Preventive & Breakdown Maintenance Work Of Turbine Side Auxiliaries Viz. Pumps ( T-Bfp, M-Bfp, Cep Etc.. ) , Hp / Lp Valves And Other Static Equipments ( Deaerator, Hotwell, Mot, Phe Etc... ) Alongwith Replacement Of Hp / Lp Valves Of Turbine Sid, anpara-Uttar Pradesh

Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited-UPRVUNL has published Preventive & Breakdown Maintenance Work Of Turbine Side Auxiliaries Viz. Pumps ( T-Bfp, M-Bfp, Cep Etc.. ) , Hp / Lp Valves And Other Static Equipments ( Deaerator, Hotwell, Mot, Phe Etc... ) Alongwith Replacement Of Hp / Lp Valves Of Turbine Sid. Submission Date for this Tender is 12-07-2022. Pump Supply Tenders in anpara Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

32268484
Corrigendum : Preventive & Breakdown Maintenance Work Of Turbine Side Auxiliaries Viz. Pumps ( T-Bfp, M-Bfp, Cep Etc.. ) , Hp / Lp Valves And Other Static Equipments ( Deaerator, Hotwell, Mot, Phe Etc... ) Alongwith Replacement Of Hp / Lp Valves Of Turbine Sid
Open Tender
Indian
Uttar Pradesh
anpara
12-07-2022

Tender Details

Preventive & Breakdown Maintenance Work Of Turbine Side Auxiliaries Viz. Pumps ( T-Bfp, M-Bfp, Cep Etc.. ) , Hp / Lp Valves And Other Static Equipments ( Deaerator, Hotwell, Mot, Phe Etc... ) Alongwith Replacement Of Hp / Lp Valves Of Turbine Side Of Unit 4 & 5 Of 2X500 Mw, Btps, Anpara.

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 25-Jun-2022 DATE EXTENSION Date 12-07-2022

Key Value

Document Fees
INR 590 /-
EMD
INR 33500.0 /-
Tender Value
INR 16.74 Lakhs /-

BOQ Items

Name of Work: Preventive & Breakdown Maintenance work of turbine side auxiliaries viz. Pumps (T-BFP, M-BFP, CEP etc..), HP/LP valves and other static equipments (Deaerator, Hotwell, MOT, PHE etc...) alongwith replacement of HP/LP valves of turbine side of Unit 4 & 5 of 2X500 MW, BTPS, Anpara.
Sl. No. Item Description
1Replacement of the Burst Atmospheric relief Diaphragm of LP Turbine of Unit # 4/5.
2Inspection, cleaning and flushing of Condenser hot well.
3Inspection, Cleaning and flushing of Deaerator.
4Inspection/Cleaning and flushing of Feed water storage Tank.
5Cleaning of Main Oil Tank of Main Turbine, Emergency Oil Tank and Unit Oil Storage Tank, transfer of Turbine oil into EOT &UOST& refilling of MOT through Main Oil Conditioner.
6Cleaning of BFP Turbine Oil Tank.
7Cleaning of water line filters / stainers of Turbine and its Auxiliaries.
8Inspection, Revisioning and Complete Cleaning of Debris Filters.
9Inspection/Minor repairing of Main Turbine turning gear chain.
10Inspection/Minor repairing of BFP Turbine turning gear chain.
11Replacement of Pin of Main Turbine turning gear system.
12Replacement of oil and minor Revisioning of HP Bypass oil system.
13Cleaning and Revisioning of Lub oilFilters of Main Turbine, M-BFPs, EHC,T-BFPs,HP Bypass etc.
14Cleaning of M-BFP oil tank, Replacement/Refilling and centrifuging of complete oil.
15Revisioning / Cleaning of Main oil conditioners.
16Centrifuging of lubricating oil and running & up keeping of ALFA LAVAL make Portable Centrifuging Machine (MAB-104) during centrifuging.
17Inspection of last stage blades of LP Turbine and minor repair work inside LP Turbine casing.
18Cleaning of sump pits of Turbine Area.
19Overhauling of sump pump of T/G area.
20Inspection / Cleaning of S. R. W. Pump discharge strainer.
21Minor Repairing of SRW Discharge strainer element.
22Complete O/H of ALFA LAVAL Plate Heat Exchanger
23Inspection / revisioning of Cooler Transfer Valve of T-BFP
24Cleaning of Suction Strainer of ACW Pump
25Cleaning of ACW Stand Pipe Inlet Strainer
26Drain Out / Flushing of ACW System
27Filling & Flushing of ACW System and normalization
28Online Replacement of Bag Filters of Main Oil Conditioners
29Rev/replacement ofThrust cum Radial Brg. No.-1 of BFP-Turbine.
30Rev/replacement ofRadial Brg.No.- 2 of BFP-Turbine.
31Inspection/Revisioning of Central Lubricating oil pressure regulating valve of BFP-T oil tank.
32Replacement of N2 Bladders of accumulators of oil tank.
33Repair Rev. of BFP-T Exhaust diaphragm and its leak testing.
34Rev/replacement of NDE radial bearing of T-BFP.
35Rev/replacement of DE radial bearing of T-BFP.
36Rev/replacement ofNDE Thrust Bearing of T-BFP.
37Inspection of/carrying out axial & radial alignment of BFP with Turbine
38Rev/replacement of NDE radial bearing of T-BFP Booster Pump
39Rev/replacement of DE radial bearing T-BFP Booster Pump
40Rev/replacement of NDE Mech. Seal of T-BFP Booster Pump.
41Rev/replacement of DE Mech. Seal of T-BFP Booster Pump.
42Rev/replacement ofNDE Thrust Bearing of T-BFP Booster Pump.
43Inspection of / carrying out axial & radial alignment of T-BFP Booster Pump with Reduction Gear.
44Rev/replacement ofradial bearing of Reduction Gear.
45Rev/replacement ofCombined bearing of Reduction Gear.
46Inspection/carrying out axial & radial alignment of Reduction Gear with BFP-Turbine
47Rev/replacement of NDE radial bearing of M-BFP.
48Rev/replacement of DE radial bearing of M-BFP.
49Rev/replacement ofNDE Thrust Bearing of M-BFP.
50Inspection /carrying out axial & radial alignment ofPump with Hydraulic Coupling.
51Rev/replacement of NDE radial bearing of M-BFP Booster Pump.
52Rev/replacement of DE radial bearing of M-BFP Booster Pump.
53Rev/replacement of NDE Mech. Seal of M-BFP Booster Pump.
54Rev/replacement of DE Mech. Seal of M-BFP Booster Pump.
55Rev/replacement ofNDE Thrust Bearing of M-BFP Booster Pump.
56Inspection /carrying out axial & radial alignment of Booster Pump with Motor.
57Inspection / Minor Overhauling of Booster Pump of T-BFP, M-BFP.
58Rev/replacement of Mech. Seal of Heater drain Pump.
59Rev/replacement of DE bearing of Heater drain Pump.
60Rev/replacement of NDE bearing of Heater drain Pump.
61Rev./ Overhauling of HD Pump & its Commissioning.
62Inspection of/carrying out axial & radial alignment of HD Pump with Motor.
63Rev/replacement of DE bearing of Deaerator Recirculation Pump.
64Rev/replacement of NDE bearing of Deaerator Recirculation Pump.
65Rev/replacement of Mech. Seal of Dea. Rec. Pump.
66Rev/replacement of lower bearing of Condensate Return Pump.
67Rev/replacement of upper bearing of Condensate Return Pump.
68Rev/Overhauling of Condensate return Pump & its Commissioning
69Cleaning/ Minor repairing of Condensate Return Tank.
70Rev/replacement of DE/ NDE bearing of GSE.
71Rev/O.H of Complete GSE & its Commissioning.
72Rev/replacement ofThrust cum Radial Brg. of CEP.
73Rev/replacement of Mech. Seal of CEP.
74Replacement of Stuffing Box Sleeve of CEP.
75Complete Overhauling of Condensate Extraction Pump.
76Inspection /carrying out axial & radial alignment of CEP with Motor.
77Removing & Cleaning of Suction Strainer of CEPs.
78Rev/O.H of Ball circulation Pump.
79Rev/O.H of Gear oil Pump.
80Repair/ overhauling of Secondary Raw Water Pump
81Revisioning / Replacement of D. E. bearing of SRW Pump.
82Revisioning / Replacement of NDE bearing of SRW Pump.
83Alignment checking & adjustment of S. R. W. Pump.
84O/H of Vapour extractor of MOT / Oil Conditioner / BFP-T Oil Tank.
85Inspection/Carrying out axial and radial alignment of DRPs/CRPs/ Ball circulation pump / Gear Oil pump/Gland steam exhauster with their motor.
86Arresting oil leakage through the felt ring of MOP of T-BFPs.
87Servicing/Overhauling Portable Oil Purifier.
88Overhauling and rectification of tube leakages of Turbine Oil Coolers.
89Cleaning of Bearing Oil Coolers and rectification of tube leakages, if any, of Turbo driven feed pumps.
90Cleaning of Bearing and Working Oil Coolers and rectification of tube leakages, if any, of Motor driven feed pumps.
91Performing of system vacuum and Condenser tube leak test and attending all the leakages by welding and plugging.
92Inspection/ revisioning of HP Bypass Oil Pump.
93Overhauling/Servicing of Hanger Supports of critical pipelines and their resetting at cold/hot set value.
94Revisioning / Replacement of DE bearing of ACW Pump.
95Revisioning / Replacement of NDE bearing of ACW Pump.
96Overhauling of ACW Pump.
97Alignment checking & adjustment of ACW Pump.
98Overhauling of Hydrazine dosing Pump.
99Alignment checking & adjustment of Hydrazine dosing Pump with motor.
100Overhauling of Portable Dewatering Pump.
101Servicing of motor operated M-BFP discharge isolation valves, control & isolating valves on feed water lines, Ist/IInd discharge NRVs ofM-BFP, manually operatedgate/globe valves installed of HP lines on Turbine side. Size: 250~300mm, Design press.: > 40 Kg/cm2, temp.: 250 oC
102Servicing of motor operated discharge isolation valve, Ist / IInd. discharge NRVs ofT-BFPs, control & isolating valves on feed water lines. Size:350 mm,Design press.: 219~302 Kg/cm2, temp.:210 oC
103Servicing of feed water minimum flow isolation valves, pneumatically operated controlvalves on Turbine side. Size:150 mm, Pr. : 219~224 Kg/cm2
104Servicing of motor operated control valve, motor operated gate/globe valves, manually operated gate/globe valves, check valves Size:150~250 mm & manually operated valves of Size: 15~100mm installed on HP lines. motor operated valves. Size: 25~100 mm Pr.> 40 Kg/cm2
105Servicing of hydraulic operated HP Bypass spray water control valves, spray isolationvalves, NRVs on Turbine side. Size:100-150mm, Pr. : 152 Kg/cm2.
106Servicing of HPH 5A, 5B, 6A, 6B Extraction steam valve, check valves. Size: 250mm, Pr.: 40~51Kg/cm2
107Servicing/Overhauling of CRH reverse current valve. Size:900 mm, Pr: 51 Kg/ cm2.
108Replacement of HP / LP valves of different Floors by cutting of damaged valve & welding of new valve. Size: 08~25 mm.
109Replacement of flange gasket of HP/LP valves & piping on per mm dia.basis of valve.
110Replacement of gland packing with new one of HP / LP Valves on per mm dia. basis of valve.
111Replacement of HP / LP Heater man hole flange gasket.
112Servicing of HPH - 5A/5B, 6A/6B, LPH-2&3, deaerator & Gland steam header safety valve.
113Servicing of suction relief valves of T-BFPs / M-BFPs / CEPs / LPHs / HPHs and safety valves of main air ejectors.
114Servicing of motor operated/control & isolation valves installed on LP lines. Size: 25~100mm, Pr. <40 Kg/cm2.
115Servicing of motor operated / control & isolation valves installed on LP lines. Size: 150~200mm, Press<40 Kg/cm2.
116Servicing of motor operated/control & isolation valves installed on LP lines. Size: 250~650 mm, Press<40 Kg/cm2.
117Servicing of mannual operated gate/globe valves & NRVs installed on LP lines. Size: 15~100mm, Pr. <40 Kg/cm2.
118Servicing of mannual operated gate/ globe valves & NRVs installed on LP lines. Size:150~350mm, Press<40 Kg/cm2.
119Servicing of mannual operated gate/ globe valves & NRVs installed on LP lines. Size: 400~650mm, Press < 40 Kg/cm2.
120Servicing of steam drain trap valve. Size: 40~50mm, Pr. < 40Kg/cm2.
121Revisioning/ Servicing of Butterfly valves installed on ACW System & Gland steam system.Size:150~350mm.
122Revisioning / Servicing of Butterfly valves of ACW System. Size: 450~750mm
123Revisioning / Servicing of NRVs installed on ACW System. Size: 500mm.
124Revisioning / Servicing of NRVs installed on SRW System. Size: 750mm.
125Servicing of gear boxes of various valves installed on ACW System, feed water, condensate & steam line. Valve Size: 100~750 mm.
126Servicing of gear boxes of variousvalves provided at condenser inlet & outlet in CW line and BFP-T exhaust to condenser.Valve Size: 1350-2100 mm.
127Revisioning/Servicing of butterfly valves of BFP-T exhaust to condenser. Size:1350 mm.
128Revisioning/Servicing of butterfly valves provided at condenser inlet & outlet in circulating water line. Size:2100 mm.
129Welding/repair of LP pipings attending leakages of pipe lines & headers etc. by cutting the damaged portions.
130Revisioning / Servicing of Ventilator valve.
131Replacement of flange type gate/globe valves of M-BFP & T-BFP oil coolers / LPlines Size: 80 -100 mm
132Replacement of butt welded gate/globe valves of M-BFP & T-BFP oil coolers/LPlinesSize: 80-100 mm
133Revisioning/Servicing of NRVs installed on sump pump pipe lines on Turbine side. Size: 50-100 mm.
134Revisioning / Servicing of Ball Collector of Condenser Tube Cleaning System.
135Inspection/minor repairing of ball catch strainer of condenser tube cleaning system installed inside CW return line of size:2100 mm
136Revisioning/Servicing of ball type valves installed on condenser tube cleaning system on Turbine side. Size:15-40 mm.
137Revisioning/Servicing of ball type valves installed on condenser tube cleaning system on Turbine side. Size: 65 -100 mm.
138Inside inspection and minor repairing of HP/LP Flash Tanks.
139Inspection/Repairing of nozzle of starting air ejector.
140Replacement of HP / LP valves of different Floors by cutting of damaged valve & welding of new valve. Size: 40~65 mm.
141Inspection and O/H of nozzles of Steam Jet Air Ejector.
142Inside inspetion of CW outlet duct by opening of its manhole
143Revisioning / Servicing of HP Heater Bypass Valve BF-031-EGV
144Revisioning / Servicing of Isolating valve for Superheater spray water SP-031-MGV
145Replacement of Main Steam line drain /HPBP Spray valves & other similar valves of size Nb-80~100 mm, Pr. > 40 Kg/cm2, Temp. > 540 oC
146Putting the new Spool Piece for replacement of Main Steam line drain /HPBP Spray valves & other similar valves of size Nb-80~100 mm, Pr. > 40 Kg/cm2, Temp. > 540 oC
147Replacement of LP Valves of size Nb-300 mm, Pressure rating < 40 Kg/cm2.
148Putting the new Spool Piece for replacement of LP Valves of size Nb-300 mm, Pressure rating < 40 Kg/cm2.
149Replacement of LP Valves of Nb-350 mm, Pressure Rating < 40 Kg/cm2.
150Putting the new Spool Piece for replacement of LP Valves of Nb-350 mm, Pressure Rating < 40 Kg/cm2.
151Replacement of LP Valves of Nb-250 mm, Pressure Rating < 40 Kg/cm2.
152Replacement of Heater Level Control Valves, isolating valves & NRVs of Pressure Rating < 40 Kg/cm2.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail