Loading, Carriage Of Following Items From Store Centre, Gauriganj / Sultanpur To Dump Store Including Unloading And Proper Stacking ( Distance 0-70 Km. ) -2 Stp / Pcc Pole 3 Acsr Weasel Conductor 4 Ab Cable Single Phase 5 Ab Cable Three P
Tender Overview
Project Description
Loading, Carriage Of Following Items From Store Centre, Gauriganj / Sultanpur To Dump Store Including Unloading And Proper Stacking ( Distance 0-70 Km. ) -2 Stp / Pcc Pole 3 Acsr Weasel Conductor 4 Ab Cable Single Phase 5 Ab Cable Three Phase 6 X Arm 7 Top Channel 8 G.I. Wire 9 Other Line Materials 10 Dragging Of Stp / Pcc Pole From Dump Store To Pit Site. 11 Digging Of Pits Up To The Depth Of 1650 / 2200 Mm. As Per Site Requirement. Fabrication & Erection Of Single Pole Support On Pcc / Stp Pole Support Including Digging Of Pit & Fixing Of All Accessories And Clamps As Per Respo Norms . ( Only Nuts & Bolts Will Be Provided By The Contractor ) . 12 Digging Of Pits Up To The Depth Of 1650 / 2200 Mm. As Per Site Requirement.Fabrication & Erection Of Double Pole Support On P.C.C. / Stp Pole Includingdigging Of Pit & Fixing Of All Accessories And Clamps ( Cost Of Clamps Nuts & Bolts Will Be Born By The Contractor ) As Per Respo Norms. 13 Grouting Of Stp / Pcc Pole In Ratio 1:4:8 With Cement Stone Ballast, Coarse Sand And Plinthing 300 Mm Above Ground Level As Well As Muffing Of Plinth. 14 Spreading, Laying & Stringing Of Acsr Weasel Conductor For Construction Of 11 Kv Line As Per Respo Norms. 15 Ordinary Earthing By 11 Kv Ms Earth Rod 2500 Mm Long As Per Respo Norm. 16 Cartage Of Complete Stay And Its Erection As Well As Concreting As Per Respo Norms. 17 Guarding Of Line As Per Respo Norms. 18 Repalcement Of Damaged / Burnd Single Phase Ab Cable. 19 Repalcement Of Damaged / Burnd Three Phase Ab Cable. 20 Strengthening Of Tilted St / Pcc Pole After Opening The Binding Then Tightening Of Conductor With Binding. 21 Resagging / Re-Stringing Of Lose Conductor Of Ht / Lt Line Alongwith Opening & Binding Of Insulator / Re-Stringing Of Line & Its Proper Binding And Jumpering. 22 Cutting Of Tree Branches. 23 Note: Any Quantity Of Item From Sl No. 1 To Sl No. 15 May Vary To Any Limit Within The Financial Value Of Agreement Against This Tender.
BOQ
| Sl. No. | Item Description |
| 1 | Loading, carriage of following items from Store Centre, Gauriganj/Sultanpur to dump store including unloading and proper stacking (distance 0-70 km.) |
| 2 | STP/PCC pole |
| 3 | ACSR Weasel Conductor |
| 4 | AB cable single phase |
| 5 | AB cable three phase |
| 6 | X arm |
| 7 | Top Channel |
| 8 | G.I. Wire |
| 9 | Other Line Materials |
| 10 | Dragging of STP/PCC Pole from dump store to pit site. |
| 11 | Digging of pits up to the depth of 1650/2200 mm. as per site requirement. Fabrication & erection of single pole support on PCC/STP pole support including digging of pit & fixing of all accessories and clamps as per RESPO norms .(only nuts & Bolts will be provided by the contractor). |
| 12 | Digging of pits up to the depth of 1650/2200 mm. as per site requirement.Fabrication & erection of double pole support on P.C.C./STP pole includingdigging of pit & fixing of all accessories and clamps (cost of clamps nuts & bolts will be born by the contractor ) as per RESPO norms. |
| 13 | Grouting of STP/PCC pole in ratio 1:4:8 with cement stone ballast, coarse sand and plinthing 300 mm above ground level as well as muffing of plinth. |
| 14 | Spreading, laying & stringing of ACSR weasel conductor for construction of 11 KV line as per RESPO norms. |
| 15 | Ordinary earthing by 11 KV MS earth rod 2500 mm long as per RESPO norm. |
| 16 | Cartage of complete stay and its erection as well as concreting as per RESPO norms. |
| 17 | Guarding of line as per RESPO norms. |
| 18 | Repalcement of damaged/burnd single phase AB cable. |
| 19 | Repalcement of damaged/burnd Three phase AB cable. |
| 20 | Strengthening of tilted ST/PCC pole after opening the binding then tightening of conductor with binding. |
| 21 | Resagging/Re-stringing of lose conductor of HT/LT line alongwith opening & Binding of insulator/Re-stringing of line & its proper binding and jumpering. |
| 22 | Cutting of tree branches. |
| 23 | Note: Any quantity of item from sl no. 1 to sl no. 15 may vary to any limit within the financial value of agreement against this tender. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.