Department of Cooperation has published Fabrication And Erection Jobs Of Nakodar Csm-2 Replacement Of Worn Out M.S. Vertical Supporting Channels & Side Plate Of Final Molasses Storage Tank No. 2 With M.S Plate And Channels. 3 Strengthening Of Pans Shell With Angle And Channels In Round Shape . Submission Date for this Tender is 31-05-2022. Clothing Accessories Tenders in nakodar Punjab. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 25-May-2022 | Date extend | Date | 31-05-2022 |
Sl. No. | Item Description |
1 | Nakodar CSM |
2 | Replacement of worn out M.S. vertical supporting channels & side plate of final molasses storage tank No. 2 with M.S Plate and channels. |
3 | Strengthening of pans shell with angle and channels in round shape with MS angle 75x75mm and Dia 4.34 mtr. ( Two rounds) |
4 | Strengthening of Evaporator shell with angle and channels in round shape with MS angle 75x75mm and Dia 2.80 mtr. ( Two rounds) |
5 | Dismantling, Fabrication, Erection of top cone below save all of evaporators. |
6 | Dismantling, Fabrication, Erection of Complete Save all (existing design) of 2nd Body evaporators including top plate, inner and outer shell. |
7 | Dismantling, Fabrication, Erection of Save all (existing design) Inner plate of 2nd Body evaporators |
8 | Dismantling, Fabrication, Erection of umbrella of save all Evaporator 4th body as per existing design including all supporting. |
9 | Dismantling, Fabrication and erection of Quad condensate tank including all connection.Size Dia509mmxlength 1800mm |
10 | Dismantling, Fabrication, Erection of Hot water receiving tank of water weighing scale. The Erection work for this job will also include all connections which are dismantled during dismantling. |
11 | Dismantling, fabrication & Erection of juice feed boxes of juice heater double bead valve. The Erection work for this job will also include all connections which are dismantled during dismantling. |
12 | Dismantling, fabrication & Erection of absorption tower of Syrup Sulphiter. The Erection work for this job will also include all connections which are dismantled during dismantling |
13 | Dismantling, Fabrication & Erection of worn out Stainer of juice Sulphiter Pump. |
14 | Dismantling, Fabrication & Erection of worn out portion of Bottom Cone of juice Sulphiter |
15 | Dismantling, fabrication and Erection of Melter of Sulphur furnace as per Existing design. This work include dismantling and Erection of all connections, man hole, flanges etc. |
16 | Dismantling, fabrication and Erection of Scrubber of Sulphur furnace as per Existing design. This work include dismantling and Erection of all connections, man hole, flanges etc . |
17 | Dismantling, Fabrication & Erection of Dorr coils(Nipple/Flange/ reducer rates as per general fabrication, Erection Rates ) |
18 | Dismantling, Fabrication & Erection of Dorr compartment shell with MS plate channel angles. The Erection work for this job will also include all connections which are dismantled during dismantling. |
19 | Dismantling, Fabrication & Erection of Dorr compartment/Chamber Roof with MS plate channel angles supports. The Erection work for this job will also include all connections which are dismantled during dismantling. |
20 | Dismantling fabrication and Erection of Base plate of mud boot of Dorr to make it leak proof. |
21 | Replacement of Sealing Ring of Dorr Mud boot |
22 | Dismantling, fabrication and Erection of Mud tank below RVF including all connections. |
23 | Dismantling, fabrication and Erection of clear juice feed box along its telescopic valve of Dorr. |
24 | Dismantling, fabrication and Erection of worn out Heavy / Light Vacuum tank of RVF including all connections. |
25 | Dismantling, fabrication and Erection of base plate of Dorr compartment with their supporting angle/ channel etc |
26 | Dismantling, fabrication & Erection of filter Juice Sealing Bottles of receiving pit for vacuum filter. The Erection work for this job will also include all connections which are dismantled during dismantling. |
27 | Dismantling Fabrication and Erection of MS barometric condenser of RVF. This job will include all connections which are dismantled during dismantling. |
28 | Dismantlingfabrication and Erection of Bagacillo pipeline from MS plate 3mm |
29 | Dismantling, Fabrication & Erection of Bagacillo Cyclone. |
30 | Dismantling, Fabrication & Erection of Bagacillo Chute. |
31 | Dismantling, Fabrication & Erection of Bottom trough of Mud Mixer for RVF |
32 | Dismantling, Fabrication & Erection of screw conveyor of Mud Mixer |
33 | Dismantling, fabrication and Erection of MS vapour pipe of different sizes.1) Dia- 1050mm |
34 | 1) Dia - 900mm , |
35 | 2) Dia - 720mm |
36 | 3) Dia – 620mm |
37 | 4) Dia – 520mm |
38 | Dia – 420mm |
39 | Dismantling, Fabrication & Erection Vapour/Exhaust pipe bend 900mm Dia |
40 | Dismantling, fabrication and Erection of distance piece of MS vapour pipe length up to 1.5 mtr.1) Dia- 1050mm |
41 | 1) Dia - 900mm , |
42 | 2) Dia - 720mm |
43 | 3) Dia – 620mm |
44 | 4) Dia – 520mm |
45 | Dia – 420mm |
46 | Dismantling of MS/CI condenser cone of Pans |
47 | Fabrication of MS condenser cone ofPans |
48 | Erection of MS/CI condenser cone of Pans |
49 | Dismantling, Fabrication, Erection of umbrellas of pan save all as per existing design including all supporting. |
50 | Replacement of worn out portion of bottom, side plate & supporting angle/channel of syrup and molasses tank at Pan station |
51 | Replacement of M.S Plate Gutter of Crystallizer station and other factory units. |
52 | Replacement of worn out portion ofpan soucer |
53 | Dismantling, fabrication and Erection of downtake of Pan from 10/12mm plate |
54 | Replacement of Feed box of Pans including all connections |
55 | Dismantling, fabrication and Erection Distributor of pans |
56 | Dismantling, Fabrication & Erection of Worn out portion of molasses conditioner. This work includes dismantling and Erection of all connection pipes and their drive unit. |
57 | Dismantling, fabrication and Erection of worn out bottom portion of crystallizer |
58 | Fabrication and Erection of catcher for C-Vacuum Crystallizer. |
59 | Replacement of crystallizer arms along with supports from 75x75mm M.S angle.(a)Dismantling |
60 | (b) Fabrication |
61 | (c) Erection |
62 | Dismantling, fabrication & Erection of cooling coils of Crystallizer including all connections. |
63 | Dismantling and Erection of branch pipes of spray pond. This work include all connections of clusters, |
64 | Dismantling of CI/MS main pipeline spray pond |
65 | Dismantling fabrication & Erection of suction pipes of injection pumps with stainer. |
66 | Dismantling fabrication & Erection of suction pipes of Spray pumps with stainer. |
67 | Dismantling ,FabricationErection of worn out Bottom half portion of B magma mixture including allconnections. |
68 | Dismantling, Fabrication and Erection of worn out Bottom half portion of A pug mill including all connections. |
69 | Dismantling, Fabrication and Erection of worn out portion of Sugar Hopper along with its alignment. Size 4’ wide x 2 mtr Length |
70 | Dismantling, Fabrication and Erection of Sugar Melter Pump stainer Including all connections |
71 | Fabrication and Erection of Bed for pump and motor of Magma mixture along with suction and delivery pipe line connections, alignment of motor with pump etc. |
72 | Modification of Bagacillo screen for easy operation with fitting of ball bearings, wheels & Guides in all respects. |
73 | Dismantling, fabrication and Erection of bottom discharge chute of continuous centrifugal machine |
74 | Fabrication and Erection of new syrup tank at pan station including all connections. |
75 | Dismantling, Fabrication and Erection of ammonia coils of pans from MS pipeDia 3”including all connection |
76 | Dismantling and Erection of tube plate (Top and Bottom) 2nd evaporator Body including fabrication & erection of downtake including all connections |
77 | Dismantling and Erection of Calendria with Tube plate (Top and Bottom) of Pan No. 4 including all connections alongwith fabrication & erection of downtake and dismantling & erection of distributor. |
78 | Fabrication and erection of Beds for Pump and Motor etc. |
79 | Dismantling and Erection of Crystallizer shaft including arms and all connections, Fittings. |
80 | Dismantling, Fabrication and Erection of internal platesof catcher forSemi kestner |
81 | Dismantling and Erection of fabricated globe valve 30 “ in exhaust line of vapour cell. |
82 | Dismantling, fabrication and erection of quad body outer shell Including all connections. |
83 | Dismantling, Fabrication and Erection Cane cutter hoods from 8-10mm thick plate with MS Angles etc. |
84 | Dismantling and Erection of Expansion joint of power turbine exhaust line. |
85 | Replacement of side plates of cane carrier chain/ RBC and trough of RBC /Bagasse elevator. |
86 | Replacement of channel and I-Beam of RBC/ Cane Carrier/ Bagasse Elevator/ Cross RBC Runner |
87 | Dismantling, fabrication erection of juice tray of mill No. 2 from MS plate |
88 | Fabrication of screw conveyor of Mill House |
89 | Dismantling, fabrication erection of ash hopper of boiler (pyjamas) cone with chute bottom portion( cone tapper portion size 15” approximate) |
90 | Dismantling, Fabrication of trough of screw conveyor, assembly of screw conveyor with trough & its erection. |
91 | Repair of rotary bagasse feeders of boilers A)Body |
92 | b) Rotor |
93 | Replacement of side plate 3mm/old ms plate of boiler (with MS plate & supporting angle/ flat) |
94 | Dismantling, fabrication & erection of worn out ducting of boiler & APCD including angle, channel, Flats& flanges |
95 | Dismantling, Fabrication & Erection damper of boiler ducting |
96 | Dismantling fabrication & erection of Expansion jointof boiler ducting (3.360 mtr x 1.260 mtr) |
97 | Replacement of MS gutter of APCD plant from wet scrubber to Ash Pits |
98 | Dismantling fabrication & erection of Damper of rotary Bagasse Feeder |
99 | Dismantling, fabrication & erection of worn out portion of ID and APCD fan casing |
100 | Replacement of sieve plates of APCD scrubber. This job also includes 10/12mm holes (324 holes per square ft.) drillingin plates |
101 | Baffle plates (MS flat 65 x 6mm) of demister in Wet Scrubber |
102 | Repair/ replacement of wornout portion of wet scrubber of Boiler No. 1 & 2 |
103 | Dismantling fabrication and erection of receiving tank/ Sum Tank/ Sealing tank of Wet scrubber. |
104 | Replacement of G.I Sheet Gutter of factory building |
105 | Replacement of worn-out of M.S. Runner of inter carrier, elevator, RBC , cross carrier & cane carrier chains |
106 | Juice heater/V.L.J.H. tubes a) Dismantling |
107 | b) Fitting |
108 | Semi kestner tubes a) Dismantling |
109 | b) Fitting |
110 | Quad bodies SS tubes1st to 4th a) Dismantling |
111 | b) Fitting |
112 | Pans tubesSS 1st to 5th a) Dismantling |
113 | b) Fitting |
114 | Welding joints of water , juice ,vapor and exhaust pipe line of Exhaust Pipe Lines of all Sizes. |
115 | MS Pipe line 1/2" to 12” dia a) Dismantling |
116 | b) Erection |
117 | SS Pipe line 1/2" to 12” dia a) Dismantling |
118 | b) Fabrication |
119 | c) Erection |
120 | CI Pipe line 1/2" to 12” dia a) Dismantling |
121 | b) Erection |
122 | MS Pipe line above 12” dia from MS plate (other than vapour pipe of pan and quad)a)Dismantling |
123 | b) Fabrication |
124 | c) Erection |
125 | A) MS Bend upto 12” dia a)Dismantling |
126 | b) Fabrication |
127 | c) Erection |
128 | B) MS Bend above 12” dia from MS plate (other than V.P. pans & quad) a)Dismantling |
129 | b) Fabrication |
130 | c) Erection |
131 | CI Bends sizes 1” to 6” a)Dismantling |
132 | b) Erection |
133 | Dismantling, Fabrication& Erection of M.S(all sizes) a) Tee, |
134 | b) Nipples, |
135 | c) Crosses |
136 | d) Reducers |
137 | e)Elbow |
138 | Dismantling, Fabrication& Erection of S.S(all sizes) a) Tee, |
139 | b) Nipples, |
140 | c) Crosses |
141 | d) Reducers |
142 | e)Flange |
143 | f)Elbow |
144 | g)Bend |
145 | Replacement of wornout MS Cone(all sizes) |
146 | MS Flanges(all sizes) a)Dismantling |
147 | b) Fabrication |
148 | c) Erection |
149 | Dismantling , fabrication and erection of ManHoles (all sizes) |
150 | a) Dismantling of platform plate |
151 | b) Fabrication & Erection of platform plate |
152 | M.S. Tankhaving round & conical & rectangular bottoms a)Dismantling |
153 | b) Fabrication |
154 | c) Erection |
155 | M.S Structure Trusses, Perlins, Columns & Beams (Factory Building) a)Dismantling |
156 | b) Fabrication |
157 | c) Erection |
158 | Platform railing from old pipe & angle a) Dismantling |
159 | b) Erection |
160 | Patch work of any part of any equipment with 3mm to 10mm thick plate max. upto 1 sq meter |
161 | Dismantling of sluice valve/ angle valve/ N.R.V. |
162 | Erection of sluice valve/ angle valve/ N.R.V. ,Butterfly Valve |
163 | Replacement of Rail line of caneunloaderwith 50mm square bar |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail