Northern Coalfields Limited-NCL has published Planning, Design, Engineering, Construction, Supply, Erection, Installation And Commissioning Of The Complete Secondary Sizer Plant And Renovation Of Conveyor No. 13 For Existing Jayant Chp And Maintenance Of Plant For Five Years . Submission Date for this Tender is 24-06-2022. Conveyors and Accessories Tenders in jayant Madhya Pradesh. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 24-May-2022 | Pre-Bid meeting VC Link | Other | 10-06-2022 |
2 | 06-Jun-2022 | Bid Submission Extension | Date | 24-06-2022 |
Sl. No. | Item Description |
1 | A. WORK & SERVICES |
2 | Detailed survey of the area, within the battery limits & submission of reports |
3 | Sub soil exploration, field and laboratory testing of samples & submission of reports |
4 | Design Engineering Cost |
5 | Preparation and submission of system engineering drawings as per system requirements |
6 | GA & detail engineering designs and drawings of all civil and structurals included in the system and scope of works |
7 | G.A. & detailed engineering designs and drawings including working and maintenance manuals of : i)all individual equipment ( Mechanical & Electricals) ii) Dust Control & Pressurisation system. iii) Fire-fighting system. iv) Chutes & Liners v)Communication system vi) Power Supply System vii)Illumination system. viii) Plant control system ix) Any other system/unit to matchthe scope of work& requirement |
8 | Documentation as per tender specification |
9 | B. CIVIL & STRUCTURAL WORKS |
10 | Civil and structural work (Conveyor Gantry, Drive & Transfer Houses,etc.) |
11 | Sizer House - 1 |
12 | Sizer House - 2 |
13 | Strengthening/Modification of Existing Conveyor Gantry |
14 | II Developmental work and infra-structure |
15 | Substation building |
16 | Misc. items of works to complete the work as per tender |
17 | C. PLANT & MACHINERY (SUPPLY) |
18 | C.(a)SUPPLY : MECHANICAL |
19 | A. CONVEYORS |
20 | B. BELTING |
21 | C. EQUIPMEMT |
22 | Other mechanical equipment |
23 | Dust suppression system with piping & other accessories. Condition monitoring system, Safety & firefighting system , and other misc. equipment/utility for any more item required to complete the project |
24 | C.(b)SUPPLY : ELECTRICAL |
25 | ELECTRICAL |
26 | PCC / SUBSTATION 6.6 kV Lightning arrestor,Isolators with/without earth switch, DO Fuse etc. as required. 6.6/0.415 kV, 500 kVA Distribution transformer-2 nos. 220V Lead Acid Battery complete with Battery Charging unit.-1 no. 6.6 kV 3 Phase, 3 Wire Switchboard (Indoor) Comprising of Incomer VCB, Buscoupler VCB and Outgoing VCBs/VCPs complete with metering and protection as required 415V Aluminium Bus-duct of suitable size as required. MCC at PCC Comprising of Incomer ACB, Buscoupler ACBs and Outgoing ACBs/MCCB/SFU/ Contactor as required.-1no. 6.6 kVCapacitor Bank with Automatic power factor correction of required capacityfor power factor improvement-2 sets. |
27 | Cables Power Cables Control & Signalling Cables Lighting Cables & wires Communication Cables |
28 | Earthing Plant Equipment Earthing Structures Earthing Earthing for Lightning Protection Tranformer neutral Earthing |
29 | Welding system including Welding Transformer and Welding MG Set |
30 | PLC System for Control & Automation,Interlocks, Signalling and instrumentation proposed system. |
31 | Remote and sequence control equipment & Accessories |
32 | Control Transformers fof AC & DC control Supply |
33 | Cable Trays, Cable Racks, Cable Trenches, Cable Voults etc. as required. |
34 | Illumination System and Luminaires, Lighting poles , Lighting DBs etc. as required |
35 | 5 kVA UPS System |
36 | Computers and Peripherals |
37 | Communication System as required |
38 | Equipment and accessories for Pressurisation and Air Conditioners |
39 | Miscellaneous Equipment (Like CCTV & Camera, Exhaust Fan, Ceiling Fan, Insulating Mats etc.) |
40 | C1. ERECTION, INSTALLATION & COMMISSIONING |
41 | 1. Erection of mechanical equipment |
42 | 2. Erection of electrical equipment |
43 | 3. Erection of other plant and machining etc. |
44 | 4. Trial run, and commissioning of the plant |
45 | C2 . OTHERS ITEM |
46 | 1. Drinking water system consisting of tanks, pipes, valves, taps etc. |
47 | 2. Plantcleaning system |
48 | 3. Any other item left out for completion of the project |
49 | C3 . MAINTENANCE AND TRAINING |
50 | Maintenance of the system for fiveyear as described in tender document |
51 | Training of the employerpersonnel as per tender document |
52 | Total impact of GST for the purpose of CTC |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy