Execution Of Agri Feeder Segrigation In Mordhana Feeder Under Rdss Scheme
Tender Value
9 Lakhs
Estimated cost
Bid Submission
02 Jun 2022
0 days left
EMD
9000
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
tirupattur → Tamil Nadu
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Execution Of Agri Feeder Segrigation In Mordhana Feeder Under Rdss Scheme
BOQ
| Sl. No. | Item Description |
| 1 | Excavation of Pole Pits/Stay Set: |
| 2 | For pole upto 8.0m length by using JCB/Manual |
| 3 | For pole above 8.0m length by using JCB/Manual |
| 4 | In Hard Soil (common to all size of poles) |
| 5 | In rocky area(common to all size of poles) byblasting/Manual |
| 6 | Excavation of Stay pit of 4.5\" to 5\" depth using JCB/Manual |
| 7 | Excavation of Stay pit in Hard rock soil |
| 8 | Erection of Poles and Accessories |
| 9 | Erection of RCC, REC, PSC poles upto 8.00m length by using JCB/Manual |
| 10 | Erection of RCC, REC, PSC poles above 8.00m length by using JCB/Manual |
| 11 | Erection of metal supports above 9m/RSJ/Rail pole/Tubular pole |
| 12 | Erection of stay set complete with fixing up stay wire Eye, Bow,Guy Shackle, Binding etc. |
| 13 | Erection of additional stay in the same stay rod, excluding excavation of stay pit and burial of stay rod. |
| 14 | Erection of stay set complete in the rocky area by blasting |
| 15 | Fixing of line materials |
| 16 | Fixing of HT VCross arms3 1/2, 4 1/2 & 5 feet |
| 17 | Fixing of LT 3 Phase cross arm |
| 18 | Fixing of LT single Phase cross arm |
| 19 | Fixing of HT / LTTI Fitting |
| 20 | Fixing of HT Pin Insulators (11/22/33KV) |
| 21 | Fixing of LT Pin Insulators |
| 22 | Fixing of Two Tapping cross arm per cut point upto 33KV line including fixing of Discs, insulators and Jumpering etc |
| 23 | Fixing of LT Shackle |
| 24 | Fixing of Aluminium knob |
| 25 | Fixing of HT LAS (3 Nos) |
| 26 | Fixing of LT LAS (3 Nos) |
| 27 | Paving and Stringing of conductor |
| 28 | Paving and stringing of conductors of sizes upto 7/2.59 mm ACSR or other equivalent conductor |
| 29 | Paving and stringing of conductors of sizes above 7/2.59 mm ACSR or other equivalent conductor upto 7/3.35mm ACSR |
| 30 | Paving and stringing of conductors of sizes 7/4.09 mm ACSR or other equivalent conductor |
| 31 | Erection of Distribution Transformers: |
| 32 | Erection of Distribution transformer including loading of distribution transformer at stores and erection at structure or vice versa upto 25KVA DT/Metering set. |
| 33 | Erection of Distribution transformer including loading of distribution transformer at stores and erection at structure or vice versa above 25KVA to 100KVA DT. |
| 34 | Erection of 11KV Single pole structure including erection of DT complete without centre support |
| 35 | Erection of 11KV Single pole structure including erection of DT complete with centre support |
| 36 | Transportation charges |
| 37 | Transportation of all types and sizes of poles and other associated material from road side to pole pit and vice versa upto 0.50KM |
| 38 | Transporting of all types of polesby bullock cart or other vehicle (for all size of poles including loading and unloading) Above 5KM of lead of every KM |
| 39 | Transport of metal pole of all size by head loads in hill areas from road side to polepit locationupto 1KM |
| 40 | Transporting of conductors of all size from road side to pit locations upto 1 KM of conductor |
| 41 | Transporting of Distribution Transformer / Line materials from stores to office/ site upto 10KM distance by engaging 1 ton capacity Minidor(lorry) |
| 42 | above 10KM |
| 43 | Loading/Unloading Charges |
| 44 | Loading/Unloading of DT upto 100KVA |
| 45 | Loading/Unloading of variouse size of REC, RCC,PSC Poles upto 8.0m length |
| 46 | Loading/Unloading of variouse size of REC, RCC,PSC Poles above 8.0m length |
| 47 | Loading/Unloading of metal Poles of all sizes |
| 48 | Loading of conductor |
| 49 | Unloading of conductor |
| 50 | Loading/Unloading of line material |
| 51 | Earthing |
| 52 | Earthing of poles with GI wires 4 or 6 SWG by coil earthing |
| 53 | Numbering of poles inclding base painting with cost of paint |
| 54 | Painting of iron poles upto 40 feet 200/100 length with double coats including cost of paint |
| 55 | Concreting Works |
| 56 | Concreting with 1:4:8 mix using 40mm jelly including curing (material +labour) mass concreting of poles |
| 57 | sleeve concreting |
| 58 | stay concreting |
| 59 | Painting of structure materials distribution transformers with aluminium paint of structure pole and writing of transformer details (Paint to be supplied by department) |
| 60 | E.P.F. @13 % should be Entered by the Bidder |
| 61 | E.S.I. @3.25 % should be Entered by the Bidder |
| 62 | G.S.T. @18% should be Entered by the Bidder |
AI Tender Summary
Tender Timeline
May 24, 2022
11:30 IST
Tender Published
Tender notice published.
CompletedJun 02, 2022
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedJun 03, 2022
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender