and taking out the laid pipeand back filling the same after the end ofShrawani Mela.
19Earth work in back filling the trenches fatter laying different types and size of pipes with earth removed during excavation within initial lead and lift as per specification and direction E/I.
20Laying ofPVC pipes of approved make in trenches with red lead and yarn with socket and screw joints and cutting pipe so size and threading ends where necessary etc. all complete as per specification and direction E/I. (Pipes to be supplied departmentally free of cost).(i) 32 mm dia PVC pipe. ( 2 x 10.00 Mtr. = 20.00 Mtr.)
21(ii) 25 mm dia PVC pipe. ( 2 x 9.00 Mtr. = 20.00 Mtr.)
22Laying of PVC pipes of approved make on walland roofwith red lead and yarn with socket and screw joints and cutting pipe so size and threading ends where necessary etc. all complete in wallas per specification and direction E/I. (Pipes to be supplied departmentally free of cost). (i) 15 mm dia PVC pipe –
23(i) 20 mm dia PVC pipe –
24(ii) 25 mm dia dia PVC pipe –
25Cost towards engaging Pump Opratar Gr.IIcum water spreader on laid sand for operating and spreading water on sand etc.all complete job. Gr.-II
26Cost towards engagingPlumber andElectric mistryduring Mela periodincluding contractor profit. PlumberGr.-II
27Electric mistryGr.-II
28Cost towards extra materials due to damages during taking out damage cut pieces including laboaur cost as per direction of E/I. in walls/trenches. 32 mm dia PVC pipe .( Rate of PVC Pipe + Laying cost charge )
2925 mm dia PVC Pipe ( Rate of PVC Pipe + Laying cost charge )
3015 mm dia PVCPipe ( Rate of PVC Pipe + Laying cost charge )
3115 mm dia PVC Elbow
3232 mm dia PVC U/S
3325 mm dia PVC U/S
3425 x 25 x 15 mm dia PVC Tee
3515 mm dia PVC FTA
3615 mm dia PVC Coupler
3725 mm diaPVC Coupler
3832 mm diaPVC Coupler
3915 mm PVC Shower
4015 mm P.V.C Bib Cock
4132 x 32 x 25 mm dia tee PVC
42SANITARY INSTALLATION
43Labour for scrapping old paint with paint remoter and below lamp as required on wooden or steel surface including cost of all labour and materials and scaffolding all complete as per balding specification and direction of E/I.
44Providing one coat of painting with ready mixed paint of approved shade and make over steel surface including cleaning the surface toughly, scaffolding and taxes all complete as per building specification and direction of E/I.
45Providing 12 mm, cement plaster (1:6) with clean coarse sand of F.M 1.5 including screening, curing with all leads and lifts of water, scaffolding taxes and royalty all complete as per building specification and direction E/I.
46Providing designation 75 A brick work in C.M.(1:6) in foundation and plinth with approved quality of clean coarse sand of F.M. 2 to 2.5 including providing 10mm think mortar joints, cost of screening materials, raking out joints of 15mm depth, curing taxes and royalty all complete as per building specification and direction of E/I
47Providing and F/Fixing water supply arrangement from GI/ HDPE Tank to Peyaoo andBathing Palatform as per site condition including required fittings and pipe all complete including installation of HDPE water storage tank including carriage of tank from departmental store to work site. ( HDPE water storage tank will be supplied free of cost departmentally)
48Providing supplying,fitting and fixing of the followingmaterials in connection of latrine room. 25 mm dia PVC pipe .(Rate of PVC Pipe + Laying cost charge)
4915 mm diaPVC pipe.(Rate of PVC Pipe + Laying cost charge)
5025 x 25 x 15 mm PVC Tee
5125 mm dia PVC Coupler
5215 mm dia PVC Coupler
5325 mm dia PVC U/Socket
5415 mm dia FTA
5525 mm dia PVC Elbow
5615 mm diaPVC Elbow
57Providing and fixing 15 mm dia male ended C.I. bodybrass spindle valve and seat bib clock of approved quality (wt- Not less than 400 Gms. ) with extra socket all complete as per specification and direction E/I..
58Providing one coat of oil bound distemper of approved shade and make over a coat of cement primer over new surface including preparing the plastered surface by rubbing month with pumice stone or fine sand paper applying putty wherever required scaffolding washing of floors and taxes all complete as per building specification tionand direction of E/I.
59Supplying of following materials. Mug
60PlasticBucket
61Providing coarse clean sand in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150 mm thick with all leads and lifts including cost of all materials, labour, royalty and taxes all complete as per building specification and direction of E/I. (Mode of measurement-compacted volume).
62Providing designation 75 A one brick flat soling joints filled with local sand including cost of watering, taxes royalty all complete as per building specification and direction of E/I.
63Dismantling pucca brick or lime work including stacking serviceable materials in countable stacks within 15 M lead and disposal of unserviceable materials with all leads all complete as per direction of E/I.
64Providing R.C.C. with nominal mix of (1:1.5:3) in stiffeners with approved quality of stone chips 20 mm to 6 mm size graded and clean coarse sand of F.M. 2.5 to 3 including shuttering, mixing cement concrete in mixer and placing in position, vibrating, striking, curing (but excluding the cost of reinforcement), taxes and royalty all complete as per building specification and direction of E/I.
65Providing T.M.T steel reinforcement of different dia rods as per approved design and drawing including carriage of M.S bars to work site, cutting bending and binding with annealed wire with cost of wire, removal of rust, placing the rods in position all complete as per building specification and direction of E/I.
66Providing 12 mm cement plaster (1:3) with clean coarse sand of F.M. 1.5 including cost of screening, curing with all leads and lifts of water, scaffolding, taxes and royalty all complete as per building specification and direction of E/I.
67Supplying, fitting and fixing 20 gauge G.C.I sheet gate fitted on M.S angle frame of size60*60*6 mm including cost of fabrication, providing necessary locking arrangement with haskal and domny duly fixed in C/C(1:2:4) blocks of required size, applying a priming red lead paint over steel work, taxes all complete as per drawing specification and direction of E/I
68INDRAVARSHA
69Earth work in excavation for laying of pipe so as to give one meter (avg.) cover over the socket of pipe and back filling the trenches after laying of pipe, again a/w in excavation and taking out the laid pipeand back filling the same after the end ofShrawani Mela
70Earth work in back filling the trenches fatter laying different types and size of pipes with earth removed during excavation within initial lead and lift as per specification and direction E/I.
71Laying of 32 mm dia GI/PVC pipe in trenches and taking out the same. ( 2 x 132.00 Mtr.)
72Supplying of 32 mm dia PVC pipe with socket in 3 M length do-do all complete.
73Laying & jointing GI/ PVC pipe in hanging position ovar support and taking out the same after and of Shrawani Mela ( pipe supplied departmentally free of cost). a. 32 mm dia.Pipe
74b. 25 mm dia. Pipe
75Supplying and fixing GI fittings of approved make all complete as per specification and direction E/I. 32 mm U/S
7625 mm Socket
7732 x 25 R.S.
7832 x 25 Elbow
7925 mm U/S
8032 mm Tee
81Electric welding of 15 mm dia x Nipple in 25 mm dia GIpipe after making hole of 20 mm dia including cost ofnipple.In 32 mm dia. Pipe
82In 15 mm dia. GI Nipple
83Cost of 15 mm dia. GI. Socket
84Cost towards fitting & fixing submersible pump with clamp etc. all complete including lowering of PVC Pipe. 2H.P to 7.5 H.P and taking out after ending mela and deposited in departmental store deoghar.
85Providing pump operator cum water spreaderfor operating motor and spreading water on laid sand. Gr.-II (1 No.x 30 Days) 9:00 AM to 5:00PM
86PEYAOO
87Providing two coats of oil bound distemper of approved shade and make over a coat of cement primer over old surface including preparing the plastered surface by rubbing smooth with pumice stone or fine sand paper applying putty wherever required scaffolding washing of floors and taxes all complete as per building specification tionand direction of E/I.
88Providing one coat of plastic emulsion paint of approved shade and make over old surface including washing, cleaning and preparing the walls, scaffolding, washing for floor and taxes all complete as per building specification and direction of E/I.
89Providing two coats of snowcem of approved shade and make over old surface including washing, cleaning, sand papering the wall, scaffolding, curing and taxes all complete as per building specification & direction of E/I.
90Providing and F/Fixing water supply arrangement from GI/ HDPE Tank to Peyaoo andBathing Palatform as per site condition including required fittings and pipe all complete including installation of HDPE water storage tank including carriage of tank from departmental store to work site. ( HDPE water storage tank will be supplied free of cost departmentally)
91SPREADING WATER OVER LAID SAND
92Providing Labour tool and equipmentfor spreading water over laid sand at Kanwariya Path during Shrawani Mela. A) Cost of Flexible PVC pipe
93B) Labour Charge for1 Place x 30 Dasys (Unskild Labour)
94Carriage ofall materials from store to work site and return back to work site to departmental store within a distance of 15KM .
95Cost towards electric consumption charge for to be paid to Electricity Board during shrawani mela .payable JSEB
96Carriage of materials fromkiln site or quarry site to work site including contractor profit, loading, unloading, transportation, etc. all complete. Bricks up to 15 K.M.
97Sand up to 15 K.M.
98Stone chips up to 15 K.M.
99Cement up to 15 K.M.
100Steel up to 15 K.M.
101Add GST @ 12%
102Add 1 % Labour Cess
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail