Supplying And Laying Of Oxygen Line Additional Oxygen Point And Bed Head Panel At A / A For Space Contains For Pediatric Intensive Care Unit Picu And Neonatal Intensive Care Unit Nicu In The Departmental At Shri Lal Bahadur Shastri Govt. Medical Colle
Tender Overview
Project Description
Supplying And Laying Of Oxygen Line Additional Oxygen Point And Bed Head Panel At A / A For Space Contains For Pediatric Intensive Care Unit Picu And Neonatal Intensive Care Unit Nicu In The Departmental At Shri Lal Bahadur Shastri Govt. Medical Colle
BOQ
| Sl. No. | Item Description |
| 1 | OXYGEN FLOW METER WITH HUMIDIFIER BOTTLE (CE MARKED) The oxygen manifold should comply with HTM 02-01/NFPA 99/ DIN / EN / ISO-7396-1 standards. Back Pressure Compensated flow meter for accurate gas flow measurement with following features: A) Control within a range of 0-15 LPM. B) It should meet strict precision and durability standard. C) The flow meter body should be made of brass chrome plated materials. D) The flow tube and shroud components should be made of clear, impact resistant polycarbonate. E) Flow tube should have large and expanded 0-15 LPM range for improved readability at low flows. F) Inlet filter of stainless steel wire mesh to prevent entry of foreign particles G) The humidifier bottle is made of unbreakable & reusable polycarbonate /polysulfone/polypropylene material autoclavable at 121 degree centigrade. |
| 2 | Ward Vacuum Units ( CE Marked)- 209 3500 731500 It should comply with HTM 02-01/NFPA 99/ DIN / EN / ISO-7396-1 standards. It must consist of the following:- 1. 1 no of Suction Regulator and 1no of 1000 ml polysulfone /polycarbonate/polypropylene collection jar. 2. Suction Regulator: Suction regulator should be supplied with a safety jar, including and antibacterial filter and an anti-overflow safety device. Should have wide membrane continuous suction controller 3. Should have vacuum levels: 0-760 mm of Hg 4. Should have vacuum gauge fitted with a protective bumper device. 5. Should have on/off knob allowing for the quick restoration of a readjusted vacuum level. 6. Must have central adjustment knob with a color coded for 0 to 760 mm of Hg. Should have Polysulfone/polycarbonate 100cc safety jar, autoclavable at 121º C, unbreakable, fitted with an anti-overflow safety device and equipped with a plastic antibacterial filter. It should be totally transparent, to ensure perfect sucked liquid visibility |
| 3 | MEDICAL COPPER PIPE |
| 4 | Copper Piping : |
| 5 | Installation: |
| 6 | Installation of piping should be carried out as per international standards with utmost cleanliness. Only pipes, fittings and valves which have been degreased as per International standards should be used. Pipe fixing clamps for upto 28 mm diameter. Pipes should be non ferrous suitable for the diameter of the pipe. For the pipes of the sized above 28 mm rigid metallic hanging or cemented supports to be used. |
| 7 | The main lines to the building to be taken overhead through metallic poles or through underground ducts with inspection removable slabs, All pipe joints should be made using inert gas flux less brazing method. All joints should be of copper to copper and should be brazed by silver brazing filler material without flux while being brazed joints shall be continuously purged with oil free dry nitrogen to prevent the formation of copper oxide on the inside surface of the joint. All pipes should be installed without springing or forcing. All pipes should be protected against mechanical injury in a manner satisfactory to authorities having jurisdiction. |
| 8 | Test: After erection, all the new pipes cleaned or purged with the help of dry nitrogen gas. Complete system should be tested with dry nitrogen at 2 times of working pressure for 24 hours. |
| 9 | Painting: All existing and proposed exposed pipes/should be painted with two coats of Synthetic enamel paint & color codification as per international standards. All concealed pipes to have gas identification bands / labels at appropriate distance. Similarly all pipes which need embedding in the wall should be tested /painted/labeled and properly insulated. |
| 10 | Certification: To be certified that pipes are suitable for the particular service and complete cross connection (anti-confusion) test will be carried out. |
| 11 | Lolyd’s |
| 12 | Copper pipe size 12mm x 0.7mm Thickness |
| 13 | Copper Pipe size 15mmx0.9mm Thickness |
| 14 | Copper Pipe Size 22mm x 0.9mm Thickness |
| 15 | Supply installation testing and commissioning of 3 gas valve box should confirm to NEPAGG/HTM-02-01/ISO-7396-I/DIN/EN cmplete in all respect. |
| 16 | Supply installation testing and commissioning 3 Gas Alarm Touch Screen should confirm to NEPAGG/HTM-02-01/ISO-7396-I/DIN/EN cmplete in all respect. |
| 17 | Supply installation testing and commissioning of horizontal/vertical bed head panel (CE marked ) as mentioned below |
| 18 | Bed head panel should confirm to NEPAGG/HTM-02-01/ISO-7396-I/DIN/EN. |
| 19 | Efficient safe & robust design in extruded aluminum section. |
| 20 | Smooth curved surface and choice of base column and fascia plates. |
| 21 | Unit should be constructed of aluminum extrusions joined together. |
| 22 | Unit should be factory assembled. |
| 23 | Unit should have electrical and mechanical components |
| 24 | Unit should have built light feature. |
| 25 | Following accessories should be provided locally with HBHP :- |
| 26 | 5/15 amp modular electrical socket with switch 6sets |
| 27 | 7V pole-2 no |
| 28 | Vacuum slide – 2no |
| 29 | Sliding block- 2no |
| 30 | Nurse call system module (cut out provision only)-1no |
| 31 | Utility basket – 1no |
| 32 | Bed head panel - |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents