Design, Supply, Integration, Installation And Commissioning Of Servo-Hydraulically Operated Control Loading System For Aircraft Iron Bird Applications Design, Supply, Integration, Installation And Commissioning Of Servo-Hydraulically Operated
Tender Overview
Project Description
Design, Supply, Integration, Installation And Commissioning Of Servo-Hydraulically Operated Control Loading System For Aircraft Iron Bird Applications Design, Supply, Integration, Installation And Commissioning Of Servo-Hydraulically Operated Control Loading System For Aircraft Iron Bird Applications , Servo-Hydraulic Actuators, Load Cells, Swivels ( Sec 4.2.2.3-1, 1A, &1B ) , Control System ( Sec 4.2.2.3-7 ) , Graphical User Interface ( Gui ) And Software ( Sec 4.2.2.3-9 ) , Hydraulic Power Pack ( Hpu ) ( Sec 4.2.2.3-2 ) , Hydraulic Service Manifold ( Sec 4.2.2.3-4 ) , Hydraulic Distribution Manifold ( Sec 4.2.2.3-4 ) , Hoses ( Sec 4.2.2.3-6 ) , Actuator Cables ( Sec 4.2.2.3-8 ) , Chiller Unit ( Sec 4.2.2.3-3 ) , Server Pc ( Sec 4.2.2.3-10 ) , Client Pc ( Sec 4.2.2.3-10 ) , Hydraulic Oil ( Oil Type As Per Design Requirement ) , Sub-Total , Less: Discount ( If Any ) , Sub-Total:Net Ex-Works Price , Add: Packing & Forwarding Charges ( If Any ) , Add: Transportation Charges ( If Any ) , Add: Insurance Charges ( From Warehouse-To-Warehouse ) ( If Any ) , Total ( A ) : , Installation & Commissioning Charges ( If Any ) , Training Charges ( If Any ) , Total ( B ) : , Bank Charges, If Any , Total ( C ) :
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 29-Jun-2022 | EXTENSION OF DUE DATE | Date | 28-Jul-2022 |
| 2 | 03-Jun-2022 | DUE DATE EXTENSION | Date | 30-Jun-2022 |
BOQ
| Sl. No. | Item Description |
| 1 | Servo-Hydraulic Actuators, Load Cells, Swivels(Sec 4.2.2.3-1, 1a, &1b) |
| 2 | Control System (Sec 4.2.2.3-7) |
| 3 | Graphical User Interface (GUI) and Software(Sec 4.2.2.3-9) |
| 4 | Hydraulic power pack (HPU) (Sec 4.2.2.3-2) |
| 5 | Hydraulic Service Manifold (Sec 4.2.2.3-4) |
| 6 | Hydraulic Distribution Manifold (Sec 4.2.2.3-4) |
| 7 | Hoses (Sec 4.2.2.3-6) |
| 8 | Actuator cables (Sec 4.2.2.3-8) |
| 9 | Chiller Unit (Sec 4.2.2.3-3) |
| 10 | Server PC (Sec 4.2.2.3-10) |
| 11 | Client PC (Sec 4.2.2.3-10) |
| 12 | Hydraulic Oil (oil type as per design requirement) |
| 13 | Sub-Total |
| 14 | Less: Discount (if any) |
| 15 | Sub-Total:Net Ex-Works Price |
| 16 | Add: Packing & Forwarding charges (if any) |
| 17 | Add: Transportation Charges (if any) |
| 18 | Add: Insurance charges (from warehouse-to-warehouse) (if any) |
| 19 | Total (A): |
| 20 | Installation & Commissioning charges (if any) |
| 21 | Training charges (if any) |
| 22 | Total (B): |
| 23 | Bank Charges, if any |
| 24 | Total (C): |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender