}

Supplying Of Materials, Tools, Plants And Skilled And Unskilled Man Power For Repairing And Maintenance Of Existing Structure And Fitting, Fixing All Works With Operation & Maintenance The Entire Works During Shrawani Melaat Near Sarasani -2 Tokhiju, deoghar-Jharkhand

Drinking Water And Sanitation Department has published Supplying Of Materials, Tools, Plants And Skilled And Unskilled Man Power For Repairing And Maintenance Of Existing Structure And Fitting, Fixing All Works With Operation & Maintenance The Entire Works During Shrawani Melaat Near Sarasani -2 Tokhiju. Submission Date for this Tender is 02-06-2022. Man Power Supply Tenders in deoghar Jharkhand. Bidders can get complete Tender details and download the document.




Tender Notice

32408387
Supplying Of Materials, Tools, Plants And Skilled And Unskilled Man Power For Repairing And Maintenance Of Existing Structure And Fitting, Fixing All Works With Operation & Maintenance The Entire Works During Shrawani Melaat Near Sarasani -2 Tokhiju
Open Tender
Indian
Jharkhand
deoghar
02-06-2022

Tender Details

Supplying Of Materials, Tools, Plants And Skilled And Unskilled Man Power For Repairing And Maintenance Of Existing Structure And Fitting, Fixing All Works With Operation & Maintenance The Entire Works During Shrawani Melaat Near Sarasani -2 Tokhijuriya School ( Near Plant No.-14 Toplant No.-16 ) Under D.W & S. Division , Deoghar In The Year 2022-23 For The Year 2022-23Group No. Sm-D-08-2 Jungal Clearence Including Weeding Out Shrubs And Small Trees Up To 150 Mm Dia Girth And There Removalas Per Specification And Direction Of E / I. 3 Supplying And Filling Stone Dust Around Urinal And Bathing Area At Khijuriya Plant 4 Dismantling Patent Stone Flooring Including Stacking Serviceable Materials In Countable Stacks Within 15 M Lead And Disposal Of Unserviceable Materials With All Leads All Complete As Per Direction Of E / I. 5 Providing 25 Mm Thick First Class Patent Stone Flooring ( 1:2:4 ) With Stone Chips, In Two Layers, Bottom Layer 19 Mm Thick ( 1:2:4 ) With 12 Mm To 6 Mm Size Graded Stone Chips And Top Layer 6 Mm Thick ( 1:2 ) With 6 Mm Down Stone Chips In Panels, Including Cost Of Curing, Finishing The Surface Smooth By Rubbing With Carborun-Dum Stone, Taxes And Royalty All Complete As Per Building Specification And Direction Of E / I. 6 Dismantling R.C.C. Work Including Stacking Serviceable Materials In Countable Stacks Within 15 M Lead And Disposal Of Unserviceable Materials With All Leads All Complete As Per Direction Of E / I.. 7 Reinforced Cement Concrete Work In Beams, Suspended Floor, Roofs, Having Slope Up To 15º Landings, Balconies, Shelves, Chajjas, Lintels, Bands, Plain Window Sills, Staircases And Spiral Stair Cases Above Plinth Level Up To Floor Five Level, Excluding The Cost Of Centring, Shuttering, Finishing And Reinforcement, With 1:1.5:3 ( 1 Cement : 1.5 Coarse Sand ( Zone-Iii ) : 3 Graded Aggregate 20Mm Nominal Size ) 8 Providing Tor Steel Reinforcement Of 8 Mm 10 Mm Dia Bars As Per Approved Design And Drawing Cutting, Bending And Binding With Annealed Wire Including The Cost Of Wire, Removal Of Rust, Placing The Rods In Position All Complete As Per Building Specification And Direction Of E / I. ( A ) 8 Mm & 10 Mm 9 Providing 12 Mm, Cement Plaster ( 1:6 ) With Clean Coarse Sand Of F.M 1-5 Including Screening, Curing With All Leads And Lifts Of Water, Scaffolding Taxes And Royalty All Complete As Per Building Specification And Direction E / I. 10 Providing Designation 75 A Brick Work In C.M. ( 1:6 ) In Foundation And Plinth With Approved Quality Of Clean Coarse Sand Of F.M. 2 To 2.5 Including Providing 10Mm Think Mortar Joints, Cost Of Screening Materials, Raking Out Joints Of 15Mm Depth, Curing Taxes And Royalty All Complete As Per Building Specification And Direction Of E / I 11 Supplying All Materials, Labour, Writing Name Of Department, Male & Female Directionon The Wall After Making Box By Good Quality Of Paint As Per Direction Of E / I. 160 Mm High Letter 12 Cost Towards Painting And Writing Slogan On Board 4’ X 3’ Size With Good Quality Paint Carrying And Fitting Fixing On Each Site Including Minor Repair Of Board Taking Back After Mela As Per Direction Of E / I. ( 150 Mm High Letter ) 13 Cost Towards Transportation Ofsubmersible Pump, Pipe Fittings Etc. From Store To Work Site Including Carriage Water Tank Etc. All Complete. 14 Cost Towards Fitting & Fixing Submersible Pump With Clamp Etc. All Complete Including Lowering Of Pvc Pipe. 2H.P To 7.5H.P And Taking Out After Ending Mela And Deposited In Departmental Store Deoghar. 15 Cost Towards Dismantling After Mela And Taking Back To Work Site From Store Including Carriage Of All Materials And Pump, Water Tank Etc. All Complete. 16 Laying Of Pvc Pipes Of Approved Make In Trenches With Red Lead And Yarn With Socket And Screw Joints And Cutting Pipe So Size And Threading Ends Where Necessary Etc. All Complete As Per Specification And Direction E / I. ( Pipes To Be Supplied Departmentally Free Of Cost ) . ( I ) 32 Mm Dia Pvc Pipe. ( 2 X 15. Mtr. ) 17 ( I ) 25 Mm Dia Pvc Pipe. ( 2 X 15 Mtr. ) 18 Laying Of Pvc Pipes Of Approved Make On Walland Roofwith Red Lead And Yarn With Socket And Screw Joints And Cutting Pipe So Size And Threading Ends Where Necessary Etc. All Complete In Wallas Per Specification And Direction E / I. ( Pipes To Be Supplied Departmentally Free Of Cost ) . ( I ) 15 Mm Dia Pvc Pipe ( 2 X 15 Mtr. ) 19 ( I ) 20 Mm Dia Pvc Pipe ( 2 X 10 Mtr. ) 20 ( Ii ) 25 Mm Dia Dia Pvc Pipe ( 2 X 6 Mtr. ) 21 Cost Towards Engaging Pump Operatar Cum Water Spreader On Laid Sand For Operating And Spreading Water On Sand Etc.All Complete Job Gr.-Ii. 22 Cost Towards Engagingplumber Andelectric Mistryduring Mela Periodincluding Contractor Profit. Plumbergr.-Ii 23 Electric Mistry Gr.-Ii 24 Cost Towards Extra Materials Due To Damages During Taking Out Damage Cut Pieces Including Laboaur Cost As Per Direction Of E / I. In Walls / Trenches. 32 Mm Dia Pvc Pipe . ( Rate Of Pvc Pipe + Laying Cost Charge ) 25 25 Mm Diapvc Pipe . ( Rate Of Pvc Pipe + Laying Cost Charge ) 26 15 Mm Diapvcpipe . ( Rate Of Pvc Pipe + Laying Cost Charge ) 27 25 Mm Dia Pvcelbow 28 15 Mm Dia Pvc Elbow 29 32 Mm Dia U / S Pvc 30 25 Mm Dia U / S Pvc 31 25 X 25 X 15 Mm Dia Reducing Tee Pvc 32 15 Mm Dia Pvc Fta 33 15 Mm Dia Pvc Coupler 34 25 Mm Diapvc Coupler 35 32 Mm Diapvc Coupler 36 15 Mm Pvc Shower 37 15 Mm P.V.C Bib Cock 38 32 X 32 X 25 Mm Dia Tee Pvc 39 Providing Two Coats Of Snowcem Of Approved Shade And Make Over Old Surface Including Washing, Cleaning And Preparing The Wall Etc. All Complete. 40 Providing One Coats Of Oil Bound Distemper Of Approved Shade And Make Over Old Surface Including Preparing The Plastered Surface By Rubbing Month With Pumice Stone Or Fine Sand Paper Applying Putty Wherever Required Scaffolding Washing Of Floors And Taxes All Complete As Per Building Specification Tionand Direction Of E / I. 41 Sanitary Installation 42 Labour For Scrapping Old Paint With Paint Remoter And Below Lamp As Required On Wooden Or Steel Surface Including Cost Of All Labour And Materials And Scaffolding All Complete As Per Balding Specification And Direction Of E / I. 43 Providing One Coat Of Painting With Ready Mixed Paint Of Approved Shade And Make Over Steel Surface Including Cleaning The Surface Toughly, Scaffolding And Taxes All Complete As Per Building Specification And Direction Of E / I. 44 Providing 12 Mm, Cement Plaster ( 1:6 ) With Clean Coarse Sand Of F.M 1.5 Including Screening, Curing With All Leads And Lifts Of Water, Scaffolding Taxes And Royalty All Complete As Per Building Specification And Direction E / I. 45 Providing Designation 75 A Brick Work In C. M. ( 1:6 ) In Different Places In Sewer Line With Approved Quality Of Clean Coarse Sand Of F. M. 2 To 2.5 Including Do…..Do…….All Complete As Per Building Specification And Direction Of E / I. 46 Providing Supplying, Fitting And Fixing Of The Followingmaterials In Connection Of Latrine Room.25 Mm Dia Pvc Pipe . ( Rate Of Pvc Pipe + Laying Cost Charge ) 47 15 Mm Diapvc Pipe. ( Rate Of Pvc Pipe + Laying Cost Charge ) 48 25 X 25 X 15 Mm Pvc Tee 49 25 Mm Dia Pvc Coupler 50 15 Mm Dia Pvc Coupler 51 25 Mm Dia Pvc U / Socket 52 25 Mm Dia Fta 53 15 Mm Dia Fta 54 25 Mm Dia Pvc Elbow 55 15 Mm Diapvc Elbow 56 Providing And Fixing 15 Mm Dia Male Ended C.I. Bodybrass Spindle Valve And Seat Bib Clock Of Approved Quality ( Wt- Not Less Than 400 Gms. ) With Extra Socket All Complete As Per Specification And Direction E / I.. 57 Providing One Coat Of Oil Bound Distemper Of Approved Shade And Make Over A Coat Of Cement Primer Over New Surface Including Preparing The Plastered Surface By Rubbing Month With Pumice Stone Or Fine Sand Paper Applying Putty Wherever Required Scaffolding Washing Of Floors And Taxes All Complete As Per Building Specification Tionand Direction Of E / I. 58 Supplying Of Following Materials .Mug 59 Balti –Plastic 60 Providing Designation 75 A Brick Work In C.M. ( 1:6 ) In Foundation And Plinth With Approved Quality Of Clean Coarse Sand Of F.M. 2 To 2.5 Including Providing 10 Mm Think Mortar Joints, Cost Of Screening Materials, Raking Out Joints Of 15Mm Depth, Curing Taxes And Royalty All Complete As Per Building Specification And Direction Of E / I 61 Providing 150 Mm Wide Brick Drain In Cement Mortar ( 1:6 ) With Av 150 Mm Clear Depth And 125 Mm Apron Including Cost Of E / W Involved, With 75 Mm Cement Concrete ( 1:4:8 ) Over One Brick Designation 100 A Flat Soling In Proper Grade And Slope At The Base, The Drain Duly Plastered In C.M ( 1:3 ) With Punning Over Exposed Surface All Complete Asper Building Specification Direction Of E / I. 62 Supplying, Fitting And Fixing 20 Gauge G.C.I Sheet Gate Fitted On M.S Angle Frame Of Size60*60*6 Mm Including Cost Of Fabrication, Providing Necessary Locking Arrangement With Haskal And Domny Duly Fixed In C / C ( 1:2:4 ) Blocks Of Required Size, Applying A Priming Red Lead Paint Over Steel Work, Taxes All Complete As Per Drawing Specification And Direction Of E / I 63 Indravarsha 64 Earth Work In Excavation For Laying Of Pipe So As To Give One Meter ( Avg. ) Cover Over The Socket Of Pipe And Back Filling The Trenches After Laying Of Pipe, Again A / W In Excavation And Taking Out The Laid Pipeand Back Filling The Same After The End Ofshrawani Mela 65 Earth Work In Back Filling The Trenches Fatter Laying Different Types And Size Of Pipes With Earth Removed During Excavation Within Initial Lead And Lift As Per Specification And Direction E / I. 66 Laying Of 32 Mm Dia Gi / Pvc Pipe In Trenches And Taking Out The Same ( 2 X 147.00 Mtr. ) 67 Supplying Of 32 Mm Dia Pvc Pipe With Socket In 3 M Length Do-Do All Complete. 68 Laying & Jointing Pvc Pipe In Hanging Position Ovar Support And Taking Out The Same After End Of Shrawani Mela ( Pipe Supplied Departmentally Free Of Cost ) ( A ) 32 Mm Dia. Pvc Pipe ( 2 X 351.00 Mtr. ) 69 ( B ) 25 Mmdia. Hanging Pvc Pipe ( 2X 198.00 Mtr. ) 70 Supplying And Fixing Gi Fittings Of Approved Make All Complete As Per Specification And Direction E / I. 32 Mm Elbow 71 32 Mm U / S 72 25 Mm Plug 73 25 Mm Socket 74 32 X 25 R.S. 75 32 X 25 Elbow 76 25 Mm U / S 77 32 Mm Tee 78 Electric Welding Of 15 Mm Dianipple In 25 Mm Dia Pvc Pipe After Making Hole Of 20 Mm Dia Including Cost Ofnipple. In 25 Mm Dia. Pipe 79 In 15 Mm Dia. Gi Nipple 80 Cost Of 15 Mm Dia. Gi. Socket 81 Cost Towards Fitting & Fixing Submersible Pump With Clamp Etc. All Complete Including Lowering Of Pvc Pipe. 2H.P To 7.5 H.P And Taking Out After Ending Mela And Deposited In Departmental Store Deoghar. 82 Providing Pump Operatorfor Operating Motor For Supplying Water Forindra Varsha. 83 Peyaoo - 84 Providing Two Coats Of Oil Bound Distemper Of Approved Shade And Make Over A Coat Of Cement Primer Over Old Surface Including Preparing The Plastered Surface By Rubbing Smooth With Pumice Stone Or Fine Sand Paper Applying Putty Wherever Required Scaffolding Washing Of Floors And Taxes All Complete As Per Building Specification Tionand Direction Of E / I. 85 Providing Two Coat Of Plastic Emulsion Paint Of Approved Shade And Make Over Old Surface Including Washing, Cleaning And Preparing The Walls, Scaffolding, Washing For Floor And Taxes All Complete As Per Building Specification And Direction Of E / I. 86 Providingtwocoat Of Snowmen Of Approved Shade And Makes Over A Coat Of Cement Primer On New Surface Including Prepering The Plastered Surface Smooth With Sand Paper, Scaffolding Curing And Taxes All Complete As Per Building Specification And Direction Of E / I. 87 Providing And F / Fixing Water Supply Arrangement From Gi Hdpe Tank To Bathing Palatform As Per Site Condition Including F / Fixing Bib Cock, Stop Cock, Gi Nipple, Tee, Elbow, Socket, R.Socket, Union Socket, Plug, Gun Metal Full Way Valve, Pvc Sch-80 Pipe All Complete Including Installation Of Hdpe Water Storage Tank Including Carriage Of Tank From Departmental Store To Work Site. ( Hdpe Water Storage Tank Will Be Supplied Free Of Cost Departmentally ) 88 Cost Towards Fitting & Fixing Submersible Pump With Clamp Etc. All Complete Including Lowering Of Pvc Pipe. 2H.P To 7.5 H.P And Taking Out After Ending Mela And Deposited In Departmental Store Deoghar. 89 Spreading Water Over Laid Sand 90 Providing Labour Tool And Equipmentfor Spreading Water Over Laid Sand At Kanwariya Path During Shrawani Mela. From 9A.Mto 5P.M A ) Cost Offlexiblepvcpipe 91 B ) Labour Charge For 1 Nos X 30 Days 92 Carriage Ofall Materials From Store To Work Site And Return Back To Work Site To Departmental Store Within A Distance Of 15Km . 93 Cost Towards Electric Consumption Charge For To Be Paid To Electricity Board During Shrawani Mela .Payable Jseb 94 Carriage Of Materials Fromkiln Site Or Quarry Site To Work Site Including Contractor Profit, Loading, Unloading, Transportation, Etc. All Complete.Bricks Up To 15 K.M. 95 Sand Up To 15 K.M. 96 Stone Chips Up To 15 K.M. 97 Cement Up To 15 K.M. 98 Steel Up To 15 K.M. 99 Add Gst @ 12% 100 Add 1 % Labour Cess

Key Value

Document Fees
INR 750 /-
EMD
INR 8100.0 /-
Tender Value
INR 4.02 Lakhs /-

BOQ Items

Name of Work: Supplying of materials, tools, plants and skilled and unskilled man power for repairing and maintenance of existing structure and fitting, fixing all works with operation & maintenance the entire works during Shrawani Melaat near Sarasani -2 toKhijuriya School (Near Plant No.-14 toPlant No.-16) under D.W & S. Division , Deoghar in the Year 2022-23 for the year 2022-23 Group No. SM-D-08
Sl. No. Item Description
1WATER SUPPLY
2Jungal clearence including weeding out shrubs and small trees up to 150 mm dia girth and there removalas per specification and direction of E/I.
3Supplying and filling stone dust around Urinal and Bathing area at Khijuriya plant
4Dismantling patent stone flooring including stacking serviceable materials in countable stacks within 15 M lead and disposal of unserviceable materials with all leads all complete as per direction of E/I.
5Providing 25 mm thick first class patent stone flooring (1:2:4) with stone chips,in two layers, bottom layer 19 mm thick (1:2:4) with 12 mm to 6 mm size graded stone chips and top layer 6 mm thick (1:2) with 6 mm down stone chips in panels,including cost of curing, finishing the surface smooth by rubbing with carborun-dum stone,taxes and royalty all complete as per building specification and direction of E/I.
6Dismantling R.C.C. work including stacking serviceable materials in countable stacks within 15 M lead and disposal of unserviceable materials with all leads all complete as per direction of E/I..
7Reinforced cement concrete work in beams, suspended floor, roofs, having slope up to 15º landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centring, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand (Zone-III) : 3 graded aggregate 20mm nominal size)
8Providing Tor steel reinforcement of 8 mm 10 mm dia bars as per approved design and drawing Cutting, bending and binding with annealed wire including the cost of wire, removal of rust, placing the rods in position all complete as per building specification and direction of E/I. (a) 8 mm & 10 mm
9Providing 12 mm, cement plaster (1:6) with clean coarse sand of F.M 1-5 including screening, curing with all leads and lifts of water, scaffolding taxes and royalty all complete as per building specification and direction E/I.
10Providing designation 75 A brick work in C.M.(1:6) in foundation and plinth with approved quality of clean coarse sand of F.M. 2 to 2.5 including providing 10mm think mortar joints, cost of screening materials, raking out joints of 15mm depth, curing taxes and royalty all complete as per building specification and direction of E/I
11Supplying all materials, labour, writing name of department, male & female directionon the wall after making box by good quality of paint as per direction of E/I. 160 mm high letter
12Cost towards painting and writing slogan on board 4’ x 3’ size with good quality paint carrying and fitting fixing on each site including Minor repair of board taking back after Mela as per direction of E/I.(150 mm high letter)
13Cost towards transportation ofsubmersible pump, pipe fittings etc. from store to work site including carriage water tank etc. all complete.
14Cost towards fitting & fixing submersible pump with clamp etc. all complete including lowering of PVC Pipe. 2H.P to 7.5H.P and taking out after ending mela and deposited in departmental store deoghar.
15Cost towards dismantling after mela and taking back to work site from store including carriage of all materials and pump, water tank etc. all complete.
16Laying of PVC pipes of approved make in trenches with red lead and yarn with socket and screw joints and cutting pipe so size and threading ends where necessary etc. all complete as per specification and direction E/I. (Pipes to be supplied departmentally free of cost). (i) 32 mm dia PVC pipe. ( 2 x 15. Mtr.)
17(i) 25 mm dia PVC pipe. (2 x 15 Mtr.)
18Laying of PVC pipes of approved make on walland roofwith red lead and yarn with socket and screw joints and cutting pipe so size and threading ends where necessary etc. all complete in wallas per specification and direction E/I. (Pipes to be supplied departmentally free of cost).(i) 15 mm dia PVC pipe (2 x 15 Mtr.)
19(i) 20 mm dia PVC pipe ( 2 x 10 Mtr.)
20(ii) 25 mm dia dia PVC pipe( 2 x 6 Mtr.)
21Cost towards engaging Pump Operatar cum water spreader on laid sand for operating and spreading water on sand etc.all complete job GR.-II.
22Cost towards engagingPlumber andElectric mistryduring Mela periodincluding contractor profit. PlumberGr.-II
23Electric mistry Gr.-II
24Cost towards extra materials due to damages during taking out damage cut pieces including laboaur cost as per direction of E/I. in walls/trenches. 32 mm dia PVC pipe .(Rate of PVC Pipe + Laying cost charge)
2525 mm diaPVC pipe .(Rate of PVC Pipe + Laying cost charge)
2615 mm diaPVCpipe .(Rate of PVC Pipe + Laying cost charge)
2725 mm dia PVCElbow
2815 mm dia PVC Elbow
2932 mm dia U/S PVC
3025 mm dia U/S PVC
3125 x 25 x 15 mm dia Reducing Tee PVC
3215 mm dia PVC FTA
3315 mm dia PVC Coupler
3425 mm diaPVC Coupler
3532 mm diaPVC Coupler
3615 mm PVC Shower
3715 mm P.V.C Bib Cock
3832 x 32 x 25 mm dia tee PVC
39Providing two coats of snowcem of approved shade and make over old surface including washing, cleaning and preparing the wall etc. all complete.
40Providing one coats of oil bound distemper of approved shade and make over old surface including preparing the plastered surface by rubbing month with pumice stone or fine sand paper applying putty wherever required scaffolding washing of floors and taxes all complete as per building specification tionand direction of E/I.
41SANITARY INSTALLATION
42Labour for scrapping old paint with paint remoter and below lamp as required on wooden or steel surface including cost of all labour and materials and scaffolding all complete as per balding specification and direction of E/I.
43Providing one coat of painting with ready mixed paint of approved shade and make over steel surface including cleaning the surface toughly, scaffolding and taxes all complete as per building specification and direction of E/I.
44Providing 12 mm, cement plaster (1:6) with clean coarse sand of F.M 1.5 including screening, curing with all leads and lifts of water, scaffolding taxes and royalty all complete as per building specification and direction E/I.
45Providing designation 75 A Brick work in C. M. (1:6) in different places in sewer line with approved quality of clean coarse sand of F. M. 2 to 2.5 including do…..do…….all complete as per building specification and direction of E/I.
46Providing supplying,fitting and fixing of the followingmaterials in connection of latrine room.25 mm dia PVC pipe .(Rate of PVC Pipe + Laying cost charge)
4715 mm diaPVC pipe.(Rate of PVC Pipe + Laying cost charge)
4825 x 25 x 15 mm PVC Tee
4925 mm dia PVC Coupler
5015 mm dia PVC Coupler
5125 mm dia PVC U/Socket
5225 mm dia FTA
5315 mm dia FTA
5425 mm dia PVC Elbow
5515 mm diaPVC Elbow
56Providing and fixing 15 mm dia male ended C.I. bodybrass spindle valve and seat bib clock of approved quality (wt- Not less than 400 Gms. ) with extra socket all complete as per specification and direction E/I..
57Providing one coat of oil bound distemper of approved shade and make over a coat of cement primer over new surface including preparing the plastered surface by rubbing month with pumice stone or fine sand paper applying putty wherever required scaffolding washing of floors and taxes all complete as per building specification tionand direction of E/I.
58Supplying of following materials .Mug
59Balti –Plastic
60Providing designation 75 A brick work in C.M.(1:6) in foundation and plinth with approved quality of clean coarse sand of F.M. 2 to 2.5 including providing 10 mm think mortar joints, cost of screening materials, raking out joints of 15mm depth, curing taxes and royalty all complete as per building specification and direction of E/I
61Providing 150 mm wide brick drain in cement mortar (1:6) with av 150 mm clear depth and 125 mm apron including cost of E/W involved,with 75 mm cement concrete (1:4:8) over one brick designation 100 A flat soling in proper grade and slope at the base,the drain duly plastered in C.M (1:3 ) with punning over exposed surface all complete asper building specification direction of E/I.
62Supplying, fitting and fixing 20 gauge G.C.I sheet gate fitted on M.S angle frame of size60*60*6 mm including cost of fabrication, providing necessary locking arrangement with haskal and domny duly fixed in C/C(1:2:4) blocks of required size, applying a priming red lead paint over steel work, taxes all complete as per drawing specification and direction of E/I
63INDRAVARSHA
64Earth work in excavation for laying of pipe so as to give one meter (avg.) cover over the socket of pipe and back filling the trenches after laying of pipe, again a/w in excavation and taking out the laid pipeand back filling the same after the end ofShrawani Mela
65Earth work in back filling the trenches fatter laying different types and size of pipes with earth removed during excavation within initial lead and lift as per specification and direction E/I.
66Laying of 32 mm dia GI/PVC pipe in trenches and taking out the same ( 2 x 147.00 Mtr.)
67Supplying of 32 mm dia PVC pipe with socket in 3 M length do-do all complete.
68Laying & jointing PVC pipe in hanging position ovar support and taking out the same after end of Shrawani Mela ( pipe supplied departmentally free of cost)(A) 32 mm Dia. PVC Pipe ( 2 x 351.00 Mtr.)
69(B) 25 mmDia. Hanging PVC Pipe ( 2x 198.00 Mtr.)
70Supplying and fixing GI fittings of approved make all complete as per specification and direction E/I. 32 mm Elbow
7132 mm U/S
7225 mm Plug
7325 mm Socket
7432 x 25 R.S.
7532 x 25 Elbow
7625 mm U/S
7732 mm Tee
78Electric welding of 15 mm diaNipple in 25 mm dia PVC pipe after making hole of 20 mm dia including cost ofnipple. In 25 mm dia. Pipe
79In 15 mm dia. GI Nipple
80Cost of 15 mm dia. GI. Socket
81Cost towards fitting & fixing submersible pump with clamp etc. all complete including lowering of PVC Pipe. 2H.P to 7.5 H.P and taking out after ending mela and deposited in departmental store deoghar.
82Providing pump operatorfor operating motor for supplying water forINDRA VARSHA .
83PEYAOO -
84Providing two coats of oil bound distemper of approved shade and make over a coat of cement primer over old surface including preparing the plastered surface by rubbing smooth with pumice stone or fine sand paper applying putty wherever required scaffolding washing of floors and taxes all complete as per building specification tionand direction of E/I.
85Providing two coat of plastic emulsion paint of approved shade and make over old surface including washing, cleaning and preparing the walls, scaffolding, washing for floor and taxes all complete as per building specification and direction of E/I.
86ProvidingTwocoat of snowmen of approved shade and makes over a coat of cement primer on new surface including prePering the plastered surface smooth with sand paper, scaffolding curing and taxes all complete as per building specification and direction of E/I.
87Providing and F/Fixing water supply arrangement from GI HDPE Tank to Bathing Palatform as per site condition including F/Fixing Bib Cock, stop cock, GI nipple, Tee, Elbow,Socket, R.Socket, Union Socket,Plug, Gun Metal Full way Valve, PVC Sch-80 Pipe all complete including installation of HDPE water storage tank including carriage of tank from departmental store to work site. (HDPE water storage tank will be supplied free of cost departmentally)
88Cost towards fitting & fixing submersible pump with clamp etc. all complete including lowering of PVC Pipe. 2H.P to 7.5 H.P and taking out after ending mela and deposited in departmental store deoghar.
89SPREADING WATER OVER LAID SAND
90Providing Labour tool and equipmentfor spreading water over laid sand at Kanwariya Path during Shrawani Mela. From 9a.mto 5p.m A) Cost ofFlexiblePVCpipe
91B) Labour Charge for 1 Nos x 30 Days
92Carriage ofall materials from store to work site and return back to work site to departmental store within a distance of 15KM .
93Cost towards electric consumption charge for to be paid to Electricity Board during shrawani mela .payable JSEB
94Carriage of materials fromkiln site or quarry site to work site including contractor profit, loading, unloading, transportation, etc. all complete.Bricks up to 15 K.M.
95Sand up to 15 K.M.
96Stone chips up to 15 K.M.
97Cement up to 15 K.M.
98Steel up to 15 K.M.
99Add GST @ 12%
100Add 1 % Labour Cess
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail