Department of Cooperation has published Fabrication & Erection Jobs ( Budhewal Csm ) - 1 Budhewal Csm 2 Pipe Linem.S1” To 12” Diaa ) Dismantling 3 B ) Erection 4 Replacementofpipe Linem.Sabove 12” Dia ( Other Than Vapour Pipe Of Pan And Quad ) 5 Pipe Linec.I.1”To 12” Diaa ) Dis. Submission Date for this Tender is 25-05-2022. Clothing Accessories Tenders in Ludhiana Punjab. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Budhewal CSM |
2 | Pipe LineM.S1” to 12” dia a)Dismantling |
3 | b)Erection |
4 | ReplacementofPipe LineM.Sabove 12” dia (other than vapour pipe of pan and quad ) |
5 | Pipe LineC.I.1”to 12” dia a)Dismantling |
6 | b)Erection |
7 | IBR Steam pipe line .3”to 8” dia a)Dismantling |
8 | b)Erection |
9 | A)Bend M.Supto 12” dia a)Dismantling |
10 | b)Erection |
11 | B)Bend M.S.above 12” dia (other than Vapour pipe line ofPans & Quad) a)Dismantling |
12 | b)Erection |
13 | BendofM .S.upto 12” dia(other than Vapour pipe line ofPans & Quad) a)Dismantling |
14 | b)Erection |
15 | NippleofM .S.upto 12” dia(other than Vapour pipe line ofPans & Quad) a)Dismantling |
16 | b)Erection |
17 | ReducerofM .S.upto 12” dia(other than Vapour pipe line ofPans & Quad) a)Dismantling |
18 | b)Erection |
19 | Bend, Nipple, Reducer ofM .S. above 12” dia(other than Vapour pipe line ofPans & Quad) |
20 | Man Holes of all sizes a)Dismantling |
21 | b)Fabrication |
22 | c)Erection |
23 | Flanges of all size a) Dismantling |
24 | b) Fabrication |
25 | c) Erection |
26 | M.STee a) Dismantling |
27 | b) Erection |
28 | M.SNipple a) Dismantling |
29 | b) Erection |
30 | M.SCross a) Dismantling |
31 | b) Erection |
32 | M.SReducers a) Dismantling |
33 | b) Erection |
34 | M.SBlind a) Dismantling |
35 | b) Erection |
36 | Dismantling, Fabrication and Erection M.SCoil of2” to 4” dia |
37 | Replacement Platform of any type |
38 | M.S. Structure work (Factory building) Replacement |
39 | M.S.Tank having round &rectangular bottomsReplacement |
40 | Trusses, Perlins, Columns & Beams (Factory Building)Replacement |
41 | Platform Pipe Line Railing of all sizes a)Dismantling |
42 | b) Erection |
43 | Electric Panel, DB and other machinery shed GI/ACC/MS Sheet a)Dismantling |
44 | b) Fabrication |
45 | c) Erection |
46 | Dismantling, Fabrication and Erection of Pump and Motor Bed of all size |
47 | Valves Sluice /Angle / N.R. /Butterfly Dismantling |
48 | b) Erection |
49 | ConefromM.Splate a)Dismantling |
50 | b) Fabrication |
51 | c) Erection |
52 | Gutter from M.S plate 5mm a)Dismantling |
53 | b) Fabrication |
54 | c) Erection |
55 | CrystallizerSlide gatevalve a)Dismantling |
56 | b) Fabrication |
57 | c) Erection |
58 | Fabrication and Erection of M. S terminal box of any type |
59 | Patch workof boiling house/Mill house |
60 | Replacementof SulphurFurnace scrubberfrom M. S. Plate from 10mm( including all connections with pipe lines ) |
61 | ReplacementofSulphurFurnace melter /receiver from M. S. Plate from 10mm ( including all connections with pipe lines ) |
62 | SulphurFurnace chamberfrom M. S. Plate from 10mm ( including all connections with pipe lines ) Dismantling , Fabrication&Erection |
63 | Dismantling ,fabrication & erection of Sulphur furnace nipples, bends |
64 | Juice heater outer shellfrom M.S. plate 10mm including hydraulic testing at 50 psi for each juice heatera) Dismantling |
65 | b) Fabrication |
66 | c) Erection |
67 | Fabrication & Erection of mud mixture scroll & side plateswith proper Alignment & commissioning |
68 | Juice clarifier inside compartment coil from M.S. Pipe 5” with all connections complete job (as where it is) Dismantling, |
69 | b) Fabrication |
70 | c) Erection |
71 | Dismantling, Fabrication & erectionof Juice Heater angle valves ,distance piece from M.S. Plate 10mm of diameter 12” |
72 | Dismantling, Fabrication & Erection of Juice Heater (top & bottom ) compartment Partition plate with rubber fitting channels from M.S/EN-8 square bar & rubber seal fitting to make it leak proof(to avoid short circuiting) i)Top compartment |
73 | ii) Bottom compartment |
74 | Dismantling Fabrication & Erection of MS channel of rubber strips of juice heater compartments with M.S/EN-8 square to avoid short circuiting |
75 | QUAD body shell from M. S. Plate12mm Dismantling |
76 | b) Fabrication |
77 | c) Erection |
78 | Top conefrom M. S. Plate12mm Dismantling |
79 | b) Fabrication |
80 | c) Erection |
81 | Umbrelllafrom M.S. Plate10mm Dismantling |
82 | b) Fabrication |
83 | c) Erection |
84 | Down take from M.S. Plate12mm Dismantling |
85 | b) Fabrication |
86 | c) Erection |
87 | Save –Allfrom M.S. Plate10mm Dismantling |
88 | b) Fabrication |
89 | c) Erection |
90 | PAN ( Capacity 40 Ton) body shell from M. S. Plate12mm Dismantling |
91 | b) Fabrication |
92 | c) Erection |
93 | Top conefrom M. S. Plate12mm Dismantling |
94 | b) Fabrication |
95 | c) Erection |
96 | Umbrelllafrom M.S. Plate10mm Dismantling |
97 | b) Fabrication |
98 | c) Erection |
99 | Down take from M.S. Plate12mm Dismantling |
100 | b) Fabrication |
101 | c) Erection |
102 | Save –Allfrom M.S. Plate10mm Dismantling |
103 | b) Fabrication |
104 | c) Erection |
105 | Vapour /ExaustPipe line of quad and pan from M.S plate 8mm a)Dismantling |
106 | b) Fabrication |
107 | c) Erection |
108 | Dismantling ,fabrication & erection of distance piece of vapor pipe of Pan /quad & injection header length upto 1.5 mtr a) Dia-1000mm |
109 | b)Dia-900mm |
110 | c)Dia-720 mm |
111 | d)Dia – 620 mm |
112 | e) Dia-400mm |
113 | Dismantling, fabrication & erectionof steam jacket of evaporator / semi-kestner including nipple, flange if any |
114 | Syrup /molasses tank from M.S plate 8mm along with strengthening with M.S angle a)Dismantling ,Fabrication &Erection |
115 | Replacement /patch work of worn out body shell of final molasses storage tankwith M.S. Plate |
116 | Replacement /patch work of worn out roof of final molasses storage tankwith M.S. Plate |
117 | A. Dismantling, fabrication & erection of Suction pipes of injection/spray pumps including reducer |
118 | B. Dismantling, fabrication & erection of Strainersof injection/spray pumps . |
119 | Dismantling, Fabrication & Erection of cooling coilsof Crystallizers including connection pipe if any |
120 | Dismantling ,fabrication and erection water weighing & receiving tanks |
121 | a)Dismantling, Fabrication, Erectionof magma mixturebodyincludingdriving units complete |
122 | b)Patch work of any magma mixture /pug mill |
123 | Replacement of worn out round portion of crystallizer body |
124 | Repairandfitting of bush to Crystallizer ‘s Central shaft |
125 | Replacementofworn out condensatejuice receiving bottleswith all connection |
126 | Dismantling, Fabrication & Erection of completescrapper hinge of juice clarifier |
127 | a)Dismantling, Fabrication & Erection of Dorr’ s scrapper |
128 | b)DismantlingFabrication & Erection of flash tank of Dorr with all nipple etc. |
129 | Replacement of C.Itailpipe of pan & quad with MS pipe line |
130 | Replacementofcondenser jet box |
131 | Dismantling, Fabrication & Erectionof the bottom portion of pug mill(centrifugal machine ) |
132 | Replacement of the outer shell of the Dorr clarifier |
133 | Replacement/repair of worn-outportionof sugargraderside plates & chutes |
134 | Replacement/repair of worn-out portionofhopper |
135 | Replacement of Air tray of hopper |
136 | Dismantling, fabrication & erection of worn-out shaft of Crystallizerincludingcomplete gear arrangement with complete commissioning |
137 | Dismantling ,fabrication & erection of ribbon type arms of crystallizer |
138 | Complete replacement of ribbon type arms of crystallizer |
139 | Dismantling , fabrication & erection of vacuum filter condenser |
140 | Dismantling , fabrication & erection Distribution plate of Central shaft of juice clarifier |
141 | Dismantling , fabrication & erection mud boot of juice clarifier |
142 | Dismantling& erection of spraypump with all connection including distance piece |
143 | Vacuum filter trough& agitator repair /patch work |
144 | Dismantling, fabrication & erection of Vacuum filter trough |
145 | Strengthening of umbrella of Pan /quad body |
146 | Strengthening of save all of Pan /quad body |
147 | Dismantling, fabrication & erection of Juice sulphitor chimney |
148 | Dismantling, fabrication & erection ofcomplete A-magma mixtureincluding fitting of central shaftwith arms & gear arrangement with commissioning |
149 | Dismantling & erection of pug mill gear arrangement& replacement of bush ,works includes fitting of radicons & commissioning |
150 | Modification of exhaust blower including strengthening of bed & commissioning |
151 | Modification of dry seed elevator bottom chute to avoid breakdown/jamming |
152 | Dismantling, loading & transportation of discharge valve of pan from CSM Patiala & unloadingat CSM Budhewal |
153 | Dismantling &Erection of Discharge valveof Pan No-4 withmodification if any including trials & commissioning at CSM Budhewal |
154 | Re-tubing of evaporator body(approx.1600tube)including hydraulic testing at 50 PSI |
155 | Dismantling &erection of tube plates of 3rd body of evaporator |
156 | Dismantling & erection of Transient heater with all connection of pipe lines, valveswith modification if any including trials & commissioning |
157 | Dismantling, loading & transportation of Transient heater from CSM Patiala & unloading at CSM Budhewal |
158 | Dismantling ,fabrication & erection of venturi of condenser |
159 | Dismantling, fabrication & erection of bottom sourcer of Pan No-4 |
160 | Dismantling,fabrication& erection of Chute of 5’ widthgrader for leak proof working |
161 | Repair/replacement of bagacillo perforated plate of bagacillo blower for R.V.F |
162 | Modification job of bottom saucer of evaporator |
163 | Dismantling ,fabrication & erection of Ammonia coil of Pan /quad |
164 | Sulphur furnace heating element repair /replacement of jacketsincluding nipples |
165 | Dismantling & Erection of partition box of juice heater |
166 | Replacement of worn-out of M.S. Runner of inter carrier, elevator, RBC, cross carrier & Cane Carrier Chains |
167 | Replacement of Rail line of cane unloader with 50mm square bar |
168 | Replacement of worn out ducting of boiler & APCDincluding angle, channel, Flats & Flanges |
169 | Replacement of side plates of cane carrier chain/RBC trough/cross elevator /Bagasse Elevator |
170 | Leveling of cross elevator chain trough |
171 | Mill house Screw conveyor Assembly(complete with bearings ) Dismantling , |
172 | b) Fabrication |
173 | c) Erection |
174 | Replacement of worn out portion of APCD includes casing/scrubberand flue gas entry connected to chimney portion etc. |
175 | Cane Cutter Hood and chopper top plate from 12 mm thickM.S plate a)Dismantling |
176 | b) Fabrication |
177 | c) Erection |
178 | Dismantling, Fabrication & Erection of worn out portion of Chute cane carrier to 1st mill |
179 | Replacement runner (flat size 50x8mm) of cane carrier /cross elevator /RBC/baggase elevator |
180 | Dismantling, Fabrication, Erection of Juice Tray of mill No. 1 & 2 from M.S plate 8mm |
181 | 10 mm |
182 | Dismantling, Fabrication, Erection of Juice Tray of mill No. 1 & 2 from S.S plate 8mm |
183 | 10 mm |
184 | Repair of rotary bagasse feeders of Boilers A) Body |
185 | B) Rotor |
186 | Replacement of casing of Boiler (both plate & supporting angle) |
187 | I.D. fan worn out casing of both boilers Dismantling |
188 | b) Fabrication |
189 | c) Erection |
190 | Replacement of the expansion joints of boilers |
191 | Replacement of worn out ductingthe boilers |
192 | Erection and fabrication ofany -thingfrom scrap |
193 | Replacement of inter carrier side plates |
194 | Replacement of scraper barside platessize :- 1 meter square |
195 | Replacement of the casing of air heater |
196 | Replacement of worn-out of M.S. Runner of inter carrier, elevator, RBC, cross carrier & Cane Carrier Chains |
197 | Replacement of Rail line of cane unloader with 50mm square bar |
198 | Replacement of worn out ducting of boiler & APCDincluding angle, channel, Flats & Flanges |
199 | Replacement of side plates of cane carrier chain/RBC trough/cross elevator /Bagasse Elevator |
200 | Leveling of cross elevator chain trough |
201 | Mill house Screw conveyor Assembly(complete with bearings ) Dismantling , |
202 | b) Fabrication |
203 | c) Erection |
204 | Replacement of worn out portion of APCD includes casing/scrubberand flue gas entry connected to chimney portion etc. |
205 | Cane Cutter Hood and chopper top plate from 12 mm thickM.S plate a)Dismantling |
206 | b) Fabrication |
207 | c) Erection |
208 | Dismantling, Fabrication & Erection of worn out portion of Chute cane carrier to 1st mill |
209 | Replacement runner (flat size 50x8mm) of cane carrier /cross elevator /RBC/baggase elevator |
210 | Erection and fabrication from scrap |
211 | Replacement of inter carrier side plates |
212 | Replacement of inter cane carrier plates |
213 | Replacement of scraper barside platessize :- 1 meter square |
214 | Replacement of Air heater tubes(Approx.555tubes)including hydraulic testing |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail