}

Supplying Of Materials, Tools , Plants And Skilled And Unskilled Man Power For Repairing And Maintenance Of Existing Structure And Fitting, Fixing All Works With Operation & Maintenance The Entire Works During Shrawani Mela Atbank Prashashnik Bhawan, deoghar-Jharkhand

Drinking Water And Sanitation Department has published Supplying Of Materials, Tools , Plants And Skilled And Unskilled Man Power For Repairing And Maintenance Of Existing Structure And Fitting, Fixing All Works With Operation & Maintenance The Entire Works During Shrawani Mela Atbank Prashashnik Bhawan. Submission Date for this Tender is 02-06-2022. Man Power Supply Tenders in deoghar Jharkhand. Bidders can get complete Tender details and download the document.




Tender Notice

32408413
Supplying Of Materials, Tools , Plants And Skilled And Unskilled Man Power For Repairing And Maintenance Of Existing Structure And Fitting, Fixing All Works With Operation & Maintenance The Entire Works During Shrawani Mela Atbank Prashashnik Bhawan
Open Tender
Indian
Jharkhand
deoghar
02-06-2022

Tender Details

Supplying Of Materials, Tools , Plants And Skilled And Unskilled Man Power For Repairing And Maintenance Of Existing Structure And Fitting, Fixing All Works With Operation & Maintenance The Entire Works During Shrawani Mela Atbank Prashashnik Bhawanto Near Sarasani ( Plant No.- 11 To Near Plant No-13 ) Under D.W & S. Division , Deoghar For The Year 2022-23Group No. Sm-D-06-2 Jungal Clearence Including Weeding Out Shrubs And Small Trees Up To 150 Mm Dia Girth And There Removalas Per Specification And Direction Of E / I. 3 Column Of Bank Plantearth Work In Excavation In Foundation Trenches In Ordinary Soil ( Vide Classification Of Soil Item-B ) And Disposal Of Excavated Earth As Obtained To A Distance Up To 50 M Including All Lifts, Levelling, Ramming The Foundation Trenches, Removing Roots Of Trees Shrubs All Complete As Per Approved Design, Building Specification And Direction Of E / I. 4 Providing Coarse Clean Sand In Filling In Foundation Trenches Or In Plinth Including Ramming And Watering In Layers Not Exceeding 150Mm Thick With All Leads Including Cost Of Materials, Labours, Royalityand Taxes All Complete As Per Building Specification And Direction Of E / I. 5 Providing Designation 75 A One Brick Flat Soling Joints Filled With Local Sand Including Cost Of Watering, Taxes Royalty All Complete As Per Building Specification And Direction Of E / I. 6 Reinforced Cement Concree Work In Walls ( Any Thickness ) Including Attached Pilasters, Buttresses Plinth And Tring Course, Fillets, Columns, Pillars, Piers, Abutment, Posts And Struts Etc. Above Plinth Level Up To Floor Five Level Excluding Cost Of Centring, Shutteringfinishing And Reinforcement. :1.5:3 ( 3 Graded Stone Aggregate 20Mm Nominal Size ) 7 Providing T.M.T Steel Reinforcement Of Different Dia Rods As Per Approved Design And Drawing Including Carriage Of M.S Bars To Work Site, Cutting Bending And Binding With Annealed Wire With Cost Of Wire, Removal Of Rust, Placing The Rods In Position All Complete As Per Building Specification And Direction Of E / I. 8 Dismantling Patent Stone Flooring Including Stacking Serviceable Materials In Countable Stacks Within 15 M Lead And Disposal Of Unserviceable Materials With All Leads All Complete As Per Direction Of E / I. 9 Providing 25 Mm Thick First Class Patent Stone Flooring ( 1:2:4 ) With Stone Chips, In Two Layers, Bottom Layer 19 Mm Thick ( 1:2:4 ) With 12 Mm To 6 Mm Size Graded Stone Chips And Top Layer 6 Mm Thick ( 1:2 ) With 6 Mm Down Stone Chips In Panels, Including Cost Of Curing, Finishing The Surface Smooth By Rubbing With Carborun-Dum Stone, Taxes And Royalty All Complete As Per Building Specification And Direction Of E / I. 10 Providing 12 Mm, Cement Plaster ( 1:6 ) With Clean Coarse Sand Of F.M 1-5 Including Screening, Curing With All Leads And Lifts Of Water, Scaffolding Taxes And Royalty All Complete As Per Building Specification And Direction E / I. 11 Providing Designation 75 A Brick Work In C.M. ( 1:6 ) In Foundation And Plinth With Approved Quality Of Clean Coarse Sand Of F.M. 2 To 2.5 Including Providing 10Mm Think Mortar Joints, Cost Of Screening Materials, Raking Out Joints Of 15Mm Depth, Curing Taxes And Royalty All Complete As Per Building Specification And Direction Of E / I 12 Supplying All Materials, Labour, Writing Name Of Department, Male & Female Directionon The Wall After Making Box By Good Quality Of Paint As Per Direction Of E / I. 160 Mm High Letter 13 Cost Towards Painting And Writing Slogan On Board 4’ X 3’ Size With Good Quality Paint Carrying And Fitting Fixing On Each Site Including Minor Repair Of Board Taking Back After Mela As Per Direction Of E / I. ( 150 Mm High Letter ) 14 Cost Towards Fitting & Fixing Submersible Pump With Clamp Etc. All Complete Including Lowering Of Pvc Pipe. 2 H.P To 7.5H.P And Taking Out After Ending Mela And Deposited In Departmental Store Deoghar. 15 Cost Towards Dismantling After Mela And Taking Back To Work Site From Store Including Carriage Of All Materials And Pump, Water Tank Etc. All Complete. 16 Cost Towards Fittingfixing Jet Pump On Angle Fixed In Walls Of Well, Cutting And Making Good The Same As Per Direction Of E / I. ( With Clamp ) 17 Earth Work In Excavation For Laying Of Pipe So As To Give One Meter ( Avg. ) Cover Over The Socket Of Pipe And Back Filling The Trenches After Laying Of Pipe, Again A / W In Excavation And Taking Out The Laid Pipeand Back Filling The Same After The End Ofshrawani Mela. 18 Earth Work In Back Filling The Trenches Fatter Laying Different Types And Size Of Pipes With Earth Removed During Excavation Within Initial Lead And Lift As Per Specification And Direction E / I. 19 Laying Of Pvc Pipes Of Approved Make In Trenches With Red Lead And Yarn With Socket And Screw Joints And Cutting Pipe So Size And Threading Ends Where Necessary Etc. All Complete As Per Specification And Direction E / I. ( Pipes To Be Supplied Departmentally Free Of Cost And Taken Out The Same After Mela ) . ( I ) 32 Mm Dia Pvc Pipe. ( 2 X 20.00 Mtr. = 40 Mtr. ) 20 ( Ii ) 25 Mm Dia Pvc Pipe. ( 2 X 15.00 Mtr. = 30 Mtr. ) 21 Laying Of Pvc Pipes Of Approved Make On Walland Roofwith Red Lead And Yarn With Socket And Screw Joints And Cutting Pipe So Size And Threading Ends Where Necessary Etc. All Complete In Wallas Per Specification And Direction E / I. ( Pipes To Be Supplied Departmentally Free Of Cost ) . ( I ) 15 Mm Dia Pvc Pipe ( 2 X 15.00 Mtr. = 30 Mtr. ) 22 ( I ) 20 Mm Dia Pvc Pipe ( 2 X 10.00 Mtr. = 20 Mtr. ) 23 ( Ii ) 25 Mm Dia Dia Pvc Pipe ( 2 X 3.00 Mtr. = 30 Mtr. ) 24 Cost Towards Engaging Pump Operatarcum Water Spreader On Laid Sand For Operating And Spreading Water On Sand Etc.All Complete Job. Gr.-Ii 25 Cost Towards Engagingplumber Andelectric Mistryduring Mela Periodincluding Contractor Profit. Plumber Gr.-Ii 26 Electric Mistrygr.-Ii 27 Cost Towards Extra Materials Due To Damages During Taking Out Damage Cut Pieces Including Laboaur Cost As Per Direction Of E / I. In Walls / Trenches. 32 Mm Dia Pvc Pipe. ( Rate Of Pvc Pipe + Laying Cost Charge ) 28 25 Mm Dia Pvc Pipe. ( Rate Of Pvc Pipe + Laying Cost Charge ) 29 15 Mm Diapvc Pipe. ( Rate Of Pvc Pipe + Laying Cost Charge ) 30 32 Mm Dia Pvc Elbow 31 25 Mm Dia Pvcelbow 32 15 Mm Dia Pvc Elbow 33 32 Mm Dia U / S Pvc 34 25 Mm Dia U / S Pvc 35 25 X 25 X 15 Mm Dia Reducing Tee Pvc 36 15 Mm Dia Pvc Fta 37 15 Mm Dia Pvc Coupler 38 25 Mm Diapvc Coupler 39 32 Mm Diapvc Coupler 40 15 Mm Pvc Shower 41 15 Mm P.V.C Bib Cock 42 32 X 32 X 25 Mm Dia Tee Pvc 43 Sanitary Installation 44 Labour For Scrapping Old Paint With Paint Remoter And Below Lamp As Required On Wooden Or Steel Surface Including Cost Of All Labour And Materials And Scaffolding All Complete As Per Balding Specification And Direction Of E / I. 45 Providing One Coat Of Painting With Ready Mixed Paint Of Approved Shade And Make Over Steel Surface Including Cleaning The Surface Toughly, Scaffolding And Taxes All Complete As Per Building Specification And Direction Of E / I. 46 Providing 12 Mm, Cement Plaster ( 1:6 ) With Clean Coarse Sand Of F.M 1.5 Including Screening, Curing With All Leads And Lifts Of Water, Scaffolding Taxes And Royalty All Complete As Per Building Specification And Direction E / I. 47 Providing Designation 75 A Brick Work In C.M. ( 1:6 ) In Foundation And Plinth With Approved Quality Of Clean Coarse Sand Of F.M. 2 To 2.5 Including Providing 10Mm Think Mortar Joints, Cost Of Screening Materials, Raking Out Joints Of 15Mm Depth, Curing Taxes And Royalty All Complete As Per Building Specification And Direction Of E / I 48 Providing Supplying, Fitting And Fixing Of The Followingmaterials In Connection Of Latrine Room. 25 Mm Dia Pvc Pipe . ( Rate Of Pvc Pipe + Laying Cost Charge ) 49 15 Mm Diapvc Pipe. ( Rate Of Pvc Pipe + Laying Cost Charge ) 50 25 X 25 X 15 Mm Pvc Tee 51 25 Mm Dia Pvc Coupler 52 15 Mm Dia Pvc Coupler 53 25 Mm Dia Pvc U / Socket 54 25 Mm Dia Fta 55 15 Mm Dia Fta 56 25 Mm Dia Pvc Elbow 57 15 Mm Diapvc Elbow 58 Providing And Fixing 15 Mm Dia Male Ended C.I. Bodybrass Spindle Valve And Seat Bib Clock Of Approved Quality ( Wt- Not Less Than 400 Gms. ) With Extra Socket All Complete As Per Specification And Direction E / I.. 59 Providing Onecoat Of Oil Bound Distemper Of Approved Shade And Make Over Old Surface Including Washing, Cleaning And Papering The Walls, Scaffolding, Washing Of Floors And Taxes All Complete As Per Building Specification And Direction Of E / I. 60 Supplying Of Following Materials.Mug 61 Plasticbucket 62 Supplying And Filling Stone Dust Around Urinal And Bathing Area Ls 63 Supplying, Fitting And Fixing 20 Gauge G.C.I Sheet Gate Fitted On M.S Angle Frame Of Size60*60*6 Mm Including Cost Of Fabrication, Providing Necessary Locking Arrangement With Haskal And Domny Duly Fixed In C / C ( 1:2:4 ) Blocks Of Required Size, Applying A Priming Red Lead Paint Over Steel Work, Taxes All Complete As Per Drawing Specification And Direction Of E / I 64 Indravarsha 65 Earth Work In Excavation For Laying Of Pipe So As To Give One Meter ( Avg. ) Cover Over The Socket Of Pipe And Back Filling The Trenches After Laying Of Pipe, Again A / W In Excavation And Taking Out The Laid Pipeand Back Filling The Same After The End Ofshrawani Mela 66 Earth Work In Back Filling The Trenches Fatter Laying Different Types And Size Of Pipes With Earth Removed During Excavation Within Initial Lead And Lift As Per Specification And Direction E / I. 67 Laying Of 32 Mm Dia Gi / Pvc Pipe In Trenches And Taking Out The Same. ( 2 X 236.00 Mtr. ) 68 Supplying Of 32 Mm Dia Pvc Pipe With Socket In 3 M Length Do-Do All Complete. 69 Laying & Jointinggi / Pvc Pipe In Hanging Position Ovar Support And Taking Out The Same After And Of Shrawani Mela ( Pipe Supplied Departmentally Free Of Cost ) .A. 32 Mm Dia.Pipe 70 B. 25 Mm Dia. Pipe 71 Supplying And Fixing Gifittings Of Approved Make All Complete As Per Specification And Direction E / I. 32 Mm Elbow 72 32 Mm U / S 73 25 Mm Plug 74 25 Mm Socket 75 32 X 25 R.S. 76 32 X 25 Elbow 77 25 Mm U / S 78 32 Mm Tee 79 Electric Welding Of 15 Mm Dia X Nipple In 25 Mm Diagipipe After Making Hole Of 20 Mm Dia Including Cost Ofnipple. In 25Mm Dia. Pipe 80 In 15 Mm Dia. Gi Nipple 81 Cost Of 15 Mm Dia. Gi. Socket 82 Cost Towards Fitting & Fixing Submersible Pump With Clamp Etc. All Complete Including Lowering Of Pvc Pipe. 2H.P To 7.5 H.P And Taking Out After Ending Mela And Deposited In Departmental Store Deoghar. 83 Providing Pump Operator Cum Water Spreaderfor Operating Motor And Spreading Water On Laid Sand. Gr.-Ii ( 01 No. X 30 Days ) 9:00Am To 5:00Pm 84 Peyaoo04 No. 85 Providing Two Coats Of Oil Bound Distemper Of Approved Shade And Make Over Old Surface Including Washing, Cleaning And Prepairing The Wall, Scaffolding Washing Of Floors And Taxes All Complete As Per Building Specification And Direction Of E / I. 86 Providing One Coat Of Plastic Emulsion Paint Of Approved Shade And Make Over Old Surface Including Washing, Cleaning And Preparing The Walls, Scaffolding, Washing For Floor And Taxes All Complete As Per Building Specification And Direction Of E / I. 87 Providing Two Coats Of Snowcem Of Approved Shade And Make Over Old Surface Including Washing, Cleaning, Sand Papering The Wall, Scaffolding, Curing And Taxes All Complete As Per Building Specification & Direction Of E / I. 88 Providing And F / Fixing Water Supply Arrangement From Gi / Hdpe Tank To Peyaoo Andbathing Palatform As Per Site Condition Including Required Fittings And Pipe All Complete Including Installation Of Hdpe Water Storage Tank Including Carriage Of Tank From Departmental Store To Work Site. ( Hdpe Water Storage Tank Will Be Supplied Free Of Cost Departmentally ) 6 X 1000 Litr.= 6000 Ltr. 89 Cost Towards Fitting & Fixing Submersible Pump With Clamp Etc. All Complete Including Lowering Of Pvc Pipe. 2H.P To 7.5 H.P And Taking Out After Ending Mela And Deposited In Departmental Store Deoghar. 90 Spreading Water Over Laid Sand 91 Providing Labour Tool And Equipmentfor Spreading Water Over Laid Sand At Kanwariya Path During Shrawani Mela. A ) Cost Of Flexible Pvc Pipe 92 B ) Labour Charge For 1No. 30 Dasys ( 9:00Am To 5:00Pm ) 93 Carriage Ofall Materials From Store To Work Site And Return Back To Work Site To Departmental Store Within A Distance Of 15Km . 94 Cost Towards Electric Consumption Charge For To Be Paid To Electricity Board During Shrawani Mela .Payable Jseb 95 Carriage Of Materials Fromkiln Site Or Quarry Site To Work Site Including Contractor Profit, Loading, Unloading, Transportation, Etc. All Complete. Bricks Up To 15 K.M. 96 Sand Up To 15 K.M. 97 Stone Chips Up To 15 K.M. 98 Cement Up To 15 K.M. 99 Steel Up To 15 K.M. 100 Add Gst @ 12% 101 Add 1 % Labour Cess

Key Value

Document Fees
INR 750 /-
EMD
INR 10000.0 /-
Tender Value
INR 4.96 Lakhs /-

BOQ Items

Name of Work: Supplying of materials, tools , plants and skilled and unskilled man power for repairing and maintenance of existing structure and fitting, fixing all works with operation & maintenance the entire works during Shrawani Mela atBank Prashashnik Bhawanto near Sarasani(Plant No.- 11 to near Plant No-13) under D.W & S. division , Deoghar for the year 2022-23 Group No. SM-D-06
Sl. No. Item Description
1WATER SUPPLY
2Jungal clearence including weeding out shrubs and small trees up to 150 mm dia girth and there removalas per specification and direction of E/I.
3Column of Bank plantEarth work in excavation in foundation trenches in ordinary soil (vide classification of soil item-B ) and disposal of excavated earth as obtained to a distance up to 50 m including all lifts, levelling, ramming the foundation trenches, removing roots of trees shrubs all complete as per approved design, building specification and direction of E/I.
4Providing coarse clean sand in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads including cost of materials,labours,royalityand taxes all complete as per building specification and direction of E/I.
5Providing designation 75 A one brick flat soling joints filled with local sand including cost of watering, taxes royalty all complete as per building specification and direction of E/I.
6Reinforced cement concree work in walls (any thickness) including attached pilasters, buttresses plinth and tring course, fillets, columns, pillars, piers, abutment, posts and struts etc. above plinth level up to floor five level excluding cost of centring, shutteringfinishing and reinforcement. :1.5:3 (3 graded stone aggregate 20mm nominal size)
7Providing T.M.T steel reinforcement of different dia rods as per approved design and drawing including carriage of M.S bars to work site, cutting bending and binding with annealed wire with cost of wire, removal of rust, placing the rods in position all complete as per building specification and direction of E/I.
8Dismantling patent stone flooring including stacking serviceable materials in countable stacks within 15 M lead and disposal of unserviceable materials with all leads all complete as per direction of E/I.
9Providing 25 mm thick first class patent stone flooring (1:2:4) with stone chips,in two layers, bottom layer 19 mm thick (1:2:4) with 12 mm to 6 mm size graded stone chips and top layer 6 mm thick (1:2) with 6 mm down stone chips in panels,including cost of curing, finishing the surface smooth by rubbing with carborun-dum stone,taxes and royalty all complete as per building specification and direction of E/I.
10Providing 12 mm, cement plaster (1:6) with clean coarse sand of F.M 1-5 including screening, curing with all leads and lifts of water, scaffolding taxes and royalty all complete as per building specification and direction E/I.
11Providing designation 75 A brick work in C.M.(1:6) in foundation and plinth with approved quality of clean coarse sand of F.M. 2 to 2.5 including providing 10mm think mortar joints, cost of screening materials, raking out joints of 15mm depth, curing taxes and royalty all complete as per building specification and direction of E/I
12Supplying all materials, labour, writing name of department, male & female directionon the wall after making box by good quality of paint as per direction of E/I. 160 mm high letter
13Cost towards painting and writing slogan on board 4’ x 3’ size with good quality paint carrying and fitting fixing on each site including Minor repair of board taking back after Mela as per direction of E/I.(150 mm high letter)
14Cost towards fitting & fixing submersible pump with clamp etc. all complete including lowering of PVC Pipe. 2 H.P to 7.5H.P and taking out after ending mela and deposited in departmental store deoghar.
15Cost towards dismantling after mela and taking back to work site from store including carriage of all materials and pump, water tank etc. all complete.
16Cost towards fittingfixing jet pump on angle fixed in walls of well, cutting and making good the same as per direction of E/I. (with clamp)
17Earth work in excavation for laying of pipe so as to give one meter (avg.) cover over the socket of pipe and back filling the trenches after laying of pipe, again a/w in excavation and taking out the laid pipeand back filling the same after the end ofShrawani Mela.
18Earth work in back filling the trenches fatter laying different types and size of pipes with earth removed during excavation within initial lead and lift as per specification and direction E/I.
19Laying of PVC pipes of approved make in trenches with red lead and yarn with socket and screw joints and cutting pipe so size and threading ends where necessary etc. all complete as per specification and direction E/I. (Pipes to be supplied departmentally free of cost and taken out the same after Mela). (i) 32 mm dia PVC pipe. ( 2 x 20.00 Mtr. = 40 Mtr.)
20(ii) 25 mm dia PVC pipe. ( 2 x 15.00 Mtr. = 30 Mtr.)
21Laying of PVC pipes of approved make on walland roofwith red lead and yarn with socket and screw joints and cutting pipe so size and threading ends where necessary etc. all complete in wallas per specification and direction E/I. (Pipes to be supplied departmentally free of cost). (i) 15 mm dia PVC Pipe ( 2 x 15.00 Mtr. = 30 Mtr.)
22(i) 20 mm dia PVC Pipe ( 2 x 10.00 Mtr. = 20 Mtr.)
23(ii) 25 mm dia dia PVC Pipe( 2 x 3.00 Mtr. = 30 Mtr.)
24Cost towards engaging Pump Operatarcum water spreader on laid sand for operating and spreading water on sand etc.all complete job. Gr.-II
25Cost towards engagingPlumber andElectric mistryduring Mela periodincluding contractor profit. Plumber Gr.-II
26Electric mistryGr.-II
27Cost towards extra materials due to damages during taking out damage cut pieces including laboaur cost as per direction of E/I. in walls/trenches. 32 mm dia PVC pipe. (Rate of PVC Pipe + Laying cost charge)
2825 mm dia PVC Pipe.(Rate of PVC Pipe + Laying cost charge)
2915 mm diaPVC pipe.(Rate of PVC Pipe + Laying cost charge)
3032 mm dia PVC Elbow
3125 mm dia PVCElbow
3215 mm dia PVC Elbow
3332 mm dia U/S PVC
3425 mm dia U/S PVC
3525 x 25 x 15 mm dia Reducing Tee PVC
3615 mm dia PVC FTA
3715 mm dia PVC Coupler
3825 mm diaPVC Coupler
3932 mm diaPVC Coupler
4015 mm PVC Shower
4115 mm P.V.C Bib Cock
4232 x 32 x 25 mm dia tee PVC
43SANITARY INSTALLATION
44Labour for scrapping old paint with paint remoter and below lamp as required on wooden or steel surface including cost of all labour and materials and scaffolding all complete as per balding specification and direction of E/I.
45Providing one coat of painting with ready mixed paint of approved shade and make over steel surface including cleaning the surface toughly, scaffolding and taxes all complete as per building specification and direction of E/I.
46Providing 12 mm, cement plaster (1:6) with clean coarse sand of F.M 1.5 including screening, curing with all leads and lifts of water, scaffolding taxes and royalty all complete as per building specification and direction E/I.
47Providing designation 75 A brick work in C.M.(1:6) in foundation and plinth with approved quality of clean coarse sand of F.M. 2 to 2.5 including providing 10mm think mortar joints, cost of screening materials, raking out joints of 15mm depth, curing taxes and royalty all complete as per building specification and direction of E/I
48Providing supplying,fitting and fixing of the followingmaterials in connection of latrine room. 25 mm dia PVC pipe .(Rate of PVC Pipe + Laying cost charge)
4915 mm diaPVC pipe.(Rate of PVC Pipe + Laying cost charge)
5025 x 25 x 15 mm PVC Tee
5125 mm dia PVC Coupler
5215 mm dia PVC Coupler
5325 mm dia PVC U/Socket
5425 mm dia FTA
5515 mm dia FTA
5625 mm dia PVC Elbow
5715 mm diaPVC Elbow
58Providing and fixing 15 mm dia male ended C.I. bodybrass spindle valve and seat bib clock of approved quality (wt- Not less than 400 Gms.) with extra socket all complete as per specification and direction E/I..
59Providing onecoat of oil bound distemper of approved shade and make over old surface including washing, cleaning and papering the walls, scaffolding, washing of floors and taxes all complete as per building specification and direction of E/I.
60Supplying of following materials.Mug
61PlasticBucket
62Supplying and filling stone dust around Urinal and Bathing area LS
63Supplying, fitting and fixing 20 gauge G.C.I sheet gate fitted on M.S angle frame of size60*60*6 mm including cost of fabrication, providing necessary locking arrangement with haskal and domny duly fixed in C/C(1:2:4) blocks of required size, applying a priming red lead paint over steel work, taxes all complete as per drawing specification and direction of E/I
64INDRAVARSHA
65Earth work in excavation for laying of pipe so as to give one meter (avg.) cover over the socket of pipe and back filling the trenches after laying of pipe, again a/w in excavation and taking out the laid pipeand back filling the same after the end ofShrawani Mela
66Earth work in back filling the trenches fatter laying different types and size of pipes with earth removed during excavation within initial lead and lift as per specification and direction E/I.
67Laying of 32 mm dia GI/PVC pipe in trenches and taking out the same.( 2 x 236.00 Mtr.)
68Supplying of 32 mm dia PVC pipe with socket in 3 M length do-do all complete.
69Laying & jointingGI/ PVC pipe in hanging position ovar support and taking out the same after and of Shrawani Mela ( pipe supplied departmentally free of cost).a. 32 mm dia.Pipe
70b. 25 mm dia. Pipe
71Supplying and fixing GIfittings of approved make all complete as per specification and direction E/I. 32 mm Elbow
7232 mm U/S
7325 mm Plug
7425 mm Socket
7532 x 25 R.S.
7632 x 25 Elbow
7725 mm U/S
7832 mm Tee
79Electric welding of 15 mm dia x Nipple in 25 mm diaGIpipe after making hole of 20 mm dia including cost ofnipple. In 25mm dia. Pipe
80In 15 mm dia. GI Nipple
81Cost of 15 mm dia. GI. Socket
82Cost towards fitting & fixing submersible pump with clamp etc. all complete including lowering of PVC Pipe. 2H.P to 7.5 H.P and taking out after ending mela and deposited in departmental store deoghar.
83Providing pump operator cum water spreaderfor operating motor and spreading water on laid sand. Gr.-II ( 01 No. x 30 Days ) 9:00AM to 5:00PM
84PEYAOO04 No.
85Providing two coats of oil bound distemper of approved shade and make over old surface including washing, cleaning and prepairing the wall,scaffolding washing of floors and taxes all complete as per building specification and direction of E/I.
86Providing one coat of plastic emulsion paint of approved shade and make over old surface including washing, cleaning and preparing the walls, scaffolding, washing for floor and taxes all complete as per building specification and direction of E/I.
87Providing two coats of snowcem of approved shade and make over old surface including washing, cleaning, sand papering the wall, scaffolding, curing and taxes all complete as per building specification & direction of E/I.
88Providing and F/Fixing water supply arrangement from GI/ HDPE Tank to Peyaoo andBathing Palatform as per site condition including required fittings and pipe all complete including installation of HDPE water storage tank including carriage of tank from departmental store to work site. ( HDPE water storage tank will be supplied free of cost departmentally)6 x 1000 Litr.= 6000 Ltr.
89Cost towards fitting & fixing submersible pump with clamp etc. all complete including lowering of PVC Pipe. 2H.P to 7.5 H.P and taking out after ending mela and deposited in departmental store deoghar.
90SPREADING WATER OVER LAID SAND
91Providing Labour tool and equipmentfor spreading water over laid sand at Kanwariya Path during Shrawani Mela. A) Cost of Flexible PVC pipe
92B) Labour Charge for 1No. 30 Dasys (9:00AM to 5:00PM)
93Carriage ofall materials from store to work site and return back to work site to departmental store within a distance of 15KM .
94Cost towards electric consumption charge for to be paid to Electricity Board during shrawani mela .payable JSEB
95Carriage of materials fromkiln site or quarry site to work site including contractor profit, loading, unloading, transportation, etc. all complete. Bricks up to 15 K.M.
96Sand up to 15 K.M.
97Stone chips up to 15 K.M.
98Cement up to 15 K.M.
99Steel up to 15 K.M.
100Add GST @ 12%
101Add 1 % Labour Cess
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail