| 1 | Morinda CSM |
| 2 | Replacement of worn-out of M.S. Runner of PCC, SCC, ICC, Elevator, RBC and cross carrier chains |
| 3 | Replacement of S.S. tubes of all juice heaters, vapour line juice heater and semi-Kestner. |
| 4 | -do-but the number of tubes below 50 no. |
| 5 | -do- but all pans during off-season |
| 6 | -do- but evaporators during off-season |
| 7 | - do – but in case of entire body of evaporator |
| 8 | Welding joints of water, juice, vapour and exhaust pipe lines of all sizes. |
| 9 | Pipe line upto 12” diaa)Dismantling |
| 10 | b) Erection |
| 11 | Pipe line above 12”diafrom MS platea)Dismantling |
| 12 | b) Fabrication |
| 13 | c) Erection |
| 14 | Bends from readymade pipe line up to 12\" dia a)Dismantling |
| 15 | b) Fabrication |
| 16 | c) Erection |
| 17 | Bends above 12” dia from MS platea)Dismantling |
| 18 | b) Fabrication |
| 19 | c) Erection |
| 20 | Tee, Nipples & Crosses upto 12” dia a)Dismantling |
| 21 | b) Fabrication |
| 22 | c) Erection |
| 23 | Tee, Nipples & Crosses above 12” dia from M.S Platea)Dismantling |
| 24 | b) Fabrication |
| 25 | c) Erection |
| 26 | Reducers of all sizes, a)Dismantling |
| 27 | b) Fabrication |
| 28 | c) Erection |
| 29 | Flanges of all sizes, a)Dismantling |
| 30 | b) Fabrication |
| 31 | c) Erection |
| 32 | Valves:a)Dismantling |
| 33 | b) Fabrication |
| 34 | c) Erection |
| 35 | Man Holes ofall sizesa)Dismantling |
| 36 | b) Fabrication |
| 37 | c) Erection |
| 38 | Platform:a) Dismantling |
| 39 | b) Fabrication |
| 40 | c) Erection |
| 41 | M.S. Structure workLighta)Dismantling |
| 42 | b) Fabrication |
| 43 | c) Erection |
| 44 | M.S. Structure work Heavya)Dismantling |
| 45 | b) Fabrication |
| 46 | c) Erection |
| 47 | M.S. Tank completehaving round & conical & rectangular bottomsa)Dismantling |
| 48 | b) Fabrication |
| 49 | c) Erection |
| 50 | M.S Rubber seated valves of any typesa)Dismantling |
| 51 | b) Fabrication |
| 52 | c) Erection |
| 53 | NRV of any type:a)Dismantling |
| 54 | b) Fabrication |
| 55 | c) Erection |
| 56 | Platform Pipe Line railing of all sizesa) Dismantling |
| 57 | b) Erection |
| 58 | Fabrication of S.S rubber seated valves and NRV of all sizes |
| 59 | M.S. Patch work |
| 60 | Fabrication and Erection M.S. stair; a) Monkey tower type |
| 61 | b) Step type |
| 62 | Repair of rubber seated valves above 12\" dia |
| 63 | Repair of NRV valves above 12\" dia |
| 64 | StraighteningM.S plate |
| 65 | Strengthening of any structure with M.S Angle/Channel |
| 66 | S.S. to S.S. welding |
| 67 | Fabrication and erection of all type of pump + motor bed. |
| 68 | Repair of cane un-loader grab arms |
| 69 | Drilling and Tapping of Mill’s top roller of square end face having size 8-20M at 265 PCD and 50mm deep thread for fitting of Ropeless coupling. |
| 70 | Repair and overhauling of Cane unloaders except hydraulic grab. |
| 71 | Replacement of cane cutting knives of chopper |
| 72 | Replacement of cane cutting knives of swing type cutter |
| 73 | Replacement of Fibrizer hammers with tip |
| 74 | -do- but only Domite tips |
| 75 | Dismantling, fabrication & erection ofmills juice tray (M.S. Plate) |
| 76 | Fabrication of SCC and inter carrier chain’s rake. |
| 77 | Repair of Secondary Cane Carrier & inter Carrier Chain’s rake. |
| 78 | Hard facing of TRPF rollers |
| 79 | To build mills top rollers square end as per standard size |
| 80 | To build mills roller crown pinion teeth as per standard template of teeth. |
| 81 | -do- but mill roller coupling square section as per standard size |
| 82 | Fabrication ofTRPF juice tray |
| 83 | Fabrication ofTRPF top roller cover |
| 84 | Dismantling, fabrication and erection of Donnelly chute of mills |
| 85 | To build up the TRPF roller journal as per standard size. |
| 86 | To build up the mill roller journal as per standard size. |
| 87 | Fabrication and erection of mill roller crown pinion guard |
| 88 | Fabrication and erection of TRPF roller crown pinion guard |
| 89 | Complete repair of TRPF pressure chute, including replacement of worn out S.S. Plate |
| 90 | Fabrication of Mill top roller scrapperassembly as per existingsize & design |
| 91 | Fabrication of discharge roller scrapper assembly. |
| 92 | Replacement of worn out bottom boot of inter carrier chain. |
| 93 | Replacement of Cast Iron Furnace chute of J.T. and Texmaco Boilers. |
| 94 | Fabrication of RBC slats made out from 3 mm thick plate for both RBC Chain |
| 95 | Repair of RBC Slat |
| 96 | Replacement of M.S. Bagasse chute of J.T. and Texmaco Boilers. |
| 97 | Replacement of worn out furnace door ofJ.T. boilers without frame |
| 98 | Replacement of worn out furnace doorframe |
| 99 | Repair & fitting of furnace door of Texmaco/JT boiler |
| 100 | a) Fabrication of steam drum partition Plates ofBoilers |
| 101 | b) Repair of steam drum partition Plates of Boilers |
| 102 | Boiler dampera)Dismantling |
| 103 | b) Fabrication |
| 104 | c) Erection |
| 105 | Repair of ID fan of J.T & Texmaco boiler |
| 106 | Repair of FD fan of J.T & Texmaco boiler |
| 107 | Replacement of worn out stainers of various types such as juice pump,lime pumps and syrup pumps. |
| 108 | Complete replacement of worn out save-all of evaporator bodies in all respects. |
| 109 | Complete replacement of worn out save-all of pans in all respects. |
| 110 | Replacement of worn out vapour pipe of various sizes of pans going to condenser |
| 111 | Replacement of worn out steam/water coil of Ordinary designsize -1/2\"\" to 3\"\" |
| 112 | do- but 4\"\" to 6\"\" |
| 113 | Replacement of worn out steam/water coil of Pure circular designsize -1/2\"\" to 3\"\" |
| 114 | do- but 4\"\" to 6\"\" |
| 115 | Dismantling, fabrication & erection of bends of pan’s vapour pipe line leading from body shell to condensers. Rates to be quoted in terms of :-Full Bend:-size 900 mm |
| 116 | 1100 mm |
| 117 | 1250 mm |
| 118 | HalfBend:-size 900 mm |
| 119 | 1100 mm |
| 120 | 1250 mm |
| 121 | Replacement of gutters a) Dismantling |
| 122 | b) Fabrication |
| 123 | c) Erection |
| 124 | a) Replacement of worn out stirrer arms(Straight Type) |
| 125 | b) Replacement of worn out stirrer arms(Worm Type) |
| 126 | Replacement of worn out umbrella of pans |
| 127 | Replacement of all pipe line of sulphur burners cooler, complete in all respect. |
| 128 | Replacement of worn out portion of sulphur burner cooler inside pipeline. |
| 129 | Complete replacement of worn-out after burner of Sulphur furnace i.e including the replacement of internal pipe line also |
| 130 | Dismantling, Fabrication and erection of sulphur burner melter of sulphur furnaces. |
| 131 | Replacement of worn-out Bagacilo pipe line made out from G.I. plain sheet of standard size |
| 132 | Replacement of Y type steam connection for syrup and molasses tank at pan station |
| 133 | Replacement of vacuum filter agitator |
| 134 | Fitting & modification of Planetary gear box along with dismantling of existing gear system. a) 80 Ton |
| 135 | b) 60 Ton |
| 136 | c) 40 Ton |
| 137 | Replacement of worn out partition plates of headers of juice heaters, complete in all respect. |
| 138 | Replacement of S.S pipeline of any size:a) Dismantling |
| 139 | b) Fabrication |
| 140 | c) Erection |
| 141 | Lowering the height of evaporator body no. 1 similar to level of evaporator body no. 2 including water levelling and fitting of all connections. |
| 142 | Repair of vapour line juice heater’s header cover:Scope of work includes:a) Dismantling, facing/machining header cover.b) S.S. lining of header cover by 6mm thick plate with duly facing and levelling. c) Fitting of existing cover plate after completion of the above mentioned work. |
| 143 | a) Replacement of Hopper trough |
| 144 | b) Replacement of complete portion of Hopper tray |
| 145 | Replacement of molasses chute of ;a) Continuous Centrifugal machine |
| 146 | b) Batch type Centrifugal machine |
| 147 | Replacement of any worn out shell portion of pug mills/magma mixers. |
| 148 | Modification of cooling coils of overhead crystallizer into air cooled type. |
| 149 | Fitting the complete magnetic separator system at Sugar Hopper tray. |
| 150 | Dismantling of Existing, obsolete AAW machines including all accessories i.e. pugmill, structure, elect. Panel etc. along with motors. |
| 151 | Dismantling of Existing, obsolete AFW machines including all accessories i.e. pugmill, structure, elect. Panel etc. along with motors. |
| 152 | Fabrication & erection of cable tray |
| 153 | Replacement ofThimble (Any Size) |
| 154 | Checking of cable connections, cleaning of thimbles & reconnection |
| 155 | Replacement of switches/MCCB 630 AMP,400 AMP,250 AMP |
| 156 | Replacement/erection of changeover switch 630 AMP/400 AMP/ 250/ AMP |