}

Supplying Of Materials, Tools , Plants And Skilled And Unskilled Man Power For Repairing And Maintenance Of Existing Structure And Fitting, Fixing All Works With Operation & Maintenance The Entire Works During Shrawani Melaat Sarasani-1 To Sarasani , deoghar-Jharkhand

Drinking Water And Sanitation Department has published Supplying Of Materials, Tools , Plants And Skilled And Unskilled Man Power For Repairing And Maintenance Of Existing Structure And Fitting, Fixing All Works With Operation & Maintenance The Entire Works During Shrawani Melaat Sarasani-1 To Sarasani . Submission Date for this Tender is 02-06-2022. Man Power Supply Tenders in deoghar Jharkhand. Bidders can get complete Tender details and download the document.




Tender Notice

32408393
Supplying Of Materials, Tools , Plants And Skilled And Unskilled Man Power For Repairing And Maintenance Of Existing Structure And Fitting, Fixing All Works With Operation & Maintenance The Entire Works During Shrawani Melaat Sarasani-1 To Sarasani
Open Tender
Indian
Jharkhand
deoghar
02-06-2022

Tender Details

Supplying Of Materials, Tools , Plants And Skilled And Unskilled Man Power For Repairing And Maintenance Of Existing Structure And Fitting, Fixing All Works With Operation & Maintenance The Entire Works During Shrawani Melaat Sarasani-1 To Sarasani -2 ( Plant No.-13 Toplant No.- 14 ) Under D.W & S. Division , Deoghar In The Year 2022-23 For The Year 2022-23Group No. Sm-D-07-2 Jungal Clearence Including Weeding Out Shrubs And Small Trees Up To 150 Mm Dia Girth And There Removalas Per Specification And Direction Of E / I. 3 Dismantling Patent Stone Flooring Including Stacking Serviceable Materials In Countable Stacks Within 15 M Lead And Disposal Of Unserviceable Materials With All Leads All Complete As Per Direction Of E / I. 4 Providing 25 Mm Thick First Class Patent Stone Flooring ( 1:2:4 ) With Stone Chips, In Two Layers, Bottom Layer 19 Mm Thick ( 1:2:4 ) With 12 Mm To 6 Mm Size Graded Stone Chips And Top Layer 6 Mm Thick ( 1:2 ) With 6 Mm Down Stone Chips In Panels, Including Cost Of Curing, Finishing The Surface Smooth By Rubbing With Carborun-Dum Stone, Taxes And Royalty All Complete As Per Building Specification And Direction Of E / I. 5 Providing 12 Mm, Cement Plaster ( 1:6 ) With Clean Coarse Sand Of F.M 1-5 Including Screening, Curing With All Leads And Lifts Of Water, Scaffolding Taxes And Royalty All Complete As Per Building Specification And Direction E / I. 6 Providing Designation 75 A Brick Work In C.M. ( 1:6 ) In Foundation And Plinth With Approved Quality Of Clean Coarse Sand Of F.M. 2 To 2.5 Including Providing 10Mm Think Mortar Joints, Cost Of Screening Materials, Raking Out Joints Of 15Mm Depth, Curing Taxes And Royalty All Complete As Per Building Specification And Direction Of E / I 7 Supplying All Materials, Labour, Writing Name Of Department, Male & Female Directionon The Wall After Making Box By Good Quality Of Paint As Per Direction Of E / I. 160 Mm High Letter 8 Cost Towards Painting And Writing Slogan On Board 4’ X 3’ Size With Good Quality Paint Carrying And Fitting Fixing On Each Site Including Minor Repair Of Board Taking Back After Mela As Per Direction Of E / I. ( 150 Mm High Letter ) 9 Cost Towards Transportation Ofsubmersible Pump, Pipe Fittings Etc. From Store To Work Site Including Carriage Water Tank Etc. All Complete. 10 Cost Towards Fitting & Fixing Submersible Pump With Clamp Etc. All Complete Including Lowering Of Pvc Pipe. 2H.P To 7.5H.P And Taking Out After Ending Mela And Deposited In Departmental Store Deoghar. 11 Cost Towards Dismantling After Mela And Taking Back To Work Site From Store Including Carriage Of All Materials And Pump, Water Tank Etc. All Complete. 12 Laying Ofpvc Pipes Of Approved Make In Trenches With Red Lead And Yarn With Socket And Screw Joints And Cutting Pipe So Size And Threading Ends Where Necessary Etc. All Complete As Per Specification And Direction E / I. ( Pipes To Be Supplied Departmentally Free Of Cost ) . ( I ) 32 Mm Dia Pvc Pipe. ( 2 X 21.00 Mtr. ) 13 ( I ) 25 Mm Dia Pvc Pipe. ( 2 X 5.00 Mtr. ) 14 Laying Of Pvc Pipes Of Approved Make On Walland Roofwith Red Lead And Yarn With Socket And Screw Joints And Cutting Pipe So Size And Threading Ends Where Necessary Etc. All Complete In Wallas Per Specification And Direction E / I. ( Pipes To Be Supplied Departmentally Free Of Cost ) . ( I ) 15 Mm Dia Pvc Pipe ( 2 X 15.00 Mtr. ) 15 ( I ) 20 Mm Dia Pvc Pipe ( 2 X 10.00 Mtr. ) 16 Cost Towards Engaging Pump Operatarcum Water Spreader On Laid Sand For Operating And Spreading Water On Sand Etc.All Complete Job. Gr.-Ii 17 Cost Towards Engagingplumberelectric Mistry One Including Contractor Profit. ( 10% ) Plumbergr.-Ii 18 Electric Mistry Gr.-Ii 19 Cost Towards Extra Materials Due To Damages During Taking Out Damage Cut Pieces Including Laboaur Cost As Per Direction Of E / I. In Walls / Trenches. 32 Mm Dia Pvc Pipe. ( Rate Of Pvc Pipe + Laying Cost Charge ) 20 25 Mm Diapvc Pipe. ( Rate Of Pvc Pipe + Laying Cost Charge ) 21 15 Mm Diapvcpipe. ( Rate Of Pvc Pipe + Laying Cost Charge ) 22 32 Mm Dia Pvc Elbow 23 25 Mm Dia Pvcelbow 24 15 Mm Dia Pvc Elbow 25 32 Mm Dia U / S Pvc 26 25 Mm Dia U / S Pvc 27 25 X 25 X 15 Mm Dia Reducing Tee Pvc 28 32 Mm Dia Pvc Fta 29 25 Mm Dia Pvc Fta 30 15 Mm Dia Pvc Fta 31 15 Mm Dia Pvc Coupler 32 25 Mm Diapvc Coupler 33 32 Mm Diapvc Coupler 34 15 Mm Pvc Shower 35 15 Mm P.V.C Bib Cock 36 32 X 32 X 25 Mm Dia Tee Pvc 37 Sanitary Installation 38 Labour For Scrapping Old Paint With Paint Remoter And Below Lamp As Required On Wooden Or Steel Surface Including Cost Of All Labour And Materials And Scaffolding All Complete As Per Balding Specification And Direction Of E / I. 39 Providing One Coat Of Painting With Ready Mixed Paint Of Approved Shade And Make Over Steel Surface Including Cleaning The Surface Toughly, Scaffolding And Taxes All Complete As Per Building Specification And Direction Of E / I.As Per Item No 16 40 Providing 12 Mm, Cement Plaster ( 1:6 ) With Clean Coarse Sand Of F.M 1.5 Including Screening, Curing With All Leads And Lifts Of Water, Scaffolding Taxes And Royalty All Complete As Per Building Specification And Direction E / I. 41 Providing Designation 75 A Brick Work In C.M. ( 1:6 ) In Foundation And Plinth With Approved Quality Of Clean Coarse Sand Of F.M. 2 To 2.5 Including Providing 10 Mm Think Mortar Joints, Cost Of Screening Materials, Raking Out Joints Of 15Mm Depth, Curing Taxes And Royalty All Complete As Per Building Specification And Direction Of E / I 42 Providing Supplying, Fitting And Fixing Of The Followingmaterials In Connection Of Latrine Room. 25 Mm Dia Pvc Pipe . ( Rate Of Pvc Pipe + Laying Cost Charge ) 43 15 Mm Diapvc Pipe. ( Rate Of Pvc Pipe + Laying Cost Charge ) 44 25 X 25 X 15 Mm Pvc Tee 45 25 Mm Dia Pvc Coupler 46 15 Mm Dia Pvc Coupler 47 25 Mm Dia Pvc U / Socket 48 25 Mm Dia Fta 49 15 Mm Dia Fta 50 25 Mm Dia Pvc Elbow 51 15 Mm Diapvc Elbow 52 15 Mm Dia Pvc Plug 53 Providing And Fixing 15 Mm Dia Male Ended C.I. Bodybrass Spindle Valve And Seat Bib Clock Of Approved Quality ( Wt- Not Less Than 400 Gms. ) With Extra Socket All Complete As Per Specification And Direction E / I.. 54 Providing Onecoat Of Oil Bound Distemper Of Approved Shade And Make Over Old Surface Including Washing, Cleaning And Papering The Walls, Scaffolding, Washing Of Floors And Taxes All Complete As Per Building Specification And Direction Of E / I. 55 Supplying Of Following Materials. Mug 56 Plasticbucket 57 Providing Designation 75 A Brick Work In C.M. ( 1:6 ) In S / S With Approved Quality Of Clean Coarse Sand Of F.M. 2 To 2.5 Including Providing 10 Mm Think Mortar Joints, Cost Of Screening Materials, Raking Out Joints Of 15 Mm Depth, Curing Taxes And Royalty All Complete As Per Building Specification And Direction Of E / I 58 Supplying Materials And Labours For Constructing Inspection Chamber Of Designation Class 75B Bricks Size 750 Mm Deep, 600 X 450 Mm Internal Dimension Having 250 Mm Wall Thickness In Cement Mortar ( 1:6 ) Including 12 Mm Cement Plaster ( 1:4 ) With Punning On Inside And Cement Plaster ( 1:6 ) With 600 X 475 Mm G.I. Cover With Frame ( Weight Not Less Than 36Kg. ) Alongwith Earth Work In Excavation And 80 Mm Thick P.C.C. ( 1:3:6 ) In Foundation And Refilling All Complete As Per Specification And Direction Of E / I. 59 Earthwork In Trench Cutting In Ordinarysoil As Earthen Drain Size 750 Mm Wide And 600 Mm Deep ( Vide Classification Of Soil Item -A ) For Drain Out Over Flow Water Of Soak Pit To A Safe Distance ) All Complete As Per Directionofe / I. 60 Providing Coarse Clean Sand In Filling In Foundation Trenches Or In Plinth Including Ramming And Watering In Layers Not Exceeding 150 Mm Thick With All Leads And Lifts Including Cost Of All Materials, Labour, Royalty And Taxes All Complete As Per Building Specification And Direction Of E / I. 61 Providing Designation 75 A One Brick Flat Soling Joints Filled With Local Sand Including Cost Of Watering, Taxes Royalty All Complete As Per Building Specification And Direction Of E / I. 62 Supplying, Fitting And Fixing 20 Gauge G.C.I Sheet Gate Fitted On M.S Angle Frame Of Size60*60*6 Mm Including Cost Of Fabrication, Providing Necessary Locking Arrangement With Haskal And Domny Duly Fixed In C / C ( 1:2:4 ) Blocks Of Required Size, Applying A Priming Red Lead Paint Over Steel Work, Taxes All Complete As Per Drawing Specification And Direction Of E / I 63 Indravarsha 64 Earth Work In Excavation For Laying Of Pipe So As To Give One Meter ( Avg. ) Cover Over The Socket Of Pipe And Back Filling The Trenches After Laying Of Pipe, Again A / W In Excavation And Taking Out The Laid Pipeand Back Filling The Same After The End Ofshrawani Mela. 65 Earth Work In Back Filling The Trenches After Laying Different Types And Size Of Pipes With Earth Removed During Excavation Within Initial Lead And Lift As Per Specification And Direction E / I.As Per Item No.-27 66 Laying Of 32 Mm Dia Gi / Pvc Pipe In Trenches And Taking Out The Same ( 2 X 9.00 Mtr. ) 67 Supplying Of 32 Mm Dia Pvc Pipe With Socket In 3 M Length Do-Do All Complete. 68 Laying & Jointing Pvc Pipe In Hanging Position Ovar Support And Taking Out The Same After And Of Shrawani Mela ( Pipe Supplied Departmentally Free Of Cost ) . 32 Mm Dia. Pipe ( 2X 24 Mtr. ) 69 25 Mm Dia. Pipe ( 2 X 18 Mtr. ) 70 Supplying And Fixing Pvc Fittings Of Approved Make All Complete As Per Specification And Direction E / I.. 32 Mm Nipple 71 32 Mm Elbow 72 32 Mm U / S 73 25 Mm Plug 74 25 Mm Socket 75 32 X 25 R.S. 76 32 X 25 Elbow 77 25 Mm U / S 78 32 Mm Tee 79 Electric Welding Of 15 Mm Dianipple In 25 Mm Dia Pvc Pipe After Making Hole Of 20 Mm Dia Including Cost Ofnipple. In 25 Mm Dia. Pipe 80 In 15 Mm Dia. Gi Nipple 81 Cost Of 15 Mm Dia. Gi. Socket 82 Peyaoo- 83 Peyaoo Wall Column Earth Work In Excavation In Foundation Trenches In Ordinary Soil ( Vide Classification Of Soil Item-B ) And Disposal Of Excavated Earth As Obtained To A Distance Up To 50 M Including All Lifts, Levelling, Ramming The Foundation Trenches, Removing Roots Of Trees Shrubs All Complete As Per Approved Design, Building Specification And Direction Of E / I. 84 Providing Coarse Clean Sand In Filling In Foundation Trenches Or In Plinth Including Ramming And Watering In Layers Not Exceeding 150Mm Thick With All Leads Including Cost Of Materials, Labours, Royalityand Taxes All Complete As Per Building Specification And Direction Of E / I. 85 Providing Designation 75 A One Brick Flat Soling Joints Filled With Local Sand Including Cost Of Watering, Taxes Royalty All Complete As Per Building Specification And Direction Of E / I. 86 Reinforced Cement Concree Work In Walls ( Any Thickness ) Including Attached Pilasters, Buttresses Plinth And Tring Course, Fillets, Columns, Pillars, Piers, Abutment, Posts And Struts Etc. Above Plinth Level Up To Floor Five Level Excluding Cost Of Centring, Shutteringfinishing And Reinforcement. :1.5:3 ( 3 Graded Stone Aggregate 20Mm Nominal Size ) 87 Providing T.M.T Steel Reinforcement Of Different Dia Rods As Per Approved Design And Drawing Including Carriage Of M.S Bars To Work Site, Cutting Bending And Binding With Annealed Wire With Cost Of Wire, Removal Of Rust, Placing The Rods In Position All Complete As Per Building Specification And Direction Of E / I. 88 Providing 12 Mm, Cement Plaster ( 1:6 ) With Clean Coarse Sand Of F.M 1-5 Including Screening, Curing With All Leads And Lifts Of Water, Scaffolding Taxes And Royalty All Complete As Per Building Specification And Direction E / I. 89 Providing Two Coats Of Oil Bound Distemper Of Approved Shade And Make Over Old Surface Including Washing, Cleaning And Prepairing The Wall, Scaffolding Washing Of Floors And Taxes All Complete As Per Building Specification And Direction Of E / I. 90 Providing One Coat Of Plastic Emulsion Paint Of Approved Shade And Make Over Old Surface Including Washing, Cleaning And Preparing The Walls, Scaffolding, Washing For Floor And Taxes All Complete As Per Building Specification And Direction Of E / I. 91 Providing Two Coats Of Snowcem Of Approved Shade And Make Over Old Surface Including Washing, Cleaning, Sand Papering The Wall, Scaffolding, Curing And Taxes All Complete As Per Building Specification & Direction Of E / I. 92 Providing And F / Fixing Water Supply Arrangement From Gi / Hdpe Tank To Peyaoo Andbathing Palatform As Per Site Condition Including Required Fittings And Pipe All Complete Including Installation Of Hdpe Water Storage Tank Including Carriage Of Tank From Departmental Store To Work Site. ( Hdpe Water Storage Tank Will Be Supplied Free Of Cost Departmentally ) 93 Spreading Water Over Laid Sand - 94 Providing Labour Tool And Equipmentfor Spreading Water Over Laid Sand At Kanwariya Path During Shrawani Mela. A ) Cost Of Flexible Pvc Pipe 95 B ) Labour Charge For 1No. X 30 Days = ( Unskild Labour ) 96 Carriage Ofall Materials From Store To Work Site And Return Back To Work Site To Departmental Store Within A Distance Of 15Km . 97 Cost Towards Electric Consumption Charge For To Be Paid To Electricity Board During Shrawani Mela .Payable Jseb 98 Carriage Of Materials Fromkiln Site Or Quarry Site To Work Site Including Contractor Profit, Loading, Unloading, Transportation, Etc. All Complete. Bricks Up To 15 K.M. 99 Sand Up To 15 K.M. 100 Stone Chips Up To 15 K.M. 101 Cement Up To 15 K.M. 102 Steel Up To 15 K.M. 103 Add Gst @ 12% 104 Add 1 % Labour Cess

Key Value

Document Fees
INR 750 /-
EMD
INR 6000.0 /-
Tender Value
INR 2.87 Lakhs /-

BOQ Items

Name of Work: Supplyingof materials, tools , plants and skilled and unskilled man power for repairing and maintenance of existing structure and fitting, fixing all works with operation & maintenance the entire works during Shrawani Melaat Sarasani-1 to Sarasani -2 (Plant No.-13 toPlant No.- 14 ) under D.W & S. division ,Deoghar in the Year 2022-23 for the year 2022-23 Group No. SM-D-07
Sl. No. Item Description
1WATER SUPPLY
2Jungal clearence including weeding out shrubs and small trees up to 150 mm dia girth and there removalas per specification and direction of E/I.
3Dismantling patent stone flooring including stacking serviceable materials in countable stacks within 15 M lead and disposal of unserviceable materials with all leads all complete as per direction of E/I.
4Providing 25 mm thick first class patent stone flooring (1:2:4) with stone chips,in two layers, bottom layer 19 mm thick (1:2:4) with 12 mm to 6 mm size graded stone chips and top layer 6 mm thick (1:2) with 6 mm down stone chips in panels,including cost of curing, finishing the surface smooth by rubbing with carborun-dum stone,taxes and royalty all complete as per building specification and direction of E/I.
5Providing 12 mm, cement plaster (1:6) with clean coarse sand of F.M 1-5 including screening, curing with all leads and lifts of water, scaffolding taxes and royalty all complete as per building specification and direction E/I.
6Providing designation 75 A brick work in C.M.(1:6) in foundation and plinth with approved quality of clean coarse sand of F.M. 2 to 2.5 including providing 10mm think mortar joints, cost of screening materials, raking out joints of 15mm depth, curing taxes and royalty all complete as per building specification and direction of E/I
7Supplying all materials, labour, writing name of department, male & female directionon the wall after making box by good quality of paint as per direction of E/I. 160 mm high letter
8Cost towards painting and writing slogan on board 4’ x 3’ size with good quality paint carrying and fitting fixing on each site including Minor repair of board taking back after Mela as per direction of E/I.(150 mm high letter)
9Cost towards transportation ofsubmersible pump, pipe fittings etc. from store to work site including carriage water tank etc. all complete.
10Cost towards fitting & fixing submersible pump with clamp etc. all complete including lowering of PVC Pipe. 2H.P to 7.5H.P and taking out after ending mela and deposited in departmental store deoghar.
11Cost towards dismantling after mela and taking back to work site from store including carriage of all materials and pump, water tank etc. all complete.
12Laying ofPVC pipes of approved make in trenches with red lead and yarn with socket and screw joints and cutting pipe so size and threading ends where necessary etc. all complete as per specification and direction E/I. (Pipes to be supplied departmentally free of cost).(i) 32 mm dia PVC pipe. ( 2 x 21.00 Mtr.)
13(i) 25 mm dia PVC pipe. ( 2 x 5.00 Mtr.)
14Laying of PVC pipes of approved make on walland roofwith red lead and yarn with socket and screw joints and cutting pipe so size and threading ends where necessary etc. all complete in wallas per specification and direction E/I. (Pipes to be supplied departmentally free of cost).(i) 15 mm dia PVC pipe( 2 x 15.00 Mtr.)
15(i) 20 mm dia PVC pipe ( 2 x 10.00 Mtr.)
16Cost towards engaging Pump Operatarcum water spreader on laid sand for operating and spreading water on sand etc.all complete job. Gr.-II
17Cost towards engagingPlumberelectric mistry one including contractor profit. (10%)PlumberGr.-II
18Electric mistry Gr.-II
19Cost towards extra materials due to damages during taking out damage cut pieces including laboaur cost as per direction of E/I. in walls/trenches. 32 mm dia PVC pipe. ( Rate of PVC Pipe + Laying cost charge)
2025 mm diaPVC pipe. ( Rate of PVC Pipe + Laying cost charge)
2115 mm diaPVCpipe. ( Rate of PVC Pipe + Laying cost charge)
2232 mm dia PVC Elbow
2325 mm dia PVCElbow
2415 mm dia PVC Elbow
2532 mm dia U/S PVC
2625 mm dia U/S PVC
2725 x 25 x 15 mm dia Reducing Tee PVC
2832 mm dia PVC FTA
2925 mm dia PVC FTA
3015 mm dia PVC FTA
3115 mm dia PVC Coupler
3225 mm diaPVC Coupler
3332 mm diaPVC Coupler
3415 mm PVC Shower
3515 mm P.V.C Bib Cock
3632 x 32 x 25 mm dia tee PVC
37SANITARY INSTALLATION
38Labour for scrapping old paint with paint remoter and below lamp as required on wooden or steel surface including cost of all labour and materials and scaffolding all complete as per balding specification and direction of E/I.
39Providing one coat of painting with ready mixed paint of approved shade and make over steel surface including cleaning the surface toughly, scaffolding and taxes all complete as per building specification and direction of E/I. As per item no 16
40Providing 12 mm, cement plaster (1:6) with clean coarse sand of F.M 1.5 including screening, curing with all leads and lifts of water, scaffolding taxes and royalty all complete as per building specification and direction E/I.
41Providing designation 75 A brick work in C.M.(1:6) in foundation and plinth with approved quality of clean coarse sand of F.M. 2 to 2.5 including providing 10 mm think mortar joints, cost of screening materials, raking out joints of 15mm depth, curing taxes and royalty all complete as per building specification and direction of E/I
42Providing supplying,fitting and fixing of the followingmaterials in connection of latrine room. 25 mm dia PVC pipe .(Rate of PVC Pipe + Laying cost charge)
4315 mm diaPVC pipe.(Rate of PVC Pipe + Laying cost charge)
4425 x 25 x 15 mm PVC Tee
4525 mm dia PVC Coupler
4615 mm dia PVC Coupler
4725 mm dia PVC U/Socket
4825 mm dia FTA
4915 mm dia FTA
5025 mm dia PVC Elbow
5115 mm diaPVC Elbow
5215 mm dia PVC Plug
53Providing and fixing 15 mm dia male ended C.I. bodybrass spindle valve and seat bib clock of approved quality (wt- Not less than 400 Gms. ) with extra socket all complete as per specification and direction E/I..
54Providing onecoat of oil bound distemper of approved shade and make over old surface including washing, cleaning and papering the walls, scaffolding, washing of floors and taxes all complete as per building specification and direction of E/I.
55Supplying of following materials. Mug
56PlasticBucket
57Providing designation 75 A brick work in C.M.(1:6) in S/S with approved quality of clean coarse sand of F.M. 2 to 2.5 including providing 10 mm think mortar joints, cost of screening materials, raking out joints of 15 mm depth, curing taxes and royalty all complete as per building specification and direction of E/I
58Supplying materials and labours for constructing inspection chamber of designation class 75B bricks size 750 mm deep, 600 x 450 mm internal dimension having 250 mm wall thickness in cement mortar (1:6) including 12 mm cement plaster (1:4) with punning on inside and cement plaster (1:6) with 600 x 475 mm G.I. Cover with frame (weight not less than 36kg.) alongwith earth work in excavation and 80 mm thick P.C.C. (1:3:6) in foundation and refilling all complete as per specification and direction of E/I.
59Earthwork in trench cutting in ordinarysoil as earthen drain size 750 mm wide and 600 mm deep ( vide classification of soil item -A ) for drain out over flow water of soak pit to a safe distance)all complete as per directionofE/I.
60Providing coarse clean sand in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150 mm thick with all leads and lifts including cost of all materials, labour, royalty and taxes all complete as per building specification and direction of E/I.
61Providing designation 75 A one brick flat soling joints filled with local sand including cost of watering, taxes royalty all complete as per building specification and direction of E/I.
62Supplying, fitting and fixing 20 gauge G.C.I sheet gate fitted on M.S angle frame of size60*60*6 mm including cost of fabrication, providing necessary locking arrangement with haskal and domny duly fixed in C/C(1:2:4) blocks of required size, applying a priming red lead paint over steel work, taxes all complete as per drawing specification and direction of E/I
63INDRAVARSHA
64Earth work in excavation for laying of pipe so as to give one meter (avg.) cover over the socket of pipe and back filling the trenches after laying of pipe, again a/w in excavation and taking out the laid pipeand back filling the same after the end ofShrawani Mela.
65Earth work in back filling the trenches after laying different types and size of pipes with earth removed during excavation within initial lead and lift as per specification and direction E/I.As per Item No.-27
66Laying of 32 mm dia GI/PVC pipe in trenches and taking out the same ( 2 x 9.00 Mtr.)
67Supplying of 32 mm dia PVC pipe with socket in 3 M length do-do all complete.
68Laying & jointing PVC pipe in hanging position ovar support and taking out the same after and of Shrawani Mela ( pipe supplied departmentally free of cost). 32 mm dia. Pipe ( 2x 24 Mtr.)
6925 mm dia. Pipe ( 2 x 18 Mtr.)
70Supplying and fixing PVC fittings of approved make all complete as per specification and direction E/I.. 32 mm Nipple
7132 mm Elbow
7232 mm U/S
7325 mm Plug
7425 mm Socket
7532 x 25 R.S.
7632 x 25 Elbow
7725 mm U/S
7832 mm Tee
79Electric welding of 15 mm diaNipple in 25 mm dia PVC pipe after making hole of 20 mm dia including cost ofnipple. In 25 mm dia. Pipe
80In 15 mm dia. GI Nipple
81Cost of 15 mm dia. GI. Socket
82PEYAOO-
83Peyaoo wall column Earth work in excavation in foundation trenches in ordinary soil (vide classification of soil item-B ) and disposal of excavated earth as obtained to a distance up to 50 m including all lifts,levelling,ramming the foundation trenches, removing roots of trees shrubs all complete as per approved design, building specification and direction of E/I.
84Providing coarse clean sand in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads including cost of materials,labours,royalityand taxes all complete as per building specification and direction of E/I.
85Providing designation 75 A one brick flat soling joints filled with local sand including cost of watering, taxes royalty all complete as per building specification and direction of E/I.
86Reinforced cement concree work in walls (any thickness) including attached pilasters, buttresses plinth and tring course, fillets, columns, pillars, piers, abutment, posts and struts etc. above plinth level up to floor five level excluding cost of centring, shutteringfinishing and reinforcement. :1.5:3 (3 graded stone aggregate 20mm nominal size)
87Providing T.M.T steel reinforcement of different dia rods as per approved design and drawing including carriage of M.S bars to work site, cutting bending and binding with annealed wire with cost of wire, removal of rust, placing the rods in position all complete as per building specification and direction of E/I.
88Providing 12 mm, cement plaster (1:6) with clean coarse sand of F.M 1-5 including screening, curing with all leads and lifts of water, scaffolding taxes and royalty all complete as per building specification and direction E/I.
89Providing two coats of oil bound distemper of approved shade and make over old surface including washing, cleaning and prepairing the wall,scaffolding washing of floors and taxes all complete as per building specification and direction of E/I.
90Providing one coat of plastic emulsion paint of approved shade and make over old surface including washing, cleaning and preparing the walls, scaffolding, washing for floor and taxes all complete as per building specification and direction of E/I.
91Providing two coats of snowcem of approved shade and make over old surface including washing, cleaning, sand papering the wall, scaffolding, curing and taxes all complete as per building specification & direction of E/I.
92Providing and F/Fixing water supply arrangement from GI/ HDPE Tank to Peyaoo andBathing Palatform as per site condition including required fittings and pipe all complete including installation of HDPE water storage tank including carriage of tank from departmental store to work site. ( HDPE water storage tank will be supplied free of cost departmentally)
93SPREADING WATER OVER LAID SAND -
94Providing Labour tool and equipmentfor spreading water over laid sand at Kanwariya Path during Shrawani Mela. A) Cost of Flexible PVC pipe
95B) Labour Charge for 1No. x 30 Days = (Unskild Labour)
96Carriage ofall materials from store to work site and return back to work site to departmental store within a distance of 15KM .
97Cost towards electric consumption charge for to be paid to Electricity Board during shrawani mela .payable JSEB
98Carriage of materials fromkiln site or quarry site to work site including contractor profit, loading, unloading, transportation, etc. all complete. Bricks up to 15 K.M.
99Sand up to 15 K.M.
100Stone chips up to 15 K.M.
101Cement up to 15 K.M.
102Steel up to 15 K.M.
103Add GST @ 12%
104Add 1 % Labour Cess
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail