| 1 | Batala CSM |
| 2 | MSpipeline up to 10” dia.a) Dismantling |
| 3 | b) Fabrication |
| 4 | Pipe line above 10” dia including vapour & Exhaust pipe.a) Dismantling |
| 5 | b) Fabrication |
| 6 | c) Erection |
| 7 | Seamlesspipeline up to 12” dia.a) Dismantling |
| 8 | b) Erection |
| 9 | Seamlessbend up to 12” dia.a) Dismantling |
| 10 | b) Erection |
| 11 | Cross, reducer, tee,Nippleup to 12” dia :a) Dismantling |
| 12 | b) Fabrication |
| 13 | c) Erection |
| 14 | Cross, reducer, tee,Nippleabove 12” dia :a) Dismantling |
| 15 | b) Fabrication |
| 16 | c) Erection |
| 17 | Valve up to12” dia :-a) Dismantling |
| 18 | b) Erection |
| 19 | Valve above12” dia :-a) Dismantling |
| 20 | b) Erection |
| 21 | Bend up to12” dia :-a) Dismantling |
| 22 | b) Fabrication |
| 23 | c) Erection |
| 24 | Bend above 12” dia :-a) Dismantling |
| 25 | b) Fabrication |
| 26 | c) Erection |
| 27 | Flange of all size a)Dismantling |
| 28 | b) Fabrication |
| 29 | c) Erection |
| 30 | Square & round tanks with flat bottom of any size ;a) Dismantling |
| 31 | b) Fabrication |
| 32 | c) Erection |
| 33 | Roof gutter for rain water from GI sheets. a) Dismantling |
| 34 | b) Fabrication |
| 35 | c) Erection |
| 36 | Platform of any size .a) Dismantling |
| 37 | b) Fabrication |
| 38 | c) Erection |
| 39 | Fabrication of Ladder/ Stair case from Angle/channel/flat/Pipe plate. |
| 40 | Trouses coloumn ,beam related to roof. a)Dismantling |
| 41 | b) Fabrication |
| 42 | c) Erection |
| 43 | Purlin . a)Dismantling |
| 44 | b) Erection |
| 45 | M.S. Patch work Max.up to 20 sq.ft at individual station(Above this will be taken in MT) |
| 46 | Dismantling and Erection of 2” square bar /oldrail on cane unloader bridge |
| 47 | Replacement of Runnerflat of CC, RC, Inter carrier, BE, RBC, sugarseed elevator chain.& Cross carrier.a) Dismantling |
| 48 | b) Fitting of new |
| 49 | Replacement of angle/channel of CC, RC, Intercarrier, BE,RBC, sugar seed elevator chain.& cross carrier.a) Dismantling |
| 50 | b) Fitting of new |
| 51 | Replacement side plate of CC,RC,BE,RBC ,Hopper& cross carrier |
| 52 | Replacement of bottom trough Hopper, BE,RC.RBC.,cross carrier. |
| 53 | Dismantling, fabrication and Erection of Donnelly chute of mills. |
| 54 | Dismantling, Fabrication & Erection of any bed of motor ,Pump & gear boxa) Below 50 HP |
| 55 | b) Above 50 HP |
| 56 | Replacement ofRack-Carrier Boot. |
| 57 | M.S. Screw conveyora) Fabrication |
| 58 | b) Erection |
| 59 | Fabricationof racks of rack carrier,bagasse elevator |
| 60 | Dismantling, fabrication & Erection of juice gutter & juice tank Boiler |
| 61 | Replacement of worn out Ducting. |
| 62 | Replacement of Boiler Fans.a)ID |
| 63 | b) FD |
| 64 | c) SA |
| 65 | Dismantling ,Fabrication & Erectionof boiler ID/FD fan damper |
| 66 | Dismantling, fabrication and Erection of Worn out portion of wet scrubber. |
| 67 | Dismantling, fabrication and erection of a) clarifier cone. |
| 68 | b) Round portion |
| 69 | Dismantling, fabrication and erection of Bagasse fedder chute |
| 70 | Replacement of worn out raw juice/ sulphited juice pump. Strainer. |
| 71 | Replacement of worn out weight juice/water receiving tank. |
| 72 | Down take of Pan, Quad & vapour cell from M.S. platea) Dismantling |
| 73 | b) Fabrication |
| 74 | c) Erection |
| 75 | M.S. Scrubber of sulphur furnance.a) Dismantling |
| 76 | b) Fabrication |
| 77 | c) Erection along with connecting valve & pipes etc. |
| 78 | Molasses Conditionara) Dismantling |
| 79 | b) Fabrication |
| 80 | c) Erection |
| 81 | Fabrication & Erection of man hole with blind cover. |
| 82 | Coil in Dorr/ Melter/ Centrifugal machine/ Steam coils etc.a) Dismantling |
| 83 | b) Fabrication |
| 84 | c) Erection |
| 85 | Replacement of foot valve of spray pump.a) Dismantling |
| 86 | b) Erection |
| 87 | S.S. bend/ Tee /Reducer/ Nipple/ Cross.a) Dismantling |
| 88 | b) Fabrication |
| 89 | c) Erection |
| 90 | d) Fabrication & Erection of All sizesS.S. pipe from S.S. plate. |
| 91 | Dismantling ,Fabrication & Erection of Condensate bottle of any size |
| 92 | Replacement of PAN body Shell (Capacity 50 Ton) from tube plate calendria to saveall including its taper portion. |
| 93 | Repair & Strengting of main structure coloumn upto 1mtr..height |
| 94 | Main structure column/Beam upto 10 mtr. Height.a) Dismantling |
| 95 | b) Fabrication |
| 96 | c) Erection |
| 97 | Main structure column/Beam above 10 mtr. Height.a) Dismantling |
| 98 | b) Fabrication |
| 99 | c) Erection |
| 100 | Replacement of Compartment tray/mud boot of juice clarifier( Dorr).a) Dismantling |
| 101 | b) Fabrication |
| 102 | c) Erection |
| 103 | Dismantling of Crystallizer/Pugmill Arms. |
| 104 | Fabrication of Crystallizer/Pugmill Arms. |
| 105 | Erection of Crystallizer/Pugmill Arms. |
| 106 | Fabrication & Erection of Sugar grader chute. |
| 107 | Fabrication & Erection of Sugar Elevator/seed chain Bucket. |
| 108 | Dismantling, Fabrication & Erection of Hopper including Alignement & trial.( Size : 44\" x4.5\" x 1 \") |
| 109 | Dismantling, Fabrication & Erection of C/F Machine internal Liner Plate. |
| 110 | Replacement ofworn outof saveall ofEvaporator bodies( including inner shell, outer shell, impeller& top plate) |
| 111 | Replacement ofworn outof saveall of Pans( including inner shell, outer shell, impeller& top plate). |
| 112 | Replacementof only impeller ofpans & quad |
| 113 | Replacement of only Top /bottom taperplate ofpans &Quad |
| 114 | Replacement of only Umbrella ofPans/ quad . |
| 115 | Dismantling, Fabrication & erection of J –pipe for saveall of any Body. |
| 116 | Replacement of Tube plate ofany body of Quad/ Pan. |
| 117 | Fab. & Erection ofSide Glass for PAN/Quad. |
| 118 | Dismantling, Fabrication & erection of condensate water receiving pocket for cylindria of pan and quad |
| 119 | Replacement ofbrass/S.S tubes ofjuice heater/ vapour line Juice heater a) Dismantling |
| 120 | b) Fitting |
| 121 | Replacement ofbrass/S.S tubes ofQuad/ vapour cell & Pan Station..a) Dismantling |
| 122 | b) Fitting |
| 123 | Replacement ofJH partition plate . |
| 124 | Replacement of worn out groove out partition plate |
| 125 | Replacement of Coils in dorr |
| 126 | Dismantling, Fabrication & erection of Bagacillo cyclone. |
| 127 | Replacementofworn out bagacillo pipeline made out from GI plain sheet |
| 128 | Dismantling, fabrication & erection of agitator of OC filter. |
| 129 | Dismantling, fabrication & erection of bottom Portion of OC filter / Crystallizer. |
| 130 | Impeller ofbagacillo blowera) Dismantling |
| 131 | b) Fabrication |
| 132 | c) Erection with drive system complete |
| 133 | M S Casing ofbagacillo blowera) Dismantling |
| 134 | b) Fabrication |
| 135 | c) Erection |
| 136 | BagacilloScreen :a) Dismantling |
| 137 | b) Replacement ofNew Screen & Erection. |
| 138 | c) Fabrication Frame |
| 139 | Replacement of cooler of sulphur burners. |
| 140 | Replacement ofsulphur cooler burner pipeline. |
| 141 | Replacement of worn outburner of sulphur furnace. |
| 142 | Dismantling, fabrication & erection of sulphur burner melter for sulphur furnace. |
| 143 | Crystallizer central shaft with ribbona) Dismantling |
| 144 | b) Fabrication |
| 145 | c) Erection |
| 146 | M.S ribbon strip in crystallzera) Dismantling |
| 147 | b) Fabrication |
| 148 | c) Erection |
| 149 | Replacement of Worm &Worm wheelfor crystallizer |
| 150 | Replacement of hopper trough. |
| 151 | Dismantling, fabrication & Erection of batch typeC/F machine discharge chute. |
| 152 | Dismantling & Erection of M.S /CI/S.S cluster with nozzle. |
| 153 | Dismantling, fabrication & erection of spray pump strainer. |
| 154 | Fabrication & Erection of street light four pole tower with Suitable platfram & painting Appx. Height 30 Ft |
| 155 | Dismantling & Erection of Flow meter. |
| 156 | Dismantling, Fabrication & Erection of Sulphur Furnance Chamber. |
| 157 | Dismantling, Fabrication & Erection of cutter hood. |
| 158 | Fabrication & Erection of any shed (from Old M.S Tube/ Angle)up to 5mtr.height. |
| 159 | Dismantling & Erection of Big valve (above 900mm) in Exhaust & Vapour pipe line/ header etc |
| 160 | Dismantling, Fabrication & Erection of M.S. Gutter for Massecuite & syrup. |