General-Rm 2022-23 / Cluster Ii / Phase-1 / One Year Rc / Iritty / Kannur District - Rm 2022-23- Zone -Ii-One Year Running Contract For Various Pwd Roads Under Roads Section Iritty In Kannur District 4 Road Stretches For A Length Of 31.940 Km Ru
Tender Overview
Project Description
General-Rm 2022-23 / Cluster Ii / Phase-1 / One Year Rc / Iritty / Kannur District - Rm 2022-23- Zone -Ii-One Year Running Contract For Various Pwd Roads Under Roads Section Iritty In Kannur District 4 Road Stretches For A Length Of 31.940 Km Running Contract For 1 Year
BOQ
| Sl. No. | Item Description |
| 1 | Appendix-A Reactive Maintenance (Initial Rectification Work) |
| 2 | 55.2:Supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a) |
| 3 | 55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement. |
| 4 | 55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface. |
| 5 | 55.9.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 12mm departmental broken stone and compacting with power roller to get a compact surface. |
| 6 | 4.12:Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. |
| 7 | 5.1.a:Providing and applying primer coat with bitumen emulsion ( SS) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 - 1.0 kg/sqm using mechanical means. |
| 8 | 5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. |
| 9 | 5.2.b:Providing and applying tack coat with bitumen emulsion (RS) using emulsion pressure distributor at the rate of 0.25 - 0.30 kg per sqm on the prepared Granular Surface cleaned with mechanical broom. |
| 10 | OD23124/2022-2023:MIx seal SurfacingProviding, laying and rolling of close graded premixed surfacing material of 20mm thickness composed of 11.2mm to .9mm(Type A) or 13.2mm to.9mm(Type B)aggregates using Bitumen VG-30to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a static roller 8-10 KN and finishing to required level and grades as per Technical specification.By Manual meansType A(Bitumen VG-30) |
| 11 | Appendix-B Pre-Monsoon Works |
| 12 | 10.11:Removal of earth from the choked hill side drain and disposing it on the valley side manually |
| 13 | OD23114/2022-2023:Lifting and replacing of RCC slab from the drain for removing silt/muck causing choking of drain all complete; as per the directions of the engineer-in-charge. |
| 14 | OD23115/2022-2023:Engaging labour for removing fallen trees and branches, providing temporary protectionworkfor restoring traffic etc, on various roads as per the direction of deptarmental officers ( Wood cutter ) |
| 15 | OD23116/2022-2023:Engaging labour for removing fallen trees and branches, providing temporary protectionwork for restoring traffic etc, on various roads as per the direction of departmental officers. ( Man & womenMazdoor) |
| 16 | OD23117/2022-2023:Engaging labour for removing of trees/branches, clearing of earth-slips and providing temporary protection work for restoring traffic etc, on various roads as per the directions of the Engineer-in-charge. (Mazdoor) |
| 17 | OD23118/2022-2023:Engaging Hydraulic Excavator and Loader in order to remove and clear the earth-slip material due to land slippages all complete as per the directions of the engineer-in-charge. All kinds of soil |
| 18 | Appendix-C Proactive/Preventive Maintenance |
| 19 | 2.3.1.A:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thicknessIn area of light jungle - By Manual Means |
| 20 | 10.3:Maintenance of Earth Shoulder (stripping excess soil) from the shoulder surface to achieve the approved level and compacting with plate compactor |
| 21 | 3.11:Removal of unserviceable soil including excavation, loading and disposal upto 1000 metres lead but excluding replacement by suitable soil which shall be paid separately as per clause 305. |
| 22 | OD23119/2022-2023:Supplying and conveying of ready mixed bituminous compound including engaging of labour and auto-pickups required in order to carry out the laying of the bituminous compound by filling potholes occurred during monsoon times or otherwise, controlling traffic etc. all complete as per the direction of the engineer-in-charge. |
| 23 | 3.24.A:Construction of unlined surface drains of average cross sectional area 0.40 sqm in soil by mechanical Means to specified lines, grades, levels and dimensions to the requirement of clause 301 and 309. Excavated material to be used in embankment within a lead of 50 metres (average lead 25 metres)<br> |
| 24 | Appendix-D Emergency Works |
| 25 | OD23121/2022-2023:Engaging labour for cutting and removing trees/branches, clearing of earth-slips and providing temporary protection work for restoring traffic etc, on various roads as per the directions of the Engineer-in-charge. (Mate) |
| 26 | OD23122/2022-2023:Engaging labour for removing of trees/branches, clearing of earth-slips and providing temporary protection work for restoring traffic etc, on various roads as per the directions of the Engineer-in-charge. (Mazdoor) |
| 27 | OD23123/2022-2023:Engaging Hydraulic Excavator and Loader in order to remove and clear the earth-slip material due to land slippages all complete as per the directions of the engineer-in-charge. All kinds of soil |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender