}

Major Maintenance, Repairing And Overhauling Works Of Primary And Secondary Crushers And Vibrating Screen In Chp, Atps, Anpara, anpara-Uttar Pradesh

Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited-UPRVUNL has published Major Maintenance, Repairing And Overhauling Works Of Primary And Secondary Crushers And Vibrating Screen In Chp, Atps, Anpara. Submission Date for this Tender is 27-06-2022. Crushers Breakers and Grinders Tenders in anpara Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

32295916
Major Maintenance, Repairing And Overhauling Works Of Primary And Secondary Crushers And Vibrating Screen In Chp, Atps, Anpara
Open Tender
Indian
Uttar Pradesh
anpara
27-06-2022

Tender Details

Major Maintenance, Repairing And Overhauling Works Of Primary And Secondary Crushers And Vibrating Screen In Chp, Atps, Anpara

Key Value

Document Fees
INR 1180 /-
EMD
INR 60000.0 /-
Tender Value
INR 29.73 Lakhs /-

BOQ Items

Name of Work:Major maintenance and repairing works of Primary and Secondary crushers, Repairing of damaged Tie Beams of Primary crushers and replacement with new repaired tie Beams, Work of overhauling of Primary and Secondary Crushers and Work of Overhauling of Vibrating Screens installed in CHP, 3X210MW, ATPS, Anpara
Sl. No. Item Description
1Major maintenance and repairing works of Primary and Secondary crushers installed in CHP (A) PRIMARY CRUSHER (04 Nos.)TRF MAKE (ROTARY BEAKER )
2Balancing of Rotor of primary crusher OR Removal of jamming of bearing of Guide Rollers
3Removal of jamming of bearing of supporting Rollers.
4Replacement of damaged bearing of supporting Rollers. OR Replacement of damaged supporting rollers by new one/ taken out from other crusher
5Replacement of damaged oil seal of guide rollers.
6Replacement of damaged / worn out guide roller assembly by new one/ taken out from other primary crusher
7Replacement of damaged Plummer block of supporting Roller
8Tightening / loosening of the drive chain
9Replacement of damaged chain link
10Repairing of chain link
11Replacement of complete drive chain
12Repairing of damaged teeth of drive/ driven sprocket by welding & grinding in position
13Replacement of damaged Sealing rubber liner
14Replacement of drive sprocket
15Replacement of driven sprocket
16Checking & Re-alignment of Rotor Assembly of Primary crusher
17Re-adjustment of angle of deflector OR Torque Setting of bolt & nut for fixing driven sprocket to feed end spider (12 Nos.) with a torque of 50-60 Kg-M.
18Replacement / re-fixing of detached deflector
19Re-adjustment of angle of lifting shelve
20Repairing of perforated screen plate by welding & grinding the worn out portion
21Replacement of Perforated screen plate
22Torque Setting of bolt & Nut for fixing of lifiting shelves & screen plate to beam with a torque of 70-80 Kg-M.
23Torque Setting of bolt & nut for refuse plough to screen & blank plate (10 Nos. ) with a torque of 70-80 Kg-M.
24Torque Setting of bolt & nut of deflector & screen plate to beam (36 Nos. ) with a torque of 70-80 Kg-m.
25Torque Setting of bolt & nut for spider to beam (64 Nos.) with a torque of 140-160 Kg-m. OR Torque Setting of bolt & nut of foundation & crusher housing. OR Repairing of distorted inspection doors of primary crusher by heating, welding & straightening etc.
26Torque Setting of bolt & nut of screen plate to beam.
27Torque Setting of bolt & nut for fixing Plummer block with a torque of 34-45 Kg. M. OR Torque Setting of bolt & nut for fixing guide roller support to roller supporting structure (21 Nos.) with a torque of 15-20 Kg. M.
28Repairing / Re-fixing of refuse plough
29Checking of tightness of check nut of bearing of supporting Roller after taking out supporting roller from its foundation & refitting in position.
30Re-adjustment of float of rotor assembly of primary crusher
31Removal of vibration by strengthening the foundation.
32Major maintenance and repairing works of Primary and Secondary crushers installed in CHP (B) SECONDARY CRUSHER (RING GRANULATORS)
33Replacement of complete set of ring hammers (78 Nos.) by new / useable old hammer OR Repairing of damaged & wornout breaker plate by cutting, grinding & welding etc.
34Replacement of damaged/ broken ring hammer by new / useable old hammers of each now.
35Alignment of Crusher only
36Replacement of damaged breaker plate by new / repaired one
37Replacement of drive side bearing or withdrawal sleeve of crusher
38Replacement of non drive side (free end side) bearing or withdrawal sleeve of crusher
39Repairing of damaged tramp iron tray by heating, straightening & welding etc. after dismantling & re-fixing the same in position after repairing.
40Repairing of damaged / worn out centre disc by welding, grinding etc. OR Repairing of damaged / distorted inspection door of secondary crusher
41Repairing of damaged straight cage side piece by straightening, welding & grinding etc.
42Replacement / Re-fixing of straight cage side piece
43Torque Setting of foundation bolts of secondary crusher & its other fasteners.
44Attending leakage of oil/grease from bearing of secondary crusher by replacing gasket etc.
45Rectification of overheating of bearing of crusher
46Repairing of end disc by welding grinding etc. OR Repairing / replacement of liner plates of secondary crusher
47Replacement of damaged / worn-out plumber block (bearing housing) of secondary crusher.
48Elimination of vibration of secondary crusher by removing all its hammers & rebalancing of rotor
49Replacement of damaged coupling pads of voith make fluid coupling of crusher
50Replacement of defective fluid coupling of crusher
51Replacement of defective oil seal of fluid coupling after removal of motor and fluid coupling from its position & normalisation of system.
52Repairing of damaged Tie Beams of Primary crushers and replacement with new repaired tie Beams installedin CHP, ATPS
53Repairing of damaged Tie Beams of Primary Crusher installed in CHP, 3x210MW, ATPS, Anpara as per scope of work.
54Replacement of Tie Beams of Primary crusher as per scope of work.
55Work of overhauling of Primary and Secondary Crushers installed in CHP, ATPS
56Overhauling of Secondary crusher as per scope of work
57Overhauling of Primary Crusher as per scope of work
58Work of Overhauling of Vibrating Screens installed in CHP, ATPS
59Complete dismantling of Vibrating Screen, repairing/ Replacement of its worn out, damaged parts and thereafter complete re-assembly as per scope of work of CHP, 3x210MW, ATPS Anapara
60Fabrication of side plate of vibrating screen with liners with provision for fitment of left and right hand bearing housing.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail