Airports Authority Of India has published Construction Of New Integrated Terminal Building Re-Construction Of Old Terminal Building Modification Of Existing Expanded Terminal Building At Civil Enclave Pune Airport Pune. Sh Provision Of Inline Baggage Handling System Along With Ct-Eds. Submission Date for this Tender is 29-06-2022. Air transport support system Tenders in pune Maharashtra. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 17-May-2022 | Notice Inviting e-Tener CORRIGENDUM-I | Fee | 21-06-2022 |
2 | 06-Jun-2022 | Corrigendum-II | Technical Bid | 21-06-2022 |
3 | 14-Jun-2022 | CORRIGENDUM-III | Date | 29-06-2022 |
4 | 15-Jun-2022 | CORRIGENDUM-IV | Technical Bid | 29-06-2022 |
Sl. No. | Item Description |
1 | SH:I SITC OF PASSENGER BAGGAGE HANDLING SYSTEM |
2 | SUPPLY OF DEPARTURE AND ARRIVAL CONVEYOR SYSTEM Design, Manufacturing and Supply of followingequipment’s for Departure and Arrival conveyor system compatible for in-line CT-EDS Baggage Screening system as per Technical Specification and conveyor layout drawings, including supply ofrequired length of power and control cables from control panel to various drive unitsincluding all item/accessories as per site requirement complete in all respect for successful commissioning of following system : |
3 | a) Check-in conveyor system in two sections comprising of Weighing & Labeling and Dispatch conveyor of minimum length1200mm with minimum useful width of 650mm between side walls along with drive unit for each conveyor section with display range 0-200 Kg with accuracy of + 0.05% and two displays (Each for Passenger and Airlines staff) including load sensor and toppling devices etc. One set comprises of 01 no. weighing & labeling conveyor, 01 no. dispatch conveyor and 02 nos. weighing display |
4 | b) Take away/Collector conveyor with inner useful belt width of minimum 1000mm between side walls along with drive unit for collecting baggage from dispatch conveyor side walls. |
5 | c) Transport Conveyor (Straight/declined/inclined/induction/T-Junction conveyor, etc.) along withdrive unit for each section to match with x-ray machine level with minimum width of 1000mm between side walls. |
6 | d) Queuing / Metering Conveyor with minimum 1500 mm length and minimum nominal width of 1000mm between side walls along with drive units. |
7 | e)Horizontal Divertersfor transfer of bagged set at an angle of 90 degree (horizontal plane) to the delivery conveyor including drive unit. |
8 | f)90° Power Curve with inner useful belt width of minimum 1000mm between side walls along with drive unit. |
9 | g)Over Height Limiter made up of stainless steel with photo sensor to detect the over height of baggage including proper support arrangement and fault reset button. |
10 | h) Automatic Tag Reader for conveyer system suitable for 360° degree scan. |
11 | i) Draught Curtains in the openings wherever the conveyor pass through the walls, consisting of flexible overlapping slats of black belt strips as per site requirement. |
12 | j) Motorized Fire Shutter of fire rating minimum 2 hours as per site requirement in the wall opening including limit switches, wiring & integration with control panel. |
13 | k) Motorized Security Shutter as per site requirement in the wall opening (wall between passenger and non-passenger area) including limit switches, wiring and integration with control panel etc. for arrival and departure. |
14 | l)Ball Table constructed from Heavy Duty Mild Steel box section, with SS balls securely attached to the table of nominal dimension 1500 mm x 1500 mm. |
15 | m) Gravity Roller Table constructed from heavy duty mild steel box section formed from 50 mm diameter heavy-duty rollers at an appropriate pitch to suit the intended duty made out of utility grade stainless steel including support etc. |
16 | n) Heavy dutyendless slat type departure baggage conveyor system of 76 mtrs length of flat make-up carousel having minimum useful widthof 1000 mm between side walls, having antistatic, flame retardant molded rubber/PVC/ABS material slats (black in colour) of minimum 5 mm thickness, speed of 24- 30 mtrs/min. |
17 | o) Heavy duty race track slat type inclined arrival baggage re-claim carousels of 52 mtrs length with minimum useful width 1000mm between side walls, having black color slats made of antistatic, flame retardantmolded rubber/PVC/ABS material of minimum 5mm thickness, slope angle as given in technical specification and drawing, speed of 24-30 meters /min. |
18 | p) PLC based control panel incorporating switch gears, protection devices, starters with all sensors and other components suitable for operation & safety of complete departure and arrival conveyor system including check-in conveyor and for interfacing & integration with CT-EDS machine, DV X-ray etc. i/c supply of all associated materials like power, control cables etc along with UPS. (Divided in minimum 07 zones as mentioned in Technical Specifications) |
19 | INSTALLATION, TESTING & COMMISSIONING (ITC) OF BAGGAGE CONVEYOR SYSTEM Installation, Testing and Commissioning (ITC) of following items for Departure & Arrival Conveyor System including minor civil works such as grouting of structures and making good the same including ITC of control panel along with necessary outgoing cables/wire, earthing for drive unit motor, limit switches, Emergency stop push buttons, indications, annunciation, IT network and control cables, power cabling etc. complete as required and as per Technical specifications. |
20 | a) Check-in conveyor system in two sections comprising of Weighing+Labeling and Dispatch conveyor |
21 | b)Take away/collector conveyor |
22 | c)Transport Conveyor ((Straight/declined/inclined/induction/T-Junction conveyor, etc.) |
23 | d)Queuing / metering Conveyors |
24 | e)Horizontal Diverters |
25 | f) 90° Power curves |
26 | g)Over Height limiter |
27 | h)Automatic Tag Reader |
28 | i) Draught curtains |
29 | j)Motorized Fire Shutter |
30 | k)Motorized Security Shutter |
31 | l)Ball Table |
32 | m)Gravity Roller Table |
33 | n)Heavy dutyendless slat typeflat departure baggage conveyor system of 76 mtrs length |
34 | o)Heavy duty race track slat type inclined arrival baggage claim carousels of 52 mtrs length |
35 | p) PLC based control panel |
36 | Design, Fabrication, Supply and Fixing of steel structure (MS flat, MS angle, MS sheet, I-section, C-Section, structural supports etc) consisting of Beams, Hangers, Steel plates, Support legs, Chequrred plates, Nuts and Bolts, Catwalks, Platforms, Walkways, Kick plates/side plates etc. including cutting, welding, fabrication, nut-bolting, fittings, jointings, painting and minor civil works etc. suitably designed to enable maintenance personnel to inspect, operate & maintain various BHS items complete in all respect and as per site requirement and Technical Specifications for successful commissioning of the system. |
37 | Design, Supply, Installation, Testing, Commissioning and Integration of SCADA system with PLC for departure and arrival system consisting of SCADA server indicating GUI, alarm and message, start stop, LAN Profit Bus/ ProFi Net connectors, UPS etc. Job includes supply of all type of hardware and licensed SCADA software along with redundant reporting server with necessary installations, accessories to accrue, process, store and retrieve the baggage processing data confirming to certification of TSA/ECAC requirement including SITC of PC and colored printers suitable for printing on A4 paper etc. complete in all respect and as per Technical Specifications for successful commissioning of the system. |
38 | SH:II SITC OF IN-LINE CT-EDS |
39 | Supply of following equipments as per Technical Specifications complete in all respect for successful commissioning of the system. |
40 | a) CT-EDS (Computed Tomography Explosive Detection System) LeveI-1 High Throughput (1200 bags/hour minimum) Baggage Screening systems confirming to BCAS requirements with suitable UPS, control panel, electrical interface components, cables, peripherals accessories and all other components required for integration with BHS system to meet technical as well as operational requirements. |
41 | b) Matrix Server with suitable UPS, fully loaded & environment controlled rack, KVM switch, LCD monitor, cables, & all peripherals & components with full redundancy as required. |
42 | c)Level 2 , 3& 4 analyst Workstations with suitable UPS, cables and all accessories as required. |
43 | Local Area Networking components which includes required switches, cables (OFC and UTP), Media Converter, racks, patch panels, patch cords, LIU & Accessories with full redundancy. |
44 | Installation, testing and commissioning of the following equipments as per Technical Specifications complete in all respect for successful commissioning of the system.:- |
45 | a)Installation, testing and commissioning of CT-EDS machines with all accessories in the existing enclosure (must be defined in shop drawing) including special material handling equipment, required Civil works such as grouting of structures etc. at the Airport site as required. |
46 | b)Installation, Testing and Commissioning of server and LAN system with all peripherals & components including fixing the rack to the floor as required. |
47 | c)Installation, Testing and Commissioning of Level-2 , Level 3 & Level 4analyst workstations with all accessories including connecting them with CT-EDS Machines with all interface requirements as required. |
48 | SH:III Annual Operation & Comprehensive Maintenance Contract |
49 | OPERATION: Annual Operation and routine maintenance of complete Departure and Arrival Conveyor systems (excluding CT-EDS)as mentioned under SH:1by providing requisite man-power, tools, consumables and technical support etc. during operations as specified in SCC, Technical Specification and particular specifications of operation & AICMC with complete in all respect. |
50 | Year 1 (during DLP) |
51 | Year 2 (during DLP) |
52 | Year 3 |
53 | Year 4 |
54 | Year 5 |
55 | Year 6 |
56 | Year 7 |
57 | Year 8 |
58 | Year 9 |
59 | Year 10 |
60 | Year 11 |
61 | Year 12 |
62 | Year 13 |
63 | Year 14 |
64 | Year 15 |
65 | All Inclusive Comprehensive Maintenance Contract (AICMC):AICMC after DLP of two years of complete Departure and Arrival Conveyor system as mentioned under SH:1 along with all its Electrical and Mechanical accessories by providing requisite man-power, all required spares, tools, consumables, preventive & corrective maintenance and technical support as specified in SCC, Technical Specification and particular specifications of operation & AICMC with complete in all respect. |
66 | Year 3 |
67 | Year 4 |
68 | Year 5 |
69 | Year 6 |
70 | Year 7 |
71 | Year 8 |
72 | Year 9 |
73 | Year 10 |
74 | Year 11 |
75 | Year 12 |
76 | Year 13 |
77 | Year 14 |
78 | Year 15 |
79 | All Inclusive Comprehensive Maintenance Contract of Screening sytem i/c CT-EDS, servers, work stations, other associated equipments etc. by providing requisite man-power, all required spares, tools, maintenance equipment, consumables,preventive & corrective maintenance and technical support as specified in SCC, Technical Specification and particular specifications of operation & AICMC with complete in all respect. |
80 | Year 3 |
81 | Year 4 |
82 | Year 5 |
83 | Year 6 |
84 | Year 7 |
85 | Year 8 |
86 | Year 9 |
87 | Year 10 |
88 | Year 11 |
89 | Year 12 |
90 | Year 13 |
91 | Year 14 |
92 | Year 15 |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail