Drinking Water Supply and Sanitation Government Departments Closing in 0 days TDR #32338932

Survey Design And Construction Of Distribution System Under Taila Silghar Water Supply Scheme Of Block Jakholi

Issued by Government Departments · jakholi, Uttarakhand
Tender Value
3.90 Crore
Estimated cost
Bid Submission
04 Jun 2022
0 days left
EMD
8 Lakhs
Bank guarantee accepted
Document Fee
5900
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
jakholi → Uttarakhand
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Survey Design And Construction Of Distribution System Under Taila Silghar Water Supply Scheme Of Block Jakholi

BOQ

Name of Work: Survey, Design andConstruction of Distribution System Under Taila Silghar W/S Scheme of Block Jakholi, consisting of RCC Intake works i.e.,BFG, SCC cum R/F, Supply main, RCC CWRs, distribution systems and all appurtenant works etc. including supply & cartage of allmaterials, labor and T&P etc. complete for completion of works. It is also including testing, commissioning ofScheme with six months trial & run after handing over the Scheme to UJS for its maintenance.
Sl. No. Item Description
1SOURCE WORKS
2Survey, design and Construction of RCC Gadhera tapping arrangement i.e., 4m wide Cross wall Boulder Filled Gallery with Intake chamber (submitted design by Contractor should be as pertype design subject to site condition) to fulfill therequierment of water demandincluding Supply of all materials, labour,carting of material T&P etc complete as per direction of Engineer in charge.(For any increase/decrease in length, rates are shouted below.)
3for increase in length
4For decrease in length
5Survey, design and Construction of605.00 kldflow/discharge or less capacity RCC SCC cum Roughening Filter with filling of supporting & filter media including Supply of design, drawing,all materials, labour,carting of material T&P etc complete and as per direction of Engineer in charge required for proper completion of work.
6Same as Item No. 1.02 but for 190.00 kld capacity of RCC SCC cum Roughening Filter
7Confirmatorysurvey, design, supply, carting , laying true to aligment and gradient, jointing and fixing of following GI (M)/(H) pipe lines including all specials fittings, white lead, hemp and other appurtenant works etc. making necessary connections with existing laid pipe line including connectingwith existing Private & Othe house hold Tap Connections with control plate/ferrule devices etc completeand make properfunctioning, confirming to IS:1239 at site of works. (The contractor have to survey the site, take levels with total station, measure the length of pipe with metallic tape on prescribed alignment and submit the design of supply main & distribution main for checking of thickness of pipebefore ordering for supply of pipe). On completion of work the laid length of pipe will be deemed eligible for supply. The respective amount for quantity of surplus supply of pipes (which remained unlaid or unutilized) will be deducted from final bill and surplus quantity of pipes will be the property of contractor.)
815 mm dia - GI (M)
920 mm dia - GI (M)
1025 mm dia - GI (M)
1132 mm dia - GI (M)
1240 mm dia - GI (M)
1350 mm dia - GI (M)
1465 mm dia - GI (M)
15Dismentling and relaying of following sizes of G.I. Pipes Medium quality confirming to IS:1239 at site of works including all labour T&P etc. complete for proper complition of work & also for making FHTC laid from existing newly laid pipe lines under scheme as per direction &instruction of given by Engineer -In-Charge.
1620mm dia
1725mm dia
1832mm dia
1940mm dia
2050mm dia
2165mm dia
22Excavation of earth for pipeline in following strata lift upto 1.5 m lead upto 30 m including refilling, watering, ramming of excavated earth into the trenches and removal of surplus earth upto a distance of 60 m from trenches including supply of labour, T & P etc.all complete assumingthat 90% pipe line is laid in trenches, it is estimated that 75% excavation will be in soilmixed with shingle, bajari and boulders and rest 25% will be in medium rock
23Soil mixed with boulder (SMB)
24Medium Rock (MR)
25Supply, cartage and fixing of Wheel Valve/ Gate Valve of the following sizes including cartage of materials, labour, T&P etc. complete
2620 mm dia
2725mm dia
2832mm dia
2940 mm dia
3050 mm dia
3165 mm dia
32Supply Cartage and fixing of Sluice Valve/Air Valve of the following sizes including cartage of materials, labour, T&P etc. complete
3380 mm dia
34100 mm dia
35ConstructingWheel Valve Chamber 60x60x75 cm, inside with 75 class designation brick work in cement mortar 1:4 (1 cement :4 coarse) including supply, cartage of all material, labour, T&P etc complete for Sluice Valve/Air Valve with C.I. surface box 100 mm. as per standard design. with locking arrangement.
36Subsoil Investigation, drawing, design and construction of following capacity RCC semi sunk reservoir, including testing and commissioning for water tightness, cost of all pipes/fittings etc. required for inlet/outlet/washout/byepass, excavation for foundation,0.60 M wide appron with 15 cm PC drain,required sluice valve chamber, fixing water level indicator, lighening arrester, fixing 03 rowse railing at top dome, MS ladder (inside and outside of CWR), MS manhole with locking arrangement, ventilator with mosquito net,two coat snowcem/distemper/painting including wall writing as per instructions given by E\"ngineer In Charge, carting & supply of scafolding & shuttering, making supply and cartage of all material, Labour and T&P etc,complete. (Cap. in KL)
3717.50 KL
38Supply, cartage and fixing ofBucket type chlorinator of 25 Liter capacity at top of service raservoirs.
39Supply and Cartage of all materials, labours, T&P, etc complete for makingferrule connection to provide FHTC to the consumers from existing/Newly laid pipe lines under scheme as per specification and instruction given by Engineer-In-charge.
40Earth work in excavation by mechanical means (Hydraulic Excavator) / manual means in hill side cutting or in foundation, including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. (For all building works works including Site Development, except pipe line trenches)
41Concrete with 2 Cm gauge stone ballast, local sand and cement in proportion of 1:2:4 in foundation and floors including supply of all materials, labour and T&P etc.required for proper completion of work.
42Concrete with 4 Cm gauge stone ballast, local sand and cement in proportion of 1:4:8 in foundation and floors including supply of all materials, labour and T&P etc.required for proper completion of work.
43R.R. Stone masonary with 1:6 cement and sand mortar including cartage and supply of all materials,labours,T&P etc. complete for proper completion of work.
44R.R.Stone masonry laid in dry including cartage and supply of all materials,labours,T&P etc. required for proper completion of work.

AI Tender Summary

OUR REF NO 32338932
AUTHORITY Government Departments
TENDER VALUE 3.90 Crore
LAST DATE 04-06-2022
Authority
Authority Name Drinking Water And Sanitation Department
Work Description Survey Design And Construction Of Distribution System Under Taila Silghar Water Supply Scheme Of Block Jakholi
Basic Detail
Tender No 01/Camp-Pauri/Tender Dated 19.05.2022
Bidding Type Tender
Location
City jakholi
State Uttarakhand
Key Dates
Publish Date 21 May 2022
Submission Date 04 Jun 2022
Open Date 07 Jun 2022
Finance
Tender Value 3.90 Crore
Tender Fee 5900
EMD 8 Lakhs
Exemption Not Available
Document List
ac0152de-1ecf-444a-a425-b3bff2e281be.html
BOQ_53223.xls
TailaTenderDocs.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

May 21, 2022
11:30 IST

Tender Published

Tender notice published.

Completed
Jun 04, 2022
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Jun 07, 2022

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

ac0152de-1ecf-444a-a425-b3bff2e281be.html

xls

BOQ_53223.xls

pdf

TailaTenderDocs.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders