Installation And Energisation Of Harlagua Rl Of Padmapur Block Under Rayagada District
Tender Value
26.06 Lakhs
Estimated cost
Bid Submission
31 May 2022
0 days left
EMD
26068
Bank guarantee accepted
Document Fee
6000
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
gunupur → Odisha
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Installation And Energisation Of Harlagua Rl Of Padmapur Block Under Rayagada District
BOQ
| Sl. No. | Item Description |
| 1 | Earthwork in excavation of foundation in hard soil including dressing & levelling of bed within initial lead of 50mt. & lift of 1.5mtr etc complete as per the direction of the Engineer-incharge. |
| 2 | Filling in foundation & plinth with sand including watering & ramming etc complete as per the direction of the Engineer-incharge. |
| 3 | Cement concrete (1:4:8) with 4cm size h.g.c.b. metal of approved quality from approved quarry with ramming watering and curring etc. complete including cost, taxes, royalty convence charge of all material to worksite, supply of cement T&P required etc. complete as per the direction of the Engineer-incharge. |
| 4 | Brick work with K.B. Brick 25cm x 12cm x 8cm size having crushing strength not less than 75kg / cm2 with dimensional tolerrance + 8% in cement mortar (1:6) in foundation & plinth etc. complete as per the Engineer-incharge. |
| 5 | Brick work with K.B. Brick 25cm x 12cm x 8cm size having crushing strength not less than 75kg / cm2 with dimensional tolerrance + 8% in cement mortar (1:6) in super structure complete as per the Engineer-incharge. |
| 6 | 12mm cement plaster in cement mortar (1:6) finished smooth to brick work after racking out joints including waterring and curring with cost, taxes, royalty and conveyance charges of all material to the worksite and supply of all labour and T&P required for the work etc complete as directed by the Engineer-incharge. |
| 7 | (a) RCC ROOF SLAB AND CHAJJA |
| 8 | (b) RCC LINTEL |
| 9 | .(c) RCC FOUNDATION & PLINTH BEND,FOOTING,BADE OF COLUMN. |
| 10 | (d) RCC PILLAR |
| 11 | R.C.C. work in C.C. (1:2:4) including hoisting & laying & curring for 28 days using 12mm. Size clean black hard granite crusher broken chips of approve quality and from approve quarry including cost taxes conveyance charges of all materials to the worksite with supply of all labour and T&P required for the work etc complete as directed by the Engineer-incharge. |
| 12 | Labour charge for M.S. reinforcement for R.C.C. work including cutting, bending & typing the grills & placing in position including cost of binding wire 18 to 20 guage per Qntl. Including cost of HYSD Still Bar (FE 415/ FE 500) |
| 13 | Dry Brick Khoa rammed to 10 cm. In Flooring. |
| 14 | 2.5 cm. AS flooring with Cement Concrete (1:2:4) with 12 mm. size HG chips with cement punning |
| 15 | Labour for fitting & fixing of MS Window grills including cost of screws complete |
| 16 | Labour for fitting & fixing of MS Door including cost of all materials complete |
| 17 | Cost of MS grill for Window |
| 18 | Cost of Iron Shutter (2.00 x 1.00) |
| 19 | Cement punning over plastering including waterring and curring with cost, taxes, royalty and conveyance charges of all material to the worksite and supply of all labour and T&P required for the work etc complete as directed by the Engineer-incharge. |
| 20 | Filling the foundation and plinth with excavated material as directed by the Engineer-incharge. |
| 21 | White washing 3 coat with approve good stone lime including cost conveyance charges of materials including supply of labour, gum, indigo etc. required for the work complete as directed by the Engineer-incharge. |
| 22 | Finishing wall with water proofing cement paints two coats for exterior walls |
| 23 | Priming 1 coats with approved primer on new work. |
| 24 | Painting of MS Door of Starter shed by enamel paint of approved quality and colour for painting over iron work including cost taxes etc. complete as per the direction of the Engineer-incharge. |
| 25 | Writing charge of required information and data on both side of the transperancy pillar including supplying of approved paints and required material for writing etc. complete as per the direction of the Engineer-incharge. |
| 26 | Fitting of un plasticised 160mm diaPVC Pipe for following inside dia mtr. for all classes of pipe including jointing the pipe with solvent cement by non-head application method including fitting and fixing of required no. of PVC Tee for outlet and PVC Shaddle and PVC Riser nipple for fitting air valve, equal Tee etc. complete including conveyance pipe from village to worksite and testing of pipe line etc. complete as per the direction of the Engineer-incharge. |
| 27 | Transportation charges of 160 mm.dia. UPVC Pipe from nearest manufacturing unit to the village road siteincluding loading, unloading and stacking properly as per the direction of the Engineer-incharge. |
| 28 | Cost of Outlet in Distribution Tank |
| 29 | Labour charges for Lowering of 5.00 HP S/S Motor including fitting & fixing of suction and delivery pipe to motor, NR Valve, Sluice Valve and other fitting materials including cutting, welding etc. complete as per the direction of the Engineer-incharge. |
| 30 | Fabrication works,cutting & threading of pipe line etc. |
| 31 | Labour charges for connection of main switch to starter and starter to motor with connection ofother electrical fittings etc. complete as per direction of the Engineer-incharge. |
| 32 | Transportation charges of materials including loading, unloading and stacking properly as per the direction of the Engineer-incharge. |
| 33 | Cost of 5.00 HP S/S pump set having discharge of 840 LPM. |
| 34 | Control Panel with S/D Starter with MCB |
| 35 | Cost of 32 Amp.400 Volt TP Main Switch |
| 36 | 3 KVR Capacitor |
| 37 | Cost of 3 x 10mm2 T.D.Cable |
| 38 | Pump Chamber Wiring |
| 39 | 7/20 PVC Wire |
| 40 | 3 Phase Energy Meter tested by DISTCO |
| 41 | Electrical installation and energisation |
| 42 | Cost of 80 mm dia G.I. Pipe |
| 43 | Cost of 100 mm dia G.I. Pipe |
| 44 | Cost of 80 mm dia G.I. Bend |
| 45 | Cost of 100 mm dia G.I. Bend |
| 46 | Cost of 100 mm dia G.I. Flange |
| 47 | Cost of 80 X 100 mm dia G.I. Reducer |
| 48 | Cost of 100 mm dia G.I. Nipple |
| 49 | Cost of 100 mm dia C.I.Reflux Valve (N.R.) |
| 50 | Cost of 100 mm dia C.I.Sluice Valve |
| 51 | Cost of 80 mm dia M.S.Clamp |
| 52 | Cost of 50 mm dia Air Release Valve with saddle & Raiser Pipe |
| 53 | Cost of 12 mm.dia Wire Rope |
| 54 | Cost of MS clamp for Starter & Main switch |
| 55 | Cost of 200 mm x 100 mm MS T/W Cap |
| 56 | Cost of 160 x 110 mm PVC Reducer |
| 57 | Labour charges for deliveryfittings including fitting ofAir Release Valve and PVC Tee etc. |
| 58 | Labour charges for Lowering the S/S pump-set including all accessories inside the T/W |
| 59 | Cost nut bolt &Rubber insertion,whitelead paint and transportation of pipes,pump and other fitting materials |
| 60 | Cost of 300 mm.dia RCC T/W Protection Coverstand |
| 61 | Cost of 160 mm dia P.V.C.Pipe (CI-I) 2.5 Kg/Cm2 |
| 62 | Cost of 160 mm.Butterfly Valve |
| 63 | Cost of 160 mm x 160mm x 100 mm MS TEE with accessories |
| 64 | Cost of 160mm x 160mm x 160 mm Equal PVCTee |
| 65 | Cost of 160 mm dia PVCEnd Cap |
| 66 | Cost of 160 mm PVC Coupler |
| 67 | Cost of 160 mm PVC Adopter |
| 68 | Cost of 160 mm PVC Short piece |
| 69 | Cost of Solvent Cement |
| 70 | COST OF 200MM DIA PVC CASING PIPE( SC.80.PIPE )AS PEREPM RATE CONTRACT. |
| 71 | LABOUR CHARGES FOR MAKING STAINER PIPE OUT OF TOTAL CASING PIPES INCLUDING LOADING AND UNLOADING & TRANSPORTATION. |
| 72 | COST OF 200MM DIA PVC WELL CAP. |
| 73 | COST OF 200MM DIA PVC CONE. |
| 74 | COST OF 200MM DIA PVC NIPPLE. |
| 75 | COST OF BENTONITE DRILLING MUD. |
| 76 | COST OF GRAVEL INCLUDING TRANSPORTATION. |
| 77 | COST OF COIR ROPE / COTTON WASTE |
| 78 | OPERATION OF RIG FOR DRILLING O TO 30 METER DEPTH. |
| 79 | OPERATION OF 5 HP WATER PUMP. |
| 80 | MOVEMENT OF RIG FOR AVERAGE 50 KMS. |
| 81 | LOWERING OF 30 METERS DEPTH TUBE WELL PVC PIPE. |
| 82 | CLEANING AND DEVELOPING THE T/W WITH AIR COMPRESSOR CONTINEOUSLYTILL ADEQUATE DISCHARGE OF CLEAR AND SAND FREE WATER 0 TO 30 MTR. |
| 83 | LABOUR CHARGES FOR SITE CLEARANCE & RIG LEVELLING. |
| 84 | LABOUR CHARGES FOR EXCAVATION OF MUD PIT & CHANNEL |
| 85 | LABOUR CHARGES FOR LOADING ,UNLOADING OF CAMP MATERIALS |
| 86 | COST OF TRIAL BORING |
| 87 | Layout for civil and electrical works |
| 88 | Photograph of Project |
| 89 | Construction of 11 K.V.Line 3 Ph 3 Wire with 9 Mtr long 300kg PSC pole using 55 sq.mm AAA Conductor 60 mtr span with all materials required for the same as per the specification & estimate of DISCOM |
| 90 | L.T.Line 3ph 4w using 3x50+1x35sq.mm XLPE ABC & 8 mtr long PSC poles with fittings with all materials required for the same as per the specification & estimate of DISCOM |
| 91 | Installation of 25 KVA,11/.4 KV Pole mounted Sub-Station using 9 Mtr long PSC pole with Stare Ratted Transformer as per the specification & estimate of DISTCOM |
| 92 | Barbed Wire Fencing size 10\"X10 \"with construction of retaining wall , erection of RCC fencing post ,sand filling & metal spreading, fixing of iron grill gate etc. as per DISTCOM specifi cation. |
| 93 | Making earthing with required earthing materials like Charcoal , Common salt , Conduit pipe, Soft solder , Alcape , Nuts & Bolts, Cable sockets etc including excavation of earth pits of size (1.20 M x 1.20 M x 1.5 M) for fixing of earthing pipes of size 37.5 mm dia x 1.5 M length with required slottings in Pipe and fitting with 37.5 mm dia G.I.Flange including excavation of earthing trench for laying of earthing G.I.Wire and filling the trench & pit after fixing of pipes on completion of earthing works including supply of all the materals, including transportation etc.complete as per the direction of the Site Engineer in Charge. |
AI Tender Summary
Tender Timeline
May 21, 2022
11:30 IST
Tender Published
Tender notice published.
CompletedMay 31, 2022
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedJun 01, 2022
Bid Opening Date
Technical bids will be opened and evaluated.