Construction Of Additional Class Room At Ssd High School Ardabahal
Tender Value
20.28 Lakhs
Estimated cost
Bid Submission
07 Jun 2022
0 days left
EMD
Ref. Documents
Bank guarantee accepted
Document Fee
6000
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
kuchinda → Odisha
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Construction Of Additional Class Room At Ssd High School Ardabahal
BOQ
| Sl. No. | Item Description |
| 1 | Ground Floor |
| 2 | Earth work excavation of foundation in hard soil or gravelly soil within 50m intial lead and 1.5m initial lift including rough dressing and leveling the bed and depositing the excavated earth including cost of all labours and T& P required for the work etc complete as per direction of Engineer-in-charge. |
| 3 | Filling foundation and plinth with filling sand laying in layers including ramming, watering, compacting including cost, conveyance and royalty of sand from approved quarry and other . if any with all leads, lifts, T&P etc complete the items of work in all respect as per specification and direction of Engineer in charge. |
| 4 | CC (1:4:8) using 40 mm size and down graded crusher broken HG stone metal free from weathered surface of approved quality from approved quarry in foundation and plinth including laying concrete in layers with due compaction, watering and curing including cost, conveyance, royalty and . of all materials with all lead, lifts and delifts, T&P etc required for completion of the work in all respect as per direction of the Engineer-in-charge. |
| 5 | RCC work of M-20 grade with 20 mm and down grade black hard granite chips including cost, conveyance, royalty and all . of all materials with all leads, lifts, T&P etc including rigid and smooth centering, shuttering and dismantling the same after the curing of RCC work for 28 days complete the item of work in all respect as per specification and direction of Engineer-in-charge. |
| 6 | Column base & Footing |
| 7 | Plinth Bend |
| 8 | Column & Beam |
| 9 | Lintel Bend |
| 10 | Chhaja |
| 11 | Roof Slab |
| 12 | Supplying, straightening coiled or bent up MS rods including cutting, bending and welding if required and tying the grills, laying and placing in proper position as per design including cost, conveyance, , . etc of tested MS/TS rod with testing data of required specification & cost of binding wires of 18 to 20 gauge, labour, T&P required for the work complete and as per the specification and direction of the Engineer-in-charge. |
| 13 | Brick work with Fly Ash Brickin cement mortar (1:6) in foundation & plinth including cost, conveyance, royalty, . of all materials, labour, T&P required for the work complete and as per the direction of the Engineer-in-charge. |
| 14 | Brick work with Fly Ash Brickin cement mortar (1:6) in superstructure including cost, conveyance, royalty, . of all materials, labour, T&P required for the work complete and as per the direction of the Engineer-in-charge. |
| 15 | Supplying of MS grill gate, MS angle chowkhat of approved specification for doors and windows welded with MS sheet shutters of 18 to 20 gauge thick, openable and electrically welded with all necessary fittings including cost of all materials, labour, T&P, transportation to worksite etc all complete in all respect. |
| 16 | Labour for fitting and fixing of MS doors and windows, MS grill gate as per approved design & all complete. |
| 17 | 12mm thick cement plaster (1:6) in cement mortar finished smooth surface on brick wall after racking out joints including watering curing to required period including cost conveyance, royalty of all materials, T&P complete etc. as per specification and direction of Engineer in charge. |
| 18 | 16mm thick cement plaster (1:6) in cement mortar finished smooth surface on brick wall after racking out joints including watering curing to required period including cost conveyance, royalty of all materials, T&P complete etc. as per specification and direction of Engineer in charge. |
| 19 | 6mm thick cement plaster in cement mortar (1:4) to RCC surface finished including watering curing to required period including cost conveyance,royality of all materials,T&P complete etc. As per specification and direction of engineer in charge. |
| 20 | Fixing Vertified tile in floors, treads on steps and landing on 25 mm thick bed of cement mortar 1:1(1cement:1 sand) joined with neat cement slurry mixed with pigment to match the shade of the tiles including rubbing and polishing,cost,, conveyance, royalty, . of all materials, labour, T&P required for the work complete and as per the direction of the Engineer-in-charge. |
| 21 | Fixing Vertifiedtiles in dado, skirting and rises of steps on 12mm thick cement plaster (1:3) joined with neat cement slurry mixed with pigment to match the shade of the tiles including rubbing and polishing including cost, conveyance, royalty, . of all materials, labour, T&P required for the work complete and as per the direction of the Engineer-in-charge. |
| 22 | Painting two coats of synthetic enamel paint over a coat of primer of approved quality, brand and shade including smoothening the surface by sand paper and filler etc complete with cost, conveyance, royalty, . of all materials, labours T&P required as per specification and direction of Engineer-in-charge. |
| 23 | Finishing to walls with two coats weather coatover one coat primer after finishing wall surface of wall with cement based wall putty (water based) and weather coat paint of approved brand and approved colour including cleaning the surfacewith cost, conveyance, royalty . of all materials labour T&P and scaffolding as required for the work and as per specification and direction of Engineer-in-charge. |
| 24 | Finishing to Distempering wall with distemperover one coat primer after finishing wall surface of wall with cement based wall putty (water based) and weather coat paint of approved brand and approved colour including cleaning the surfacewith cost, conveyance, royalty . of all materials labour T&P and scaffolding as required for the work and as per specification and direction of Engineer-in-charge. |
| 25 | Supply ,Fitting & Fixing of stainless steel of 304 grade in hand railing using 50 mm dia of 2 mm thick circular pipe with Balustrade of size 32 mm x 32 mm x 2 mm @ .09 mtr C/C and stainless square pipe bracing of 32 mm x 32 mm x 2 mm in 3 row in stair case as per approved design and specification buffing,polishing etc. with cost ,conveyancy . of all material, labour ,T&P etc. required for the |
| 26 | Cement concrete in cm (1:2:4) using 12 mm size h.g.c.b. chipsfree from weathered surface of approved quality from approved quarry in foundation and plinth including laying concrete in layers with due compaction, watering and curing including cost, conveyance, royalty and . of all materials with all lead, lifts and delifts, T&P etc required for completion of the work in all respect as per direction of the Engineer-in-charge. |
AI Tender Summary
Tender Timeline
May 27, 2022
11:30 IST
Tender Published
Tender notice published.
CompletedJun 07, 2022
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedJun 08, 2022
Bid Opening Date