Department of Cooperation has published Fabrication And Erection Jobs Of Gurdaspur Csm- 1 Gurdaspur Csm 2 Repair Of Cane Unloader Grab Arms 3 Replacement Of Sq. Bar Of Cane Unloader. 4 Fabrication & Erection Of Hydraulic Grab Of Unloader Complete. 5 Repair, Strenghening And Alingment . Submission Date for this Tender is 25-05-2022. Clothing Accessories Tenders in gurdaspur Punjab. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Gurdaspur CSM |
2 | Repair of cane unloader grab arms |
3 | Replacement of sq. bar of cane unloader. |
4 | Fabrication & Erection of hydraulic Grab of unloader complete. |
5 | Repair, strenghening and alingment of bridge span of unloader no. 1 |
6 | Dismantling, Fabrication and Erection ofa) Mincer Hood |
7 | b) Cutter Hood |
8 | c) Chopper Hood |
9 | Replacement ofcane cutting knives of cutters |
10 | Replacement ofcane cutting knives of Mincer |
11 | Fabrication & Fitting of stationary knives structure withknives |
12 | Replacement ofhammers of Mincer |
13 | Replacement of domite tipsof Mincer |
14 | To build mill top rollers square end as per standard size |
15 | To build mill rollers crown pinion teeth as per standard template of teeth. |
16 | To build mill rollers coupling square section as per standard size |
17 | To build mill rollers journal as per standard size |
18 | To build millunder feeder rollers drive gear teeth as per standard template of teeth |
19 | Fabrication and erection of mill rollers crown pinion guard |
20 | Fabrication and erection of Donnelly chute of mills |
21 | Dismantling, Fabrication and erection of worn-out Juice tray at mill house from 10/12 mm plate |
22 | Dis. Feb. & erection ofMill house screw conveyor |
23 | Dis. Feb. & erection of mill house screw conveyor trough along with dismantling and fitting of conveyor and drive system. |
24 | Dismantling and erection of worn-out runners of cane carrier, RBC, Bagasse Elevator and inter carrier. |
25 | Dismantling, Fabrication and erection of worn-out side plates of cane carrier, RBC, Bagasse Elevator and inter carrier. |
26 | Dismantling, Fabrication and erection of worn-out trough of RBC, Bagasse Elevator & Rack carriers froma) MS plate6/8 mm |
27 | b)SS plate 4/5 mm |
28 | DismantlingFabrication and erectionstructure of cane carrier drive ,RBC chain drive, Rakecarrier and elevator chain drive |
29 | Replacement of worn out bottom boot of intercarrier chain / secondary chain |
30 | Replacement of angle and channel of cane carrier / RBC / Rack carrier & Elevator . |
31 | Repair of secondarycane carrier chain and elevator chain rake |
32 | Fabrication of secondarycane carrier chain and elevator chain rake |
33 | Fabrication of RBC slates |
34 | Repair of RBC slates |
35 | Dis. And erection of bagassecillow blower |
36 | Fabrication of bagassecillow blower |
37 | Dismantling and Erection of boiler bagasse feeding CI furnace mouth piece of WIL make Boiler. |
38 | Dismantling and Erection of boiler bagasse feeding CI furnace chute |
39 | Replacement of furnace door frame of WIL make Boiler & Texmaco make boiler |
40 | Replacement of furnace doorof WIL make Boiler & Texmaco make boiler |
41 | Repair and fitting of furnace door frame of WIL make boiler & Texmaco make boiler |
42 | Repair and fitting of furnace doorof WIL make boiler & Texmaco make boiler |
43 | Replacement of furnace chamber door frame of WIL make Boiler & Texmaco make boiler |
44 | Replacement of furnace chamber door of WIL make Boiler & Texmaco make boiler |
45 | Repair and fitting of furnace chamber doorof WIL make boiler& Texmaco make boiler |
46 | Repair and fitting of furnace chamber door frameof WIL make boiler& Texmaco make boiler |
47 | Dismatling of Boiler Dampers |
48 | Fabrication of Boiler Dampers |
49 | Erection of Boiler Dampers |
50 | Repair of Boiler Dampers |
51 | Repair ofID fanofWIL and Texmaco make boiler |
52 | Repair ofFD fanofWIL and Texmaco make boiler |
53 | Dismantling, Fabrication and Erection of boiler bagasse feeding MS chute between boiler furnance and RBC chain |
54 | Patch work |
55 | Dis, feb, & errection of boiler flue gas ducting between FD fan, ID fan& chimney. |
56 | Dismantling, Fabrication & Erection of bend of boiler flue gas ducting between ID FAN and chimney from 6/8mm thick plate. |
57 | Dismantling, Fabrication & Erection of Side plate & Top plates(4mm) of boilers. |
58 | Dismantling, Fabrication & Erection Economiser top & side plates |
59 | Dismantling, Fabrication & Erection Air heatertop & side plates |
60 | Dismantling and fitting of GI/ACC sheet. a) Dismantling |
61 | b)Fitting |
62 | Dismantling of machinery structure. |
63 | Fabrication and Erection of machinery structure. |
64 | Dismantling & erection of FD Fan Casing |
65 | Fabrication of FD Fan Casing |
66 | Repair of FD Fan Casing |
67 | Dismantling & erection of ID Fan Casing |
68 | Fabrication of ID Fan Casing |
69 | Repair of ID Fan Casing |
70 | Dismantling, Fabrication & Erection(a)pump and motor bed |
71 | b) Motor and radicon |
72 | c) Cutter motor bed |
73 | Dismantling fabrication and erection ofwet scrubber cone |
74 | Dismantling fabrication and erection ofwet scrubber side plates |
75 | Dismantling fabrication and erection ofclarifier cone of Boiler |
76 | Dismantling fabrication and erection ofman hole |
77 | Dismantling fabrication and erection ofman hole blind |
78 | Dismantling of Sieve plate of boiler no. 3 wet scrubber |
79 | Fabrication of Sieve plate of boiler no. 3 wet scrubber |
80 | Drilling of Sieve plate of boiler no. 3 wet scrubber |
81 | erection of Sieve plate of boiler no. 3 wet scrubber |
82 | Dismantling , fabrication and erection ofboiler no. 3 chimney (top portion up to 18- 20 mtr ) |
83 | Repair and strenthing of the boiler no. 1 & 2 chimney |
84 | Dismantling of boiler no. 3 air heater tubes |
85 | Fabrication and erection of boiler no. 3 air heater tubes |
86 | Erection of boiler no. 3 air heater tubes |
87 | Dismantling Air heater tube plate (Top and bottom) |
88 | Fabrication Air heater tube plate (Top and bottom) |
89 | Drilling Air heater tube plate (Top and bottom) |
90 | Erection Air heater tube plate (Top and bottom) |
91 | Dismantling Air heater centre tube plate |
92 | Fabrication Air heater centre tube plate |
93 | Drilling Air heater centre tube plate |
94 | Erection Air heater centre tube plate |
95 | Fabrications mill roller bearing cover |
96 | Dismantling of Structure |
97 | Fabrication of Structure |
98 | Erection of Structure |
99 | Dismantling of platform plates |
100 | Fabrication of platform plates |
101 | Erection of platform plates |
102 | DismantlingofRailing |
103 | Fabrication & erection of railing |
104 | POWER HOUSE Fabrication & erection of cable tray |
105 | Replacement ofThimble (Any Size) |
106 | Checking of cable connections, cleaning of thimbles and reconnection |
107 | Replacement of switches/MCCB 630 AMP/400AMP/250 AMP |
108 | Replacement/erection of changeover switch 630AMP/400AMP/250 AMP |
109 | Overhauling of SpareElectricalmotorsa) 0-50 HP |
110 | b) Above 50 Hp |
111 | c) Three speed motors |
112 | d)150 HP motor- 01 no. |
113 | e)unloader motor 15 HP - 02 nos. |
114 | f) Four speed motor- 04 nos. |
115 | Laying & connection of power & control cables from main panels to remote box and motor- 03 no. jobs |
116 | Dismantling of existing three speed electrical panel |
117 | Erection of New four speed panel |
118 | a. Extensionjuice tray of mill no. 1 |
119 | b. Extension juice tray of mill no. 2 |
120 | Fabrication and erection ofMS stairs with railing |
121 | Mill pinion guard (bottom ) |
122 | Open gear guard (bottom) of all chain |
123 | Fabrication ofmotor protection cover |
124 | Fabrication of shed (any size) with structure |
125 | Repair of DSM screen |
126 | Dismantling and erection of DSM Screen |
127 | Civil foundationrepair along with alignment of transmission gear bed of mill no. 4 |
128 | Repair ofFMG oil tank leakage |
129 | Dismantling of M.S. Round/SquareTanks |
130 | Fabrication of M.S. Round Square Tanks |
131 | Erection of M S Round /square Tanks |
132 | Dismantling of M.S./G.I./ C.I./ SS / RMP pipe from 1” to 12” dia |
133 | Erect ion of MS/GI/CI/SS/ RMP pipe 1” to 12” dia |
134 | Fabrication of M S / SS pipe line above 12” dia from M.S. / SSplate |
135 | Dismantling of M.S. / SS/C.I. pipe line above12” dia |
136 | Erection of M.S./ C.Ipipe line above 12” dia |
137 | a)Dismantling of Nipple 1” to 12” dia up to 24” length |
138 | b)Fabrication of Nipple 1” to 12” Ø & up to 24” length |
139 | c)Erection of Nipple 1” to 12”dia & up to24” length |
140 | a)Dismantling of Nipple above 12” dia up to 1 mtr. length |
141 | b)Fabrication of Nipple above 12” dia up to 1 mtr. length |
142 | c)Erection of Nipple above 12” dia up to 1 mtr. length |
143 | a) Dismantling of bend 1” to 12” dia |
144 | b) Fabrication of Bend 1” to 12” dia |
145 | c) Erection of bend 1” to 12” dia |
146 | Dismantling ,fabrication & erection of Bend above 12” below 36” dia |
147 | Dismantling of Reducer/Tee1” to 12” dia & up to 24” length |
148 | a) Dismantling of Blind 1” to 12” dia |
149 | b) Fabrication of blind 1” to 12” dia |
150 | c) Erection of blind 1” to 12” dia |
151 | a) Dismantling ofabove12” dia |
152 | b) Fabrication of blind above 12”dia |
153 | c) Erection of blind above 12” dia |
154 | a) Dismantling of valve 1” to 12” dia |
155 | b) Erection of valves 1” to 12” dia |
156 | c) Dismantling of valve above 12” dia |
157 | d) Erection of valvesabove 12” dia |
158 | a)Dismantling of flange 1” to 12” dia |
159 | b) Fabrication of flange 1” to 12” dia |
160 | c) erection of flange above 12” dia |
161 | Dismantling, Fabrication & fitting of Jet Box in M.S. Material |
162 | Dismantling, Fabrication, fitting of Jet Box in S SMaterial |
163 | Dismantling, Fabrication & fitting of Nipples 8” to 10” dia for Jet Box of Condenser |
164 | a) Fabrication of Vapour pipe bend 36” to 40” dia |
165 | b) Dismantling & erection of vapour pipe bend 36” to 40” dia |
166 | Dismantling and erection of existing syrup/ molasses/ magma pipe lines for their internal/external cleaning. |
167 | a) Dismantling of Vapour pipe 900 mm/ 1000 mm dia |
168 | b) Fabrication of vapour pipe 900/1000 mm dia |
169 | c) Erection of Vapour pipe 900/1000 mm dia |
170 | Dismantling, Fabrication & erection of Save all from 10 mm to 12mm platea) Pan |
171 | b) Quad& Vapour cell |
172 | Dismantling, fabrication & erection of save all from 8mm to 10mm MS plate excluding outer shell |
173 | Replacement of J-pipe in vapour cell/ quad body/ pan |
174 | Dismantling, Fabrication & erection of Umbrellaa) Pan |
175 | b) Quad& Vapour cell |
176 | Dismantling, fabrication & erection of bottom and top cone a) Pan |
177 | b) Quad & Vapour cell |
178 | c) Juice sulphiter / syrupsulphiterand cone of any other units above 12” dia |
179 | Dismantlingof inter connecting square box for juice heater Double beat valve and Fabrication, Erection with pipe(modify) |
180 | a) Replacement of cooling jacket for the sulphur burning chamber. |
181 | b) Replacementof sulphur furnace coolingscrubber complete withinternal8” cooling jacket, 6” gas pipe and 4” cooling pipe |
182 | c) dismantling, fabrication & erection of cooler made from 8” dia pipe for sulphur furnace |
183 | Dismantling, Fabrication & erection of Sulphur burning chamber of Sulphur Furnace |
184 | Dismantling, fabrication & erection of Sulphur melt Tank |
185 | Dismantling, fabrication & erection of coil for Sulphur melter |
186 | 1. Lime hopper: Fabrication& Erection along with connecting valves &pipeswith its drive system etc. |
187 | 2. Lifting of Lime Slacker along with connecting parts up to 2 ft. Height suitable for fitting Lime Hopper. |
188 | Dismantling, Fabrication&erection of condenser of vacuum filter |
189 | Dismantling, Fabrication & erection of Vacuum filtera) Mud Trough |
190 | b) Abgitator |
191 | Replacement of vacuum filter drum complete including connected accessoriesa) Dismantling of existing RVF Drum and to be shifted at scrap yard. |
192 | b) New RVF drum to be erected at position including connected accessories etc. |
193 | 1) Dismantling, Fabrication & erection of Mud Scroll/ screw conveyor |
194 | 2) Dismantling, Fabrication & erection of Mud Mixture |
195 | Dismantling, Fabrication & erection ofBagacillocyclone |
196 | Dismantlingof Angle valves /Straight valve a)Size 450 mm to 700 mm |
197 | Size 700 mm to 1000 mm |
198 | Erectionof Angle valves /Straight valve a)Size 450 mm to 700 mm |
199 | Size 700 mm to 1000 mm |
200 | Patch work at Boiling House and C/F House etc. |
201 | Fabrication & erection of Mud Bootsfor Dorr |
202 | a. Replacement of clarifiercenter tube |
203 | b. Replacement of MS Scrapper arms of clarifier center tubes. |
204 | c. Replacement of clarifier juice distribution plates |
205 | a) Replacement of Clarifier Bottom plate(compartment) |
206 | b) Dismantling,Fabrication & erection of Clarifier |
207 | Coils in Dorr/Melter/Centrifugal machines/Steam coils etc: a) Dismantling |
208 | b) Fabrication |
209 | c) Erection |
210 | Dismantling, Fabrication and erection of semi Kestner bottom nipple 24” dia |
211 | Replacement of Quad / Vapour Cell down take |
212 | Replacement of Pan down take |
213 | Patch work of worn our portion of pan / evaporatorbody shell |
214 | Patch work of Save all of pan / evaporator bodies |
215 | Patch work of Umbrella of pan/ evaporator bodies |
216 | a) Strengthing ofshell with coil type channel with cross by pipe/ channel at two places of pan |
217 | b) Strengthing of Umbrella of pan / evaporator bodies |
218 | Dismantling, Fabrication & Erection of body shell a) Juice Sulphitor |
219 | b) Evaporator bodies |
220 | c) Pans |
221 | Dismantling, Fabrication & Erection of Bottom/Top Taper portion ofa)Pans |
222 | b) Evaporator bodies |
223 | Dismantling of SS tubes of a) Pans |
224 | b) Evaporator bodies |
225 | c) Juice heater |
226 | Fitting of SS Tubes and to be tested at80 PSI Hyd. Pressure a) Pans |
227 | b) Evaporator bodies |
228 | c) Juice heater |
229 | a) Dismantling of S.S tube of semi kestner |
230 | b) Fitting of S.S Tubes of semi kestner and to be tested 80 PSI Hyd. Pressure |
231 | Dismantling, fabrication and erection of shaft with arms of Dry seed crystallizer / vacuum crystallizer. |
232 | Dismantling, fabrication and erection of agitator arms of juice sulphitor/dry seed crystallizer / vacuum crystallizer. |
233 | Replacement of ribbon type stirrer of air cooled crystallizer. |
234 | Crystallizer central shaft with Ribbon:a) Dismantling |
235 | b) Fabrication |
236 | c) Erection |
237 | Dismantling, fabrication and erection of condensate bottle big size(from 1.5mtr to 2.0mtr) |
238 | Dismantling, fabrication and erection of condensate bottle big size(from 1.0mtr to 1.5mtr) |
239 | Dismantling, fabrication and erection of segment of pan shell |
240 | Dismantling, Fabrication and erection of complete pan shell including sight glass, Man hole, provision of key sample, vacuum gauge, ammonia pipes ,glass washing pipe, cold water lineconnections and other accessories connectedto body shell, Umbrella including welding of M.S. angles for supports etc., top taper cone including connections of washing steam pipes etc., save all including J-pipes etc, vapour pipe outletnipple of save all, Feed pipe connections etc. |
241 | Vacuum crystallizer / Dry seed crystallizer (i) Dismantling, fabrication & erection of complete shell ( including side plates ) along with dismantling, erection & alignment of complete drive system |
242 | Dismantling, fabrication & erection of complete shell ( excluding vertical side plates ) |
243 | Worm and worm wheel, Gland housing of Crystallizers: a)Dismantling and erection of existing worm and worm wheel, gear box, motor and alignment work of worm and worm wheel, gear box and motor for satisfactory trial. |
244 | b) Dismantling and erection of gland housing of crystallizer shaft. |
245 | S.S Bend/TEE/reducer/Nipple/crossa) Dismantling |
246 | b)Fabrication |
247 | c)Erection |
248 | Dismantling, Fabrication & erection of Manhole with neck flange cover 16” to 24” dia |
249 | Cutting & strengthening of old material |
250 | Dismantling, Fabrication & erection of worn out feeding Header of pans |
251 | Dismantling, fabrication & erection of central tube with cooling coil (shaft) for water cooled crystallizer-40 tons |
252 | a) Dismantling, Fabrication & erection of cooling pipe coil in the crystallizermadefrom 4” dia pipe |
253 | b) Patch work of crystallizer cooling shaft |
254 | Coils Fabricationof coil |
255 | Dismantling & erection of coils |
256 | Dismantling of existing condenser including their venture, tail pipe, bend etc. and thereafterinstallation ofefficient single entry new condensers including fabrication / erection of venture, tail pipe & bends etc. Fabrication and erection of base frame and other associated fabrication & erection jobs. |
257 | Dismantling, Fabrication & erection of M.S.Gutters. |
258 | Replacement of C.I. Cone (venture)of Multijet condenser |
259 | Dismantling C/F Machine including water, steam connection and discharge chute |
260 | Dismantling and erection of sugar grader of side plate including modification of structure. |
261 | Hoppers a) Dismantling, fabrication & erection of Deck piece & alignments of Hopper |
262 | a) Dismantling, fabrication & erection of Hopper piece from Deck piece to end of Hopper |
263 | b) Dismantling, Fabrication & erection of Hopper piece from Deck piece to start of Hopper including Multi trays. |
264 | Dismantling, Fabrication & erection of Hopper complete with deck piece and multi tray for hot/cold air blower. |
265 | Magma Mixera) Dismantling of magma mixer including shaft / arms / drive etc. |
266 | b) Fabrication of magma mixer including shaft / arms / drive etc. |
267 | c) Erection of magma mixer including shaft / arms / drive etc. |
268 | Dismantling’ fabrication & erection of molasses gutter for centrifugal machines |
269 | Dismantling and erection of existing syrup/ molasses/ magma pipe lines for their internal/external cleaning. |
270 | Fabrication of bucket for Sugar Elevator / Dry Seed Elevator |
271 | For spray Pond a) Fabrication of SS pipe line up to 12” dia from 4 mm thick Ss plate |
272 | a) Fabrication of SS cluster for fitting 2” sized pipes with nozzles ( as fitted in existing clusters) . |
273 | Threading in 2” dia SS pipe line for fitting nozzles |
274 | Formation of purlin and structure at the height of 20 mtrs approx. With angle size 75x75x6mm and channel size 100x50x5 mm and 200x76x7.5 mm for the fitting of Rooftop sheets |
275 | Part-B Cutting and welding of Boiler tubes for cleaning |
276 | Cutting and welding ofheader capsfor cleaningof boiler tubes |
277 | Seamless pipe ½’’to 8’’OD & above(various lengths)a) Dismantling |
278 | b) Fabrication |
279 | c) Erection |
280 | Seamless pipe nippleup to8’’OD& above a) Dismantling |
281 | b) Fabrication |
282 | c) Erection |
283 | Seamless pipe bendsup to8’’OD& above a) Dismantling |
284 | b) Fabrication |
285 | c) Erection |
286 | Dismantling, and erection of air heater tubes 63.5 mm OD x 8 feet length |
287 | Dismantling, and erection of air heater tubes 63.5 mm OD x 16 feet length |
288 | Cutting,welding and fitting ofair heaterold tubes |
289 | Dismantling ,fabrication and erection ofAir heatercentre tube plate |
290 | Dismantling ,fabrication, drilling and erection ofAir heaterTOP and Bottom tube plate |
291 | IBR valveup to36’’ODa) Dismantling |
292 | b) Erection |
293 | IBR flangea) Dismantling |
294 | b) Fabrication |
295 | c) Erection |
296 | IBR Teea) Dismantling |
297 | b) Fabrication |
298 | c) Erection |
299 | Reducera) Dismantling |
300 | b) Fabrication |
301 | c) Erection |
302 | Boiler drum partition platesa) Dismantling |
303 | b) Fabrication |
304 | c) Erection |
305 | d) repair |
306 | Boiler drum water seprator a) Dismantling |
307 | b) Fabrication |
308 | c) Erection |
309 | d) repair |
310 | Boiler wet scrubber seive plate as per drawinga) Dismantling |
311 | b) Fabrication |
312 | c) Drilliing |
313 | d) Erection |
314 | IBR welding joint |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail