| 1 | E-Tender for AGRI FEEDER SEGREGATION with DT\"s and HT/LT line in Kottaiyur Feeder of 110 / 11 KV Watrap SS of Town/Watrap Section in Srivilliputhur Division (Under RDSS Scheme) |
| 2 | Excavation of Staypit4.5\" to 5\" depth by using JCB or manual |
| 3 | Excavationofpolepitupto8 mtr PSC poles by using JCB or manual |
| 4 | Excavationofpolepitupto9.14 mtr Pole by using JCB or manual |
| 5 | Erection of 8 mtr PSC poles by using JCB or maual |
| 6 | Erection of 9 mtr PSC poles by using JCB or maual |
| 7 | Erectionofstay set complete |
| 8 | Fixing of 3.6\"\"V\" crossarms(all types) / channelcrossarms/ guarding Crossarms |
| 9 | Fixing of LT 3 phasecross arms |
| 10 | Fixing of LT Single phase cross arms |
| 11 | Fixing of HT/LT TIFittings |
| 12 | Fixingofpin Insulators with Pin 11 KV |
| 13 | Fixingof11 KVstrain disc. |
| 14 | FixingofLT pin Insulator with pin |
| 15 | FixingofLT shackle |
| 16 | FixingofAluminium Knob |
| 17 | Earthingofpolewithpinincludingburyingloopingand binding |
| 18 | PavingofConductor,stringing,binding Jumperingetc., completewith7/4.09ACSRforbothHT/LTlines with LC work. |
| 19 | PavingofConductor,stringing,binding Jumperingetc., completewith7/3.35 mm ACSRfor both HT/LT lines with LC work. |
| 20 | PavingofConductor,stringing,binding Jumperingetc., completewith7/2.59 mm ACSRfor both HT/LT lines with LC work. |
| 21 | Concreting of Poles as per Board standards (2*2*5). The material such as sand, jelly, etc., have to be supplied by contractor including Cement supplied by Contractor (Cement concrete mix 1:4:8 using 40mm hard broken stone including cost of labour Charges for placing Transporting of Sand, jally, from box and water curing etc,. complete as per field Engineer\"s instructions. |
| 22 | Sleeveconcreting including materials (Cement 1/2 bag +river sand and Blue metals and watering) as per field Engineer\"s instructions. |
| 23 | ErectionofSingle Pole Transformerstructure completeinallrespects withwiring Earthing,fixingofopentypefuseunits, HT/LT/LASandjumpering3 Nos.Earth pitswithtubs includingpaintingofmetal parts, structurepoles,fixingof topchannel seatingchannel, beltingangle (Except erection ofTransformer) |
| 24 | Erectionof Double Pole Transformerstructure completeinallrespects withwiring Earthing,fixingofopentypefuseunits, HT/LT/LASandjumpering3 Nos.Earth pitswithtubs includingpaintingofmetal parts, structurepoles,fixingof topchannel seatingchannel, beltingangle (Except erection ofTransformer) |
| 25 | Loading/Unloadingofpolesupto8 mtr PSC poles |
| 26 | Loading/Unloadingofpolesupto9 mtr PSC poles & RCC Square Pole |
| 27 | LoadingorunloadingofTransformer upto200 KVAfor each |
| 28 | Transporting ofDistribution Transformer up to 20KM |
| 29 | Transporting ofDistribution Transformer beyond 20KMS |
| 30 | ErectionofNewTransformerupto 200 KVA |
| 31 | ErectionofD.P. structurewithAB switch top channel, crossbracing,HGfuseset,earthing,painting, providingstayandpole concreting as per field Engineer\"s instructions. |
| 32 | Changing of Pin Point to Cut point in LT line |
| 33 | ProvisionofDistributionTransformerName Board (Name ofthe22/11KV #, Name of theSS, Capacity, Danger Board.) |
| 34 | Cutting of coconut leaves (per tree) |
| 35 | Drilling of hole in channel only 3/4\" & 1\" per hole |
| 36 | Cutting of Angle |