}

Rate Contract For Steel Fabrication , M.S. Grill Of Required Pattern As Per Design ( Ornamental ) , M.S. Grill Of Required Pattern As Per Design Plane Type ( Made Of Ms Flat / Ms Round ) , M.S. Grill Of Required Pattern As Per Design S, Jammu-Jammu And Kashmir

Jammu And Kashmir Small Scale Industries Development Corporation Limited has published Rate Contract For Steel Fabrication , M.S. Grill Of Required Pattern As Per Design ( Ornamental ) , M.S. Grill Of Required Pattern As Per Design Plane Type ( Made Of Ms Flat / Ms Round ) , M.S. Grill Of Required Pattern As Per Design S. Submission Date for this Tender is 16-06-2022. Wrenches and Drivers Tenders in Jammu Jammu And Kashmir. Bidders can get complete Tender details and download the document.




Tender Notice

32346873
Rate Contract For Steel Fabrication , M.S. Grill Of Required Pattern As Per Design ( Ornamental ) , M.S. Grill Of Required Pattern As Per Design Plane Type ( Made Of Ms Flat / Ms Round ) , M.S. Grill Of Required Pattern As Per Design S
Open Tender
Indian
Jammu And Kashmir
Jammu
16-06-2022

Tender Details

Rate Contract For Steel Fabrication , M.S. Grill Of Required Pattern As Per Design ( Ornamental ) , M.S. Grill Of Required Pattern As Per Design Plane Type ( Made Of Ms Flat / Ms Round ) , M.S. Grill Of Required Pattern As Per Design Square Bar Type , Angle Iron Fencing Posts And Flat Strips Mademof Standard Angle Sections, Cut And Bend At Bottom With Holes Drilled And Top Bent, Duly Red Oxide Painted ( For Fencing Purposes ) , Flat Iron Strips Made Of Standard Sections Duly Cut And Holes Drilled, Complete With Red Oxide Paint. ( For Fencing Purposes ) , Rolling Shutter Made From Hr / Bp Sheet 22G , Fitting, Fixing , Sign Boards Supply Of Sign Boards Made Out Of Isa 50X50x6mm Legs And Frame With M.S. Flat40x5mm On Cr Sheet 22 Guage Duly Welded And Fitted With Nuts Bolts Wherever Required Incl. Cost Of Painting And Letter Writing As Per Sizeof Department. ( As Per Requirement ) , Sign Boards Supply Of Sign Boards Made Out Of Isa 50X50x6mm Legs And Frame With M.S. Flat40x5mm On Cr Sheet 22 Guage Duly Welded And Fitted With Nuts Bolts Wherever Required Without Painting And Writing As Per Sizeof Department. ( As Per Requirement ) , Steel Sign Boards Made Out Of 2 Dia Ms Pipe Frame Over Legs With 16G Cr Sheets Fitted With M.S. Flat Clips 40X5mm With Pipe Frame And Ms Plate 4X4 At The Bottom Of The Legs Duly Painted And Lettering Complete. , Steel Sign Boards Made Out Of 2 Dia Ms Pipe Frame Over Legs With 16G Cr Sheets Fitted With M.S. Flat Clips 40X5mm With Pipe Frame And Ms Plate 4X4 At The Bottom Of The Legs Without Painting And Writing , Iron Notice Board Size 6’X3’ Iron Notice Board Size 6’X3’ Frame Made Of Angle Iron 50X50x6mm Fixed With Ms Sheet 0.80Mm, Front Side Covered With Doors Of Iron Jail, With Locking Facility Board Having Legs Of Angle Iron. , Iron Notice Board Size 4’X2.5’ Iron Notice Board Size 4’X2.5’ Frame Made Of Anglre Iron 32X32x5mm Fixed With Ms Sheet 0.80Mm, Front Side Covered With Doors Of Angle Jail, With Locking Facility Board Having Provision To Be Mounted On Wall , Iron Gates Iron Gate Ofdouble Leaf Made Out Of Isa 50X50x6mm Frame And Supports Of M.S.Flat 40X5mm Fitted On Joints Of Cr Sheet Cover 1.6Mm Incl. Hold Fasts And Locking Arrangement And Vichetgate Duly Welded And Painted With Red Oxide Paint , Iron Gates Iron Gate Ofdouble Leaf Made Out Of Isa 50X50x6mm Frame And Supports Of M.S.Flat 40X5mm Fitted On Joints Of Cr Sheet Cover 1.6Mm Incl. Hold Fasts And Locking Arrangement And Vichetgate Duly Welded And Painted With Red Oxide Paint Fancy Type Using Fancy Pipe, Sq.Bar And Gate Channel , Iron Gates Iron Gate Ofdouble Leaf Made Out Of Isa 50X50x6mm Frame And Supports Of M.S.Flat 40X5mm Fitted On Joints Of Cr Sheet Cover 1.6Mm Incl. Hold Fasts And Locking Arrangement And Vichetgate Duly Welded And Painted With Red Oxide Paint Plane Type Using Angle Iron Amd Ms Sheet Of 1.6Mm , Iron Gates Iron Gate Ofdouble Leaf Made Out Of Isa 50X50x6mm Frame And Supports Of M.S.Flat 40X5mm Fitted On Joints Of Cr Sheet Cover 1.6Mm Incl. Hold Fasts And Locking Arrangement And Vichetgate Duly Welded And Painted With Red Oxide Paint Using Ms Pipe 40Mm Dia And Wire Mesh , Iron Sagri Medium Size Made Of 0.63Mm Cr Sheet , Waste Paper Basket Standard Size Made Out Of Cr Sheet 0.63Mm With Reducing Base Duly Painted , Collapsible Shutters Collapsible Steel Shutters With Vertical Channels 20X10x2mm And Braced With Flat Iron Diagonals 20X5mm Size With Top & Bottom Rail T-Iron 40X40x6mm With 40Mm Dia, Steel Pulley Complete With Bolts Nut Locking Arrangement, Stoppers, Handles Including Applying A Priming Coat Of App. Steel Primer. , Collapsible Shutters Fixation Charges Per Shutter , Guide Frame Angle Iron 40X40x6mm With 50” Long 1.25” Dia Gi Pipe B-Class And Angle Iron 1”X1”X1 Suter Attached With The Gi Pipe To The Length Of 1’ With Slotting Alongwith Nut Bolts Complete Job ( As Per Drawing ) . , Gas Holder Frame Work With 12Mm Square Bar With 79” Long 2” Dia Gi Pipe Fitted With The Plates At Bottom & Top Of Size 6”X6”X6mm And Fabricated With14 Guage Sheet Round And 16 Guage Sheet At The Top Fitted With ¾” Gi Socket And 4 Nos. Of Handle Complete Job ( As Per Drawing ) . , Pasenger Shed Sainless Steel Pessenger Shed Made Of 304 Pure Quality Steel Of Size 8’X20’ Which Includes 6’’ Dia Pipe For Pillar 4Nos. Of 10’Trusses / Purlins, Vertical Section Made Of Stainless Steel Pipe Of 1.5’’X1.5’’, 9 Nos. & 3’’X1.5’’ Pipe 1 No. Of 20’, Base Plate 12’’X12’’, Top Plate 8’’X8’’ Stainless Steel & Iron Base Plate 6Mm Thick With A Complete Roofing Made Of Sinusoidal Color Coated Sheet Of Standard Thickness 2.0Mm With Sitting Arrangement With Two No. Chrome Coated Full Length Chairs ( 3 Seater ) , Skylight Dome: Skylight Dome ( Polycarbonate Sheet Dome ) Made Of Ms Hollow Pipe Section Painted With Enamel Paint, Anchored To The Base Concrete With Necessary Base Plates With Fastener, Aluminium Profile With Epdm Gasket In Between For Fixing 10Mm Multiwall Polycarbonate Sheet ( Uv Coated ) Fixed In Position, Incl, Erection , Cocoon Tray Cocoon Tray Size 124X91cm Having Depth 7.5Cm, Base Wire Mesh 1.6Cm Sq. Sides With Cgi Sheet With Partition In The Middle Of Cgi Sheet. Tray Mounted On Angle Iron Frame Of Angle Iron 2.5Cm, 4 Legs Of 2.5Cm Of Having Height 21Cms. Each Leg With Top Collar Of Same Thickness ( 3Cm ) Angle Welded Giving One Cm. Space For Stacking Of Trays One Above The Other. Total Weight Of Tray 11.500 Kgs ( +5% ) To Be Supplied As Per Sample , Garbage Container Blue / Yellow Or As Per Requirement 4.5 Cubic Mtr. Made Out Of Plate / Hr Sheet 5Mm, 3Mm & 2.5Mm And Cr Sheet1.6Mm, Channel 75X40mm, Angle Iron 40X4x0x5mm; Bottom 5Mm Hr Sheet / Plate, Side 3Mm, Top Cover Tall Gate 2.5Mm Hr Sheet, Window 1.6Mm Cr Sheet Bottom & Side Structure; Channel 75X40mm, Angle Iron 40X40x5mm Leading Windows 4 No’S , Fabrication Of R.C. Bins: Including Painting And Letter Writing Complete Job For Capacity 1M M.S Plate At Sides 3Mm, Bottom 4Mm, Ms Angle At Top Frame 50X50x6mm, Side Handle 2 Nos 25Mm Ms Round, Bse 48”X30”, Top 60”X42”, Height Of Bin 36”, Bottom Support Of Ms Angle 65X6mm, Painting Body Blue / Green, Interior Anti Rust Coating , Handlomm Weaving Machine ( Loom ) Made Of Pipe 3”X11 / 2”, 2”X1” Sq, 1” Round, 3 / 4 “Round, 1 1 / 2 “ Round Rings, Pullers, Sheet Box Etc Fitted With Nut-Bolts With Paint Work , Passenger Shed / Vatika ( Gazebo Type ) Made Out Of M.S Steel Pipes 6” Dia Fitted With Gusset Plates, Angle Iron 40X40x6mm And Also Provide 0.5Mm Profile Sheet Roofing With J / 2 Hook Bolts And Also Provide Cast Iron Heavy Duty Ornamental Grills On Bottom & Top With Hollow Sw Pipe Railing To Bottom End. ( As Per Department Requirement ) , Seed Bins Made Of Size 17’ Length & 17’ Height Having A Storage Capacity Of 50 Kgs Of Rice Made Out Of Gp Sheets 0.5 Mm Thickness Including Cost Of Hings, Lock, Kundi, Handless, Revets Etc Complete Job , Item: Steel Complaint Boxes Size: 18”X15”X8” ( Lxbxh ) Sheet: Gp Sheet 22 Guage Hings: 02 Nos. ( 3” ) Lock: Link Or Godrej Make Paint: Blue Enamel Paintwith Writing , Item: Steel Complaint Boxes Size: 18”X15”X8” ( Lxbxh ) Sheet: Cr Sheet 22 Guage Hings: 02 Nos. ( 3” ) Lock: Link Or Godrej Make Paint: Blue Enamel Paintwith Writing , Mobile Toilet Van Specification For Toilet Van •Length Of The Toilet Van Excluding Hook 7 Feet 6 Inches. • Breadth Of The Toilet Van Including The Walk Way On Both Sides-6 Feet 10 Inches. • Height From Ground-10 Feet. • Cubical Height - 6 Feet. • Cubical Width – 3 Feet. • Cubical Breadth- 3 Feet. • Number Of W.C Of Stain Less Steel Railway Type- 04 No’S For Four Seater Toilet Van. • Night Soil Tank Of 3Mm M.S Sheet Painted With Anti Corrosive Paint-700 Ltrs Capacity. • Heavy Duty Ms Water Tank With Two Taps Mounted On The Chassis-500 Lts Capacity. • Door Of Each Compartment Made Of Ms Frame Fixed With 3Mm Aluminum Composite Panel And The Partitions Of The Same Material. • The Walk Way Of M.S. Angle Iron 40X5mm With Flat Iron Supports 1”X6mm Provided With Hinges Fitted With Chequered M.S. Sheet 3Mm Thick On Top. • Railing Of M.S. Pipe 40Mm And M.S. Pipe 25Mm Dia. • There Shall Be Ladder Fitted On The Both Sides Of The Van. • One Outlet Valve 21 / 2” Pipe For Foul Smell. • Roof Shall Be Made Of 24 Swg Frp Sheet Or Polycarbonate Sheet 3Mm To Be Bolted At The Top. • Flooring Of Each Cubical Shall Be Chequered Aluminum Sheet. • 100Mm Out Let Valve For Drainage. • There Shall Be 2 Wash Basins With At The Back Of The Van With Proper Disposal. • There Shall Be Two Mirrors At The Back Of The Van. • There Shall Be 2 No’S Handle, 1 Clothes Hook, 2 No’S Locking Bolts In Each Cubical. • The Whole Toilet Van Shall Be Painted With Green And Blue Color Or Any Other Colour Combination From Outside As Per The Design With Will Be Given By The Department. • 100Mm Dia 20 Feet Long Steel Wire Reinforced Synthetic Rubber Pipe For Disposal Of Waste. • The Chassis Shall Be Movable On A Chassis Fitted With The Tyres, Tubes And Rims. • Heavy Duty Toeing Hook Shall Be Provided In Front Of The Van. , Iron Fencing Of Size 9’X6’ Frame Made Of Angle Iron 40X40x5mm And 32X32x5mm Fitted With Gi Chain Link Mesh Of Size 50X50mm. Mesh Strengthened With Flat Iron 40X5mm And 32X5mm Fixed With 2Mm Dia Wire. Total Height Of Frame Shall Be 7 ½’ Including 6’ Height Of Frame And 1 1 / 2 ‘ Angle Iron For Plenth , Ballot Box Metal 1. Size: Height=470 Mm Length=335 Mm Width =280 Mm Slit Size :Length=95 Mm Width =10 Mm 2. Sheet:- Sail / Tata Manufacture Cr Sheet / Coll. 3. Bottom And Side Walls Of The Ballot Box: 1.00 Mm 4. Upper Lid / Covering Lever / Handle / Bracket Of Size : 1.60 Mm 5. Locking Plate / Locking Lever : 2.0 Mm 6. Ballot Paper Inserting Slot ( In Upper Lid ) Of Size: 95X10 Mm 7. Slit For Paper Seal: 0.63 Mm 8. Thickness Of Frame : 0.63Mm 9. Tolerance Admissible : + 5% As Per Is Standard 10. Primer : Single Coat 11. Painting Double Coat: Olive Green 12. Primer / Paint Make : Nerolac / Berger / Asian / Shalimar The Serial Number Of Ballot Box Will Have To Be Embossed On The Outside Of The Ballot Box. Like Jk20 _ _ _ 1 , Iron Fencing Size 8’X6’ Height Of Frame 9’. Frame Consists Of Angle Iron Picket 9’ Long Ofsize 50X50x6mm ( Including 6” Slit ) , Picket Shall Be Requiring 4 Nos Of 12Mm Dia Holes At Equal Distance In Between From Top To Below 6’ Length, Flat Iron Of 40X6mm To Be Fixed With Picket Of Length 6’ With Same Nos Of Holes. Another Angle Iron 8’ Length Of Size 50X50x6mm To Be Fixed Horizontally To Tie Two Vertical Pickets, It Shall Be Requiring 5 Nos Of 12Mm Dia Holes At Equal Distance, Flat Iron 8’ Long Of Size 40X6mm To Be Fixed With Angle With Same Nos Of Holes. Nut Bolt 10Mm Dia 50Mm Long To Be Provided As Per Requirement All Material Shall Be Painted A Coat Of Red Oxide Primer. The Material Shall Be Marked With The Logo Of The Firm , Angle Iron Rack Providing And Fixing Of Iron Racks Made Of Angle Iron 40X40x6 Mm And Flat Iron 40X6 Mm For Keeping Answer Sheets , Angle Iron Frame Welded Mesh ( 1”X1” Square Inch ) Iron Fencing Frame Made Of Angle Iron 40X40x6mm Fitted With Welded Mesh ( 1”X1” Square Inch ) . Mesh Strengthened With Flat Iron 20X6mm Fixed , Construction Of Car / Scooter Parking For Staff & Student Student Parking Shed, Parking Shelter Made Out Of Tubular Trusses Made Out Of Rectangular Hollow Section 96Mmx48mmx3.2Mm Structural Steel Confirming To Is:4923 With A Spacing Supported On Columns Of Ms Steel 3”Dia Round Pipe Fitted With Gusset Plates. The Struts Shall Be Made Of 66Mmx33mmx2.9Mm Rectangular Hollow Section With Providing Color Coated Sheet On Top Fitted With Gi Nuts And Bolts. All Structure Be Pre Coated With Primer And Enamel Painted In Black Color. , Supply, Fabrication & Installation Of Sanitizing Tunnel Structure Size 8’X5’X8’ ( Lxbxh ) Made Of M.S. Square Pipe 40X40mm ( 16 Gauge ) For Structure, M.S. Square Pipe 25X25mm For Roof And Internal Support Duly Painted With White Color Including Red Oxide Primer Coat. Two Sides Fitted With Acp ( Aluminum Composite Panel ) 3Mm Sheet & On The Top Color Coated Sheet. Fogging System Consists Of 6 Nos Foggers, Lateral 16Mm As Submain & 32Mm As Main Pipeline Alongwith Fitting & Accessories. Water Storage Tank Capacity 500 Ltr – White Color ( Minimum 3 Layers ) Alongwith Mono Block Pump Of 1 Hp ( Isi Mark ) Alongwith Fittings & Accessories. Antiskid Mat 5’X8’ For Flooring. The Structure Shall Have Provision Of Led Bulb Alongwith Switchboard Of Mono Block Pump. The Entrance & Exit Of The Tunnel Shall Be Covered With Transparent Sheet Of Standard Quality. Providing Flex As Per Logo Design Provided By The Intending Department. ( Complete Job ) , Student Bench: Student Seating Benches 3 Tier, Size 6’-Length 7’-Wide 7’ Height Above Ground Level From Back Side And 1’Height Above Ground Level From The Front Side. Frame Made Of Angle Iron Comprising Of Isi:Of 40X40x5mm And Flat Iron Comprising Of Isi:Of 40Mmx5mm, Each Seating Step Of 6’X2’, Each Tierheight Be Of 18”And Height Of The Top Seat Resting Back Be 18”Also. Front Step Size Be 6’X1’. Vertical Angles On Back Side Be Welded In Box Shaped Design For Strengthening. Structure Be Pre Coated With Primer And Enamel Paint Of Black Color. , Stadium Shed: Providing And Fixing Of Stadium Shed Made Out Of Ms Angle 40Mmx40mmx5mm In Box Shaped Welding With Arc Design And Purlins Of 40Mmx40mmx2.9Mm Ms Hollow Section Square Pipe. Columns Made Of 6”X6” Rectangular Section ( Two Sections Of 6”X3” Welded To Give It A Shape Of 6”X6” ) And Fitted With L’ Shaped 4”X4” Rectangular Section ( Two Sections Of 4”X2” Welded To Give It A Shape Of 4”X4” ) . Also Providing Polycarbonate Sheet Of 0.5Mm On Top Fitted With Gi Nuts And Bolts. All Structure Be Pre Coated With Primer And Enamel Painted In Black Color. , Staff Parking Shed ( Semi Circle Shaped ) : Staff Parking Shed ( Semi Circle Shaped ) , Structure Made Out Of Angle Iron Of 32Mmx32mmx5mm Welded In Box Shaped. Columns Made Of Ms Steel Round Pipe 3” Dia Isi Standard Fitted With Gusset Plates With Trusses In Semi Circle Shape Made Of Angle Iron 32Mmx32mmx5mm And Flat Iron 32Mmx5mm . Also Provide The Polycarbonate Sheet Of 0.5Mm On Top For Roofing And Sides Of The Arc Shaped Trusses Fixed With G.I Strips, Nuts And Bolts. , Student Parking Shed: Student Parking Shed, Parking Shelter Made Out Of Tubular Trusses Made Out Of Rectangular Hollow Section 96Mmx48mmx3.2Mm Structural Steel Confirming To Is:4923 With A Spacing Supported On Columns Of Ms Steel 3”Dia Round Pipe Fitted With Gusset Plates. The Struts Shall Be Made Of 66Mmx33mmx2.9Mm Rectangular Hollow Section With Providing Polycarbonate Sheet Of 0.5Mm On Top Fitted With Gi Nuts And Bolts. All Structure Be Pre Coated With Primer And Enamel Painted In Black Color. , Hi-Tech Green House With Fan And Pad System Covered With Polycarbonate Sheet Of Area 90Sq. Mtr.-162 Sq. Mtr Along With Drip Irrigation System And Fogging System Structure:- It Consists Of Square Pipe Isi Marked 2Mm Thick- Foundation 38Mm X 38Mm, Column 50Mm X 50Mm, Arch 50Mm X 50Mm , Bottom 50Mmmm, Roof Purlins 50Mmx50mmand Side Purlin 50Mm X 50Mm, Clamps, Nut Bolts, Accessories, Entrance Room With Door Size 1Mx2m- 2Noscovering:- U.V. Stabilized Polycarbonate Sheet 6Mm Thickness For Covering Both Roof And Side.Profiles:-Profilefixing Of Polycarbonate Sheet For Roof And Side. Insect Net:- Insect Net 40 Mesh On Cooling Pad From Outside.Shade Net:- Shade Net 50% Green Colour Superior Quality Inside Green House With Manual Collapsible Arrangement.Exhaust Fan:- Exhaust Fan 48 Inch Withmotor, Belt Drive- 1 Nos On Front Side. Cooling Pad:-It Consists Of Cellulose Cooling Pad Of Size Height 2.0M And 0.1 M Thick Size For Rare Side Of Green House, Along With Water Circulation Systems Including Water Collecting Gutter, Pvc Water Distribution System, Fitting And Accessories, Mono Block Pump 1Hp Of Reputed Brand- 1No Water Storage Tank Triple Layered 1000 Liter- 1Nos. For Cooling Pad System. Electrical Control Panel :- Panel Box Having Mcb, Relay, Switch, Volt Meter Etc. To Operate Fogging System And Cooling System.Air Curtain- Air Curtain To Be Installed At The Entry Of Entrance Room.Heater- 2 Nos Of Heater Is To Be Provided Inside Green House. Drip Irrigation System- It Consist Of Hdpe / Pvc Pipe As Main And Submain, Lateral / Dripline 16Mm, Screen Filter, Ball Valves, Fittings And Accessories. Foggers System- It Consists Of Hdpe / Pvc Pipe As Main And Submain, Four Wayfoggers With 28Lph Discharge At 3M X 3M Spacing, Ball Valves, Laterals16mm, Fitting And Accessories. Pump-Mono Block Pump 1 Hp Of Reputed Brand- 1No, Water Storage Tank Triple Layered 1000 Liter-1No.For Drip And Fogging System. Civil Work-Earth Excavtion For Plinth Construction Of Bricks Wall 0.9M Above The Ground And 0.45M Below The Ground Including Both Sides Plaster For Cooling Pad Side And 0.30M Above The Ground And 0.30M Below The Ground For Other Three Side Including Both Sides Plaster Work And Foundation Block For Main Column And Corridor Of Green House. Installation, Transportation And Commissioning Of Hi-Tech Green House , Hi-Tech Green House With Fan And Pad System Covered With Polycarbonate Sheet Of Area 180Sq. Mtr. -336 Sq. Mtralong With Drip Irrigation System And Fogging System Structure:- It Consists Of Squarepipe Isi Marked 2Mm Thick- Foundation 38Mm X 38Mm, Column 50Mm X 50Mm, Arch 50Mm X 50Mm , Bottom 50Mmmm, Roof Purlins 50Mmx50mmand Side Purlin 50Mm X 50Mm, Clamps, Nut Bolts, Gutter With Pvc Pipe, Accessories, Entrance Room With Door Size 1Mx2m- 2Noscovering:- U.V. Stabilized Polycarbonate Sheet 6Mm Thickness For Covering Both Roof And Side.Profiles:-Profilefixing Of Polycarbonate Sheet For Roof And Side. Insect Net:- Insect Net 40 Mesh On Cooling Pad From Outside.Shade Net:- Shade Net 50% Green Colour Superior Quality Inside Green House With Manual Collapsible Arrangement.Exhaust Fan:- Exhaust Fan 48 Inch Withmotor, Belt Drive- 2 Nos On Front Side. Cooling Pad:-It Consists Of Cellulose Cooling Pad Of Size Height 2.0M And 0.1 M Thick Size For Rare Side Of Green House, Along With Water Circulation Systems Including Water Collecting Gutter, Pvc Water Distribution System, Fitting And Accessories, Mono Block Pump 1Hp Of Reputed Brand- 1No Water Storage Tank Triple Layered 1000 Liter- 1Nos. For Cooling Pad System. Electrical Control Panel :- Panel Box Having Mcb, Relay, Switch, Volt Meter Etc. To Operate Fogging System And Cooling System.Air Curtain- Air Curtain To Be Installed At The Entry Of Entrance Room.Heater- 4 Nos Of Heater Is To Be Provided Inside Green House. Drip Irrigation System- It Consist Of Hdpe / Pvc Pipe As Main And Submain, Lateral / Dripline 16Mm, Screen Filter, Ball Valves, Fittings And Accessories. Foggers System- It Consists Of Hdpe / Pvc Pipe As Main And Submain, Four Wayfoggers With 28Lph Discharge At 3M X 3M Spacing, Ball Valves, Laterals16mm, Fitting And Accessories. Pump-Mono Block Pump 1 Hp Of Reputed Brand- 1No, Water Storage Tank Triple Layered 1000 Liter-1No.For Drip And Fogging System.Gutter- Gutter Is To Be Provided For Smooth Drainage Of Water Along With Gutter Funnel, Gutter End And Pvc Pipe From Top To Bottom. Civil Work-Earth Excavtion For Plinth Construction Of Bricks Wall 0.9M Above The Ground And 0.45M Below The Ground Including Both Sides Plaster For Cooling Pad Side And 0.30M Above The Ground And 0.30M Below The Ground For Other Three Side Including Both Sides Plaster Work And Foundation Block For Main Column And Corridor Of Green House. Installation, Transportation And Commissioning Of Hi-Tech Green House , Hi-Tech Green House With Fan And Pad System Covered With Polycarbonate Sheet Of Area 432Sq. Mtr.-540Sq. Mtr Along With Drip Irrigation System And Fogging System Structure:- It Consists Of Squarepipe Isi Marked 2Mm Thick- Foundation 38Mm X 38Mm, Column 50Mm X 50Mm, Arch 50Mm X 50Mm , Bottom 50Mmmm, Roof Purlins 50Mmx50mmand Side Purlin 50Mm X 50Mm, Clamps, Nut Bolts, Gutter With Pvc Pipe, Accessories, Entrance Room With Door Size 1Mx2m- 2Noscovering:- U.V. Stabilized Polycarbonate Sheet 6Mm Thickness For Covering Both Roof And Side.Profiles:-Profilefixing Of Polycarbonate Sheet For Roof And Side. Insect Net:- Insect Net 40 Mesh On Cooling Pad From Outside.Shade Net:- Shade Net 50% Green Colour Superior Quality Inside Green House With Manual Collapsible Arrangement.Exhaust Fan:- Exhaust Fan 48 Inch Withmotor, Belt Drive- 3 Nos On Front Side. Cooling Pad:-It Consists Of Cellulose Cooling Pad Of Size Height 2.0M And 0.1 M Thick Size For Rare Side Of Green House, Along With Water Circulation Systems Including Water Collecting Gutter, Pvc Water Distribution System, Fitting And Accessories, Mono Block Pump 1.5Hp Of Reputed Brand- 1No Water Storage Tank Triple Layered 1000 Liter- 1Nos. For Cooling Pad System. Electrical Control Panel :- Panel Box Having Mcb, Relay, Switch, Volt Meter Etc. To Operate Fogging System And Cooling System.Air Curtain- Air Curtain To Be Installed At The Entry Of Entrance Room.Heater- 8 Nos Of Heater Is To Be Provided Inside Green House. Drip Irrigation System- It Consist Of Hdpe / Pvc Pipe As Main And Submain, Lateral / Dripline 16Mm, Screen Filter, Ball Valves, Fittings And Accessories. Foggers System- It Consists Of Hdpe / Pvc Pipe As Main And Submain, Four Wayfoggers With 28Lph Discharge At 3M X 3M Spacing, Ball Valves, Laterals16mm, Fitting And Accessories. Pump-Mono Block Pump 1.5 Hp Of Reputed Brand- 1No, Water Storage Tank Triple Layered 1000 Liter-1No.For Drip And Fogging System.Gutter- Gutter Is To Be Provided For Smooth Drainage Of Water Along With Gutter Funnel, Gutter End And Pvc Pipe From Top To Bottom. Civil Work-Earth Excavtion For Plinth Construction Of Bricks Wall 0.9M Above The Ground And 0.45M Below The Ground Including Both Sides Plaster For Cooling Pad Side And 0.30M Above The Ground And 0.30M Below The Ground For Other Three Side Including Both Sides Plaster Work And Foundation Block For Main Column And Corridor Of Green House. Installation, Transportation And Commissioning Of Hi-Tech Green House , Hi-Tech Green House With Fan And Pad System Covered With Polycarbonate Sheet Of Area 630 Sq. Mtr-900Sq. Mtr. Along With Drip Irrigation System And Fogging System Structure:- It Consists Of Square Pipe Isi Marked 2Mm Thick- Foundation 38Mm X 38Mm, Column 50Mm X 50Mm, Arch 50Mm X 50Mm , Bottom 50Mmmm, Roof Purlins 50Mmx50mmand Side Purlin 50Mm X 50Mm, Clamps, Nut Bolts, Gutter With Pvc Pipe, Accessories, Entrance Room With Door Size 1Mx2m- 2Noscovering:- U.V. Stabilized Polycarbonate Sheet 6Mm Thickness For Covering Both Roof And Side.Profiles:-Profilefixing Of Polycarbonate Sheet For Roof And Side. Insect Net:- Insect Net 40 Mesh On Cooling Pad From Outside.Shade Net:- Shade Net 50% Green Colour Superior Quality Inside Green House With Manual Collapsible Arrangement.Exhaust Fan:- Exhaust Fan 48 Inch Withmotor, Belt Drive- 4 Nos On Front Side. Cooling Pad:-It Consists Of Cellulose Cooling Pad Of Size Height 2.0M And 0.1 M Thick Size For Rare Side Of Green House, Along With Water Circulation Systems Including Water Collecting Gutter, Pvc Water Distribution System, Fitting And Accessories, Mono Block Pump 2Hp Of Reputed Brand- 1No Water Storage Tank Triple Layered 2000 Liter- 1Nos. For Cooling Pad System. Electrical Control Panel :- Panel Box Having Mcb, Relay, Switch, Volt Meter Etc. To Operate Fogging System And Cooling System.Air Curtain- Air Curtain To Be Installed At The Entry Of Entrance Room.Heater- 12 Nos Of Heater Is To Be Provided Inside Green House. Drip Irrigation System- It Consist Of Hdpe / Pvc Pipe As Main And Submain, Lateral / Dripline 16Mm, Screen Filter, Ball Valves, Fittings And Accessories. Foggers System- It Consists Of Hdpe / Pvc Pipe As Main And Submain, Four Wayfoggers With 28Lph Discharge At 3M X 3M Spacing, Ball Valves, Laterals16mm, Fitting And Accessories. Pump-Mono Block Pump 2 Hp Of Reputed Brand- 1No, Water Storage Tank Triple Layered 2000 Liter-1No.For Drip And Fogging System.Gutter- Gutter Is To Be Provided For Smooth Drainage Of Water Along With Gutter Funnel, Gutter End And Pvc Pipe From Top To Bottom. Civil Work-Earth Excavtion For Plinth Construction Of Bricks Wall 0.9M Above The Ground And 0.45M Below The Ground Including Both Sides Plaster For Cooling Pad Side And 0.30M Above The Ground And 0.30M Below The Ground For Other Three Side Including Both Sides Plaster Work And Foundation Block For Main Column And Corridor Of Green House. Installation, Transportation And Commissioning Of Hi-Tech Green House , Hi-Tech Green House With Fan And Pad System Of Area 100Sq. Mtr-180Sq. Mtr. Along With Drip Irrigation System And Fogging System Structure:- It Consists Of Galvanized Tubular Structure Having Gi Pipe Isi Marked 2Mm Thick- Foundation 38Mm, Column 50Mm, Arch 38Mm , Bottom 25Mm, Corridor 38Mm , Bracing 25Mm, Roof Purlins 38Mmand Side Purlin 32Mm, Clamps, Nut Bolts, Accessories Gutter, Entrance Room With Door Size 1Mx2m- 2Noscovering:- U.V. Stabilized Polyethylene Film 200 Micron Thickness For Covering Both Roof And Side. Locking Profiles:- Locking Profile With Zig Zag Spring For Fixing Of Poly Film For Roof And Side. Insect Net:- Insect Net 40 Mesh On Cooling Pad From Outside.Shade Net:- Shade Net 50% Green Colour Superior Quality Inside Green House With Manual Collapsible Arrangement. Exhaust Fan:- Exhaust Fan 48 Inch Withmotor, Belt Drive- 1 Nos On Front Side. Cooling Pad:-It Consists Of Cellulose Cooling Pad Of Size Height 2.0M And 0.1 M Thick Size For Rare Side Of Green House, Along With Water Circulation Systems Including Water Collecting Gutter, Pvc Water Distribution System, Fitting And Accessories, Mono Block Pump 1Hp Of Reputed Brand- 1No Water Storage Tank Triple Layered 1000 Liter- 1Nos. For Cooling Pad System. Electrical Control Panel :- Panel Box Having Mcb, Relay, Switch, Volt Meter Etc. To Operate Fogging System And Cooling System.Air Curtain- Air Curtain To Be Installed At The Entry Of Entrance Room.Drip Irrigation System- It Consist Of Hdpe / Pvc Pipe As Main And Submain, Lateral / Dripline 16Mm, Screen Filter, Ball Valves, Fittings And Accessories.Foggers System- It Consists Of Hdpe / Pvc Pipe As Main And Submain, Four Wayfoggers With 28Lph Discharge At 3M X 3M Spacing, Ball Valves, Laterals16mm, Fitting And Accessories. Pump-Mono Block Pump 1 Hp Of Reputed Brand- 1No, Water Storage Tank Triple Layered 1000 Liter-1No.For Drip And Fogging System.Gutter- Gutter Is To Be Provided For Smooth Drainage Of Water Along With Gutter Funnel, Gutter End And Pvc Pipe From Top To Bottom. Civil Work-Earth Excavtion For Plinth Construction Of Bricks Wall 0.9M Above The Ground And 0.45M Below The Ground Including Both Sides Plaster For Cooling Pad Side And 0.30M Above The Ground And 0.30M Below The Ground For Other Three Side Including Both Sides Plaster Work And Foundation Block For Main Column And Corridor Of Green House. Installation, Transportation And Commissioning Of Hi-Tech Green House , Hi-Tech Green House With Fan And Pad System Of Area 224Sq. Mtr.-392 Sq. Mtr Along With Drip Irrigation System And Fogging System Structure:- It Consists Of Galvanized Tubular Structure Having Gi Pipe Isi Marked 2Mm Thick- Foundation 38Mm, Column 50Mm, Arch 38Mm , Bottom 25Mm, Corridor 38Mm , Bracing 25Mm, Roof Purlins 38Mmand Side Purlin 32Mm, Clamps, Nut Bolts, Accessories Gutter, Entrance Room With Door Size 1Mx2m- 2Noscovering:- U.V. Stabilized Polyethylene Film 200 Micron Thickness For Covering Both Roof And Side. Locking Profiles:- Locking Profile With Zig Zag Spring For Fixing Of Poly Film For Roof And Side. Insect Net:- Insect Net 40 Mesh On Cooling Pad From Outside.Shade Net:- Shade Net 50% Green Colour Superior Quality Inside Green House With Manual Collapsible Arrangement. Exhaust Fan:- Exhaust Fan 48 Inch Withmotor, Belt Drive- 2 Nos On Front Side. Cooling Pad:-It Consists Of Cellulose Cooling Pad Of Size Height 2.0M And 0.1 M Thick Size For Rare Side Of Green House, Along With Water Circulation Systems Including Water Collecting Gutter, Pvc Water Distribution System, Fitting And Accessories, Mono Block Pump 1.5Hp Of Reputed Brand- 1No Water Storage Tank Triple Layered 1000 Liter- 1Nos. For Cooling Pad System. Electrical Control Panel :- Panel Box Having Mcb, Relay, Switch, Volt Meter Etc. To Operate Fogging System And Cooling System.Air Curtain- Air Curtain To Be Installed At The Entry Of Entrance Room.Drip Irrigation System- It Consist Of Hdpe / Pvc Pipe As Main And Submain, Lateral / Dripline 16Mm, Screen Filter, Ball Valves, Fittings And Accessories.Foggers System- It Consists Of Hdpe / Pvc Pipe As Main And Submain, Four Wayfoggers With 28Lph Discharge At 3M X 3M Spacing, Ball Valves, Laterals16mm, Fitting And Accessories. Pump-Mono Block Pump 1.5 Hp Of Reputed Brand- 1No, Water Storage Tank Triple Layered 1000 Liter-1No.For Drip And Fogging System.Gutter- Gutter Is To Be Provided For Smooth Drainage Of Water Along With Gutter Funnel, Gutter End And Pvc Pipe From Top To Bottom. Civil Work-Earth Excavtion For Plinth Construction Of Bricks Wall 0.9M Above The Ground And 0.45M Below The Ground Including Both Sides Plaster For Cooling Pad Side And 0.30M Above The Ground And 0.30M Below The Ground For Other Three Side Including Both Sides Plaster Work And Foundation Block For Main Column And Corridor Of Green House. Installation, Transportation And Commissioning Of Hi-Tech Green House , Hi-Tech Green House With Fan And Pad System Of Area 456Sq. Mtr.-672 Sq. Mtr Along With Drip Irrigation System And Fogging System Structure:- It Consists Of Galvanized Tubular Structure Having Gi Pipe Isi Marked 2Mm Thick- Foundation 38Mm, Column 50Mm, Arch 38Mm , Bottom 25Mm, Corridor 38Mm , Bracing 25Mm, Roof Purlins 38Mmand Side Purlin 32Mm, Clamps, Nut Bolts, Accessories, Entrance Room With Door Size 1Mx2m- 2Noscovering:- U.V. Stabilized Polyethylene Film 200 Micron Thickness For Covering Both Roof And Side. Locking Profiles:- Locking Profile With Zig Zag Spring For Fixing Of Poly Film For Roof And Side. Insect Net:- Insect Net 40 Mesh On Cooling Pad From Outside.Shade Net:- Shade Net 50% Green Colour Superior Quality Inside Green House With Manual Collapsible Arrangement.Exhaust Fan:- Exhaust Fan 48 Inch Withmotor, Belt Drive- 3 Nos On Front Side. Cooling Pad:-It Consists Of Cellulose Cooling Pad Of Size Height 2.0M And 0.1 M Thick Size For Rare Side Of Green House, Along With Water Circulation Systems Including Water Collecting Gutter, Pvc Water Distribution System, Fitting And Accessories, Mono Block Pump 1.5Hp Of Reputed Brand- 1No Water Storage Tank Triple Layered 1000 Liter- 1Nos. For Cooling Pad System. Electrical Control Panel :- Panel Box Having Mcb, Relay, Switch, Volt Meter Etc. To Operate Fogging System And Cooling System.Air Curtain- Air Curtain To Be Installed At The Entry Of Entrance Room.Drip Irrigation System- It Consist Of Hdpe / Pvc Pipe As Main And Submain, Lateral / Dripline 16Mm, Screen Filter, Ball Valves, Fittings And Accessories.Foggers System- It Consists Of Hdpe / Pvc Pipe As Main And Submain, Four Wayfoggers With 28Lph Discharge At 3M X 3M Spacing, Ball Valves, Laterals16mm, Fitting And Accessories. Pump-Mono Block Pump 1.5 Hp Of Reputed Brand- 1No, Water Storage Tank Triple Layered 1000 Liter-1No.For Drip And Fogging System. Gutter- Gutter Is To Be Provided For Smooth Drainage Of Water Along With Gutter Funnel, Gutter End And Pvc Pipe From Top To Bottom.Civil Work-Earth Excavtion For Plinth Construction Of Bricks Wall0 .9M Above The Ground And 0.45M Below The Ground Including Both Sides Plaster For Cooling Pad Side And 0.30M Above The Ground And 0.30M Below The Ground For Other Three Side Including Both Sides Plaster Work And Foundation Block For Main Column And Corridor Of Green House. Installation, Transportation And Commissioning Of Hi-Tech Green House , Hi-Tech Green House With Fan And Pad System Of Area 812Sq. Mtr.- 1020 Sq. Mtr Along With Drip Irrigation System And Fogging System Structure:- It Consists Of Galvanized Tubular Structure Having Gi Pipe Isi Marked 2Mm Thick- Foundation 38Mm, Column 50Mm, Arch 38Mm , Bottom 25Mm, Corridor 38Mm , Bracing 25Mm, Roof Purlins 38Mmand Side Purlin 32Mm, Clamps, Nut Bolts, Gutter With Pvc Pipe, Accessories, Entrance Room With Door Size 1Mx2m- 2Noscovering:- U.V. Stabilized Polyethylene Film 200 Micron Thickness For Covering Both Roof And Side. Locking Profiles:- Locking Profile With Zig Zag Spring For Fixing Of Poly Film For Roof And Side. Insect Net:- Insect Net 40 Mesh On Cooling Pad From Outside.Shade Net:- Shade Net 50% Green Colour Superior Quality Inside Green House With Manual Collapsible Arrangement.Exhaust Fan:- Exhaust Fan 48 Inch Withmotor, Belt Drive- 4 Nos On Front Side. Cooling Pad:-It Consists Of Cellulose Cooling Pad Of Size Height 2.0M And 0.1 M Thick Size For Rare Side Of Green House, Along With Water Circulation Systems Including Water Collecting Gutter, Pvc Water Distribution System, Fitting And Accessories, Mono Block Pump 2Hp Of Reputed Brand- 1No Water Storage Tank Triple Layered 2000 Liter- 1Nos. For Cooling Pad System. Electrical Control Panel :- Panel Box Having Mcb, Relay, Switch, Volt Meter Etc. To Operate Fogging System And Cooling System.Air Curtain- Air Curtain To Be Installed At The Entry Of Entrance Room.Drip Irrigation System- It Consist Of Hdpe / Pvc Pipe As Main And Submain, Lateral / Dripline 16Mm, Screen Filter, Ball Valves, Fittings And Accessories. Foggers System- It Consists Of Hdpe / Pvc Pipe As Main And Submain, Four Wayfoggers With 28Lph Discharge At 3M X 3M Spacing, Ball Valves, Laterals16mm, Fitting And Accessories. Pump-Mono Block Pump 2 Hp Of Reputed Brand- 1No, Water Storage Tank Triple Layered 2000 Liter-1No.For Drip And Fogging System.Gutter- Gutter Is To Be Provided For Smooth Drainage Of Water Along With Gutter Funnel, Gutter End And Pvc Pipe From Top To Bottom. Civil Work-Earth Excavtion For Plinth Construction Of Bricks Wall 0.9M Above The Ground And 0.45M Below The Ground Including Both Sides Plaster For Cooling Pad Side And 0.30M Above The Ground And 0.30M Below The Ground For Other Three Side Including Both Sides Plaster Work And Foundation Block For Main Column And Corridor Of Green House. Installation, Transportation And Commissioning Of Hi-Tech Green House , Insect Net House Of Area 192Sq. Mtr.-400 Sq. Mtr Along With Drip Irrigation System And Fogging System Structure:- It Consists Of Galvanized Tubular Structure Having Gi Pipe Isi Marked 2Mm Thick- Foundation 38Mm, Column 50Mm, Arch 38Mm, Bottom 25Mm, Corridor 38Mm , Bracing 25Mm, Roof Purlins 38Mmand Side Purlin 32Mm, Clamps, Nut Bolts, Accessories, Door Size 1Mx2mcovering:- U.V. Stabilized Insect Net 40 Mesh For Covering Both Roof And Side. Locking Profiles:- Locking Profile With Zig Zag Spring For Fixing Of Poly Film For Roof And Side. Drip Irrigation System- It Consist Of Hdpe / Pvc Pipe As Main And Submain, Lateral / Dripline 16Mm, Screen Filter, Ball Valves, Fittings And Accessories.Foggers System- It Consists Of Hdpe / Pvc Pipe As Main And Submain, Four Wayfoggers With 28Lph Discharge At 3M X 3M Spacing, Ball Valves, Laterals16mm, Fitting And Accessories. Pump-Mono Block Pump 1.5 Hp Of Reputed Brand- 1No, Water Storage Tank Triple Layered 1000 Liter-1No.For Drip And Fogging Systemcivil Work- Foundation Block For Main Column And Corridor Of Insect Net House. Installation, Transportation And Commissioning Of Insect Net House , Insect Net House Of Area 480Sq. Mtr.-896Sq. Mtr Along With Drip Irrigation System And Fogging System Structure:- It Consists Of Galvanized Tubular Structure Having Gi Pipe Isi Marked 2Mm Thick- Foundation 38Mm, Column 50Mm, Arch 38Mm , Bottom 25Mm, Corridor 38Mm , Bracing 25Mm, Roof Purlins 38Mmand Side Purlin 32Mm, Clamps, Nut Bolts, Accessories, Door Size 1Mx2mcovering:- U.V. Stabilized Insect Net 40 Mesh For Covering Both Roof And Side. Locking Profiles:- Locking Profile With Zig Zag Spring For Fixing Of Poly Film For Roof And Side. Drip Irrigation System- It Consist Of Hdpe / Pvc Pipe As Main And Submain, Lateral / Dripline 16Mm, Screen Filter, Ball Valves, Fittings And Accessories.Foggers System- It Consists Of Hdpe / Pvc Pipe As Main And Submain, Four Wayfoggers With 28Lph Discharge At 3M X 3M Spacing, Ball Valves, Laterals16mm, Fitting And Accessories. Pump-Mono Block Pump 1.5 Hp Of Reputed Brand- 1No, Water Storage Tank Triple Layered 1000 Liter-1No.For Drip And Fogging Systemcivil Work- Foundation Block For Main Column And Corridor Of Insect Net House. Installation, Transportation And Commissioning Of Insect Net House , Insect Net House Of Area 1008Sq. Mtr.-1440 Sq. Mtr Along With Drip Irrigation System And Fogging System Structure:- It Consists Of Galvanized Tubular Structure Having Gi Pipe Isi Marked 2Mm Thick- Foundation 38Mm, Column 50Mm, Arch 38Mm, Bottom 25Mm, Corridor 38Mm , Bracing 25Mm, Roof Purlins 38Mmand Side Purlin 32Mm, Clamps, Nut Bolts, Accessories, Door Size 1Mx2mcovering:- U.V. Stabilized Insect Net 40 Mesh For Covering Both Roof And Side. Locking Profiles:- Locking Profile With Zig Zag Spring For Fixing Of Poly Film For Roof And Side.Drip Irrigation System- It Consist Of Hdpe / Pvc Pipe As Main And Submain, Lateral / Dripline 16Mm, Screen Filter, Ball Valves, Fittings And Accessories.Foggers System- It Consists Of Hdpe / Pvc Pipe As Main And Submain, Four Wayfoggers With 28Lph Discharge At 3M X 3M Spacing, Ball Valves, Laterals16mm, Fitting And Accessories. Pump-Mono Block Pump 2 Hp Of Reputed Brand- 1No, Water Storage Tank Triple Layered 2000 Liter-1No.For Drip And Fogging Systemcivil Work- Foundation Block For Main Column And Corridor Of Insect Net House. Installation, Transportation And Commissioning Of Insect Net House , Insect Net House Of Area 1728 Sq. Mtr-2016Sq. Mtr. Along With Drip Irrigation System And Fogging System Structure:- It Consists Of Galvanized Tubular Structure Having Gi Pipe Isi Marked 2Mm Thick- Foundation 38Mm, Column 50Mm, Arch 38Mm, Bottom 25Mm, Corridor 38Mm , Bracing 25Mm, Roof Purlins 38Mmand Side Purlin 32Mm, Clamps, Nut Bolts, Accessories, Door Size 1Mx2mcovering:- U.V. Stabilized Insect Net 40 Mesh For Covering Both Roof And Side. Locking Profiles:- Locking Profile With Zig Zag Spring For Fixing Of Poly Film For Roof And Side.Drip Irrigation System- It Consist Of Hdpe / Pvc Pipe As Main And Submain, Lateral / Dripline 16Mm, Screen Filter, Ball Valves, Fittings And Accessories.Foggers System- It Consists Of Hdpe / Pvc Pipe As Main And Submain, Four Wayfoggers With 28Lph Discharge At 3M X 3M Spacing, Ball Valves, Laterals16mm, Fitting And Accessories. Pump-Mono Block Pump 3 Hp Of Reputed Brand- 1No, Water Storage Tank Triple Layered 4000 Liter-1No.For Drip And Fogging Systemcivil Work- Foundation Block For Main Column And Corridor Of Insect Net House. Installation, Transportation And Commissioning Of Insect Net House , Naturally Ventilated / Semi Hi-Tech Poly House Of Area 192Sq. Mtr.- 400 Sq. Mtr Along With Drip Irrigation System And Fogging System Structure:- It Consists Of Galvanized Tubular Structure Having Gi Pipe Isi Marked 2Mm Thick- Foundation 38Mm, Column 50Mm, Arch 38Mm , Bottom 25Mm, Corridor 38Mm , Bracing 25Mm, Top Purlins 38Mm, Bottom Purlin 32Mm And Side Purlin 32Mm, Clamps, Nut Bolts, Accessories, Entrance Room With Door Size 1Mx2m- 2Noscovering:- U.V. Stabilized Polyethylene Film 200 Micron Thickness For Covering. Apron Of Polyfilm 1.2 To 1.5Mtr On All Four Sides With Fixing Arrangement At The Apron Top And Bottom Of Polyfilm Embedded In Soil.Locking Profiles:- Locking Profile With Zig Zag Spring For Fixing Of Polyfilm For Roof And Side. Side Ventilation:-It Consists Of Manual Operable Side Roll Up Curtains 3.0 To 4.0 Mtr On All Four Sides With Cutain Pipe, Handles, Universal Joint And Insect Net 40 Mesh Below The Curtains With Proper Fixing Arrangement.Insect Net :- U.V Stabilized Insect Net 40 Mesh At Ridge Vent.Shade Net:- Shade Net 50% Green Colour Superior Quality Inside Green House With Manual Collapsible Arrangement. Drip Irrigation System- It Consist Of Hdpe / Pvc Pipe As Main And Submain, Lateral / Dripline 16Mm, Screen Filter, Ball Valves, Fittings And Accessories.Foggers System- It Consists Of Hdpe / Pvc Pipe As Main And Submain, Four Wayfoggers With 28Lph Discharge At 3M X 3M Spacing, Ball Valves, Laterals16mm, Fitting And Accessories. Pump-Mono Block Pump 1.5 Hp Of Reputed Brand- 1No, Water Storage Tank Triple Layered 1000 Liter-1No.For Drip And Fogger Systemcivil Work- Foundation Block For Main Column And Corridor Of Nvph. Installation, Transportation And Commissioning Of Nvph. , Naturally Ventilated / Semi Hi-Tech Poly House Of Area 480Sq. Mtr.-896 Sq. Mtr Along With Drip Irrigation System And Fogging System Structure:- It Consists Of Galvanized Tubular Structure Having Gi Pipe Isi Marked 2Mm Thick- Foundation 38Mm, Column 50Mm, Arch 38Mm , Bottom 25Mm, Corridor 38Mm , Bracing 25Mm, Top Purlins 38Mm, Bottom Purlins 32Mm And Side Purlin 32Mm, Clamps, Nut Bolts, Accessories, Entrance Room With Door Size 1Mx2m- 2Noscovering:- U.V. Stabilized Polyethylene Film 200 Micron Thickness For Covering. Apron Of Polyfilm 1.2 To 1.5Mtr On All Four Sides Withfixing Arrangement At The Apron Top And Bottom Of Polyfilm Embedded In Soil.Locking Profiles:- Locking Profile With Zig Zag Spring For Fixing Of Polyfilm For Roof And Side. Side Ventilation:-It Consists Of Manual Operable Side Roll Up Curtains 3.0 To 4.0 Mtr On All Four Sides With Cutain Pipe, Handles, Universal Joint And Insect Net 40 Mesh Below The Curtains With Proper Fixing Arrangement.Insect Net :- U.V Stabilized Insect Net 40 Mesh At Ridge Vent.Shade Net:- Shade Net 50% Green Colour Superior Quality Inside Green House With Manual Collapsible Arrangement. Drip Irrigation System- It Consist Of Hdpe / Pvc Pipe As Main And Submain, Lateral / Dripline 16Mm, Screen Filter, Ball Valves, Fittings And Accessories.Foggers System- It Consists Of Hdpe / Pvc Pipe As Main And Submain, Four Wayfoggers With 28Lph Discharge At 3M X 3M Spacing, Ball Valves, Laterals16mm, Fitting And Accessories. Pump-Mono Block Pump 1.5 Hp Of Reputed Brand- 1No, Water Storage Tank Triple Layered 1000 Liter-1No.For Drip And Fogger System. Gutter- Gutter Is To Be Provided For Smooth Drainage Of Water Along With Gutter Funnel, Gutter End And Pvc Pipe From Top To Bottom.Civil Work- Foundation Block For Main Column And Corridor Of Nvph. Installation, Transportation And Commissioning Of Nvph. , Naturally Ventilated / Semi Hi-Tech Poly House Of Area 1008 Sq. Mtr.-1440 Sq. Mtr Along With Drip Irrigation System And Fogging System Structure:- It Consists Of Galvanized Tubular Structure Having Gi Pipe Isi Marked 2Mm Thick- Foundation 38Mm, Column 50Mm, Arch 38Mm , Bottom 25Mm, Corridor 38Mm , Bracing 25Mm, Top Purlins 38Mm, Bottom Purlins 32Mm And Side Purlin 32Mm, Clamps, Nut Bolts, Accessories, Entrance Room With Door Size 1Mx2m- 2Noscovering:- U.V. Stabilized Polyethylene Film 200 Micron Thickness For Covering. Apron Of Polyfilm 1.2 To 1.5Mtr On All Four Sides With Fixing Arrangement At The Apron Top And Bottom Of Polyfilm Embedded In Soil. Locking Profiles:- Locking Profile With Zig Zag Spring For Fixing Of Polyfilm For Roof And Side. Side Ventilation:-It Consists Of Manual Operable Side Roll Up Curtains 3.0 To 4.0 Mtr On All Four Sides With Cutain Pipe, Handles, Universal Joint And Insect Net 40 Mesh Below The Curtains With Proper Fixing Arrangement.Insect Net :- U.V Stabilized Insect Net 40 Mesh At Ridge Vent.Shade Net:- Shade Net 50% Green Colour Superior Quality Inside Green House With Manual Collapsible Arrangement. Drip Irrigation System- It Consist Of Hdpe / Pvc Pipe As Main And Submain, Lateral / Dripline 16Mm, Screen Filter, Ball Valves, Fittings And Accessories.Foggers System- It Consists Of Hdpe / Pvc Pipe As Main And Submain, Four Wayfoggers With 28Lph Discharge At 3M X 3M Spacing, Ball Valves, Laterals16mm, Fitting And Accessories. Pump-Mono Block Pump 2 Hp Of Reputed Brand- 1No, Water Storage Tank Triple Layered 2000 Liter-1No.For Drip And Fogger System Gutter- Gutter Is To Be Provided For Smooth Drainage Of Water Along With Gutter Funnel, Gutter End And Pvc Pipe From Top To Bottom. Civil Work- Foundation Block For Main Column And Corridor Of Nvph. Installation, Transportation And Commissioning Of Nvph. , Naturally Ventilated / Semi Hi-Tech Poly House Of Area 1728 Sq. Mtr-2016Sq. Mtr. Along With Drip Irrigation System And Fogging System Structure:- It Consists Of Galvanized Tubular Structure Having Gi Pipe Isi Marked 2Mm Thick- Foundation 38Mm, Column 50Mm, Arch 38Mm , Bottom 25, Corridor 38Mm , Bracing 25Mm, Top Purlins 38Mm, Bottom Purlins 32Mm And Side Purlin 32Mm, Clamps, Nut Bolts, Accessories, Entrance Room With Door Size 1Mx2m- 2Noscovering:- U.V. Stabilized Polyethylene Film 200 Micron Thickness For Covering. Apron Of Polyfilm 1.2 To 1.5Mtr On All Four Sides With Fixing Arrangement At The Apron Top And Bottom Of Polyfilm Embedded In Soil. Locking Profiles:- Locking Profile With Zig Zag Spring For Fixing Of Polyfilm For Roof And Side. Side Ventilation:-It Consists Of Manual Operable Side Roll Up Curtains 3.0 To 4.0 Mtr On All Four Sides With Cutain Pipe, Handles, Universal Joint And Insect Net 40 Mesh Below The Curtains With Proper Fixing Arrangement.Insect Net :- U.V Stabilized Insect Net 40 Mesh At Ridge Vent.Shade Net:- Shade Net 50% Green Colour Superior Quality Inside Green House With Manual Collapsible Arrangement. Drip Irrigation System- It Consist Of Hdpe / Pvc Pipe As Main And Submain, Lateral / Dripline 16Mm, Screen Filter, Ball Valves, Fittings And Accessories.Foggers System- It Consists Of Hdpe / Pvc Pipe As Main And Submain, Four Wayfoggers With 28Lph Discharge At 3M X 3M Spacing, Ball Valves, Laterals16mm, Fitting And Accessories. Pump-Mono Block Pump 3 Hp Of Reputed Brand- 1No, Water Storage Tank Triple Layered 4000 Liter-1No.For Drip And Fogger Systemgutter- Gutter Is To Be Provided For Smooth Drainage Of Water Along With Gutter Funnel, Gutter End And Pvc Pipe From Top To Bottom.Civil Work- Foundation Block For Main Column And Corridor Of Nvph. Installation, Transportation And Commissioning Of Nvph. , Screen House Of Area 90Sq. Mtr.-162 Sq. Mtr Along With Drip Irrigation System And Fogging System Structure:- It Consists Ofsquare Pipe Isi Marked 2Mm Thick- Foundation 38Mm X 38Mm, Column 50Mm X 50Mm, Arch 50Mm X 50Mm , Bottom 50Mmmm, Roof Purlins 50Mmx50mmand Side Purlin 50Mm X 50Mm, Clamps, Nut Bolts, Accessories, Entrance Room With Door Size 1Mx2m- 2Noscovering:- Stainless Steel Jaali 40Mesh For Covering Both Roof And Side.Profiles:-Profilefixing Of Stainless Steel Jaali For Roof And Side. Shade Net:- Shade Net 50% Green Colour Superior Quality Inside Green House With Manual Collapsible Arrangement. Drip Irrigation System- It Consist Of Hdpe / Pvc Pipe As Main And Submain, Lateral / Dripline 16Mm, Screen Filter, Ball Valves, Fittings And Accessories. Foggers System- It Consists Of Hdpe / Pvc Pipe As Main And Submain, Four Wayfoggers With 28Lph Discharge At 3M X 3M Spacing, Ball Valves, Laterals16mm, Fitting And Accessories. Pump-Mono Block Pump 1 Hp Of Reputed Brand- 1No, Water Storage Tank Triple Layered 1000 Liter-1No.For Drip And Fogging System. Civil Work-Earth Excavtion For Plinth Construction Of Bricks Wall 0.3M Above The Ground And 0.30M Below The Ground Including Both Sides Plaster For All Sides Of Screen House And Foundation Block For Main Column. Installation, Transportation And Commissioning Of Screen House , Screen House Of Area 180Sq. Mtr.-252 Sq. Mtr Along With Drip Irrigation System And Fogging System Structure:- It Consists Of Square Pipe Isi Marked 2Mm Thick- Foundation 38Mm X 38Mm, Column 50Mm X 50Mm, Arch 50Mm X 50Mm , Bottom 50Mmmm, Roof Purlins 50Mmx50mmand Side Purlin 50Mm X 50Mm, Clamps, Nut Bolts, Accessories, Entrance Room With Door Size 1Mx2m- 2Noscovering:- Stainless Steel Jaali 40Mesh For Covering Both Roof And Side.Profiles:-Profilefixing Of Stainless Steel Jaali For Roof And Side. Shade Net:- Shade Net 50% Green Colour Superior Quality Inside Green House With Manual Collapsible Arrangement. Drip Irrigation System- It Consist Of Hdpe / Pvc Pipe As Main And Submain, Lateral / Dripline 16Mm, Screen Filter, Ball Valves, Fittings And Accessories. Foggers System- It Consists Of Hdpe / Pvc Pipe As Main And Submain, Four Wayfoggers With 28Lph Discharge At 3M X 3M Spacing, Ball Valves, Laterals16mm, Fitting And Accessories. Pump-Mono Block Pump 1.5 Hp Of Reputed Brand- 1No, Water Storage Tank Triple Layered 1000 Liter-1No.For Drip And Fogging System. Civil Work-Earth Excavtion For Plinth Construction Of Bricks Wall 0.3M Above The Ground And 0.30M Below The Ground Including Both Sides Plaster For All Sides Of Screen House And Foundation Block For Main Column. Installation, Transportation And Commissioning Of Screen House , Screen House Of Area 288Sq. Mtr.-432Sq. Mtr Along With Drip Irrigation System And Fogging System Structure:- It Consists Of Square Pipe Isi Marked 2Mm Thick- Foundation 38Mm X 38Mm, Column 50Mm X 50Mm, Arch 50Mm X 50Mm , Bottom 50Mmmm, Roof Purlins 50Mmx50mmand Side Purlin 50Mm X 50Mm, Clamps, Nut Bolts, Accessories, Entrance Room With Door Size 1Mx2m- 2Noscovering:- Stainless Steel Jaali 40Mesh For Covering Both Roof And Side.Profiles:-Profilefixing Of Stainless Steel Jaali For Roof And Side. Shade Net:- Shade Net 50% Green Colour Superior Quality Inside Green House With Manual Collapsible Arrangement. Drip Irrigation System- It Consist Of Hdpe / Pvc Pipe As Main And Submain, Lateral / Dripline 16Mm, Screen Filter, Ball Valves, Fittings And Accessories. Foggers System- It Consists Of Hdpe / Pvc Pipe As Main And Submain, Four Wayfoggers With 28Lph Discharge At 3M X 3M Spacing, Ball Valves, Laterals16mm, Fitting And Accessories. Pump-Mono Block Pump 1.5 Hp Of Reputed Brand- 1No, Water Storage Tank Triple Layered 1000 Liter-1No.For Drip And Fogging System. Civil Work-Earth Excavtion For Plinth Construction Of Bricks Wall 0.3M Above The Ground And 0.30M Below The Ground Including Both Sides Plaster For All Sides Of Screen House And Foundation Block For Main Column. Installation, Transportation And Commissioning Of Screen House , Screen House Of Area 486Sq. Mtr-648Sq. Mtr. Along With Drip Irrigation System And Fogging System Structure:- It Consists Of Square Pipe Isi Marked 2Mm Thick- Foundation 38Mm X 38Mm, Column 50Mm X 50Mm, Arch 50Mm X 50Mm , Bottom 50Mmmm, Roof Purlins 50Mmx50mmand Side Purlin 50Mm X 50Mm, Clamps, Nut Bolts, Accessories, Entrance Room With Door Size 1Mx2m- 2Noscovering:- Stainless Steel Jaali 40Mesh For Covering Both Roof And Side.Profiles:-Profilefixing Of Stainless Steel Jaali For Roof And Side. Shade Net:- Shade Net 50% Green Colour Superior Quality Inside Green House With Manual Collapsible Arrangement. Drip Irrigation System- It Consist Of Hdpe / Pvc Pipe As Main And Submain, Lateral / Dripline 16Mm, Screen Filter, Ball Valves, Fittings And Accessories. Foggers System- It Consists Of Hdpe / Pvc Pipe As Main And Submain, Four Wayfoggers With 28Lph Discharge At 3M X 3M Spacing, Ball Valves, Laterals16mm, Fitting And Accessories. Pump-Mono Block Pump 2 Hp Of Reputed Brand- 1No, Water Storage Tank Triple Layered 2000 Liter-1No.For Drip And Fogging System. Civil Work-Earth Excavtion For Plinth Construction Of Bricks Wall 0.3M Above The Ground And 0.30M Below The Ground Including Both Sides Plaster For All Sides Of Screen House And Foundation Block For Main Column. Installation, Transportation And Commissioning Of Screen House , Screen House Of Area 720Sq. Mtr-990Sq. Mtr. Along With Drip Irrigation System And Fogging System Structure:- It Consists Of Square Pipe Isi Marked 2Mm Thick- Foundation 38Mm X 38Mm, Column 50Mm X 50Mm, Arch 50Mm X 50Mm , Bottom 50Mmmm, Roof Purlins 50Mmx50mmand Side Purlin 50Mm X 50Mm, Clamps, Nut Bolts, Accessories, Entrance Room With Door Size 1Mx2m- 2Noscovering:- Stainless Steel Jaali 40Mesh For Covering Both Roof And Side.Profiles:-Profilefixing Of Stainless Steel Jaali For Roof And Side. Shade Net:- Shade Net 50% Green Colour Superior Quality Inside Green House With Manual Collapsible Arrangement. Drip Irrigation System- It Consist Of Hdpe / Pvc Pipe As Main And Submain, Lateral / Dripline 16Mm, Screen Filter, Ball Valves, Fittings And Accessories. Foggers System- It Consists Of Hdpe / Pvc Pipe As Main And Submain, Four Wayfoggers With 28Lph Discharge At 3M X 3M Spacing, Ball Valves, Laterals16mm, Fitting And Accessories. Pump-Mono Block Pump 2 Hp Of Reputed Brand- 1No, Water Storage Tank Triple Layered 2000 Liter-1No.For Drip And Fogging System. Civil Work-Earth Excavtion For Plinth Construction Of Bricks Wall 0.3M Above The Ground And 0.30M Below The Ground Including Both Sides Plaster For All Sides Of Screen House And Foundation Block For Main Column. Installation, Transportation And Commissioning Of Screen House , Shade Net House Of Area 192Sq. Mtr.-400 Sq. Mtr Along With Drip Irrigation System And Fogging System Structure:- It Consists Of Galvanized Tubular Structure Having Gi Pipe Isi Marked 2Mm Thick- Foundation 38Mm, Column 50Mm, Arch 38Mm, Bottom 25Mm, Corridor 38Mm , Bracing 25Mm, Roof Purlins 38Mmand Side Purlin 32Mm, Clamps, Nut Bolts, Accessories, Door Size 1Mx2mcovering:- Shade Net 50% / 75% Green Colour Superior Quality For Covering Both Roof And Side. Locking Profiles:- Locking Profile With Zig Zag Spring For Fixing Of Poly Film For Roof And Side. Drip Irrigation System- It Consist Of Hdpe / Pvc Pipe As Main And Submain, Lateral / Dripline 16Mm, Screen Filter, Ball Valves, Fittings And Accessories.Foggers System- It Consists Of Hdpe / Pvc Pipe As Main And Submain, Four Wayfoggers With 28Lph Discharge At 3M X 3M Spacing, Ball Valves, Laterals16mm, Fitting And Accessories. Pump-Mono Block Pump 1.5 Hp Of Reputed Brand- 1No, Water Storage Tank Triple Layered 1000 Liter-1No.For Drip And Fogging System.Civil Work- Foundation Block For Main Column And Corridor Of Shade Net House. Installation, Transportation And Commissioning Of Shade Net House , Shade Net House Of Area 480Sq. Mtr.-896 Sq. Mtr Along With Drip Irrigation System And Fogging System Structure:- It Consists Of Galvanized Tubular Structure Having Gi Pipe Isi Marked 2Mm Thick- Foundation 38Mm, Column 50Mm, Arch 38Mm, Bottom 25Mm, Corridor 38Mm , Bracing 25Mm, Roof Purlins 38Mmand Side Purlin 32Mm, Clamps, Nut Bolts, Accessories, Door Size 1Mx2mcovering:- Shade Net 50% / 75% Green Colour Superior Quality For Covering Both Roof And Side. Locking Profiles:- Locking Profile With Zig Zag Spring For Fixing Of Poly Film For Roof And Side. Drip Irrigation System- It Consist Of Hdpe / Pvc Pipe As Main And Submain, Lateral / Dripline 16Mm, Screen Filter, Ball Valves, Fittings And Accessories.Foggers System- It Consists Of Hdpe / Pvc Pipe As Main And Submain, Four Wayfoggers With 28Lph Discharge At 3M X 3M Spacing, Ball Valves, Laterals16mm, Fitting And Accessories. Pump-Mono Block Pump 1.5 Hp Of Reputed Brand- 1No, Water Storage Tank Triple Layered 1000 Liter-1No.For Drip And Fogging System. Civil Work- Foundation Block For Main Column And Corridor Of Shade Net House. Installation, Transportation And Commissioning Of Shade Net House , Shade Net Houseof Area 1008Sq. Mtr.-1440 Sq. Mtr Along With Drip Irrigation System And Fogging System Structure:- It Consists Of Galvanized Tubular Structure Having Gi Pipe Isi Marked 2Mm Thick- Foundation 38Mm, Column 50Mm, Arch 38Mm, Bottom 25Mm, Corridor 38Mm , Bracing 25Mm, Roof Purlins 38Mmand Side Purlin 32Mm, Clamps, Nut Bolts, Accessories, Door Size 1Mx2mcovering:- Shade Net 50% / 75%Green Colour Superior Quality For Covering Both Roof And Side. Locking Profiles:- Locking Profile With Zig Zag Spring For Fixing Of Poly Film For Roof And Side. Drip Irrigation System- It Consist Of Hdpe / Pvc Pipe As Main And Submain, Lateral / Dripline 16Mm, Screen Filter, Ball Valves, Fittings And Accessories.Foggers System- It Consists Of Hdpe / Pvc Pipe As Main And Submain, Four Wayfoggers With 28Lph Discharge At 3M X 3M Spacing, Ball Valves, Laterals16mm, Fitting And Accessories. Pump-Mono Block Pump 2 Hp Of Reputed Brand- 1No, Water Storage Tank Triple Layered 2000 Liter-1No.For Drip And Fogging System.Civil Work- Foundation Block For Main Column And Corridor Of Shade Net House. Installation, Transportation And Commissioning Of Shade Net House , Shade Net Houseof Area 1728 Sq. Mtr-2016Sq. Mtr. Along With Drip Irrigation System And Fogging System Structure:- It Consists Of Galvanized Tubular Structure Having Gi Pipe Isi Marked 2Mm Thick- Foundation 38Mm, Column 50Mm, Arch 38Mm, Bottom 25Mm, Corridor 38Mm , Bracing 25Mm, Roof Purlins 38Mmand Side Purlin 32Mm, Clamps, Nut Bolts, Accessories, Door Size 1Mx2mcovering:- Shade Net 50% / 75%Green Colour Superior Quality For Covering Both Roof And Side. Locking Profiles:- Locking Profile With Zig Zag Spring For Fixing Of Poly Film For Roof And Side. Drip Irrigation System- It Consist Of Hdpe / Pvc Pipe As Main And Submain, Lateral / Dripline 16Mm, Screen Filter, Ball Valves, Fittings And Accessories.Foggers System- It Consists Of Hdpe / Pvc Pipe As Main And Submain, Four Wayfoggers With 28Lph Discharge At 3M X 3M Spacing, Ball Valves, Laterals16mm, Fitting And Accessories. Pump-Mono Block Pump 3 Hp Of Reputed Brand- 1No, Water Storage Tank Triple Layered 4000 Liter-1No.For Drip And Fogging System.Civil Work- Foundation Block For Main Column And Corridor Of Shade Net House. Installation, Transportation And Commissioning Of Shade Net House , Polyhouse Structure 40 Sq. Mtr - It Consists Of Gi Pipe Isi Having Trusses & Legs 1, Purlins 1 / 2, Clamps And Nut Bolt Etc. , Polyhouse Structure 40 Sq. Mtr With Uv Sheet - It Consists Of Gi Pipe Isi Having Trusses & Legs 1, Purlins 1 / 2, Clamps And Nut Bolt, Covered With Uv Sheet Etc.

Key Value

Document Fees
INR 25 /-
EMD
INR 5000.0 /-
Tender Value
Refer document

BOQ Items

Name of Work : Steel Fabrication
Sl. No. Item Description
1M.S. Grill of required pattern as per design (Ornamental)
2M.S. Grill of required pattern as per design Plane type (made of MS Flat/MS Round)
3M.S. Grill of required pattern as per design Square Bar Type
4Angle iron fencing posts and flat strips mademof standard angle sections, cut and bend at bottom with holes drilled and top bent, duly red oxide painted (For fencing purposes)
5Flat iron strips made of standard sections duly cut and holes drilled, complete with red oxide paint. (For fencing purposes)
6Rolling Shutter made from HR/BP Sheet 22g
7Fitting, fixing
8SIGN BOARDS Supply of sign boards made out of ISA 50x50x6mm legs and frame with M.S. Flat40x5mm on CR Sheet 22 guage duly welded and fitted with nuts bolts wherever required incl. cost of painting and letter writing as per sizeof department.(as per requirement)
9SIGN BOARDS Supply of sign boards made out of ISA 50x50x6mm legs and frame with M.S. Flat40x5mm on CR Sheet 22 guage duly welded and fitted with nuts bolts wherever required without painting and writing as per sizeof department.(as per requirement)
10Steel sign boards made out of 2" dia MS Pipe frame over legs with 16g CR Sheets fitted with M.S. Flat clips 40x5mm with pipe frame and MS plate 4"x4" at the bottom of the legs duly painted and lettering complete.
11Steel sign boards made out of 2" dia MS Pipe frame over legs with 16g CR Sheets fitted with M.S. Flat clips 40x5mm with pipe frame and MS plate 4"x4" at the bottom of the legs without painting and writing
12IRON NOTICE BOARD SIZE 6’X3’ Iron Notice Board size 6’x3’ frame made of angle Iron 50x50x6mm fixed with MS Sheet 0.80mm, front Side covered with doors of iron jail, with locking facility Board having legs of angle iron.
13IRON NOTICE BOARD SIZE 4’X2.5’ Iron Notice Board size 4’x2.5’ frame made of anglre Iron 32x32x5mm fixed with MS sheet 0.80mm, front Side covered with doors of angle jail, with locking facility Board having provision to be mounted on wall
14IRON GATES Iron Gate ofdouble leaf made out of ISA 50x50x6mm frame and supports of M.S.Flat 40x5mm fitted on joints of CR Sheet cover 1.6mm incl. hold fasts and locking arrangement and vichetgate duly welded and painted with red oxide paint
15IRON GATES Iron Gate ofdouble leaf made out of ISA 50x50x6mm frame and supports of M.S.Flat 40x5mm fitted on joints of CR Sheet cover 1.6mm incl. hold fasts and locking arrangement and vichetgate duly welded and painted with red oxide paint Fancy type using fancy pipe, sq.bar and gate channel
16IRON GATES Iron Gate ofdouble leaf made out of ISA 50x50x6mm frame and supports of M.S.Flat 40x5mm fitted on joints of CR Sheet cover 1.6mm incl. hold fasts and locking arrangement and vichetgate duly welded and painted with red oxide paint Plane type using angle iron amd MS Sheet of 1.6mm
17IRON GATES Iron Gate ofdouble leaf made out of ISA 50x50x6mm frame and supports of M.S.Flat 40x5mm fitted on joints of CR Sheet cover 1.6mm incl. hold fasts and locking arrangement and vichetgate duly welded and painted with red oxide paint Using MS Pipe 40mm dia and wire mesh
18Iron Sagri medium size made of 0.63mm CR Sheet
19Waste paper basket standard size made out of CR Sheet 0.63mm with reducing base duly painted
20Collapsible Shutters Collapsible steel shutters with vertical Channels 20x10x2mm and braced with Flat Iron diagonals 20x5mm size with top & bottom rail T-Iron 40x40x6mm with 40mm dia, Steel Pulley complete with Bolts Nut locking arrangement, stoppers, handles including applying a priming coat of app. Steel primer.
21Collapsible Shutters Fixation charges per shutter
22Guide Frame Angle Iron 40x40x6mm with 50” long 1.25” dia GI Pipe B-Class and Angle Iron 1”x1”x1 suter attached with the GI Pipe to the length of 1’ with slotting alongwith Nut Bolts complete job (As per drawing).
23Gas Holder Frame work with 12mm Square bar with 79” long 2” dia GI Pipe fitted with the plates at bottom & top of size 6”x6”x6mm and fabricated with14 guage sheet round and 16 guage sheet at the top fitted with ¾” GI Socket and 4 Nos. of handle complete job (As per drawing).
24PASENGER SHED Sainless Steel Pessenger Shed Made of 304 pure quality Steel of Size 8’x20’ which includes 6’’ dia Pipe for pillar 4Nos. of 10’Trusses/purlins, vertical section made of stainless steel pipe of 1.5’’x1.5’’, 9 Nos. & 3’’x1.5’’ pipe 1 No. of 20’, base plate 12’’x12’’, top plate 8’’x8’’ stainless steel & Iron base plate 6mm thick with a complete roofing Made of sinusoidal color coated sheet of standard thickness 2.0mm with Sitting arrangement with two No. chrome coated full length chairs (3 seater)
25SKYLIGHT DOME: Skylight Dome (polycarbonate sheet dome) made of MS hollow pipe Section painted with enamel paint, anchored to the base concrete with Necessary base plates with fastener, aluminium profile with EPDM Gasket in between for fixing 10mm multiwall polycarbonate sheet (UV Coated) fixed in position, incl, erection
26COCOON TRAY Cocoon Tray size 124x91cm having depth 7.5cm, base wire mesh 1.6cm Sq. sides with CGI sheet with partition in the middle of CGI Sheet. Tray Mounted on Angle Iron frame of angle iron 2.5cm, 4 legs of 2.5cm of Having height 21cms. Each leg with top collar of same thickness (3cm) Angle welded giving one cm. space for stacking of trays one above the Other. Total weight of Tray 11.500 kgs (+5%) To be supplied as per Sample
27Garbage Container Blue /Yellow or as per requirement 4.5 Cubic Mtr. Made out of Plate/HR Sheet 5mm, 3mm & 2.5mm and CR Sheet1.6mm, Channel 75x40mm, Angle Iron 40x4x0x5mm; Bottom 5mm HR Sheet/Plate,Side 3mm, Top cover tall gate 2.5mm HR Sheet, Window 1.6mm CR Sheet Bottom & Side structure; Channel 75x40mm, Angle Iron 40x40x5mm Leading windows 4 No’s
28Fabrication of R.C. bins: including painting and letter writing complete job for capacity 1m M.S Plate at sides 3mm, bottom 4mm, MS Angle at top frame 50x50x6mm, side handle 2 nos 25mm MS round, Bse 48”x30”, Top 60”x42”, Height of bin 36”, Bottom Support of MS Angle 65x6mm, Painting Body Blue / Green, Interior Anti Rust Coating
29Handlomm Weaving Machine (Loom) made of pipe 3”x11/2”,2”x1” sq, 1” round,3/4 “round, 1 1/2 “ round rings, pullers, sheet box etc fitted with nut-bolts with paint work
30Passenger Shed / Vatika (Gazebo type) Made out of M.S steel pipes 6” dia fitted with gusset plates, angle iron 40x40x6mm and also provide 0.5mm profile sheet roofing with J/2 hook bolts and also provide cast iron heavy duty ornamental grills on bottom & top with hollow SW pipe railing to bottom end.(as per department requirement)
31Seed Bins made of size 17’ length & 17’ height having a Storage capacity of 50 kgs of rice made out of GP Sheets 0.5 MM thickness including cost of Hings, Lock, Kundi, Handless, Revets etc complete job
32Item: Steel Complaint Boxes Size: 18”x15”x8” (LxBxH) Sheet: GP Sheet 22 Guage Hings: 02 Nos. (3”) Lock: Link or Godrej Make Paint: Blue Enamel Paintwith writing
33Item: Steel Complaint Boxes Size: 18”x15”x8” (LxBxH) Sheet: CR Sheet 22 Guage Hings: 02 Nos. (3”) Lock: Link or Godrej Make Paint: Blue Enamel Paintwith writing
34Mobile Toilet Van Specification for Toilet Van •Length of the toilet van excluding hook 7 feet 6 inches. • Breadth of the toilet van including the walk way on both sides-6 feet 10 inches. • Height from ground-10 feet. • Cubical height - 6 feet. • Cubical width – 3 feet. • Cubical breadth- 3 feet. • Number of W.c of stain less steel Railway Type- 04 No’s for four seater toilet Van. • Night soil tank of 3mm M.s sheet painted with Anti corrosive paint-700 ltrs capacity. • Heavy Duty MS water tank with two taps mounted on the chassis-500 lts capacity. • Door of each compartment made of MS frame fixed with 3mm aluminum composite panel and the partitions of the same material. • The walk way of M.S. angle iron 40x5mm with flat iron supports 1”x6mm provided with hinges fitted with chequered M.S. sheet 3mm thick on top. • Railing of M.S. pipe 40mm and M.S. pipe 25mm dia. • There shall be ladder fitted on the both sides of the van. • One outlet valve 21/2” pipe for foul smell. • Roof shall be made of 24 SWG FRP sheet or Polycarbonate sheet 3mm to be bolted at the top. • Flooring of each cubical shall be chequered Aluminum sheet. • 100mm out let valve for drainage. • There shall be 2 wash basins with at the back of the van with proper disposal. • There shall be two mirrors at the back of the van. • There shall be 2 no’s handle, 1 clothes hook, 2 no’s locking bolts in each cubical. • The whole toilet van shall be painted with green and blue color or any other colour combination from outside as per the design with will be given by the Department. • 100mm dia 20 feet long steel wire reinforced synthetic rubber pipe for disposal of waste. • The chassis shall be movable on a chassis fitted with the tyres, tubes and Rims. • Heavy duty toeing hook shall be provided in front of the van.
35Iron Fencing of size 9’x6’ frame made of Angle Iron 40x40x5mm and 32x32x5mm fitted with GI Chain Link Mesh of size 50x50mm. Mesh strengthened with Flat Iron 40x5mm and 32x5mm fixed with 2mm dia wire. Total height of frame shall be 7 ½’ including 6’ height of frame and 1 1/2 ‘ angle iron for plenth
36Ballot Box Metal 1. Size: Height=470 mm Length=335 mm Width =280 mm Slit Size :Length=95 mm Width =10 mm 2. Sheet:- SAIL/TATA Manufacture CR Sheet/Coll. 3. Bottom and side walls of the ballot box: 1.00 mm 4. Upper Lid/Covering Lever/Handle/ Bracket of size : 1.60 mm 5. Locking plate/Locking lever : 2.0 mm 6. Ballot Paper inserting slot (in upper lid) of size: 95x10 mm 7. Slit for Paper Seal: 0.63 mm 8. Thickness of frame : 0.63mm 9. Tolerance Admissible : + 5% As per IS Standard 10. Primer : Single Coat 11. Painting Double Coat: Olive Green 12. Primer/Paint make : Nerolac/Berger/Asian/ Shalimar The serial number of ballot box will have to be embossed on the outside of the Ballot box. Like JK20 _ _ _ 1
37Iron fencing size 8’x6’ height of frame 9’. Frame consists of angle iron picket 9’ long ofsize 50x50x6mm (including 6” slit), picket shall be requiring 4 nos of 12mm dia holes at equal distance in between from top to below 6’ length, flat iron of 40x6mm to be fixed with picket of length 6’ with same nos of holes. Another angle iron 8’ length of size 50x50x6mm to be fixed horizontally to tie two vertical pickets, it shall be requiring 5 nos of 12mm dia holes at equal distance, flat iron 8’ long of size 40x6mm to be fixed with angle with same nos of holes. Nut bolt 10mm dia 50mm long to be provided as per requirement all material shall be painted a coat of red oxide primer. The material shall be marked with the "logo" of the firm
38Angle Iron Rack Providing and Fixing of Iron Racks made of angle iron 40x40x6 mm and Flat Iron 40x6 mm for keeping answer sheets
39Angle Iron Frame Welded Mesh (1”x1” square inch) Iron Fencing frame made of Angle Iron 40x40x6mm fitted with Welded Mesh (1”x1” square inch). Mesh strengthened with Flat Iron 20x6mm fixed
40Construction of Car / Scooter Parking for staff & student Student parking shed, parking shelter made out of tubular trusses made out of rectangular hollow section 96mmx48mmx3.2mm structural steel confirming to is:4923 with a spacing supported on columns of MS steel 3”dia round pipe fitted with gusset plates. The struts shall be made of 66mmx33mmx2.9mm rectangular hollow section with providing color coated sheet on top fitted with GI nuts and bolts. All structure be pre coated with primer and enamel painted in black color.
41Supply, Fabrication & Installation of Sanitizing Tunnel structure size 8’x5’x8’ (LxBxH) made of M.S. Square Pipe 40x40mm (16 Gauge) for structure, M.S. Square Pipe 25x25mm for roof and internal support duly painted with white color including red oxide primer coat. Two sides fitted with ACP (Aluminum Composite Panel) 3mm Sheet & on the top color coated sheet. Fogging System consists of 6 nos foggers, lateral 16mm as submain & 32mm as main pipeline alongwith fitting & accessories. Water Storage Tank Capacity 500 Ltr – white color (minimum 3 layers) alongwith Mono block Pump of 1 HP (ISI Mark) alongwith fittings & accessories. Antiskid mat 5’x8’ for flooring. The structure shall have provision of LED bulb alongwith switchboard of mono block pump. The entrance & exit of the tunnel shall be covered with transparent sheet of standard quality. Providing flex as per logo design provided by the intending department. (Complete Job)
42Student Bench: Student seating benches 3 tier, size 6’-length 7’-wide 7’ height above ground level from back side and 1’height above ground level from the front side. Frame made of Angle Iron comprising of isi:of 40x40x5mm and flat iron comprising of ISI:of 40mmx5mm, each seating step of 6’x2’, each tierheight be of 18”and height of the top seat resting back be 18”also. Front step size be 6’x1’. Vertical angles on back side be welded in box shaped design for strengthening. Structure be Pre coated with Primer and enamel paint of black color.
43Stadium Shed: Providing and fixing of Stadium Shed made out of MS angle 40mmx40mmx5mm in box shaped welding with arc design and purlins of 40mmx40mmx2.9mm MS hollow section square pipe. columns made of 6”x6” rectangular section (two sections of 6”x3” welded to give it a shape of 6”x6”) and fitted with L’ shaped 4”x4” rectangular section ( two sections of 4”x2” welded to give it a shape of 4”x4”). Also providing polycarbonate sheet of 0.5mm on top fitted with GI nuts and bolts. All structure be pre coated with primer and enamel painted in black color.
44Staff Parking Shed (Semi Circle Shaped): Staff parking shed (Semi Circle Shaped ) , Structure made out of Angle Iron of 32mmx32mmx5mm welded in box shaped. columns Made of MS Steel round pipe 3” dia ISI standard fitted with gusset plates with trusses in semi circle shape made of angle iron 32mmx32mmx5mm and flat iron 32mmx5mm . Also provide the polycarbonate sheet of 0.5mm on top for roofing and sides of the arc shaped trusses fixed with G.I Strips, nuts and bolts.
45Student Parking Shed: student parking shed, parking shelter made out of tubular trusses made out of rectangular hollow section 96mmx48mmx3.2mm structural steel confirming to is:4923 with a spacing supported on columns of MS steel 3”dia round pipe fitted with gusset plates. The struts shall be made of 66mmx33mmx2.9mm rectangular hollow section with providing polycarbonate sheet of 0.5mm on top fitted with GI nuts and bolts. All structure be pre coated with primer and enamel painted in black color.
46Hi-Tech Green House with fan and Pad system Covered with Polycarbonate sheet of area 90Sq. mtr.-162 Sq. mtr along with Drip Irrigation System and Fogging System Structure:- It consists of Square Pipe ISI Marked 2mm Thick- Foundation 38mm x 38mm, Column 50mm x 50mm, Arch 50mm x 50mm , Bottom 50mmmm, Roof Purlins 50mmx50mmand side purlin 50mm x 50mm, Clamps, Nut Bolts, Accessories, Entrance Room with Door Size 1mx2m- 2NosCovering:- U.V. stabilized Polycarbonate sheet 6mm thickness for covering both roof and side.Profiles:-Profilefixing of polycarbonate sheet for roof and side. Insect Net:- Insect Net 40 mesh on cooling pad from outside.Shade Net:- Shade net 50% Green colour superior Quality inside Green house with manual collapsible arrangement.Exhaust fan:- Exhaust fan 48 inch withmotor, belt drive- 1 nos on Front Side. Cooling Pad:-It consists of cellulose cooling pad of size height 2.0m and 0.1 m thick size for Rare side of Green House, along with water circulation systems including Water Collecting Gutter,PVC Water Distribution System, Fitting and Accessories, Mono Block Pump 1hp of Reputed Brand- 1no water Storage Tank Triple layered 1000 liter- 1Nos. for Cooling Pad system. Electrical Control Panel :- Panel Box Having MCB, Relay, switch, Volt meter etc. to operate fogging system and cooling system.Air Curtain- Air Curtain to be installed at the entry of Entrance Room.Heater- 2 Nos of Heater is to be Provided inside Green House. Drip Irrigation System- It consist of HDPE/PVC pipe as main and submain, Lateral/Dripline 16mm, Screen filter,Ball Valves, Fittings and Accessories. Foggers System- It consists of HDPE/PVC Pipe as Main and submain, Four wayfoggers with 28lph discharge at 3m X 3m Spacing, ball valves, laterals16mm, fitting and accessories. Pump-Mono Block Pump 1 hp of Reputed Brand- 1no, water storage tank Triple layered 1000 liter-1no.for Drip and Fogging system. Civil work-Earth Excavtion for plinth construction of bricks wall 0.9m above the ground and 0.45m below the ground including both sides plaster for cooling pad side and 0.30m above the ground and 0.30m below the ground for other three side including both sides Plaster Work and Foundation block for Main Column and Corridor of Green House. Installation, Transportation and commissioning of Hi-tech Green House
47Hi-Tech Green House with fan and Pad system Covered with Polycarbonate sheet of area 180Sq. mtr. -336 Sq. mtralong with Drip Irrigation System and Fogging System Structure:- It consists of SquarePipe ISI Marked 2mm Thick- Foundation 38mm x 38mm, Column 50mm x 50mm, Arch 50mm x 50mm , Bottom 50mmmm, Roof Purlins 50mmx50mmand side purlin 50mm x 50mm, Clamps, Nut Bolts, Gutter with Pvc Pipe,Accessories, Entrance Room with Door Size 1mx2m- 2NosCovering:- U.V. stabilized Polycarbonate sheet 6mm thickness for covering both roof and side.Profiles:-Profilefixing of polycarbonate sheet for roof and side. Insect Net:- Insect Net 40 mesh on cooling pad from outside.Shade Net:- Shade net 50% Green colour superior Quality inside Green house with manual collapsible arrangement.Exhaust fan:- Exhaust fan 48 inch withmotor, belt drive- 2 nos on Front Side. Cooling Pad:-It consists of cellulose cooling pad of size height 2.0m and 0.1 m thick size for Rare side of Green House, along with water circulation systems including Water Collecting Gutter,PVC Water Distribution System, Fitting and Accessories, Mono Block Pump 1hp of Reputed Brand- 1no water Storage Tank Triple layered 1000 liter- 1Nos. for Cooling Pad system. Electrical Control Panel :- Panel Box Having MCB, Relay, switch, Volt meter etc. to operate fogging system and cooling system.Air Curtain- Air Curtain to be installed at the entry of Entrance Room.Heater- 4 Nos of Heater is to be Provided inside Green House. Drip Irrigation System- It consist of HDPE/PVC pipe as main and submain, Lateral/Dripline 16mm, Screen filter,Ball Valves, Fittings and Accessories. Foggers System- It consists of HDPE/PVC Pipe as Main and submain, Four wayfoggers with 28lph discharge at 3m X 3m Spacing, ball valves, laterals16mm, fitting and accessories. Pump-Mono Block Pump 1 hp of Reputed Brand- 1no, water storage tank Triple layered 1000 liter-1no.for Drip and Fogging system.Gutter- Gutter is to be Provided for smooth drainage of water along with gutter Funnel, Gutter End and Pvc Pipe from Top to Bottom. Civil work-Earth Excavtion for plinth construction of bricks wall 0.9m above the ground and 0.45m below the ground including both sides plaster for cooling pad side and 0.30m above the ground and 0.30m below the ground for other three side including both sides Plaster Work and Foundation block for Main Column and Corridor of Green House. Installation, Transportation and commissioning of Hi-tech Green House
48Hi-Tech Green House with fan and Pad system Covered with Polycarbonate sheet of area 432Sq. mtr.-540Sq. mtr along with Drip Irrigation System and Fogging System Structure:- It consists of SquarePipe ISI Marked 2mm Thick- Foundation 38mm x 38mm, Column 50mm x 50mm, Arch 50mm x 50mm , Bottom 50mmmm, Roof Purlins 50mmx50mmand side purlin 50mm x 50mm, Clamps, Nut Bolts, Gutter with Pvc Pipe,Accessories, Entrance Room with Door Size 1mx2m- 2NosCovering:- U.V. stabilized Polycarbonate sheet 6mm thickness for covering both roof and side.Profiles:-Profilefixing of polycarbonate sheet for roof and side. Insect Net:- Insect Net 40 mesh on cooling pad from outside.Shade Net:- Shade net 50% Green colour superior Quality inside Green house with manual collapsible arrangement.Exhaust fan:- Exhaust fan 48 inch withmotor, belt drive- 3 nos on Front Side. Cooling Pad:-It consists of cellulose cooling pad of size height 2.0m and 0.1 m thick size for Rare side of Green House, along with water circulation systems including Water Collecting Gutter,PVC Water Distribution System, Fitting and Accessories, Mono Block Pump 1.5hp of Reputed Brand- 1no water Storage Tank Triple layered 1000 liter- 1Nos. for Cooling Pad system. Electrical Control Panel :- Panel Box Having MCB, Relay, switch, Volt meter etc. to operate fogging system and cooling system.Air Curtain- Air Curtain to be installed at the entry of Entrance Room.Heater- 8 Nos of Heater is to be Provided inside Green House. Drip Irrigation System- It consist of HDPE/PVC pipe as main and submain, Lateral/Dripline 16mm, Screen filter,Ball Valves, Fittings and Accessories. Foggers System- It consists of HDPE/PVC Pipe as Main and submain, Four wayfoggers with 28lph discharge at 3m X 3m Spacing, ball valves, laterals16mm, fitting and accessories. Pump-Mono Block Pump 1.5 hp of Reputed Brand- 1no, water storage tank Triple layered 1000 liter-1no.for Drip and Fogging system.Gutter- Gutter is to be Provided for smooth drainage of water along with gutter Funnel, Gutter End and Pvc Pipe from Top to Bottom. Civil work-Earth Excavtion for plinth construction of bricks wall 0.9m above the ground and 0.45m below the ground including both sides plaster for cooling pad side and 0.30m above the ground and 0.30m below the ground for other three side including both sides Plaster Work and Foundation block for Main Column and Corridor of Green House. Installation, Transportation and commissioning of Hi-tech Green House
49Hi-Tech Green House with fan and Pad system Covered with Polycarbonate sheet of area 630 Sq. mtr-900Sq. mtr. along with Drip Irrigation System and Fogging System Structure:- It consists of Square Pipe ISI Marked 2mm Thick- Foundation 38mm x 38mm, Column 50mm x 50mm, Arch 50mm x 50mm , Bottom 50mmmm, Roof Purlins 50mmx50mmand side purlin 50mm x 50mm, Clamps, Nut Bolts, Gutter with Pvc Pipe,Accessories, Entrance Room with Door Size 1mx2m- 2NosCovering:- U.V. stabilized Polycarbonate sheet 6mm thickness for covering both roof and side.Profiles:-Profilefixing of polycarbonate sheet for roof and side. Insect Net:- Insect Net 40 mesh on cooling pad from outside.Shade Net:- Shade net 50% Green colour superior Quality inside Green house with manual collapsible arrangement.Exhaust fan:- Exhaust fan 48 inch withmotor, belt drive- 4 nos on Front Side. Cooling Pad:-It consists of cellulose cooling pad of size height 2.0m and 0.1 m thick size for Rare side of Green House, along with water circulation systems including Water Collecting Gutter,PVC Water Distribution System, Fitting and Accessories, Mono Block Pump 2hp of Reputed Brand- 1no water Storage Tank Triple layered 2000 liter- 1Nos. for Cooling Pad system. Electrical Control Panel :- Panel Box Having MCB, Relay, switch, Volt meter etc. to operate fogging system and cooling system.Air Curtain- Air Curtain to be installed at the entry of Entrance Room.Heater- 12 Nos of Heater is to be Provided inside Green House. Drip Irrigation System- It consist of HDPE/PVC pipe as main and submain, Lateral/Dripline 16mm, Screen filter,Ball Valves, Fittings and Accessories. Foggers System- It consists of HDPE/PVC Pipe as Main and submain, Four wayfoggers with 28lph discharge at 3m X 3m Spacing, ball valves, laterals16mm, fitting and accessories. Pump-Mono Block Pump 2 hp of Reputed Brand- 1no, water storage tank Triple layered 2000 liter-1no.for Drip and Fogging system.Gutter- Gutter is to be Provided for smooth drainage of water along with gutter Funnel, Gutter End and Pvc Pipe from Top to Bottom. Civil work-Earth Excavtion for plinth construction of bricks wall 0.9m above the ground and 0.45m below the ground including both sides plaster for cooling pad side and 0.30m above the ground and 0.30m below the ground for other three side including both sides Plaster Work and Foundation block for Main Column and Corridor of Green House. Installation, Transportation and commissioning of Hi-tech Green House
50Hi-Tech Green House with fan and Pad system of area 100Sq. mtr-180Sq. mtr. along with Drip Irrigation System and Fogging System Structure:- It consists of Galvanized Tubular structure having GI Pipe ISI Marked 2mm Thick- Foundation 38mm, Column 50mm, Arch 38mm , Bottom 25mm, Corridor 38mm , Bracing 25mm, Roof Purlins 38mmand side purlin 32mm, Clamps, Nut Bolts, Accessories Gutter, Entrance Room with Door Size 1mx2m- 2NosCovering:- U.V. stabilized Polyethylene film 200 micron thickness for covering both roof and side. Locking Profiles:- Locking profile with zig zag spring for fixing of poly film for roof and side. Insect Net:- Insect Net 40 mesh on cooling pad from outside.Shade Net:- Shade net 50% Green colour superior Quality inside Green house with manual collapsible arrangement. Exhaust fan:- Exhaust fan 48 inch withmotor, belt drive- 1 nos on Front Side. Cooling Pad:-It consists of cellulose cooling pad of size height 2.0m and 0.1 m thick size for Rare side of Green House, along with water circulation systems including Water Collecting Gutter,PVC Water Distribution System, Fitting and Accessories, Mono Block Pump 1hp of Reputed Brand- 1no water Storage Tank Triple layered 1000 liter- 1Nos. for Cooling Pad system. Electrical Control Panel :- Panel Box Having MCB, Relay, switch, Volt meter etc. to operate fogging system and cooling system.Air Curtain- Air Curtain to be installed at the entry of Entrance Room.Drip Irrigation System- It consist of HDPE/PVC pipe as main and submain, Lateral/Dripline 16mm, Screen filter,Ball Valves, Fittings and Accessories.Foggers System- It consists of HDPE/PVC Pipe as Main and submain, Four wayfoggers with 28lph discharge at 3m X 3m Spacing, ball valves, laterals16mm, fitting and accessories. Pump-Mono Block Pump 1 hp of Reputed Brand- 1no, water storage tank Triple layered 1000 liter-1no.for Drip and Fogging system.Gutter- Gutter is to be Provided for smooth drainage of water along with gutter Funnel, Gutter End and Pvc Pipe from Top to Bottom. Civil work-Earth Excavtion for plinth construction of bricks wall 0.9m above the ground and 0.45m below the ground including both sides plaster for cooling pad side and 0.30m above the ground and 0.30m below the ground for other three side including both sides Plaster Work and Foundation block for Main Column and Corridor of Green House. Installation, Transportation and commissioning of Hi-tech Green House
51Hi-Tech Green House with fan and Pad system of area 224Sq. mtr.-392 Sq. mtr along with Drip Irrigation System and Fogging System Structure:- It consists of Galvanized Tubular structure having GI Pipe ISI Marked 2mm Thick- Foundation 38mm, Column 50mm, Arch 38mm , Bottom 25mm, Corridor 38mm , Bracing 25mm, Roof Purlins 38mmand side purlin 32mm, Clamps, Nut Bolts, Accessories Gutter, Entrance Room with Door Size 1mx2m- 2NosCovering:- U.V. stabilized Polyethylene film 200 micron thickness for covering both roof and side. Locking Profiles:- Locking profile with zig zag spring for fixing of poly film for roof and side. Insect Net:- Insect Net 40 mesh on cooling pad from outside.Shade Net:- Shade net 50% Green colour superior Quality inside Green house with manual collapsible arrangement. Exhaust fan:- Exhaust fan 48 inch withmotor, belt drive- 2 nos on Front Side. Cooling Pad:-It consists of cellulose cooling pad of size height 2.0m and 0.1 m thick size for Rare side of Green House, along with water circulation systems including Water Collecting Gutter,PVC Water Distribution System, Fitting and Accessories, Mono Block Pump 1.5hp of Reputed Brand- 1no water Storage Tank Triple layered 1000 liter- 1Nos. for Cooling Pad system. Electrical Control Panel :- Panel Box Having MCB, Relay, switch, Volt meter etc. to operate fogging system and cooling system.Air Curtain- Air Curtain to be installed at the entry of Entrance Room.Drip Irrigation System- It consist of HDPE/PVC pipe as main and submain, Lateral/Dripline 16mm, Screen filter,Ball Valves, Fittings and Accessories.Foggers System- It consists of HDPE/PVC Pipe as Main and submain, Four wayfoggers with 28lph discharge at 3m X 3m Spacing, ball valves, laterals16mm, fitting and accessories. Pump-Mono Block Pump 1.5 hp of Reputed Brand- 1no, water storage tank Triple layered 1000 liter-1no.for Drip and Fogging system.Gutter- Gutter is to be Provided for smooth drainage of water along with gutter Funnel, Gutter End and Pvc Pipe from Top to Bottom. Civil work-Earth Excavtion for plinth construction of bricks wall 0.9m above the ground and 0.45m below the ground including both sides plaster for cooling pad side and 0.30m above the ground and 0.30m below the ground for other three side including both sides Plaster Work and Foundation block for Main Column and Corridor of Green House. Installation, Transportation and commissioning of Hi-tech Green House
52Hi-Tech Green House with fan and Pad system of area 456Sq. mtr.-672 Sq. mtr along with Drip Irrigation System and Fogging System Structure:- It consists of Galvanized Tubular structure having GI Pipe ISI Marked 2mm Thick- Foundation 38mm, Column 50mm, Arch 38mm , Bottom 25mm, Corridor 38mm , Bracing 25mm, Roof Purlins 38mmand side purlin 32mm, Clamps, Nut Bolts, accessories, Entrance Room with Door Size 1mx2m- 2NosCovering:- U.V. stabilized Polyethylene film 200 micron thickness for covering both roof and side. Locking Profiles:- Locking profile with zig zag spring for fixing of poly film for roof and side. Insect Net:- Insect Net 40 mesh on cooling pad from outside.Shade Net:- Shade net 50% Green colour superior Quality inside Green house with manual collapsible arrangement.Exhaust fan:- Exhaust fan 48 inch withmotor, belt drive- 3 nos on Front Side. Cooling Pad:-It consists of cellulose cooling pad of size height 2.0m and 0.1 m thick size for Rare side of Green House, along with water circulation systems including Water Collecting Gutter,PVC Water Distribution System, Fitting and Accessories, Mono Block Pump 1.5hp of Reputed Brand- 1no water Storage Tank Triple layered 1000 liter- 1Nos. for Cooling Pad system. Electrical Control Panel :- Panel Box Having MCB, Relay, switch, Volt meter etc. to operate fogging system and cooling system.Air Curtain- Air Curtain to be installed at the entry of Entrance Room.Drip Irrigation System- It consist of HDPE/PVC pipe as main and submain, Lateral/Dripline 16mm, Screen filter,Ball Valves, Fittings and Accessories.Foggers System- It consists of HDPE/PVC Pipe as Main and submain, Four wayfoggers with 28lph discharge at 3m X 3m Spacing, ball valves, laterals16mm, fitting and accessories. Pump-Mono Block Pump 1.5 hp of Reputed Brand- 1no, water storage tank Triple layered 1000 liter-1no.for Drip and Fogging system. Gutter- Gutter is to be Provided for smooth drainage of water along with gutter Funnel, Gutter End and Pvc Pipe from Top to Bottom.Civil work-Earth Excavtion for plinth construction of bricks wall0 .9m above the ground and 0.45m below the ground including both sides plaster for cooling pad side and 0.30m above the ground and 0.30m below the ground for other three side including both sides Plaster Work and Foundation block for Main Column and Corridor of Green House. Installation, Transportation and commissioning of Hi-tech Green House
53Hi-Tech Green House with fan and Pad system of area 812Sq. mtr.- 1020 Sq. mtr along with Drip Irrigation System and Fogging System Structure:- It consists of Galvanized Tubular structure having GI Pipe ISI Marked 2mm Thick- Foundation 38mm, Column 50mm, Arch 38mm , Bottom 25mm, Corridor 38mm , Bracing 25mm, Roof Purlins 38mmand side purlin 32mm, Clamps, Nut Bolts, Gutter with Pvc Pipe,Accessories, Entrance Room with Door Size 1mx2m- 2NosCovering:- U.V. stabilized Polyethylene film 200 micron thickness for covering both roof and side. Locking Profiles:- Locking profile with zig zag spring for fixing of poly film for roof and side. Insect Net:- Insect Net 40 mesh on cooling pad from outside.Shade Net:- Shade net 50% Green colour superior Quality inside Green house with manual collapsible arrangement.Exhaust fan:- Exhaust fan 48 inch withmotor, belt drive- 4 nos on Front Side. Cooling Pad:-It consists of cellulose cooling pad of size height 2.0m and 0.1 m thick size for Rare side of Green House, along with water circulation systems including Water Collecting Gutter,PVC Water Distribution System, Fitting and Accessories, Mono Block Pump 2hp of Reputed Brand- 1no water Storage Tank Triple layered 2000 liter- 1Nos. for Cooling Pad system. Electrical Control Panel :- Panel Box Having MCB, Relay, switch, Volt meter etc. to operate fogging system and cooling system.Air Curtain- Air Curtain to be installed at the entry of Entrance Room.Drip Irrigation System- It consist of HDPE/PVC pipe as main and submain, Lateral/Dripline 16mm, Screen filter,Ball Valves, Fittings and Accessories. Foggers System- It consists of HDPE/PVC Pipe as Main and submain, Four wayfoggers with 28lph discharge at 3m X 3m Spacing, ball valves, laterals16mm, fitting and accessories. Pump-Mono Block Pump 2 hp of Reputed Brand- 1no, water storage tank Triple layered 2000 liter-1no.for Drip and Fogging system.Gutter- Gutter is to be Provided for smooth drainage of water along with gutter Funnel, Gutter End and Pvc Pipe from Top to Bottom. Civil work-Earth Excavtion for plinth construction of bricks wall 0.9m above the ground and 0.45m below the ground including both sides plaster for cooling pad side and 0.30m above the ground and 0.30m below the ground for other three side including both sides Plaster Work and Foundation block for Main Column and Corridor of Green House. Installation, Transportation and commissioning of Hi-tech Green House
54Insect Net House of area 192Sq. mtr.-400 Sq. mtr along with Drip Irrigation System and Fogging System Structure:- It consists of Galvanized Tubular structure having GI Pipe ISI Marked 2mm Thick- Foundation 38mm, Column 50mm, Arch 38mm, Bottom 25mm, Corridor 38mm , Bracing 25mm, Roof Purlins 38mmand side purlin 32mm, Clamps, Nut Bolts, Accessories, Door Size 1mx2mCovering:- U.V. stabilized Insect Net 40 Mesh for covering both roof and side. Locking Profiles:- Locking profile with zig zag spring for fixing of poly film for roof and side. Drip Irrigation System- It consist of HDPE/PVC pipe as main and submain, Lateral/Dripline 16mm, Screen filter,Ball Valves, Fittings and Accessories.Foggers System- It consists of HDPE/PVC Pipe as Main and submain, Four wayfoggers with 28lph discharge at 3m X 3m Spacing, ball valves, laterals16mm, fitting and accessories. Pump-Mono Block Pump 1.5 hp of Reputed Brand- 1no, water storage tank Triple layered 1000 liter-1no.for Drip and Fogging systemCivil work- Foundation block for Main Column and Corridor of Insect Net House. Installation, Transportation and commissioning of Insect Net House
55Insect Net House of area 480Sq. mtr.-896Sq. mtr along with Drip Irrigation System and Fogging System Structure:- It consists of Galvanized Tubular structure having GI Pipe ISI Marked 2mm Thick- Foundation 38mm, Column 50mm, Arch 38mm , Bottom 25mm, Corridor 38mm , Bracing 25mm, Roof Purlins 38mmand side purlin 32mm, Clamps, Nut Bolts, Accessories, Door Size 1mx2mCovering:- U.V. stabilized Insect Net 40 Mesh for covering both roof and side. Locking Profiles:- Locking profile with zig zag spring for fixing of poly film for roof and side. Drip Irrigation System- It consist of HDPE/PVC pipe as main and submain, Lateral/Dripline 16mm, Screen filter,Ball Valves, Fittings and Accessories.Foggers System- It consists of HDPE/PVC Pipe as Main and submain, Four wayfoggers with 28lph discharge at 3m X 3m Spacing, ball valves, laterals16mm, fitting and accessories. Pump-Mono Block Pump 1.5 hp of Reputed Brand- 1no, water storage tank Triple layered 1000 liter-1no.for Drip and Fogging systemCivil work- Foundation block for Main Column and Corridor of Insect Net House. Installation, Transportation and commissioning of Insect Net House
56Insect Net House of area 1008Sq. mtr.-1440 Sq. mtr along with Drip Irrigation System and Fogging System Structure:- It consists of Galvanized Tubular structure having GI Pipe ISI Marked 2mm Thick- Foundation 38mm, Column 50mm, Arch 38mm, Bottom 25mm, Corridor 38mm , Bracing 25mm, Roof Purlins 38mmand side purlin 32mm, Clamps, Nut Bolts, Accessories, Door Size 1mx2mCovering:- U.V. stabilized Insect Net 40 Mesh for covering both roof and side. Locking Profiles:- Locking profile with zig zag spring for fixing of poly film for roof and side.Drip Irrigation System- It consist of HDPE/PVC pipe as main and submain, Lateral/Dripline 16mm, Screen filter,Ball Valves, Fittings and Accessories.Foggers System- It consists of HDPE/PVC Pipe as Main and submain, Four wayfoggers with 28lph discharge at 3m X 3m Spacing, ball valves, laterals16mm, fitting and accessories. Pump-Mono Block Pump 2 hp of Reputed Brand- 1no, water storage tank Triple layered 2000 liter-1no.for Drip and Fogging systemCivil work- Foundation block for Main Column and Corridor of Insect Net House. Installation, Transportation and commissioning of Insect Net House
57Insect Net House of area 1728 Sq. mtr-2016Sq. mtr. along with Drip Irrigation System and Fogging System Structure:- It consists of Galvanized Tubular structure having GI Pipe ISI Marked 2mm Thick- Foundation 38mm, Column 50mm, Arch 38mm, Bottom 25mm, Corridor 38mm , Bracing 25mm, Roof Purlins 38mmand side purlin 32mm, Clamps, Nut Bolts, Accessories, Door Size 1mx2mCovering:- U.V. stabilized Insect Net 40 Mesh for covering both roof and side. Locking Profiles:- Locking profile with zig zag spring for fixing of poly film for roof and side.Drip Irrigation System- It consist of HDPE/PVC pipe as main and submain, Lateral/Dripline 16mm, Screen filter,Ball Valves, Fittings and Accessories.Foggers System- It consists of HDPE/PVC Pipe as Main and submain, Four wayfoggers with 28lph discharge at 3m X 3m Spacing, ball valves, laterals16mm, fitting and accessories. Pump-Mono Block Pump 3 hp of Reputed Brand- 1no, water storage tank Triple layered 4000 liter-1no.for Drip and Fogging systemCivil work- Foundation block for Main Column and Corridor of Insect Net House. Installation, Transportation and commissioning of Insect Net House
58Naturally Ventilated / Semi Hi-Tech Poly House of area 192Sq. mtr.- 400 Sq. mtr along with Drip Irrigation System and Fogging System Structure:- It consists of Galvanized Tubular structure having GI Pipe ISI Marked 2mm Thick- Foundation 38mm, Column 50mm, Arch 38mm , Bottom 25mm, Corridor 38mm , Bracing 25mm, Top Purlins 38mm, Bottom Purlin 32mm and side purlin 32mm, Clamps, Nut Bolts, Accessories, Entrance Room with Door Size 1mx2m- 2NosCovering:- U.V. stabilized Polyethylene film 200 micron thickness for covering. Apron of Polyfilm 1.2 to 1.5mtr on all four sides with fixing arrangement at the apron Top and bottom of Polyfilm embedded in soil.Locking Profiles:- Locking profile with zig zag spring for fixing of Polyfilm for roof and side. Side Ventilation:-It Consists of Manual Operable side roll up curtains 3.0 to 4.0 mtr on all four sides with cutain pipe, handles, Universal Joint and Insect Net 40 Mesh below the curtains with proper fixing arrangement.Insect Net :- U.V Stabilized Insect Net 40 mesh at ridge vent.Shade Net:- Shade net 50% Green colour superior Quality inside Green house with manual collapsible arrangement. Drip Irrigation System- It consist of HDPE/PVC pipe as main and submain, Lateral/Dripline 16mm, Screen filter,Ball Valves, Fittings and Accessories.Foggers System- It consists of HDPE/PVC Pipe as Main and submain, Four wayfoggers with 28lph discharge at 3m X 3m Spacing, ball valves, laterals16mm, fitting and accessories. Pump-Mono Block Pump 1.5 hp of Reputed Brand- 1no, water storage tank Triple layered 1000 liter-1no.for Drip and Fogger systemCivil work- Foundation block for Main Column and Corridor of NVPH. Installation, Transportation and commissioning of NVPH.
59Naturally Ventilated/ Semi Hi-Tech Poly House of area 480Sq. mtr.-896 Sq. mtr along with Drip Irrigation System and Fogging System Structure:- It consists of Galvanized Tubular structure having GI Pipe ISI Marked 2mm Thick- Foundation 38mm, Column 50mm, Arch 38mm ,Bottom 25mm, Corridor 38mm , Bracing 25mm, Top Purlins 38mm, Bottom Purlins 32mm and side purlin 32mm, Clamps, Nut Bolts, Accessories, Entrance Room with Door Size 1mx2m- 2NosCovering:- U.V. stabilized Polyethylene film 200 micron thickness for covering. Apron of Polyfilm 1.2 to 1.5mtr on all four sides withfixing arrangement at the apron Top and bottom of Polyfilm embedded in soil.Locking Profiles:- Locking profile with zig zag spring for fixing of Polyfilm for roof and side. Side Ventilation:-It Consists of Manual Operable side roll up curtains 3.0 to 4.0 mtr on all four sides with cutain pipe, handles, Universal Joint and Insect Net 40 Mesh below the curtains with proper fixing arrangement.Insect Net :- U.V Stabilized Insect Net 40 mesh at ridge vent.Shade Net:- Shade net 50% Green colour superior Quality inside Green house with manual collapsible arrangement. Drip Irrigation System- It consist of HDPE/PVC pipe as main and submain, Lateral/Dripline 16mm, Screen filter,Ball Valves, Fittings and Accessories.Foggers System- It consists of HDPE/PVC Pipe as Main and submain, Four wayfoggers with 28lph discharge at 3m X 3m Spacing, ball valves, laterals16mm, fitting and accessories. Pump-Mono Block Pump 1.5 hp of Reputed Brand- 1no, water storage tank Triple layered 1000 liter-1no.for Drip and Fogger system. Gutter- Gutter is to be Provided for smooth drainage of water along with gutter Funnel, Gutter End and Pvc Pipe from Top to Bottom.Civil work- Foundation block for Main Column and Corridor of NVPH. Installation, Transportation and commissioning of NVPH.
60Naturally Ventilated/ Semi Hi-Tech Poly House of area 1008 Sq. mtr.-1440 Sq. mtr along with Drip Irrigation System and Fogging System Structure:- It consists of Galvanized Tubular structure having GI Pipe ISI Marked 2mm Thick- Foundation 38mm, Column 50mm, Arch 38mm , Bottom 25mm, Corridor 38mm , Bracing 25mm, Top Purlins 38mm, Bottom Purlins 32mm and side purlin 32mm, Clamps, Nut Bolts, Accessories, Entrance Room with Door Size 1mx2m- 2NosCovering:- U.V. stabilized Polyethylene film 200 micron thickness for covering. Apron of Polyfilm 1.2 to 1.5mtr on all four sides with fixing arrangement at the apron Top and bottom of Polyfilm embedded in soil. Locking Profiles:- Locking profile with zig zag spring for fixing of Polyfilm for roof and side. Side Ventilation:-It Consists of Manual Operable side roll up curtains 3.0 to 4.0 mtr on all four sides with cutain pipe, handles, Universal Joint and Insect Net 40 Mesh below the curtains with proper fixing arrangement.Insect Net :- U.V Stabilized Insect Net 40 mesh at ridge vent.Shade Net:- Shade net 50% Green colour superior Quality inside Green house with manual collapsible arrangement. Drip Irrigation System- It consist of HDPE/PVC pipe as main and submain, Lateral/Dripline 16mm, Screen filter,Ball Valves, Fittings and Accessories.Foggers System- It consists of HDPE/PVC Pipe as Main and submain, Four wayfoggers with 28lph discharge at 3m X 3m Spacing, ball valves, laterals16mm, fitting and accessories. Pump-Mono Block Pump 2 hp of Reputed Brand- 1no, water storage tank Triple layered 2000 liter-1no.for Drip and Fogger system Gutter- Gutter is to be Provided for smooth drainage of water along with gutter Funnel, Gutter End and Pvc Pipe from Top to Bottom. Civil work- Foundation block for Main Column and Corridor of NVPH. Installation, Transportation and commissioning of NVPH.
61Naturally Ventilated/ Semi Hi-Tech Poly House of area 1728 Sq. mtr-2016Sq. mtr. along with Drip Irrigation System and Fogging System Structure:- It consists of Galvanized Tubular structure having GI Pipe ISI Marked 2mm Thick- Foundation 38mm, Column 50mm, Arch 38mm , Bottom 25, Corridor 38mm , Bracing 25mm, Top Purlins 38mm, Bottom Purlins 32mm and side purlin 32mm, Clamps, Nut Bolts, Accessories, Entrance Room with Door Size 1mx2m- 2NosCovering:- U.V. stabilized Polyethylene film 200 micron thickness for covering. Apron of Polyfilm 1.2 to 1.5mtr on all four sides with fixing arrangement at the apron Top and bottom of Polyfilm embedded in soil. Locking Profiles:- Locking profile with zig zag spring for fixing of Polyfilm for roof and side. Side Ventilation:-It Consists of Manual Operable side roll up curtains 3.0 to 4.0 mtr on all four sides with cutain pipe, handles, Universal Joint and Insect Net 40 Mesh below the curtains with proper fixing arrangement.Insect Net :- U.V Stabilized Insect Net 40 mesh at ridge vent.Shade Net:- Shade net 50% Green colour superior Quality inside Green house with manual collapsible arrangement. Drip Irrigation System- It consist of HDPE/PVC pipe as main and submain, Lateral/Dripline 16mm, Screen filter,Ball Valves, Fittings and Accessories.Foggers System- It consists of HDPE/PVC Pipe as Main and submain, Four wayfoggers with 28lph discharge at 3m X 3m Spacing, ball valves, laterals16mm, fitting and accessories. Pump-Mono Block Pump 3 hp of Reputed Brand- 1no, water storage tank Triple layered 4000 liter-1no.for Drip and Fogger systemGutter- Gutter is to be Provided for smooth drainage of water along with gutter Funnel, Gutter End and Pvc Pipe from Top to Bottom.Civil work- Foundation block for Main Column and Corridor of NVPH. Installation, Transportation and commissioning of NVPH.
62Screen House of area 90Sq. mtr.-162 Sq. mtr along with Drip Irrigation System and Fogging System Structure:- It consists ofSquare Pipe ISI Marked 2mm Thick- Foundation 38mm x 38mm, Column 50mm x 50mm, Arch 50mm x 50mm , Bottom 50mmmm, Roof Purlins 50mmx50mmand side purlin 50mm x 50mm, Clamps, Nut Bolts, Accessories, Entrance Room with Door Size 1mx2m- 2NosCovering:- Stainless steel jaali 40mesh for covering both roof and side.Profiles:-Profilefixing of Stainless steel jaali for roof and side. Shade Net:- Shade net 50% Green colour superior Quality inside Green house with manual collapsible arrangement. Drip Irrigation System- It consist of HDPE/PVC pipe as main and submain, Lateral/Dripline 16mm, Screen filter,Ball Valves, Fittings and Accessories. Foggers System- It consists of HDPE/PVC Pipe as Main and submain, Four wayfoggers with 28lph discharge at 3m X 3m Spacing, ball valves, laterals16mm, fitting and accessories. Pump-Mono Block Pump 1 hp of Reputed Brand- 1no, water storage tank Triple layered 1000 liter-1no.for Drip and Fogging system. Civil work-Earth Excavtion for plinth construction of bricks wall 0.3m above the ground and 0.30m below the ground including both sides plaster for all sides of Screen House and Foundation block for Main Column. Installation, Transportation and commissioning of Screen House
63Screen House of area 180Sq. mtr.-252 Sq. mtr along with Drip Irrigation System and Fogging System Structure:- It consists of Square pipe ISI Marked 2mm Thick- Foundation 38mm x 38mm, Column 50mm x 50mm, Arch 50mm x 50mm , Bottom 50mmmm, Roof Purlins 50mmx50mmand side purlin 50mm x 50mm, Clamps, Nut Bolts, Accessories, Entrance Room with Door Size 1mx2m- 2NosCovering:- Stainless steel jaali 40mesh for covering both roof and side.Profiles:-Profilefixing of Stainless steel jaali for roof and side. Shade Net:- Shade net 50% Green colour superior Quality inside Green house with manual collapsible arrangement. Drip Irrigation System- It consist of HDPE/PVC pipe as main and submain, Lateral/Dripline 16mm, Screen filter,Ball Valves, Fittings and Accessories. Foggers System- It consists of HDPE/PVC Pipe as Main and submain, Four wayfoggers with 28lph discharge at 3m X 3m Spacing, ball valves, laterals16mm, fitting and accessories. Pump-Mono Block Pump 1.5 hp of Reputed Brand- 1no, water storage tank Triple layered 1000 liter-1no.for Drip and Fogging system. Civil work-Earth Excavtion for plinth construction of bricks wall 0.3m above the ground and 0.30m below the ground including both sides plaster for all sides of Screen House and Foundation block for Main Column. Installation, Transportation and commissioning of Screen House
64Screen House of area 288Sq. mtr.-432Sq. mtr along with Drip Irrigation System and Fogging System Structure:- It consists of Square Pipe ISI Marked 2mm Thick- Foundation 38mm x 38mm, Column 50mm x 50mm, Arch 50mm x 50mm , Bottom 50mmmm, Roof Purlins 50mmx50mmand side purlin 50mm x 50mm, Clamps, Nut Bolts, Accessories, Entrance Room with Door Size 1mx2m- 2NosCovering:- Stainless steel jaali 40mesh for covering both roof and side.Profiles:-Profilefixing of Stainless steel jaali for roof and side. Shade Net:- Shade net 50% Green colour superior Quality inside Green house with manual collapsible arrangement. Drip Irrigation System- It consist of HDPE/PVC pipe as main and submain, Lateral/Dripline 16mm, Screen filter,Ball Valves, Fittings and Accessories. Foggers System- It consists of HDPE/PVC Pipe as Main and submain, Four wayfoggers with 28lph discharge at 3m X 3m Spacing, ball valves, laterals16mm, fitting and accessories. Pump-Mono Block Pump 1.5 hp of Reputed Brand- 1no, water storage tank Triple layered 1000 liter-1no.for Drip and Fogging system. Civil work-Earth Excavtion for plinth construction of bricks wall 0.3m above the ground and 0.30m below the ground including both sides plaster for all sides of Screen House and Foundation block for Main Column. Installation, Transportation and commissioning of Screen House
65Screen House of area 486Sq. mtr-648Sq. mtr. along with Drip Irrigation System and Fogging System Structure:- It consists of Square Pipe ISI Marked 2mm Thick- Foundation 38mm x 38mm, Column 50mm x 50mm, Arch 50mm x 50mm , Bottom 50mmmm, Roof Purlins 50mmx50mmand side purlin 50mm x 50mm, Clamps, Nut Bolts, Accessories, Entrance Room with Door Size 1mx2m- 2NosCovering:- Stainless steel jaali 40mesh for covering both roof and side.Profiles:-Profilefixing of Stainless steel jaali for roof and side. Shade Net:- Shade net 50% Green colour superior Quality inside Green house with manual collapsible arrangement. Drip Irrigation System- It consist of HDPE/PVC pipe as main and submain, Lateral/Dripline 16mm, Screen filter,Ball Valves, Fittings and Accessories. Foggers System- It consists of HDPE/PVC Pipe as Main and submain, Four wayfoggers with 28lph discharge at 3m X 3m Spacing, ball valves, laterals16mm, fitting and accessories. Pump-Mono Block Pump 2 hp of Reputed Brand- 1no, water storage tank Triple layered 2000 liter-1no.for Drip and Fogging system. Civil work-Earth Excavtion for plinth construction of bricks wall 0.3m above the ground and 0.30m below the ground including both sides plaster for all sides of Screen House and Foundation block for Main Column. Installation, Transportation and commissioning of Screen House
66Screen House of area 720Sq. mtr-990Sq. mtr. along with Drip Irrigation System and Fogging System Structure:- It consists of Square Pipe ISI Marked 2mm Thick- Foundation 38mm x 38mm, Column 50mm x 50mm, Arch 50mm x 50mm , Bottom 50mmmm, Roof Purlins 50mmx50mmand side purlin 50mm x 50mm, Clamps, Nut Bolts, Accessories, Entrance Room with Door Size 1mx2m- 2NosCovering:- Stainless steel jaali 40mesh for covering both roof and side.Profiles:-Profilefixing of Stainless steel jaali for roof and side. Shade Net:- Shade net 50% Green colour superior Quality inside Green house with manual collapsible arrangement. Drip Irrigation System- It consist of HDPE/PVC pipe as main and submain, Lateral/Dripline 16mm, Screen filter,Ball Valves, Fittings and Accessories. Foggers System- It consists of HDPE/PVC Pipe as Main and submain, Four wayfoggers with 28lph discharge at 3m X 3m Spacing, ball valves, laterals16mm, fitting and accessories. Pump-Mono Block Pump 2 hp of Reputed Brand- 1no, water storage tank Triple layered 2000 liter-1no.for Drip and Fogging system. Civil work-Earth Excavtion for plinth construction of bricks wall 0.3m above the ground and 0.30m below the ground including both sides plaster for all sides of Screen House and Foundation block for Main Column. Installation, Transportation and commissioning of Screen House
67Shade Net House of area 192Sq. mtr.-400 Sq. mtr along with Drip Irrigation System and Fogging System Structure:- It consists of Galvanized Tubular structure having GI Pipe ISI Marked 2mm Thick- Foundation 38mm, Column 50mm, Arch 38mm, Bottom 25mm, Corridor 38mm , Bracing 25mm, Roof Purlins 38mmand side purlin 32mm, Clamps, Nut Bolts, Accessories, Door Size 1mx2mCovering:- Shade Net 50%/75% Green Colour Superior Quality for covering both roof and side. Locking Profiles:- Locking profile with zig zag spring for fixing of poly film for roof and side. Drip Irrigation System- It consist of HDPE/PVC pipe as main and submain, Lateral/Dripline 16mm, Screen filter,Ball Valves, Fittings and Accessories.Foggers System- It consists of HDPE/PVC Pipe as Main and submain, Four wayfoggers with 28lph discharge at 3m X 3m Spacing, ball valves, laterals16mm, fitting and accessories. Pump-Mono Block Pump 1.5 hp of Reputed Brand- 1no, water storage tank Triple layered 1000 liter-1no.for Drip and Fogging system.Civil work- Foundation block for Main Column and Corridor of Shade Net House. Installation, Transportation and commissioning of Shade Net House
68Shade Net House of area 480Sq. mtr.-896 Sq. mtr along with Drip Irrigation System and Fogging System Structure:- It consists of Galvanized Tubular structure having GI Pipe ISI Marked 2mm Thick- Foundation 38mm, Column 50mm, Arch 38mm, Bottom 25mm, Corridor 38mm , Bracing 25mm, Roof Purlins 38mmand side purlin 32mm, Clamps, Nut Bolts, Accessories, Door Size 1mx2mCovering:- Shade Net 50%/75% Green Colour Superior Quality for covering both roof and side. Locking Profiles:- Locking profile with zig zag spring for fixing of poly film for roof and side. Drip Irrigation System- It consist of HDPE/PVC pipe as main and submain, Lateral/Dripline 16mm, Screen filter,Ball Valves, Fittings and Accessories.Foggers System- It consists of HDPE/PVC Pipe as Main and submain, Four wayfoggers with 28lph discharge at 3m X 3m Spacing, ball valves, laterals16mm, fitting and accessories. Pump-Mono Block Pump 1.5 hp of Reputed Brand- 1no, water storage tank Triple layered 1000 liter-1no.for Drip and Fogging system. Civil work- Foundation block for Main Column and Corridor of Shade Net House. Installation, Transportation and commissioning of Shade Net House
69Shade Net Houseof area 1008Sq. mtr.-1440 Sq. mtr along with Drip Irrigation System and Fogging System Structure:- It consists of Galvanized Tubular structure having GI Pipe ISI Marked 2mm Thick- Foundation 38mm, Column 50mm, Arch 38mm, Bottom 25mm, Corridor 38mm , Bracing 25mm, Roof Purlins 38mmand side purlin 32mm, Clamps, Nut Bolts, Accessories, Door Size 1mx2mCovering:- Shade Net 50%/75%Green Colour Superior Quality for covering both roof and side. Locking Profiles:- Locking profile with zig zag spring for fixing of poly film for roof and side. Drip Irrigation System- It consist of HDPE/PVC pipe as main and submain, Lateral/Dripline 16mm, Screen filter,Ball Valves, Fittings and Accessories.Foggers System- It consists of HDPE/PVC Pipe as Main and submain, Four wayfoggers with 28lph discharge at 3m X 3m Spacing, ball valves, laterals16mm, fitting and accessories. Pump-Mono Block Pump 2 hp of Reputed Brand- 1no, water storage tank Triple layered 2000 liter-1no.for Drip and Fogging system.Civil work- Foundation block for Main Column and Corridor of Shade Net House. Installation, Transportation and commissioning of Shade Net House
70Shade Net Houseof area 1728 Sq. mtr-2016Sq. mtr. along with Drip Irrigation System and Fogging System Structure:- It consists of Galvanized Tubular structure having GI Pipe ISI Marked 2mm Thick- Foundation 38mm, Column 50mm, Arch 38mm, Bottom 25mm, Corridor 38mm , Bracing 25mm, Roof Purlins 38mmand side purlin 32mm, Clamps, Nut Bolts, Accessories, Door Size 1mx2mCovering:- Shade Net 50%/75%Green Colour Superior Quality for covering both roof and side. Locking Profiles:- Locking profile with zig zag spring for fixing of poly film for roof and side. Drip Irrigation System- It consist of HDPE/PVC pipe as main and submain, Lateral/Dripline 16mm, Screen filter,Ball Valves, Fittings and Accessories.Foggers System- It consists of HDPE/PVC Pipe as Main and submain, Four wayfoggers with 28lph discharge at 3m X 3m Spacing, ball valves, laterals16mm, fitting and accessories. Pump-Mono Block Pump 3 hp of Reputed Brand- 1no, water storage tank Triple layered 4000 liter-1no.for Drip and Fogging system.Civil work- Foundation block for Main Column and Corridor of Shade Net House. Installation, Transportation and commissioning of Shade Net House
71Polyhouse structure 40 Sq. mtr - It consists of GI Pipe ISI having Trusses & legs 1", Purlins 1/2", clamps and Nut Bolt Etc.
72Polyhouse structure 40 Sq. mtr with UV Sheet - It consists of GI Pipe ISI having Trusses & legs 1", Purlins 1/2", clamps and Nut Bolt, covered with UV Sheet Etc.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail