| 1 | Excavation of pole pit for below 9m(30\"\")Pole/Staypit per location |
| 2 | Excavation of pole /stay pit for 9 m(30\"\")and abovepole per location |
| 3 | Excavation of pole /stay pit per location for hard rock with blasting |
| 4 | Excavation of pole /stay pit per location for hard rockwithout blasting . |
| 5 | Transporting of RCC / RSJ fabricated pole from road sideto pole pit head per pole upto 100m |
| 6 | Erection /dismantling of RCCPoles/Metal poles above 9.14m using machines |
| 7 | Erection of stay set complete per stay |
| 8 | Fixing of 3\"-6\" V-X-Arm |
| 9 | Fixing of tapping channel cross arm |
| 10 | Fixing Guarding Cross Arm |
| 11 | Fixing of LT 3 phase X-Arm |
| 12 | Fixing of HT/LT TI fitting |
| 13 | Fixing of 11 KV Disc with MP |
| 14 | Fixing of 11 KV Pin with Insulator |
| 15 | Fixing of Alu- Knob |
| 16 | Fixing of HT LAS ( 3 Nos) |
| 17 | Fixing of LT LAS ( 3 Nos) |
| 18 | Earthing of pole with Pit including burying loop and binding per loc |
| 19 | Paving of conductor ,stringing binding jumpering complete with 7/3.35 & 7/4.09 OR EQUIVALENT |
| 20 | Paving of conductor ,stringing binding jumpering Complete with 7/2.59 & 7/2.11 OR EQUIVALENT |
| 21 | Painting of pole at ground |
| 22 | Painting of pole for transformer structure with two coats for each structure |
| 23 | MassConcreting of pole including materials |
| 24 | Transformer structure erection complete withwiringearthingincluding fixing of open type fuse unitsH.T ,L.T LAS Jumpering,3Nos. Earth pits with tubes , painting of metal part a6nd structure poles. Jumpering complete in all respects except erection of transformer including concreting |
| 25 | Erection of Transformer below 200 KVA(Derated) |
| 26 | Releasing of existing transformer irrespective of capacity. |
| 27 | Transporting of DT/ metering set/material up by using private vehicle other than bullock cart upto 8 Kms/Trip |
| 28 | Transporting of DT/ metering set/material up by usingprivate vehicle other than bullock cart above 8 Kms/Trip |
| 29 | Loading of RCC pole up to 9.0 M per pole. |
| 30 | Unloading of poles PSC/RCC Metal poles |
| 31 | Drilling of hole in channel angle etc.. 3/4\"&1\" per hole |
| 32 | Alteration of back clamp to suit works. |
| 33 | Alteration of stay clamp for suit works. |
| 34 | Erection/Dismantling of metering set 11 KV |
| 35 | Destruction of pole concreting at site. |
| 36 | Lettering with paint inDanger board, Bill board |
| 37 | Transporting of materialsfrom substores to section Up to 8 KM |
| 38 | Painting metal poles including cross arms ( Single coating )excluding paint cost |
| 39 | Numbering of poles with paint and with base painting |
| 40 | Erection Of D.P. Structure with AB Switch, top channel,crossbrancing,HG fuse set, earthing painting providing stay and pole Concreting |
| 41 | Releasing of grills from RCC Pole |
| 42 | Dismantlimg of pole pit for below 9m(30\"\")Pole/Stay |
| 43 | Dismantling of RCC Pole / metal poles up to 8.0 by using JCB |
| 44 | Removing of HT Pin |
| 45 | Dismantlingof conductor , stringing binding jumpering complete with ACSR |