Fabrication And Erection Jobs Of Gurdaspur Csm- 1 Gurdaspur Csm 2 Repair Of Cane Unloader Grab Arms 3 Replacement Of Sq. Bar Of Cane Unloader. 4 Fabrication & Erection Of Hydraulic Grab Of Unloader Complete. 5 Repair, Strenghening And Alingment , gurdaspur-Punjab

Department of Cooperation has published Fabrication And Erection Jobs Of Gurdaspur Csm- 1 Gurdaspur Csm 2 Repair Of Cane Unloader Grab Arms 3 Replacement Of Sq. Bar Of Cane Unloader. 4 Fabrication & Erection Of Hydraulic Grab Of Unloader Complete. 5 Repair, Strenghening And Alingment . Submission Date for this Tender is 25-05-2022. Clothing Accessories Tenders in gurdaspur Punjab. Bidders can get complete Tender details and download the document.




Tender Notice

32288422
Fabrication And Erection Jobs Of Gurdaspur Csm- 1 Gurdaspur Csm 2 Repair Of Cane Unloader Grab Arms 3 Replacement Of Sq. Bar Of Cane Unloader. 4 Fabrication & Erection Of Hydraulic Grab Of Unloader Complete. 5 Repair, Strenghening And Alingment
Open Tender
Indian
Punjab
gurdaspur
25-05-2022

Tender Details

Fabrication And Erection Jobs Of Gurdaspur Csm- 1 Gurdaspur Csm 2 Repair Of Cane Unloader Grab Arms 3 Replacement Of Sq. Bar Of Cane Unloader. 4 Fabrication & Erection Of Hydraulic Grab Of Unloader Complete. 5 Repair, Strenghening And Alingment Of Bridge Span Of Unloader No. 1 6 Dismantling, Fabrication And Erection Ofa ) Mincer Hood 7 B ) Cutter Hood 8 C ) Chopper Hood 9 Replacement Ofcane Cutting Knives Of Cutters 10 Replacement Ofcane Cutting Knives Of Mincer 11 Fabrication & Fitting Of Stationary Knives Structure Withknives 12 Replacement Ofhammers Of Mincer 13 Replacement Of Domite Tipsof Mincer 14 To Build Mill Top Rollers Square End As Per Standard Size 15 To Build Mill Rollers Crown Pinion Teeth As Per Standard Template Of Teeth. 16 To Build Mill Rollers Coupling Square Section As Per Standard Size 17 To Build Mill Rollers Journal As Per Standard Size 18 To Build Millunder Feeder Rollers Drive Gear Teeth As Per Standard Template Of Teeth 19 Fabrication And Erection Of Mill Rollers Crown Pinion Guard 20 Fabrication And Erection Of Donnelly Chute Of Mills 21 Dismantling, Fabrication And Erection Of Worn-Out Juice Tray At Mill House From 10 / 12 Mm Plate 22 Dis. Feb. & Erection Ofmill House Screw Conveyor 23 Dis. Feb. & Erection Of Mill House Screw Conveyor Trough Along With Dismantling And Fitting Of Conveyor And Drive System. 24 Dismantling And Erection Of Worn-Out Runners Of Cane Carrier, Rbc, Bagasse Elevator And Inter Carrier. 25 Dismantling, Fabrication And Erection Of Worn-Out Side Plates Of Cane Carrier, Rbc, Bagasse Elevator And Inter Carrier. 26 Dismantling, Fabrication And Erection Of Worn-Out Trough Of Rbc, Bagasse Elevator & Rack Carriers Froma ) Ms Plate6 / 8 Mm 27 B ) Ss Plate 4 / 5 Mm 28 Dismantlingfabrication And Erectionstructure Of Cane Carrier Drive , Rbc Chain Drive, Rakecarrier And Elevator Chain Drive 29 Replacement Of Worn Out Bottom Boot Of Intercarrier Chain / Secondary Chain 30 Replacement Of Angle And Channel Of Cane Carrier / Rbc / Rack Carrier & Elevator . 31 Repair Of Secondarycane Carrier Chain And Elevator Chain Rake 32 Fabrication Of Secondarycane Carrier Chain And Elevator Chain Rake 33 Fabrication Of Rbc Slates 34 Repair Of Rbc Slates 35 Dis. And Erection Of Bagassecillow Blower 36 Fabrication Of Bagassecillow Blower 37 Dismantling And Erection Of Boiler Bagasse Feeding Ci Furnace Mouth Piece Of Wil Make Boiler. 38 Dismantling And Erection Of Boiler Bagasse Feeding Ci Furnace Chute 39 Replacement Of Furnace Door Frame Of Wil Make Boiler & Texmaco Make Boiler 40 Replacement Of Furnace Doorof Wil Make Boiler & Texmaco Make Boiler 41 Repair And Fitting Of Furnace Door Frame Of Wil Make Boiler & Texmaco Make Boiler 42 Repair And Fitting Of Furnace Doorof Wil Make Boiler & Texmaco Make Boiler 43 Replacement Of Furnace Chamber Door Frame Of Wil Make Boiler & Texmaco Make Boiler 44 Replacement Of Furnace Chamber Door Of Wil Make Boiler & Texmaco Make Boiler 45 Repair And Fitting Of Furnace Chamber Doorof Wil Make Boiler& Texmaco Make Boiler 46 Repair And Fitting Of Furnace Chamber Door Frameof Wil Make Boiler& Texmaco Make Boiler 47 Dismatling Of Boiler Dampers 48 Fabrication Of Boiler Dampers 49 Erection Of Boiler Dampers 50 Repair Of Boiler Dampers 51 Repair Ofid Fanofwil And Texmaco Make Boiler 52 Repair Offd Fanofwil And Texmaco Make Boiler 53 Dismantling, Fabrication And Erection Of Boiler Bagasse Feeding Ms Chute Between Boiler Furnance And Rbc Chain 54 Patch Work 55 Dis, Feb, & Errection Of Boiler Flue Gas Ducting Between Fd Fan, Id Fan& Chimney. 56 Dismantling, Fabrication & Erection Of Bend Of Boiler Flue Gas Ducting Between Id Fan And Chimney From 6 / 8Mm Thick Plate. 57 Dismantling, Fabrication & Erection Of Side Plate & Top Plates ( 4Mm ) Of Boilers. 58 Dismantling, Fabrication & Erection Economiser Top & Side Plates 59 Dismantling, Fabrication & Erection Air Heatertop & Side Plates 60 Dismantling And Fitting Of Gi / Acc Sheet. A ) Dismantling 61 B ) Fitting 62 Dismantling Of Machinery Structure. 63 Fabrication And Erection Of Machinery Structure. 64 Dismantling & Erection Of Fd Fan Casing 65 Fabrication Of Fd Fan Casing 66 Repair Of Fd Fan Casing 67 Dismantling & Erection Of Id Fan Casing 68 Fabrication Of Id Fan Casing 69 Repair Of Id Fan Casing 70 Dismantling, Fabrication & Erection ( A ) Pump And Motor Bed 71 B ) Motor And Radicon 72 C ) Cutter Motor Bed 73 Dismantling Fabrication And Erection Ofwet Scrubber Cone 74 Dismantling Fabrication And Erection Ofwet Scrubber Side Plates 75 Dismantling Fabrication And Erection Ofclarifier Cone Of Boiler 76 Dismantling Fabrication And Erection Ofman Hole 77 Dismantling Fabrication And Erection Ofman Hole Blind 78 Dismantling Of Sieve Plate Of Boiler No. 3 Wet Scrubber 79 Fabrication Of Sieve Plate Of Boiler No. 3 Wet Scrubber 80 Drilling Of Sieve Plate Of Boiler No. 3 Wet Scrubber 81 Erection Of Sieve Plate Of Boiler No. 3 Wet Scrubber 82 Dismantling , Fabrication And Erection Ofboiler No. 3 Chimney ( Top Portion Up To 18- 20 Mtr ) 83 Repair And Strenthing Of The Boiler No. 1 & 2 Chimney 84 Dismantling Of Boiler No. 3 Air Heater Tubes 85 Fabrication And Erection Of Boiler No. 3 Air Heater Tubes 86 Erection Of Boiler No. 3 Air Heater Tubes 87 Dismantling Air Heater Tube Plate ( Top And Bottom ) 88 Fabrication Air Heater Tube Plate ( Top And Bottom ) 89 Drilling Air Heater Tube Plate ( Top And Bottom ) 90 Erection Air Heater Tube Plate ( Top And Bottom ) 91 Dismantling Air Heater Centre Tube Plate 92 Fabrication Air Heater Centre Tube Plate 93 Drilling Air Heater Centre Tube Plate 94 Erection Air Heater Centre Tube Plate 95 Fabrications Mill Roller Bearing Cover 96 Dismantling Of Structure 97 Fabrication Of Structure 98 Erection Of Structure 99 Dismantling Of Platform Plates 100 Fabrication Of Platform Plates 101 Erection Of Platform Plates 102 Dismantlingofrailing 103 Fabrication & Erection Of Railing 104 Power House Fabrication & Erection Of Cable Tray 105 Replacement Ofthimble ( Any Size ) 106 Checking Of Cable Connections, Cleaning Of Thimbles And Reconnection 107 Replacement Of Switches / Mccb 630 Amp / 400Amp / 250 Amp 108 Replacement / Erection Of Changeover Switch 630Amp / 400Amp / 250 Amp 109 Overhauling Of Spareelectricalmotorsa ) 0-50 Hp 110 B ) Above 50 Hp 111 C ) Three Speed Motors 112 D ) 150 Hp Motor- 01 No. 113 E ) Unloader Motor 15 Hp - 02 Nos. 114 F ) Four Speed Motor- 04 Nos. 115 Laying & Connection Of Power & Control Cables From Main Panels To Remote Box And Motor- 03 No. Jobs 116 Dismantling Of Existing Three Speed Electrical Panel 117 Erection Of New Four Speed Panel 118 A. Extensionjuice Tray Of Mill No. 1 119 B. Extension Juice Tray Of Mill No. 2 120 Fabrication And Erection Ofms Stairs With Railing 121 Mill Pinion Guard ( Bottom ) 122 Open Gear Guard ( Bottom ) Of All Chain 123 Fabrication Ofmotor Protection Cover 124 Fabrication Of Shed ( Any Size ) With Structure 125 Repair Of Dsm Screen 126 Dismantling And Erection Of Dsm Screen 127 Civil Foundationrepair Along With Alignment Of Transmission Gear Bed Of Mill No. 4 128 Repair Offmg Oil Tank Leakage 129 Dismantling Of M.S. Round / Squaretanks 130 Fabrication Of M.S. Round Square Tanks 131 Erection Of M S Round / Square Tanks 132 Dismantling Of M.S. / G.I. / C.I. / Ss / Rmp Pipe From 1” To 12” Dia 133 Erect Ion Of Ms / Gi / Ci / Ss / Rmp Pipe 1” To 12” Dia 134 Fabrication Of M S / Ss Pipe Line Above 12” Dia From M.S. / Ssplate 135 Dismantling Of M.S. / Ss / C.I. Pipe Line Above12” Dia 136 Erection Of M.S. / C.Ipipe Line Above 12” Dia 137 A ) Dismantling Of Nipple 1” To 12” Dia Up To 24” Length 138 B ) Fabrication Of Nipple 1” To 12” Ø & Up To 24” Length 139 C ) Erection Of Nipple 1” To 12”Dia & Up To24” Length 140 A ) Dismantling Of Nipple Above 12” Dia Up To 1 Mtr. Length 141 B ) Fabrication Of Nipple Above 12” Dia Up To 1 Mtr. Length 142 C ) Erection Of Nipple Above 12” Dia Up To 1 Mtr. Length 143 A ) Dismantling Of Bend 1” To 12” Dia 144 B ) Fabrication Of Bend 1” To 12” Dia 145 C ) Erection Of Bend 1” To 12” Dia 146 Dismantling , Fabrication & Erection Of Bend Above 12” Below 36” Dia 147 Dismantling Of Reducer / Tee1” To 12” Dia & Up To 24” Length 148 A ) Dismantling Of Blind 1” To 12” Dia 149 B ) Fabrication Of Blind 1” To 12” Dia 150 C ) Erection Of Blind 1” To 12” Dia 151 A ) Dismantling Ofabove12” Dia 152 B ) Fabrication Of Blind Above 12”Dia 153 C ) Erection Of Blind Above 12” Dia 154 A ) Dismantling Of Valve 1” To 12” Dia 155 B ) Erection Of Valves 1” To 12” Dia 156 C ) Dismantling Of Valve Above 12” Dia 157 D ) Erection Of Valvesabove 12” Dia 158 A ) Dismantling Of Flange 1” To 12” Dia 159 B ) Fabrication Of Flange 1” To 12” Dia 160 C ) Erection Of Flange Above 12” Dia 161 Dismantling, Fabrication & Fitting Of Jet Box In M.S. Material 162 Dismantling, Fabrication, Fitting Of Jet Box In S Smaterial 163 Dismantling, Fabrication & Fitting Of Nipples 8” To 10” Dia For Jet Box Of Condenser 164 A ) Fabrication Of Vapour Pipe Bend 36” To 40” Dia 165 B ) Dismantling & Erection Of Vapour Pipe Bend 36” To 40” Dia 166 Dismantling And Erection Of Existing Syrup / Molasses / Magma Pipe Lines For Their Internal / External Cleaning. 167 A ) Dismantling Of Vapour Pipe 900 Mm / 1000 Mm Dia 168 B ) Fabrication Of Vapour Pipe 900 / 1000 Mm Dia 169 C ) Erection Of Vapour Pipe 900 / 1000 Mm Dia 170 Dismantling, Fabrication & Erection Of Save All From 10 Mm To 12Mm Platea ) Pan 171 B ) Quad& Vapour Cell 172 Dismantling, Fabrication & Erection Of Save All From 8Mm To 10Mm Ms Plate Excluding Outer Shell 173 Replacement Of J-Pipe In Vapour Cell / Quad Body / Pan 174 Dismantling, Fabrication & Erection Of Umbrellaa ) Pan 175 B ) Quad& Vapour Cell 176 Dismantling, Fabrication & Erection Of Bottom And Top Cone A ) Pan 177 B ) Quad & Vapour Cell 178 C ) Juice Sulphiter / Syrupsulphiterand Cone Of Any Other Units Above 12” Dia 179 Dismantlingof Inter Connecting Square Box For Juice Heater Double Beat Valve And Fabrication, Erection With Pipe ( Modify ) 180 A ) Replacement Of Cooling Jacket For The Sulphur Burning Chamber. 181 B ) Replacementof Sulphur Furnace Coolingscrubber Complete Withinternal8” Cooling Jacket, 6” Gas Pipe And 4” Cooling Pipe 182 C ) Dismantling, Fabrication & Erection Of Cooler Made From 8” Dia Pipe For Sulphur Furnace 183 Dismantling, Fabrication & Erection Of Sulphur Burning Chamber Of Sulphur Furnace 184 Dismantling, Fabrication & Erection Of Sulphur Melt Tank 185 Dismantling, Fabrication & Erection Of Coil For Sulphur Melter 186 1. Lime Hopper: Fabrication& Erection Along With Connecting Valves &Pipeswith Its Drive System Etc. 187 2. Lifting Of Lime Slacker Along With Connecting Parts Up To 2 Ft. Height Suitable For Fitting Lime Hopper. 188 Dismantling, Fabrication&Erection Of Condenser Of Vacuum Filter 189 Dismantling, Fabrication & Erection Of Vacuum Filtera ) Mud Trough 190 B ) Abgitator 191 Replacement Of Vacuum Filter Drum Complete Including Connected Accessoriesa ) Dismantling Of Existing Rvf Drum And To Be Shifted At Scrap Yard. 192 B ) New Rvf Drum To Be Erected At Position Including Connected Accessories Etc. 193 1 ) Dismantling, Fabrication & Erection Of Mud Scroll / Screw Conveyor 194 2 ) Dismantling, Fabrication & Erection Of Mud Mixture 195 Dismantling, Fabrication & Erection Ofbagacillocyclone 196 Dismantlingof Angle Valves / Straight Valve A ) Size 450 Mm To 700 Mm 197 Size 700 Mm To 1000 Mm 198 Erectionof Angle Valves / Straight Valve A ) Size 450 Mm To 700 Mm 199 Size 700 Mm To 1000 Mm 200 Patch Work At Boiling House And C / F House Etc. 201 Fabrication & Erection Of Mud Bootsfor Dorr 202 A. Replacement Of Clarifiercenter Tube 203 B. Replacement Of Ms Scrapper Arms Of Clarifier Center Tubes. 204 C. Replacement Of Clarifier Juice Distribution Plates 205 A ) Replacement Of Clarifier Bottom Plate ( Compartment ) 206 B ) Dismantling, Fabrication & Erection Of Clarifier 207 Coils In Dorr / Melter / Centrifugal Machines / Steam Coils Etc: A ) Dismantling 208 B ) Fabrication 209 C ) Erection 210 Dismantling, Fabrication And Erection Of Semi Kestner Bottom Nipple 24” Dia 211 Replacement Of Quad / Vapour Cell Down Take 212 Replacement Of Pan Down Take 213 Patch Work Of Worn Our Portion Of Pan / Evaporatorbody Shell 214 Patch Work Of Save All Of Pan / Evaporator Bodies 215 Patch Work Of Umbrella Of Pan / Evaporator Bodies 216 A ) Strengthing Ofshell With Coil Type Channel With Cross By Pipe / Channel At Two Places Of Pan 217 B ) Strengthing Of Umbrella Of Pan / Evaporator Bodies 218 Dismantling, Fabrication & Erection Of Body Shell A ) Juice Sulphitor 219 B ) Evaporator Bodies 220 C ) Pans 221 Dismantling, Fabrication & Erection Of Bottom / Top Taper Portion Ofa ) Pans 222 B ) Evaporator Bodies 223 Dismantling Of Ss Tubes Of A ) Pans 224 B ) Evaporator Bodies 225 C ) Juice Heater 226 Fitting Of Ss Tubes And To Be Tested At80 Psi Hyd. Pressure A ) Pans 227 B ) Evaporator Bodies 228 C ) Juice Heater 229 A ) Dismantling Of S.S Tube Of Semi Kestner 230 B ) Fitting Of S.S Tubes Of Semi Kestner And To Be Tested 80 Psi Hyd. Pressure 231 Dismantling, Fabrication And Erection Of Shaft With Arms Of Dry Seed Crystallizer / Vacuum Crystallizer. 232 Dismantling, Fabrication And Erection Of Agitator Arms Of Juice Sulphitor / Dry Seed Crystallizer / Vacuum Crystallizer. 233 Replacement Of Ribbon Type Stirrer Of Air Cooled Crystallizer. 234 Crystallizer Central Shaft With Ribbon:A ) Dismantling 235 B ) Fabrication 236 C ) Erection 237 Dismantling, Fabrication And Erection Of Condensate Bottle Big Size ( From 1.5Mtr To 2.0Mtr ) 238 Dismantling, Fabrication And Erection Of Condensate Bottle Big Size ( From 1.0Mtr To 1.5Mtr ) 239 Dismantling, Fabrication And Erection Of Segment Of Pan Shell 240 Dismantling, Fabrication And Erection Of Complete Pan Shell Including Sight Glass, Man Hole, Provision Of Key Sample, Vacuum Gauge, Ammonia Pipes , Glass Washing Pipe, Cold Water Lineconnections And Other Accessories Connectedto Body Shell, Umbrella Including Welding Of M.S. Angles For Supports Etc., Top Taper Cone Including Connections Of Washing Steam Pipes Etc., Save All Including J-Pipes Etc, Vapour Pipe Outletnipple Of Save All, Feed Pipe Connections Etc. 241 Vacuum Crystallizer / Dry Seed Crystallizer ( I ) Dismantling, Fabrication & Erection Of Complete Shell ( Including Side Plates ) Along With Dismantling, Erection & Alignment Of Complete Drive System 242 Dismantling, Fabrication & Erection Of Complete Shell ( Excluding Vertical Side Plates ) 243 Worm And Worm Wheel, Gland Housing Of Crystallizers: A ) Dismantling And Erection Of Existing Worm And Worm Wheel, Gear Box, Motor And Alignment Work Of Worm And Worm Wheel, Gear Box And Motor For Satisfactory Trial. 244 B ) Dismantling And Erection Of Gland Housing Of Crystallizer Shaft. 245 S.S Bend / Tee / Reducer / Nipple / Crossa ) Dismantling 246 B ) Fabrication 247 C ) Erection 248 Dismantling, Fabrication & Erection Of Manhole With Neck Flange Cover 16” To 24” Dia 249 Cutting & Strengthening Of Old Material 250 Dismantling, Fabrication & Erection Of Worn Out Feeding Header Of Pans 251 Dismantling, Fabrication & Erection Of Central Tube With Cooling Coil ( Shaft ) For Water Cooled Crystallizer-40 Tons 252 A ) Dismantling, Fabrication & Erection Of Cooling Pipe Coil In The Crystallizermadefrom 4” Dia Pipe 253 B ) Patch Work Of Crystallizer Cooling Shaft 254 Coils Fabricationof Coil 255 Dismantling & Erection Of Coils 256 Dismantling Of Existing Condenser Including Their Venture, Tail Pipe, Bend Etc. And Thereafterinstallation Ofefficient Single Entry New Condensers Including Fabrication / Erection Of Venture, Tail Pipe & Bends Etc. Fabrication And Erection Of Base Frame And Other Associated Fabrication & Erection Jobs. 257 Dismantling, Fabrication & Erection Of M.S.Gutters. 258 Replacement Of C.I. Cone ( Venture ) Of Multijet Condenser 259 Dismantling C / F Machine Including Water, Steam Connection And Discharge Chute 260 Dismantling And Erection Of Sugar Grader Of Side Plate Including Modification Of Structure. 261 Hoppers A ) Dismantling, Fabrication & Erection Of Deck Piece & Alignments Of Hopper 262 A ) Dismantling, Fabrication & Erection Of Hopper Piece From Deck Piece To End Of Hopper 263 B ) Dismantling, Fabrication & Erection Of Hopper Piece From Deck Piece To Start Of Hopper Including Multi Trays. 264 Dismantling, Fabrication & Erection Of Hopper Complete With Deck Piece And Multi Tray For Hot / Cold Air Blower. 265 Magma Mixera ) Dismantling Of Magma Mixer Including Shaft / Arms / Drive Etc. 266 B ) Fabrication Of Magma Mixer Including Shaft / Arms / Drive Etc. 267 C ) Erection Of Magma Mixer Including Shaft / Arms / Drive Etc. 268 Dismantling’ Fabrication & Erection Of Molasses Gutter For Centrifugal Machines 269 Dismantling And Erection Of Existing Syrup / Molasses / Magma Pipe Lines For Their Internal / External Cleaning. 270 Fabrication Of Bucket For Sugar Elevator / Dry Seed Elevator 271 For Spray Pond A ) Fabrication Of Ss Pipe Line Up To 12” Dia From 4 Mm Thick Ss Plate 272 A ) Fabrication Of Ss Cluster For Fitting 2” Sized Pipes With Nozzles ( As Fitted In Existing Clusters ) . 273 Threading In 2” Dia Ss Pipe Line For Fitting Nozzles 274 Formation Of Purlin And Structure At The Height Of 20 Mtrs Approx. With Angle Size 75X75x6mm And Channel Size 100X50x5 Mm And 200X76x7.5 Mm For The Fitting Of Rooftop Sheets 275 Part-B Cutting And Welding Of Boiler Tubes For Cleaning 276 Cutting And Welding Ofheader Capsfor Cleaningof Boiler Tubes 277 Seamless Pipe ½’’To 8’’Od & Above ( Various Lengths ) A ) Dismantling 278 B ) Fabrication 279 C ) Erection 280 Seamless Pipe Nippleup To8’’Od& Above A ) Dismantling 281 B ) Fabrication 282 C ) Erection 283 Seamless Pipe Bendsup To8’’Od& Above A ) Dismantling 284 B ) Fabrication 285 C ) Erection 286 Dismantling, And Erection Of Air Heater Tubes 63.5 Mm Od X 8 Feet Length 287 Dismantling, And Erection Of Air Heater Tubes 63.5 Mm Od X 16 Feet Length 288 Cutting, Welding And Fitting Ofair Heaterold Tubes 289 Dismantling , Fabrication And Erection Ofair Heatercentre Tube Plate 290 Dismantling , Fabrication, Drilling And Erection Ofair Heatertop And Bottom Tube Plate 291 Ibr Valveup To36’’Oda ) Dismantling 292 B ) Erection 293 Ibr Flangea ) Dismantling 294 B ) Fabrication 295 C ) Erection 296 Ibr Teea ) Dismantling 297 B ) Fabrication 298 C ) Erection 299 Reducera ) Dismantling 300 B ) Fabrication 301 C ) Erection 302 Boiler Drum Partition Platesa ) Dismantling 303 B ) Fabrication 304 C ) Erection 305 D ) Repair 306 Boiler Drum Water Seprator A ) Dismantling 307 B ) Fabrication 308 C ) Erection 309 D ) Repair 310 Boiler Wet Scrubber Seive Plate As Per Drawinga ) Dismantling 311 B ) Fabrication 312 C ) Drilliing 313 D ) Erection 314 Ibr Welding Joint

Key Value

Document Fees
Refer document
EMD
INR 50000.0 /-
Tender Value
Refer document

BOQ Items

Name of Work: Fabrication & Erection Jobs (Gurdaspur CSM)
Sl. No. Item Description
1Gurdaspur CSM
2Repair of cane unloader grab arms
3Replacement of sq. bar of cane unloader.
4Fabrication & Erection of hydraulic Grab of unloader complete.
5Repair, strenghening and alingment of bridge span of unloader no. 1
6Dismantling, Fabrication and Erection ofa) Mincer Hood
7b) Cutter Hood
8c) Chopper Hood
9Replacement ofcane cutting knives of cutters
10Replacement ofcane cutting knives of Mincer
11Fabrication & Fitting of stationary knives structure withknives
12Replacement ofhammers of Mincer
13Replacement of domite tipsof Mincer
14To build mill top rollers square end as per standard size
15To build mill rollers crown pinion teeth as per standard template of teeth.
16To build mill rollers coupling square section as per standard size
17To build mill rollers journal as per standard size
18To build millunder feeder rollers drive gear teeth as per standard template of teeth
19Fabrication and erection of mill rollers crown pinion guard
20Fabrication and erection of Donnelly chute of mills
21Dismantling, Fabrication and erection of worn-out Juice tray at mill house from 10/12 mm plate
22Dis. Feb. & erection ofMill house screw conveyor
23Dis. Feb. & erection of mill house screw conveyor trough along with dismantling and fitting of conveyor and drive system.
24Dismantling and erection of worn-out runners of cane carrier, RBC, Bagasse Elevator and inter carrier.
25Dismantling, Fabrication and erection of worn-out side plates of cane carrier, RBC, Bagasse Elevator and inter carrier.
26Dismantling, Fabrication and erection of worn-out trough of RBC, Bagasse Elevator & Rack carriers froma) MS plate6/8 mm
27b)SS plate 4/5 mm
28DismantlingFabrication and erectionstructure of cane carrier drive ,RBC chain drive, Rakecarrier and elevator chain drive
29Replacement of worn out bottom boot of intercarrier chain / secondary chain
30Replacement of angle and channel of cane carrier / RBC / Rack carrier & Elevator .
31Repair of secondarycane carrier chain and elevator chain rake
32Fabrication of secondarycane carrier chain and elevator chain rake
33Fabrication of RBC slates
34Repair of RBC slates
35Dis. And erection of bagassecillow blower
36Fabrication of bagassecillow blower
37Dismantling and Erection of boiler bagasse feeding CI furnace mouth piece of WIL make Boiler.
38Dismantling and Erection of boiler bagasse feeding CI furnace chute
39Replacement of furnace door frame of WIL make Boiler & Texmaco make boiler
40Replacement of furnace doorof WIL make Boiler & Texmaco make boiler
41Repair and fitting of furnace door frame of WIL make boiler & Texmaco make boiler
42Repair and fitting of furnace doorof WIL make boiler & Texmaco make boiler
43Replacement of furnace chamber door frame of WIL make Boiler & Texmaco make boiler
44Replacement of furnace chamber door of WIL make Boiler & Texmaco make boiler
45Repair and fitting of furnace chamber doorof WIL make boiler& Texmaco make boiler
46Repair and fitting of furnace chamber door frameof WIL make boiler& Texmaco make boiler
47Dismatling of Boiler Dampers
48Fabrication of Boiler Dampers
49Erection of Boiler Dampers
50Repair of Boiler Dampers
51Repair ofID fanofWIL and Texmaco make boiler
52Repair ofFD fanofWIL and Texmaco make boiler
53Dismantling, Fabrication and Erection of boiler bagasse feeding MS chute between boiler furnance and RBC chain
54Patch work
55Dis, feb, & errection of boiler flue gas ducting between FD fan, ID fan& chimney.
56Dismantling, Fabrication & Erection of bend of boiler flue gas ducting between ID FAN and chimney from 6/8mm thick plate.
57Dismantling, Fabrication & Erection of Side plate & Top plates(4mm) of boilers.
58Dismantling, Fabrication & Erection Economiser top & side plates
59Dismantling, Fabrication & Erection Air heatertop & side plates
60Dismantling and fitting of GI/ACC sheet. a) Dismantling
61b)Fitting
62Dismantling of machinery structure.
63Fabrication and Erection of machinery structure.
64Dismantling & erection of FD Fan Casing
65Fabrication of FD Fan Casing
66Repair of FD Fan Casing
67Dismantling & erection of ID Fan Casing
68Fabrication of ID Fan Casing
69Repair of ID Fan Casing
70Dismantling, Fabrication & Erection(a)pump and motor bed
71b) Motor and radicon
72c) Cutter motor bed
73Dismantling fabrication and erection ofwet scrubber cone
74Dismantling fabrication and erection ofwet scrubber side plates
75Dismantling fabrication and erection ofclarifier cone of Boiler
76Dismantling fabrication and erection ofman hole
77Dismantling fabrication and erection ofman hole blind
78Dismantling of Sieve plate of boiler no. 3 wet scrubber
79Fabrication of Sieve plate of boiler no. 3 wet scrubber
80Drilling of Sieve plate of boiler no. 3 wet scrubber
81erection of Sieve plate of boiler no. 3 wet scrubber
82Dismantling , fabrication and erection ofboiler no. 3 chimney (top portion up to 18- 20 mtr )
83Repair and strenthing of the boiler no. 1 & 2 chimney
84Dismantling of boiler no. 3 air heater tubes
85Fabrication and erection of boiler no. 3 air heater tubes
86Erection of boiler no. 3 air heater tubes
87Dismantling Air heater tube plate (Top and bottom)
88Fabrication Air heater tube plate (Top and bottom)
89Drilling Air heater tube plate (Top and bottom)
90Erection Air heater tube plate (Top and bottom)
91Dismantling Air heater centre tube plate
92Fabrication Air heater centre tube plate
93Drilling Air heater centre tube plate
94Erection Air heater centre tube plate
95Fabrications mill roller bearing cover
96Dismantling of Structure
97Fabrication of Structure
98Erection of Structure
99Dismantling of platform plates
100Fabrication of platform plates
101Erection of platform plates
102DismantlingofRailing
103Fabrication & erection of railing
104POWER HOUSE Fabrication & erection of cable tray
105Replacement ofThimble (Any Size)
106Checking of cable connections, cleaning of thimbles and reconnection
107Replacement of switches/MCCB 630 AMP/400AMP/250 AMP
108Replacement/erection of changeover switch 630AMP/400AMP/250 AMP
109Overhauling of SpareElectricalmotorsa) 0-50 HP
110b) Above 50 Hp
111c) Three speed motors
112d)150 HP motor- 01 no.
113e)unloader motor 15 HP - 02 nos.
114f) Four speed motor- 04 nos.
115Laying & connection of power & control cables from main panels to remote box and motor- 03 no. jobs
116Dismantling of existing three speed electrical panel
117Erection of New four speed panel
118a. Extensionjuice tray of mill no. 1
119b. Extension juice tray of mill no. 2
120Fabrication and erection ofMS stairs with railing
121Mill pinion guard (bottom )
122Open gear guard (bottom) of all chain
123Fabrication ofmotor protection cover
124Fabrication of shed (any size) with structure
125Repair of DSM screen
126Dismantling and erection of DSM Screen
127Civil foundationrepair along with alignment of transmission gear bed of mill no. 4
128Repair ofFMG oil tank leakage
129Dismantling of M.S. Round/SquareTanks
130Fabrication of M.S. Round Square Tanks
131Erection of M S Round /square Tanks
132Dismantling of M.S./G.I./ C.I./ SS / RMP pipe from 1” to 12” dia
133Erect ion of MS/GI/CI/SS/ RMP pipe 1” to 12” dia
134Fabrication of M S / SS pipe line above 12” dia from M.S. / SSplate
135Dismantling of M.S. / SS/C.I. pipe line above12” dia
136Erection of M.S./ C.Ipipe line above 12” dia
137a)Dismantling of Nipple 1” to 12” dia up to 24” length
138b)Fabrication of Nipple 1” to 12” Ø & up to 24” length
139c)Erection of Nipple 1” to 12”dia & up to24” length
140a)Dismantling of Nipple above 12” dia up to 1 mtr. length
141b)Fabrication of Nipple above 12” dia up to 1 mtr. length
142c)Erection of Nipple above 12” dia up to 1 mtr. length
143a) Dismantling of bend 1” to 12” dia
144b) Fabrication of Bend 1” to 12” dia
145c) Erection of bend 1” to 12” dia
146Dismantling ,fabrication & erection of Bend above 12” below 36” dia
147Dismantling of Reducer/Tee1” to 12” dia & up to 24” length
148a) Dismantling of Blind 1” to 12” dia
149b) Fabrication of blind 1” to 12” dia
150c) Erection of blind 1” to 12” dia
151a) Dismantling ofabove12” dia
152b) Fabrication of blind above 12”dia
153c) Erection of blind above 12” dia
154a) Dismantling of valve 1” to 12” dia
155b) Erection of valves 1” to 12” dia
156c) Dismantling of valve above 12” dia
157d) Erection of valvesabove 12” dia
158a)Dismantling of flange 1” to 12” dia
159b) Fabrication of flange 1” to 12” dia
160c) erection of flange above 12” dia
161Dismantling, Fabrication & fitting of Jet Box in M.S. Material
162Dismantling, Fabrication, fitting of Jet Box in S SMaterial
163Dismantling, Fabrication & fitting of Nipples 8” to 10” dia for Jet Box of Condenser
164a) Fabrication of Vapour pipe bend 36” to 40” dia
165b) Dismantling & erection of vapour pipe bend 36” to 40” dia
166Dismantling and erection of existing syrup/ molasses/ magma pipe lines for their internal/external cleaning.
167a) Dismantling of Vapour pipe 900 mm/ 1000 mm dia
168b) Fabrication of vapour pipe 900/1000 mm dia
169c) Erection of Vapour pipe 900/1000 mm dia
170Dismantling, Fabrication & erection of Save all from 10 mm to 12mm platea) Pan
171b) Quad& Vapour cell
172Dismantling, fabrication & erection of save all from 8mm to 10mm MS plate excluding outer shell
173Replacement of J-pipe in vapour cell/ quad body/ pan
174Dismantling, Fabrication & erection of Umbrellaa) Pan
175b) Quad& Vapour cell
176Dismantling, fabrication & erection of bottom and top cone a) Pan
177b)      Quad & Vapour cell
178c) Juice sulphiter / syrupsulphiterand cone of any other units above 12” dia
179Dismantlingof inter connecting square box for juice heater Double beat valve and Fabrication, Erection with pipe(modify)
180a) Replacement of cooling jacket for the sulphur burning chamber.
181b) Replacementof sulphur furnace coolingscrubber complete withinternal8” cooling jacket, 6” gas pipe and 4” cooling pipe
182c) dismantling, fabrication & erection of cooler made from 8” dia pipe for sulphur furnace
183Dismantling, Fabrication & erection of Sulphur burning chamber of Sulphur Furnace
184Dismantling, fabrication & erection of Sulphur melt Tank
185Dismantling, fabrication & erection of coil for Sulphur melter
1861. Lime hopper: Fabrication& Erection along with connecting valves &pipeswith its drive system etc.
1872. Lifting of Lime Slacker along with connecting parts up to 2 ft. Height suitable for fitting Lime Hopper.
188Dismantling, Fabrication&erection of condenser of vacuum filter
189Dismantling, Fabrication & erection of Vacuum filtera) Mud Trough
190b) Abgitator
191Replacement of vacuum filter drum complete including connected accessoriesa) Dismantling of existing RVF Drum and to be shifted at scrap yard.
192b) New RVF drum to be erected at position including connected accessories etc.
1931) Dismantling, Fabrication & erection of Mud Scroll/ screw conveyor
1942) Dismantling, Fabrication & erection of Mud Mixture
195Dismantling, Fabrication & erection ofBagacillocyclone
196Dismantlingof Angle valves /Straight valve a)Size 450 mm to 700 mm
197Size 700 mm to 1000 mm
198Erectionof Angle valves /Straight valve a)Size 450 mm to 700 mm
199Size 700 mm to 1000 mm
200Patch work at Boiling House and C/F House etc.
201Fabrication & erection of Mud Bootsfor Dorr
202a. Replacement of clarifiercenter tube
203b. Replacement of MS Scrapper arms of clarifier center tubes.
204c. Replacement of clarifier juice distribution plates
205a) Replacement of Clarifier Bottom plate(compartment)
206b) Dismantling,Fabrication & erection of Clarifier
207Coils in Dorr/Melter/Centrifugal machines/Steam coils etc: a) Dismantling
208b)       Fabrication
209c) Erection
210Dismantling, Fabrication and erection of semi Kestner bottom nipple 24” dia
211Replacement of Quad / Vapour Cell down take
212Replacement of Pan down take
213Patch work of worn our portion of pan / evaporatorbody shell
214Patch work of Save all of pan / evaporator bodies
215Patch work of Umbrella of pan/ evaporator bodies
216a) Strengthing ofshell with coil type channel with cross by pipe/ channel at two places of pan
217b) Strengthing of Umbrella of pan / evaporator bodies
218Dismantling, Fabrication & Erection of body shell a) Juice Sulphitor
219b)      Evaporator bodies
220c) Pans
221Dismantling, Fabrication & Erection of Bottom/Top Taper portion ofa)Pans
222b) Evaporator bodies
223Dismantling of SS tubes of a) Pans
224b)      Evaporator bodies
225c) Juice heater
226Fitting of SS Tubes and to be tested at80 PSI Hyd. Pressure a) Pans
227b)      Evaporator bodies
228c) Juice heater
229a)      Dismantling of S.S tube of semi kestner
230b)      Fitting of S.S Tubes of semi kestner and to be tested 80 PSI Hyd. Pressure
231Dismantling, fabrication and erection of shaft with arms of Dry seed crystallizer / vacuum crystallizer.
232Dismantling, fabrication and erection of agitator arms of juice sulphitor/dry seed crystallizer / vacuum crystallizer.
233Replacement of ribbon type stirrer of air cooled crystallizer.
234Crystallizer central shaft with Ribbon:a) Dismantling
235b) Fabrication
236c) Erection
237Dismantling, fabrication and erection of condensate bottle big size(from 1.5mtr to 2.0mtr)
238Dismantling, fabrication and erection of condensate bottle big size(from 1.0mtr to 1.5mtr)
239Dismantling, fabrication and erection of segment of pan shell
240Dismantling, Fabrication and erection of complete pan shell including sight glass, Man hole, provision of key sample, vacuum gauge, ammonia pipes ,glass washing pipe, cold water lineconnections and other accessories connectedto body shell, Umbrella including welding of M.S. angles for supports etc., top taper cone including connections of washing steam pipes etc., save all including J-pipes etc, vapour pipe outletnipple of save all, Feed pipe connections etc.
241Vacuum crystallizer / Dry seed crystallizer (i) Dismantling, fabrication & erection of complete shell ( including side plates ) along with dismantling, erection & alignment of complete drive system
242Dismantling, fabrication & erection of complete shell ( excluding vertical side plates )
243Worm and worm wheel, Gland housing of Crystallizers: a)Dismantling and erection of existing worm and worm wheel, gear box, motor and alignment work of worm and worm wheel, gear box and motor for satisfactory trial.
244b) Dismantling and erection of gland housing of crystallizer shaft.
245S.S Bend/TEE/reducer/Nipple/crossa) Dismantling
246b)Fabrication
247c)Erection
248Dismantling, Fabrication & erection of Manhole with neck flange cover 16” to 24” dia
249Cutting & strengthening of old material
250Dismantling, Fabrication & erection of worn out feeding Header of pans
251Dismantling, fabrication & erection of central tube with cooling coil (shaft) for water cooled crystallizer-40 tons
252a)      Dismantling, Fabrication & erection of cooling pipe coil in the crystallizermadefrom 4” dia pipe
253b)      Patch work of crystallizer cooling shaft
254Coils Fabricationof coil
255Dismantling & erection of coils
256Dismantling of existing condenser including their venture, tail pipe, bend etc. and thereafterinstallation ofefficient single entry new condensers including fabrication / erection of venture, tail pipe & bends etc. Fabrication and erection of base frame and other associated fabrication & erection jobs.
257Dismantling, Fabrication & erection of M.S.Gutters.
258Replacement of C.I. Cone (venture)of Multijet condenser
259Dismantling C/F Machine including water, steam connection and discharge chute
260Dismantling and erection of sugar grader of side plate including modification of structure.
261Hoppers a) Dismantling, fabrication & erection of Deck piece & alignments of Hopper
262a)      Dismantling, fabrication & erection of Hopper piece from Deck piece to end of Hopper
263b)      Dismantling, Fabrication & erection of Hopper piece from Deck piece to start of Hopper including Multi trays.
264Dismantling, Fabrication & erection of Hopper complete with deck piece and multi tray for hot/cold air blower.
265Magma Mixera) Dismantling of magma mixer including shaft / arms / drive etc.
266b)       Fabrication of magma mixer including shaft / arms / drive etc.
267c) Erection of magma mixer including shaft / arms / drive etc.
268Dismantling’ fabrication & erection of molasses gutter for centrifugal machines
269Dismantling and erection of existing syrup/ molasses/ magma pipe lines for their internal/external cleaning.
270Fabrication of bucket for Sugar Elevator / Dry Seed Elevator
271For spray Pond a) Fabrication of SS pipe line up to 12” dia from 4 mm thick Ss plate
272a)      Fabrication of SS cluster for fitting 2” sized pipes with nozzles ( as fitted in existing clusters) .
273Threading in 2” dia SS pipe line for fitting nozzles
274Formation of purlin and structure at the height of 20 mtrs approx. With angle size 75x75x6mm and channel size 100x50x5 mm and 200x76x7.5 mm for the fitting of Rooftop sheets
275Part-B Cutting and welding of Boiler tubes for cleaning
276Cutting and welding ofheader capsfor cleaningof boiler tubes
277Seamless pipe ½’’to 8’’OD & above(various lengths)a) Dismantling
278b)       Fabrication
279c) Erection
280Seamless pipe nippleup to8’’OD& above a) Dismantling
281b)       Fabrication
282c) Erection
283Seamless pipe bendsup to8’’OD& above a) Dismantling
284b)       Fabrication
285c) Erection
286Dismantling, and erection of air heater tubes 63.5 mm OD x 8 feet length
287Dismantling, and erection of air heater tubes 63.5 mm OD x 16 feet length
288Cutting,welding and fitting ofair heaterold tubes
289Dismantling ,fabrication and erection ofAir heatercentre tube plate
290Dismantling ,fabrication, drilling and erection ofAir heaterTOP and Bottom tube plate
291IBR valveup to36’’ODa) Dismantling
292b)       Erection
293IBR flangea) Dismantling
294b)       Fabrication
295c) Erection
296IBR Teea) Dismantling
297b)       Fabrication
298c) Erection
299Reducera) Dismantling
300b)       Fabrication
301c) Erection
302Boiler drum partition platesa) Dismantling
303b)       Fabrication
304c) Erection
305d) repair
306Boiler drum water seprator a) Dismantling
307b)       Fabrication
308c) Erection
309d) repair
310Boiler wet scrubber seive plate as per drawinga) Dismantling
311b)       Fabrication
312c) Drilliing
313d) Erection
314IBR welding joint
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail