Scheme Work Contract Agri Feeder Segregation In 22 Kv Ambasamuthram Feeder In Town Uthamapalayam Section Under Rdss Scheme
Tender Value
Ref. Documents
Estimated cost
Bid Submission
30 May 2022
0 days left
EMD
16500
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
uthamapalayam → Tamil Nadu
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Scheme Work Contract Agri Feeder Segregation In 22 Kv Ambasamuthram Feeder In Town Uthamapalayam Section Under Rdss Scheme
BOQ
| Sl. No. | Item Description |
| 1 | Fixing of shackle |
| 2 | Fixing of shackle |
| 3 | Fixing of HT strain disc 22 KV |
| 4 | Fixing of Aluminium knob |
| 5 | Fixing of HT LAS (3 Nos.) |
| 6 | Fixing of LT LAS (3 Nos.) |
| 7 | Paving and stringing of conductors of sizes upto 7/2.59 mm ACSR or other equivalent conductor |
| 8 | Erection of Distribution Transformer structure complete as per TNEB standard including painting, feeders arrangrment, colour washing of RCC poles etc.. Fixing of poles type to be unit HT / LT LAS and jumpering 3 Nos Earth pits with earth trough except erection of Distribution Transformer. |
| 9 | Erection of Distribution Transformer including loading of Distribution Transformer at stores and erection at structure or vice versa. Above 25 kva to 100kva |
| 10 | Erection of DP structure with stay as per TNEB standard including fixing of top channel, cross bracing, concreting, painting, colour washing etc., ( 22/33KV AB switch |
| 11 | Concreting with 1:4:8 mix using 40 mm Jelly including curing(Material + labour) Mass concreting of poles |
| 12 | Concreting with 1:4:8 mix using 40 mm Jelly including curing(Material + labour)Sleeveconcreting |
| 13 | Fixing of LT PIN insulator |
| 14 | Fixing of HT PIN insulator with Pin 22 kv |
| 15 | Fixing of HT / LT Ti fitting |
| 16 | Fixing of LT 3 phase cross arm |
| 17 | Fixing of Line Materials v cross arm 4.5 feet |
| 18 | Erection of stay set complete in the rock area by blasting |
| 19 | Erection of stay set complete with fixing up stay wire Eye, Bow, Guy Shackle, Binding etc. |
| 20 | Erection of metal supports above 9m / RSJ / Rail Pole/Tubular Poles |
| 21 | Erection of RCC, REC, PSC poles upto 8.00m length by using Crane / Manual |
| 22 | Excavation of Stay pit in Hard rock soil |
| 23 | Excavation of Stay pit of 4.5 \" to 5 \"depth using JCB / Manual |
| 24 | In Hard Soil (common to all size of poles) |
| 25 | For pole above 8.00m length by using JCB/Manual |
| 26 | For pole upto 8.00m length by using JCB/Manual |
| 27 | Paving and stringing of conductors ofabove7/2.59 mm ACSR or other equivalent conductor upto 7/3.35mm ACSR or other equivalent conductor |
| 28 | Concreting with 1:4:8 mix using 40 mm Jelly including curing(Material + labour)Stay concreting |
| 29 | Numbering of poles including base painting and with cost of paint |
| 30 | Transportation of all types and sizes of poles and other associated materials from Road side to pole pit and vice versa upto 0.50 KM |
| 31 | Erection of Distribution Transformer including loading of Distribution Transformer at stores and erection at structure or vice versa. Upto 25 KVA Distribution transformer / Metering set. |
| 32 | Releasing and reerection (resagging) of one run of all sizes of conductor |
| 33 | Paving and stringing of conductors of7/4.09mm ACSR or other equivalent conductor |
| 34 | Pipie earthing including excavation of earth pit and fixing earth pipe 3 m length |
| 35 | loading or unloading DT Upto 100 KVA |
| 36 | Leveling of transformerstructure yard, providing cut stone or bricks etc., (with materials) |
| 37 | Clearing of tree braches of Neem, Tamarin, Country etc |
| 38 | Clearing of tree braches of coconut trees |
| 39 | Jungle clearance such as kattu karuvai in the various area without uprooting |
| 40 | Bush Clearance out side substation yard / office premises (light) |
| 41 | Manufacturing of earth pipe clamps for structure including of drilling holes and welding and clamp with earth pipe |
| 42 | AB switch or open type side arm stud, cutting and drilling holes |
| 43 | Drilling of holes in the structure materials clamps etc., |
| 44 | Painting of structure materials distribution transformers with aluminium paint of structure poles and writing of transformer details (Items 1 to 6 brush to be owned by the contractor)(Paint to be supplied by Department) |
| 45 | Painting of Cement poles by Distember coating including cost of distember |
| 46 | Painting of distribution transformer of all capacities (paint to be supplied by the Board) including cleaning of DT |
| 47 | Dismantling of RCC, REC, PSC & metal pole of all sizes including the closing of the pit |
| 48 | Transporting of Distribution Transformer / Line materials from stores to office / site upto 10 KM distance by engaging 1 Ton capacity Minidor (Lorry) |
| 49 | Transportation of conductor |
| 50 | Transportation of all type of poles by bullock cart or other vehicle above 5km of everykm |
| 51 | Transportation of all type of poles by bullock cart or other vehicle lead upto 5km |
| 52 | Loading / Unloading of LT Pin insulator shackle, guy shackle, LT Pin, Metal parts, HT pin etc., |
| 53 | loading /unloading of line11kv strain disc |
| 54 | Loading / Unloading of line materials |
| 55 | Loading / Unloading of Iron & Steel |
| 56 | Unloading of Conductor |
| 57 | Loading of Conductor |
| 58 | Loading or unloading of various sizes of poles metal pole all sizes |
| 59 | Loading or unloading of various sizes of poles 8.0m length rec,rcc,psc pole above |
| 60 | Loading or unloading of various sizes of poles 8.0m length rec,rcc,psc pole |
| 61 | Loading or unloading of Distribution Transformer Upto 100 KVA |
| 62 | Pipie earthing including excavation of earth pit and fixing earth pipe 3 m length |
| 63 | Earthing of poles with GI wires 4 or 6 SWG by coil earthing |
| 64 | Altering of back clamp |
AI Tender Summary
Tender Timeline
May 24, 2022
11:30 IST
Tender Published
Tender notice published.
CompletedMay 30, 2022
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedMay 31, 2022
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender