Urban Improvement Trust-UIT has published Repair And Maintenance Of Canal Wall From Nag Nagin Mandir Steel Bridge To 80 Ft . Submission Date for this Tender is 27-05-2022. Wall construction Tenders in kota Rajasthan. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter.All kinds of soils |
2 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. M10 grade Nominal Mix 1: 3: 6 (1 cement : 3 coarse sand : 6 graded stoneaggregate 20mm nominal size). |
3 | Random Rubble stone masonry for with hard stone in foundation and plinth in Cement Sand mortar above 30 CM thick wall in: Cement Mortar 1:4 ( 1-Cement : 4-Sand). |
4 | Plaster on new surface on walls in cement sand mortar 1 : 4 including racking of joints etc. complete fine finish :20mm thick. |
5 | Providing and laying damp-proof course with cement concrete grade M-150 (1 : 2 : 4) mortar prepared with 1% solution of water-proof compound completeandno glass strips are used andnot applying 2 coats of hot bitumen complete as per specifications. 50mm thick. |
6 | Providing and laying in position specified grade ofcement concrete forall RCC structural elements upto plinth level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers( if required) excluding the cost of centering, shuttering and reinforcement.M20 grade Nominal Mix |
7 | Providing and fabricating reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding (including cost of binding wire) all complete up to floor Three level.: Hot rolled deformed bars (IS : 1139). |
8 | Centering and Shuttering with plywood or steel sheets including strutting, propping bracing both ways and removal of formwork for foundation , footings,strap beams, raft , bases of columns etc. upto Plinth level. |
9 | Finishing wall with water proofing cement paint of approved brand and manufacture and or required shadetogive an even shade including all scaffolding:New work |
10 | (Two or more coats applied @ 3.84 kg/10 sqm). |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy