|
| 1 | CLEANING OF TERRACE: Cleaning of dry leaves, dust, silt, scarp materials, vegetation, bushes, fungus, algae, green wild creepers and like other loose materials such as brick bats, metal etc. from flat / slope roofs, rain water gutter, parapet, chajjas, catwalks and cleaning the rain water down take pipes, water spout pipes at all heights etc. and as directed by the EIC during the entire monsoon period. The rates including cost of polythene bags. The collected debris shall not be thrown from terrace. The collected debris shall be kept at one place for further transportation to dumping yard.. Note:- Contractor should visit the site before quoting the rate for this item. |
| 2 | CLEANING OF PH SERVICE SHAFTS: Cleaning thoroughly the existing service shafts behind RCC jali / behind gents & ladies toilet at all floors including cleaning throughly out side surface of the existing cast iron soil and rain water pipes of all wastes, removing rags, loose material, cob webs, cloth pieces, broken concrete pieces and all deleterios materials including lift and lead charges, cost of all tools, tackles, plants, accessories etc. all complete and as directed by the EIC. |
| 3 | CLEANING OF OPEN STORM DRAINS: Removing of silt, dry leaves, murrum, small boulders etc. completely from the bed of open nallah, drains, open rubble pitched drains, canals & disposingthe removed earth within a lead of 50mtr. during monsoon / non-monsoon period. The rates are including removing of green wild creepers etc. including silt thickness on the drain bed upto 150 mm thick. |
| 4 | 230 to 749 mm wide at bottom |
| 5 | 750 to 2000 mm wide at bottom |
| 6 | 2001 mm to 3000 mm wide at Bottom |
| 7 | CLEANING OF COVERED STORM DRAINS: Removing of silt, dry leaves, murrum, small boulders etc. completely from the bed of closed drains withRCC / CIgrating, box culverts etc. havingdepth not beyond 2.5 mts. anddisposing the removed earth & debris within a lead of50mts. including removalandputtingbacktheRCC / CIgrating properly as required during the eintire monsoon / non-monsoon period and as directed by EIC. |
| 8 | CLEANING RCC PIPE STORM DRAIN: Cleaning of existing storm water Hume Pipe lines of different diameters / pipe culverts and at all locations such as road, berms/ lawns, burried inside the building etc. which are partly or fully filled with silt, small boulders, dry leaves, grass, etc. by disposing the removed debris within a lead of 50 mtrs and as directed by the EIC. |
| 9 | CLEANING OF STORM CHAMBERS:Removal ofsilt, dry leaves, mud, soil, grass, debris, etc. fromstorm watercollection chambersmanually after removingC.I.covers & re-fixing the covers at proper location includingdisposal ofretrievedmaterial to aleadof 500 mts., at BARC Hospital, CT&CRS building and Khrghar dispensary. |
| 10 | CLEANING JUNGLE: Clearing Jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared as per specifications and as directed by the EIC. |
| 11 | SURFACE DRESSING: Surface dressing of the ground including removing vegetation and in levelling not exceeding 15 cm deep and disposal of rubbish at a lead up to 50 M in all kinds of soil complete as per specifications and as directed by the EIC. |
| 12 | TRIMING THE BRANCHES OR CLEARING THE SITE OF FALLEN TREE: Triming the branches or clearing the site of fallen tree of girth measured at a height of 1.0 m above ground level including trimming of branches or cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable materials complete as per specifications and as directed by the EIC. |
| 13 | Girth more than 30cm & upto 60cm |
| 14 | Girth more than 60cm & upto 120cm |
| 15 | SUPPLYING MAN POWER IN MONSOON: Supplying man power (2 Labours/shift for 3 Shift a day from 01st June to 30th September including Saturday, Sunday & Holidays) along with necessary pans, spades, shovels, pickaxe, punjas, ropes, small special spade, raincoats, safety shoes, etc. @ labour per day upto maximum any number of labour as and when decided by EIC to work for 08 hours per shift/day/night in monsoon period to carry out the cleaning of choked drains / grating grills / hume pipes / footpath by removing the dryleaves, silt etc. and also carry out seasonable departmental work allotted by EIC from time to time. . |
| 16 | HIRE CHARGES OF HYDRA / JCB for trimming Tree Branches during Monsoon Preparedness or as & when required during emergency in monsoon period etc. complete as directed by Engineer In-Charge. |
| 17 | LEAD CHARGES FOR LEAD UPTO 4 KM:Lead charges for lead exceeding 3 km but not exceeding 4 km by mechanical transport includinmg loading, unloading, stacking, levelling etc. (Note: The rates in respect of Item are applicable for NET Quantities arrived at after making deduction for voids @ 30% from corresponding TRUCK Measurement).Note: Trasporting of debries at disposal ground, disposing, stacking, leveling & statutery charges if any will be responsibility of the Contractor and no extra charges shall be paid for the same. |
| 18 | Debris Beyond 3 km but upto and including 4 km |
| 19 | Providing & Fixing TEMPORARY WEATHER PROTECTION COVERING IN PORTICO or ENTRANCE DURING MONSOON, Using GI Post, Bamboo Purlins tied with Coconut Wires and covering with good quality Terpoline Sheets for prtection from rain/heavy wind with rain/hot-sunlightetc. complete for a period from 1st May to 31st October as directed by Engineer In-Charge. |
| 20 | CLEANING OF GULLY TRAPS: Cleaning of Gully Trap / Gully Chambers and stoneware pipes upto adjoining Inspection Chamber and CI pipes from Nahani trap to Gully trap. The rates areinclusive removingand refixing CI cover of Gully Trap / Gully Chambers. |
| 21 | CLEANING OF INSPECTION CHAMBERS, MANHOLES OF SEWAGE LINE:Cleaning of Sewage Manholes / Inspection Chambers of canteen, toilets, sewage line etc. carefully by mechanical means or with sewage cleaning tools complete all as directed by EIC.Pipe in between chambers will be measured seperately.The rates are inclusive of removing muck, solids and disposing the same beyond 2 km distance. Pumping arrangement for water is to be made by contractor at his own cost.The rates are inclusive of pumping as required if any. |
| 22 | CLEANING OF SEWAGE PIPE LINE: Cleaning and removal of sewage or drainage wastes, muck etc. from horizontal, sloping RCC/CI/PVC lines of all dia. (burried undergroung/under roads/exposed)connecting to sewage inspection chambers, manhole chamber etc. by mechanically / manually as desired by EIC including cost of labour, tools, machines, transportation etc. Note: The scope of one operatiare inclusive ofi) BARC Hospital Building - Appx. 700 RM ii) CT&CRS Building - 150 RM |
| 23 | CLEANING OF SEWAGE COLLECTION SUMP:Cleaning of Sewage Collection Sump / RCC septic tank / Hume Pipe Septic Tank of various size by Brihanmumbai Municipal Corporation Vehicles. The rates are inclusive of removing silt, muck, solid material etc. and disposing the same by mechanical transport beyond 1-2 km. lead complete all as directed by EIC. Pumping arrangement for water is to be made by contractor at his own cost.The rates are inclusive of pumping. Note: Measurement will be as per Sewage Collection Tank / Septic Tank dimensions and solid waste depth will be measured for payment. |
| 24 | COLLECTING SEWAGE SAMPLES, TRANSPORTATION TO LABORATORY AND TESTING OF SEWAGE SAMPLE FOR THE FOLLOWING PARAMETERS: Temperature, Turbidity, pH, Total Dissolved Solids, Total Suspended Solids, Oil & Grease, Biological Oxygen Demand (27°C - 3 days), Chemical Oxygen demand, Electrical Conductivity, Calcium Hardness as CaCO3 & Magnesium Hardness as CaCO3, Total Hardness as CaCO3, Total Alkalinity as CaCO3,Ammonia as NH3-N,Residual Chlorine, Chlorides as Cl¯, Nitrate as NO3¯, Sulphate as SO4¯,Iron as Fe, Silica as SiO2. |
| 25 | REMOVING AND RELAYING 60mm/80mm THICK CEMENT CONCRETE INTERLOCKING BLOCK with 150 mm thick compacted bed of stone dust / Murrum, filling the joints with crushed sand etc. all complete as -per the direction of the Engineer-in-charge |
| 26 | PROVIDING AND LAYING 60 MM THICK FACTORY MADE CEMENT CONCRETE INTERLOCKING PAVER BLOCK OF M-30 GRADE madewith strong vibratory compaction and approved size, shape, design laid in required colour and pattern over and including 50 mm thick compacted bed of crushed sand, filling the joints with crushed sand etc. all complete as per the direction of the Engineer-in-charge |
| 27 | Providing and laying in position CEMENT CONCRETE OF 1:2:4 (1 cement, 2 crushed sand, 4 graded stone aggregate of nominal size 20mm) including consolidation, finishing, curing etc. complete as per specification and drawingsbut excluding the cost of Formworkshuttering, centering and steel reinforcement at all Levels. |
| 28 | Providng and fixing at or near ground level PRECAST CEMENT CONCRETE 1:2:4 IN KERBS, Using 100% manufactured sand, edgings etc. as per approved patterns and setting in position with C.M 1:3 (using coarse sand) including consolidation, curing, cost of required centering, shuttering, finishing smooth with 6 mm thick cement plaster 1:3 (using fine sand) on exposed surfaces complete as per specifications. |
| 29 | Providing and constructing BRICK WORK in cement mortar using Standardbricks of approved quality / class, make / brandin super structure above plinth up to Floor-II level in all shapes and sizes including curing, raking out jointscomplete as per specifications and as directed by the Engineer-in-charge. Brickwork in super structure with standard bricks in C.M 1:4 using crushed sand. |
| 30 | Providing 20mm THICK INTERNAL PLASTERINGin C.M without cement punning 1:4 (usingcrushed sand) finished smooth, including sieving of sand to required fineness, preparation of the surface, scaffolding, curingall as per specifications, drawings and as directed at site complete. |
| 31 | Supplying and fixing CAST IRON MAN HOLE COVERS and CAST IRON STEPS of approved make and weight as specified in the drawings or as directed by the Engineer in charge. |
| 32 | Supplying and providing CANVASS HOSE PIPE with SS Male &Female Coupling, instantanous spring lock arrangement of approved make and weight as specified in the drawings or as directed by the Engineer in charge. |
| 33 | 63mm NB |
| 34 | 75mm NB |
| 35 | 100mm NB |
| 36 | ClLEANING & PROVIDING ZYCOSIL ANTISKIDDING COMPOUND: Providing & Applying Zycosil Antiskid Compound Paint on Paver Block/Footpath/Road Surface as directed by Engineering-in-Charge. |
| 37 | MAINTENANCE OF 5HP DIESEL ENGINE DRIVEN PUMP SET (DEWATERING FLOOD CONTROL PUMP) and ensuring its proper operation on round-the-clock basis during the entire period of monsoon along with Pre-monsoon checking & conditioning of Diesel Engine Drivem Pump and and laying 200m PVC Pipes etc. complete for a period from 1st May to 31st October, utilising for Monsoon Emergengy Response etc. and as directed by Engineering-in-Charge. |
| 38 | MAINTENANCE OF 10HP SUBMERSIBLE PUMPS (DEWATERING FLOOD CONTROL PUMP) and ensuring its proper operation on round-the-clock basis during the entire period of monsoon along with Pre-monsoon checking & conditioning of Electrical Engine Drivem Pump and laying 200m PVC Pipes etc. complete for a period from 1st May to 31st October, utilising for Monsoon Emergengy Response etc. and as directed by Engineering-in-Charge. |
| 39 | MAINTENANCE OF 5HP SUBMERSIBLE PUMPS (DEWATERING FLOOD CONTROL PUMP) and ensuring its proper operation on round-the-clock basis during the entire period of monsoon along with Pre-monsoon checking & conditioning of Electrical Engine Drivem Pump and laying 200m PVC Pipes etc. complete for a period from 1st May to 31st October, utilising for Monsoon Emergengy Response etc. and as directed by Engineering-in-Charge. |
| 40 | MAINTENANCE OF 2HP SUBMERSIBLE PUMPS (DEWATERING FLOOD CONTROL PUMP) and ensuring its proper operation on round-the-clock basis during the entire period of monsoon along with Pre-monsoon checking & conditioning of Electrical Engine Drivem Pump and laying 200m PVC Pipes etc. complete for a period from 1st May to 31st October, utilising for Monsoon Emergengy Response etc. and as directed by Engineering-in-Charge. |
| 41 | MAINTENANCE OF MONOBLOCK PUMP SETS (DEWATERING PUMPS) of capacity 0.5HP / 1.0HP utilising for Monsoon Emergengy Response and as directed by Engineering-in-Charge. |
| 42 | Maintenance including oiling, greasing, cleaning etc. as & when required. |
| 43 | Overhauling of Motors / Starters |
| 44 | MAINTENANCE OF SUBMERSIBLE BORE WELL PUMPS (NON-POTABLE WATER SUPPLY PUMP) and ensuring its proper operation during the entire period of contract along with checking & conditioning of Electrical Engine Drivem Pump as directed by Engineering-in-Charge. |
| 45 | Removal of Submersible Pump from existing bore well, cleaning, servicing, ressembling, reinstallation, testing and commissioning at existing site |
| 46 | Repairing of Submersible Pump including removal from existing bore well, reinstallation, testing and commissioning at existing site |
| 47 | MAINTENANCE OF 10HP SUBMERSIBLE SEWAGE WATER PUMPS and ensuring its proper operation on round-the-clock basis during the entire period of monsoon along with Pre-monsoon checking & conditioning of Diesel Engine Drivem Pump and laying 200m PVC Pipes etc. utilising for Monsoon Emergengy Response and as directed by Engineering-in-Charge. |
| 48 | MAINTENANCE OF 5HP SUBMERSIBLE SEWAGE WATER PUMPS and ensuring its proper operation on round-the-clock basis during the entire period of monsoon along with Pre-monsoon checking & conditioning of Diesel Engine Drivem Pump and laying 200m PVC Pipes etc. utilising for Monsoon Emergengy Response and as directed by Engineering-in-Charge. |
| 49 | Carrying out Civil Engineering Works like SURVEYING, LEVELLING, CHECKING OF FORMWORK, FABRICATION, REINFORCEMENT, WITNESSING SAMPLE RETRIEVAL & TESTING, PREPARATION OF RA BILLS, ENSURING CONCRETE INGREDIENT RATIO IN RCC / PCC WORKS, BRICKWORK, PLASTER, FLOORING AND OTHER CIVIL WORKS AT SITE including preparation of tender documents, draft work order, agreements, compiling, binding, labeling and keeping data in computer as per direction of Engineer-in-Charge.Note: 1) Each Job shall be carried out by one qualified Diploma holder / Licentiate in Civil / Construction Engineering / Technology conducted by board of Technical Examinations / University / Autonomous Govt. / Govt. recognized Polytechnic / Institute with minimum 2 years experience.2) Deployment: The contractor shall deploy one engineer per month for a job for 6 working days per week for minimum 08:30 hours per day with 30 minutes of break.3) Mode of measurement: Measurement will be as per job basis and part thereof. Deployment of one engineer per month will be measured as one job. |
| 50 | CARRYING OUT MANUAL MISC. PLUMBING / CIVIL / SEWERE CLEANING / CARPENTRY / MASONRY WORKS JOBS like minor repairs, fixing fitting and fixtures etc.as and when required and as directed by the Engineer-in-charge Note: 1. Labours shall bring necessary carpentary / plumbing tools,minimum materials such as washher, taflon tape, rawlpludge, screws, clips etc. 2) Payment shall be made as per the Log book duly approved by the Enginner in charge. 3) Contrator shall arrange necessary Police Verification Certificate for the workers engaged for thess work. |
| 51 | SEMI-SKILLED PLUMBING / CIVIL / SEWERE CLEANING / CARPENTRY / MASONRY JOB / WORKSwith valid Police Verification Certificate for entire contract period. |