Work Of Breakdown Maintenance Of Tt, Gear Boxes, Belt Feeders, Vibro Feeders And Vibrating Screens, Round The Clock Checking, Routine And Breakdown Maintenance Of Stacker Cum Reclaimer Machine And Vibro Feeders And Paddle Feeders In Chp, Atps Anpara, anpara-Uttar Pradesh

Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited-UPRVUNL has published Work Of Breakdown Maintenance Of Tt, Gear Boxes, Belt Feeders, Vibro Feeders And Vibrating Screens, Round The Clock Checking, Routine And Breakdown Maintenance Of Stacker Cum Reclaimer Machine And Vibro Feeders And Paddle Feeders In Chp, Atps Anpara. Submission Date for this Tender is 27-06-2022. screening machines Tenders in anpara Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

32295706
Work Of Breakdown Maintenance Of Tt, Gear Boxes, Belt Feeders, Vibro Feeders And Vibrating Screens, Round The Clock Checking, Routine And Breakdown Maintenance Of Stacker Cum Reclaimer Machine And Vibro Feeders And Paddle Feeders In Chp, Atps Anpara
Open Tender
Indian
Uttar Pradesh
anpara
27-06-2022

Tender Details

Work Of Breakdown Maintenance Of Tt, Gear Boxes, Belt Feeders, Vibro Feeders And Vibrating Screens, Round The Clock Checking, Routine And Breakdown Maintenance Of Stacker Cum Reclaimer Machine And Vibro Feeders And Paddle Feeders In Chp, Atps Anpara

Key Value

Document Fees
INR 1180 /-
EMD
INR 70000.0 /-
Tender Value
INR 34.94 Lakhs /-

BOQ Items

Name of Work: Work of breakdown maintenance of TT, Gear Boxes, Belt Feeders, Vibro feeders and Vibrating screens, Round the Clock checking, Routine and Breakdown maintenance of Stacker cum Reclaimer machine and Vibro feeders and Round the clock checking, Routine and Breakdown maintenance of Paddle feeders installed in CHP, 3X210MW, ATPS, Anpara.
Sl. No. Item Description
1(A) Work of breakdown maintenance of TT, Gear Boxes, Belt feeders, Vibro feeders and Vibrating screens installed in CHP TRAVELLING TRIPPER (02 nos.)
2Replacement of damaged/ distorted transmission wheel of tripper
3Replacement of damaged bearing of tripper carriage shaft.
4Replacement of damaged Plummer block of tripper carriage shaft.
5Attending oil leakage of gar box by providing gasket etc.
6Repairing of main drive chain link
7Replacement of main drive chain link
8Replacement of drive chain of cable reeling mechanism.
9Repairing of driven chain of cable reelingmechanism.
10Repairing of driven teeth of main drive/ driven sprockets by welding and grinding
11Repairing of drive / driven teeth of cable reeling mechanism
12Replacement of sprockets drive/ driven of cable reeling mechanism
13Re-alignment of sprockets drive / driven of cable reeling mechanism
14Re-alignment of main drive of travelling tripper i.e., motor gear box, drive and driven sprocket
15Removal of fouling of tripper wheel with structure
16Strengthening of tripper structure whenever required by providing additional angle, channel and ribs etc.
17Replacement of damaged bibby coupling along with proper alignment
18Replacement of brake shoe liner
19Removal of jamming of cable guide roller assembly
20Checking of re-alignment and leveling of rail track of tripper.
21Replacement / Re-fixing of rail scrapper
22Re-alignment of bunker sealing belt by adjusting roller and tension of belt.
23Straightening of vertical post of tripper rail by providing stiffeners etc.
24Replacement of damaged bearing / Plummer block of rollers of bunker sealing belt.
25Replacement of brake assembly mechanism
26Repairing of gear box body of tripper by grinding & welding
27Repairing of guards & Hand railing of tripper
28Replacement of complete gear box by new one/ by taken out gear box from other tripper
29Replacement of transmission shaft
30Providing of stiffeners in distorted transmission wheel by cutting and welding
31Replacement / repairing of shaft of bunker sealing belt roller by cutting & welding
32Repairing of shaft of cable reeling drum by welding, grinding and making hole for lock in shaft.
33Repairing of brake shoe liner
34Repairing of tripper brake drum by welding and grinding
35Revisioning of bearing, CRD sprocket assembly
36Tightening of check nut of Plummer block of TT shaft.
37Re-welding and grinding of stiffeners of TT Wheel.
38Replacement of bunker sealing belt rollers of tripper
39Replacement of bent / damaged ISMC of size 200 mm of carriage drive Plummer block base frame after jacking of TT by cutting, grinding & welding etc.
40Replacement of spring of bibby coupling
41GEAR BOXES (conveyor system, crushers)
42Replacement of gear box unit by new / taken out from other equipment
43Repairingof gear box body by grinding and welding.
44Replacement of damaged bearing of input shaft / intermediate shafts/ output shaft by dismantling the complete gear assembly and its re-alignment with driven equipment and motor also.
45Replacement of Input shaft / intermediate shafts / output shaft by dismantling the complete gear box assembly and its re-alignment with driven equipment and motor also.
46Replacement of oil seals of input / output shaft of gear box by dismantling the complete gear box assembly and its re-alignment with driven equipment and motor also.
47Overhauling of gear boxes of conveyor system, belt feeders & primary crushers. This involves opening of gear box cover, cleaning, minor repairs, checking of bearings, re-assembly, alignment & trial run. This will also include alignment of gear box with motor.
48Attending oil leakage from gear box by providing gasket etc.
49Opening of gear box upper housing for checking of input shaft bearing and checking nut of gear box
50Replacement of damaged and distorted jack bolt of gear box by cutting and welding.
51Changing of gear box assembly from left hand to right hand and vice –versa.
52Removal and re-fixing of matching gear fitted into intermediate shaft.
53Removal & Refixing of bearings of input shaft of gear box for repairing of housing, check nut and making thread.
54Replacement of upper and lower housing of gear box with new one or by repaired one.
55Removal and re-fixing of coupling fitted in input shaft of gear box.
56VIBRATING SCREEN (4nos.)
57Replacement of damaged supporting springs
58Replacement of damaged bottom deck screen cloth
59Replacement of damaged oil seals of bearings
60Replacement of damaged bearing of drive shaft
61Repairing of back cover plates by welding & cutting etc.
62Re-fixing of detached back cover plates.
63Checking & re-alignment of vibrating screen & motor
64Leveling of vibrating screen by providing / removing packing etc.
65Re-adjustment of stroke of vibrating screen by removing / adding counter screen weights
66Replacement of damaged top deck mesh by welding / cutting
67Repairing of damaged top deck mesh by welding / cutting.
68Replacement of damaged bottom deck mesh by welding / cutting
69Fabrication & fixing of holding down channel for bottom deck mesh
70Elimination of any abnormal sound from vibrating screen.
71Replacement of damaged sealing rubber
72Attending leakage of grease from bearing housing by providing gasket etc.
73Replacement of main shaft of vibrating screen by new one/ repaired one.
74Repositioning, alignment and welding of spring supporting suspension shaft after dismantling hood etc. if reqd.
75Repairing / repositioning of hood of vibrating screen by welding / cutting
76Torque setting of all the H.T. bolts by torqe wrench at specified torque including bolts of screen mesh panels.
77Replacement of damaged screen bar by cutting and welding
78Repairing of damaged bar by welding
79Replacement / repairing of damaged canopy of oil chamber by welding & strengthening of screen
80Repairing of oil chamber leakage by grinding, welding
81Attending oil leakage of inspection pipe of screen
82Replacement / repairing of clit base of motor for proper alignment
83Replacement of bearing housing of screen
84Replacement of inspection pipe line of vibrating screen
85Replacement of oil chamber in V.S. by new or by repaired one.
86VIBRO FEEDERS (4nos. )
87Replacement of damaged supporting spring.
88Replacement of damaged gasket of oil chamber
89Replacement of damaged bearing by new one
90Re-adjustment of stroke of vibro feeder by changing drive pulley of motor
91Leveling of vibro feeder by providing / removing packing below supporting springs bed.
92Checking and re-alignment of motor with vibro feeder.
93Replacement of damaged drive/ driven gears.
94Replacement of damaged drive / driven shaft.
95Replacement of Vibrator assembly after taking out from other vibro feeders.
96Replacement of V-Belt pulley of motor whenever required.
97Torque setting of all the HT bolts by torque wrench at specified torque.
98Replacement of Pin bush / Plummer block of motor base frame by cutting & welding.
99Replacement / Repairing of cracked motor base frame after cutting, grinding & welding etc.
100BELT FEEDERS (08nos.)
101Replacement of damaged takeup screw by new one after cutting and welding (size 40 x 60 mm)
102Checking, re-alignment of complete drive unit i.e. motor, gear box and drive pulley.
103FLUID COUPLING
104Replacement of damaged driving (resilient plate) of fluid coupling Up to 280KW
105Replacement of damaged driving (resilient plate) of fluid coupling Above 280KW to 400KW
106Replacement of damaged driving (resilient plate) of fluid coupling Above 400KW to 800KW
107Replacement of defective/damaged multidisc of fluid coupling Up to280KW
108Replacement of defective/damaged multidisc of fluid coupling Above 280KW to 400KW
109Replacement of defective/damaged multidisc of fluid coupling Above 400KW to 800KW
110Replacement of defective/worn-out fluid coupling by new one/overhauled one up to100KW
111Replacement of defective/worn-out fluid coupling by new one/overhauled one Above 100KWto 280KW
112Replacement of defective/worn-out fluid coupling by new one/overhauled one Above 280KW
113Replacement of defective/worn-out fluid coupling by taking out coupling from equipmentup to 100KW
114Replacement of defective/worn-out fluid coupling by taking out coupling from equipmentAbove 100KW to 280KW
115Replacement of defective/worn-out fluid coupling by taking out coupling from equipmentAbove 280KW
116Replacement of Oil seals/O-rings of fluid coupling by taking out the coupling, dismantling, reassembly and alignmentup to 100KW
117Replacement of Oil seals/O-rings of fluid coupling by taking out the coupling, dismantling, reassembly and alignmentAbove 100KW to 280KW
118Replacement of Oil seals/O-rings of fluid coupling by taking out the coupling, dismantling, reassembly and alignmentAbove 280KW
119Attending minor oil leakage from various fluid coupling
120Replacement of Bearing of fluid coupling by taking out the complete fluid coupling, dismantling, reassembly & alignmentup to 100KW
121Replacement of Bearing of fluid coupling by taking out the complete fluid coupling, dismantling, reassembly & alignmentAbove 100KW to 280KW
122Replacement of Bearing of fluid coupling by taking out the complete fluid coupling, dismantling, reassembly & alignmentAbove 280KW
1236.6KV/0.4KV MOTOR ALIGNMENT
124Realignment of gear-box unit assembly with drive unit and trial run up to 50KW.
125Realignment of gear-box unit assembly with drive unit and trial run up to 100KW.
126Realignment of gear-box unit assembly with drive unit and trial run up to 280KW.
127Realignment of gear-box unit assembly with drive unit and trial run above 280KW.
128Alignment of the crusher with motor.
129(B) Round the Clock checking, Routine and Breakdown maintenance of Stacker cum Reclaimer machine and Vibro feeders of CHP. Checking/ Maintenance and operation work round the clock of Stacker-reclaimer machine & vibro feeders of CHP, ATP, Anpara.
130BREAK DOWN MAINTENANCE L. T. Mechanism
131Repair / Replacement of gear / Bearing of L.T. Gear Box.
132Repair / Replacement of gear of track wheel
133Replacement of hinged bearing of L.T. Gear box / bearing of track wheel of under carriage.
134Overhauling of L.T. Gear box.
135Alignment of L.T. gear box with motor
136Repair / Replacement of oil seal / ring feeders of L.T. gear box.
137Replacement of damaged gasket of L.T. gear box. OR Repair / Replacement of gear track wheel of tripper
138Attending oil leakage from the oil pipe line of L.T. gear box.
139Repair / Replacement of oil pump break / brake liners of L.T. Gear box / L.T. drive / manual break system.
140Replacement of bearing of track wheel of under carriage
141Repairing of manual break system / limit operated frame by welding etc.
142Fabrication and fittings of limit operated frames.
143Replacement of limit operated frames.
144Lubrication System
145Replacement of pipe line / Gear hose
146Replacement of nipples / door feeder
147Repair of door feeders. OR Replacement of gear pump coupling
148Repair of gear pump.
149Repair of lien leakage.
150Flushing of jammed pipe line of grease and re-installation in position.
151Repairing of manual grease pump.
152HYDRAULIC SYSTEM
153Replacement of lines.
154Replacement of hose / Ferrule / End connector.
155Repairing of line leakage from hydraulic lines.ORRepairing of the Knuckle joint stud.
156Repair / Replacement of auxiliary cylinder
157Cleaning of the hydraulic tank.
158Replacement of coupling bush / coupling of hydraulic pump.
159Alignment of auxiliary cylinder with respect to tie rod of material gate/ skirt board.
160BUCKET WHEEL
161Repair / Replacement of Plummer block / bearing / drive side bearing of gear box.
162Re-alignment of bucket wheel
163Replacement of drive side oil seals of gear box. OR Repairing of ring chute.
164Repair of oil pump / re visioning of bearing
165Replacement of oil pump with new / repaired one. OR Attending oil leakage of pipe line.
166Replacement of coupling / Coupling bush of oil pump OR Repairing of brake drum OR Strengthening of the ring chute by welding.
167Replacement of fluid coupling/ gasket of gear box.
168Repairing of multidisc/ drive plate of fluid coupling. OR Providing wedge lock on bucket.
169Replacement of oil seal of fluid coupling. OR Repair of fluid coupling to avoid oil leakage from flange.
170Repair / Replacement of brake mechanism
171Repair / Replacement of ring feeder.
172Repositioning of the ring chute to bucket
173Repairing of bucket by welding and hard facing.
174Boom Conveyor and Tripper Car
175Replacement of gear box.
176Overhauling of gear box/Replacement of oil seal/ Bearing / Gears/Repairing of the tail pulley hold frame.
177Repair/ Replacement of ring feeder of gear box. OR Brake mechanism
178Replacement of oil seal of fluid coupling/Repair / Replacement of limit switch sprocket.
179Replacement of fluid coupling
180Repositioning of the bearing drum of pulley of tripper car.
181Repairing of Plummer block
182Rectification of jamming of bearing of pulley.
183Repairing of hinged tie / pin/ brake drum.
184Replacement tail / drive pulley of boom conveyor along with replacement / re visioning of bearings and Plummer blocks.
185Repositioning of bearing drum of drive pulley of boom conveyor. OR Re tensioning of boom conveyor
186Training of boom conveyor belt. OR Repairing of the jack bolt block with jack bolt.
187Repairing of the scrappers of boom conveyor tripper car and feed dray
188Repairing of the defective idlers of boom conveyor
189Replacement of bearings of pulleys of tripper car.
190Replacement of Plummer block of pulleys of tripper car.
191Repairing of brackets / frames of idlers.
192Repairing/ Replacement of chain of limit switch sprocket.
193Replacement of defective gasket of gear box.
194Repairing of fluid coupling/ multidisc/ drive plate.
195Replacement of defective idler of boom conveyor tripper and feed tray.
196Fixing of jack bolts on the side of Plummer block.
197Tightening of the check nut of bearings of pulleys.
198Replacement of scrapper rubber
199Slew Mechanism
200Replacement / Overhauling of gear box.
201Repair of limit switch sprocket.
202Attending of leakage from gear box clutch.
203Repairing of the thruster brake assembly.
204Changing of the lining of thruster brake.
205Adjusting the thruster brake.
206Material gate / skirt board Mechanism
207Repair / Replacement of Plummer block
208Replacement of bearing of Plummer block.
209Repair/ Replacement of tie rod stud.
210Replacement of damaged skirt board material gate rubber lining
211Alignment of tie rods with respect to gate.
212VIBRO FEEDERS :
213Replacement of oil seals of exciter.
214Replacement of torque shaft/ supporting spring
215Replacement of tension bolt.
216Replacement of gear of exciter
217Adjusting the stroke of exciter
218Replacement of exciter assembly by new / repaired one.
219Replacement of coupling shaft by new/ repaired one.
220Coupling of exciter with motor after alignment.
221Repairing of the flexible coupling shaft with universal joints.
222Removal of fouling of vibro feeder deck for making V.F. for free vibrations. OR Leveling of vibro feeder unit.
223Overhauling of exciter unit. OR Replacement of bearing of exciter.
224Auto Rail Clamp
225Changing of brake lining of auto rail clamp.
226(C) Round the clock checking, Routine and Breakdown maintenance of Paddle feeders installed in CHP, 3X210MW, ATPS, Anpara Round the clock checking / Routine maintenance of Paddle Feeder of CHP, ATPS, Anpara
227Paddle Feeder
228Repairing of resilient plate of fluid coupling by cutting welding and grinding.
229Replacement of damaged multi disc of fluid coupling
230Replacement of damaged resilient plate of fluid coupling by new / repaired
231Replacement & re-alignment of defective / damaged fluid coupling by new or after taking out from other Paddle Feeders.
232Replacement of damaged VV coupling by new/ repaired and realignment after replacement of coupling
233Replacement of damaged connection spring of VV coupling
234Replacement of half geared coupling of hollow shaft.
235Repair / Replacement of PIV chain.
236Replacement of damaged blades of PF by new/ repaired one.
237Complete flushing & cleaning of pipe line & filters etc. of lubricating system of main gear box of Paddle Feeders.
238Replacement of damaged bearing of wheel
239Replacement of damaged plummer block of wheel
240Replacement of rubber rail scrappers (8 Nos. scrappers) / P.F.
241Repairing of chain of cable reeling drum.
242Repositioning/ removal of jamming and re-adjustment of cable guide roller (2 rollers on each P.F.)
243Checking & re-alignment and levellingof rails for travel of P.F. There are two sets of rails and length of rail is about 200 mtrs. for travel of P.F.
244Checking & re-alignment of motor, PIV gear box, blade drive gear box and blade mounting shaft.
245Checking & re-alignment of motor PIV gear box, fixed base gear box and pivoted base gear box of carriage of P.F.
246Replacement of damaged geared coupling of blade, drive gear box and shaft, its re-alignment after replacement. Coupling will be taken out after removing main gear box from foundation.
247Repairing of upper bearing supporting structures of blades shaft by heating welding etc.
248Re-alignment of cable reeling drum.
249Attending leakage of oil from different gear boxes of PF by providing gasket etc.
250Repairing of drive / driven sprocket teeth of cable reeling drum by welding grinding and machining etc.
251Replacement of drive / driven sprocket of CRD mechanism by new / repaired after taking out from other P.F.
252Torque setting of blades fixing bolts (72 Nos. for one P.F.)
253Replacement of gear box unit by taking out from other equipment
254Repairing of gear box body by grinding welding etc.
255Replacement of damaged bearing of Input Shaft / Intermediate shaft / output shaft by dismantling the complete gear box assembly with re-assembly the re-alignment
256Repairing of Garland Idler
257Replacement of Garland Idler
258Repairing of Garland Idler supporting frame by cutting & Welding etc.
259Replacement of damaged frame of garland idler.
260Replacement of damaged skirt rubber Lining of P.F.
261Repositioning of skirt board plate of Paddle Feeders.
262Replacement of damaged/ wornout liner plate / motor plate of hopper ofP.F.
263Re-fixing of detached skirt board plate / element wear plate
264Replacement of PIV chain tension shoe
265Shifting of PF upto head end/ tail end by dismantling the blade in case of some problem with the blades drive arrangement to clear the travel of P.F.
266Replacement of bracket of Garland idlers.
267Replacement of tension rod of PIV gear box of carriage.
268Replacement of tension rod of PIV gear box of blade feeder
269Changing of oil seal of vertical mounting shaft of paddle feeder.
270Dismantling of bearing housing (2 Nos.), its 3 Nos. bearing, laybyrinth, adopter sleeve, from TRF make rotor shaft of blade drive and thereafter its assy.
271Removal of hexagonal base frame support from rotor shaft for its repairing / replacement and thereafter assembly of bearings, housing etc.
272Replacement of Rotor shaft with new one, thereafter fixing of hexagonal base frame support & other assembly work of bearings, housing etc.
273Overhauling of PIV gear box of blade drive of M/s. Jaimpex make after shifting it to ‘0’ meter at site workshop.
274Overhauling of ESENPRO make main gear box of blade drive after shifting it to ‘0’ meter at site workshop.
275Overhauling of PIV gear box and worm gear boxes of M/s. Jaimpex & Esenpro make having ration 20/1 and 50/1 for carriage drive after shifting them to ‘0’ meter at site workshop.
276Cutting of foreign materials such as M.S. Plate, Angle , Beam etc. entangled with PF blade with the help of gas etc.
277Replacement of fixed coupling with new one/ repaired one of carriage drive of paddle feeder
278Replacement of damaged bolts of blade by new one after cutting with gas etc.
279Re-railment of paddle feeder
280Replacement of damaged 250mm beam , rail etc.
281Fabrication & Erection ofBase Plate for fixing PF blade.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail