Public Works Department-PWD has published Redevelopment Of Assam Police Reserve Campus At Guwahati, Assam. Submission Date for this Tender is 24-06-2022. Civil Work Tenders in guwahati Assam. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 20-May-2022 | Corrigendum CUM Addendum | Technical Bid | 24-06-2022 |
2 | 24-May-2022 | Addendum-2 | Technical Bid | 24-06-2022 |
3 | 24-May-2022 | Addendum-3 | Technical Bid | 24-06-2022 |
4 | 10-Jun-2022 | Corrigendum-2 | Technical Bid | 24-06-2022 |
5 | 17-Jun-2022 | Corrigendum-4 | Technical Bid | 24-06-2022 |
6 | 18-Jun-2022 | Corrigendum-5 | Technical Bid | 24-06-2022 |
Sl. No. | Item Description |
1 | Planning, Designing, and Construction on EPC Basis Type A Building with support services & allied facilities by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incorporating stipulated specification and adopting NBC-2016 norms, & IS Codes and guidelines complete in all respect. Note :- Plinth Area shall be measured for the actual constructed. |
2 | Planning, Designing, and Construction on EPC Basis Type B&C Building with support services & allied facilities by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incorporating stipulated specification and adopting NBC-2016 norms, & IS Codes and guidelines complete in all respect. Note :- Plinth Area shall be measured for the actual constructed. |
3 | Planning, Designing, and Construction on EPC Basis Type D Building with support services & allied facilities by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incorporating stipulated specification and adopting NBC-2016 norms, & IS Codes and guidelines complete in all respect. Note :- Plinth Area shall be measured for the actual constructed. |
4 | Planning, Designing, and Construction on EPC Basis Office and ArmouryBuilding with support services & allied facilities by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incorporating stipulated specification and adopting NBC-2016 norms, & IS Codes and guidelines complete in all respect. Note :- Plinth Area shall be measured for the actual constructed. |
5 | Planning, Designing, and Construction on EPC Basis Barracks with support services & allied facilities by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incorporating stipulated specification and adopting NBC-2016 norms, & IS Codes and guidelines complete in all respect. Note :- Plinth Area shall be measured for the actual constructed. |
6 | Planning, Designing, and Construction on EPC Basis MLCP Building with support services & allied facilities by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incorporating stipulated specification and adopting NBC-2016 norms, & IS Codes and guidelines complete in all respect. Note :- Plinth Area shall be measured for the actual constructed. |
7 | Planning, Designing, and Construction on EPC Basis School Building with support services & allied facilities by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incorporating stipulated specification and adopting NBC-2016 norms, & IS Codes and guidelines complete in all respect. Note :- Plinth Area shall be measured for the actual constructed. |
8 | Planning, Designing, and Construction on EPC Basis Community Building with support services & allied facilities by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incorporating stipulated specification and adopting NBC-2016 norms, & IS Codes and guidelines complete in all respect. Note :- Plinth Area shall be measured for the actual constructed. |
9 | Planning, Designing, and Construction on EPC Basis Shops with support services & allied facilities by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incorporating stipulated specification and adopting NBC-2016 norms, & IS Codes and guidelines complete in all respect. Note :- Plinth Area shall be measured for the actual constructed. |
10 | Planning, Designing, and Construction on EPC Basis Temple & Securitywith support services & allied facilities by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incorporating stipulated specification and adopting NBC-2016 norms, & IS Codes and guidelines complete in all respect. Note :- Plinth Area shall be measured for the actual constructed. |
11 | Planning, Designing and construction of Civil External development works as per approval of the Engineer- in-Charge |
12 | Finishing walls with 100% Premium acrylic emulsion paint having VOC Less than 50gm/ lt and UV resistance as per IS 15489 : 2004 , Alkali & fungal resistance, dirt resistance exterior paint of required shade ( Company Depot tinted ) with Silicon additives. New work (two or more coats applied @ 1.43 l/ 10 sqm. Over and including priming coat of exterior primer applied @ 0.90L/ 10 sqm |
13 | Providing and fixing 1st quality Ceramic glazed wall tiles conforming to IS:15622 (thickness to be specified by the manufacturer), of approved make, in all colour, shades except burgundy, bottle green, black of any size as approved by Engineer-in-charge, in skirting, risers of steps and dados, over 12mm thick bed of cement mortar 1:3 (1 cement :3 coarse sand ) and jointing with grey cement slurry @ 3.3 kg per sqm, including pointing in white cement mixed with pigment of matching shade complete. |
14 | Providing and laying ceramic glazed floor tiles of size 300x300mm ( thickness to be specified by the manufacturer ) of 1 st quality confirming to IS:15622, of approved make, in all colours, shades, except white, ivory, grey, fume red brown, laind on 20mm thick bed of cement mortar 1:4 ( 1 cement : 4 coarse sand), jointing with grey cement slurry @ 3.3 kg/sq.m. including pointing the joints with the white cement and matching pigments etc., complete. |
15 | Distempering with 1st quality acrylic distemper ( ready mixed ) having VOC content less than 50 gms/ litre, of approved manufacturer, of required shade and colour complete, as per manufacturer"s specification. Two or more for new work |
16 | Providing and Appying Polymer modified, flexible cementatious negative side waterproofinf coating with elastic waterproofing polymer on inetrior wall plaster surface in 3 (three) coats @ 14.35 kg/10 sqm . One coat of of self priming of cementatious water proofing polymer (dilution with water in the ratio of 1:1) and 2(two) coats of centatious water proofing polymer (dilution with water in the ratio of 3:1) after scraping and properly cleanig the surface to remove pre-existing paint flim and loose particles till plaster is visible, complete in all respect as per the direction of Engineer-in-charge |
17 | Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 meters lead. For thickness of tiles above 10 mm and up to 25 mm |
18 | Provision of CP and sanitary fixtures including pipe line inside the existing toilets |
19 | Provision of CP and sanitary fixtures including pipe line inside the existing kitchen |
20 | Surface preparation to chip out the loose mortar, application of Nitozinc primer to the corroded reinforcement rod after removal of rust layer on top. Application of bonding Agent Nitobond EP to the existing prepared concrete surfaces and applying Renderoc mortar flush to the adjoining ceiling surfaces. |
21 | Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade: New works (two or more coats) over an including water thinnable priming coat with cement primer |
22 | Dismantling of screed from the terrace slab an clearing of the debris |
23 | Providing and laying integral cement based water proofing treatment including preparation of surface as required for treatment of roofs, balconies, terraces etc. |
24 | Dimolishing R.C.C. work manually by mechanical means including staking of steel bars and disposal of uncerviceable material within 50 metres lead as per direction of Engineer-in-charge. |
25 | Extra for cutting reinforcement bars manually by mechanical means in R.C.C or R.B work (Payment shall be made on the cross sectional area or R.C.C or R.B work) as per direction of Engineer in charge. |
26 | Extra for scrapping, cleaning and straightening reinforcement from R.C.C or R.B work. |
27 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in charge.In Cement mortar |
28 | Removing mortar from bricks and cleaning bricks including stacking within a lead of 50 m (stacks of cleaned bricks shall be measured) From brick work in cement mortar. |
29 | Dismantling doors, windows and clerestory windows (steel or wood) shutter including Chowkaths, architrave,holdfasts etc. complete and stacking within 50 meters lead.Of area beyond 3 sq. meters |
30 | Taking out doors, windows and clerestory window shutters(steel or wood) including stacking within 50 meters lead:Of area beyond 3 sq meters |
31 | Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 meters lead. For thickness of tiles above 25 mm and up to 40 mm |
32 | Dismantling C.I or asbestos rain water pipe with fittings and clamps including stacking the material within 50 meters lead:100 mm dia pipe |
33 | Dismantling manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable within 50 meters lead as per direction of Engineer in charge: bituminous road |
34 | Dismantling G.I. pipes (External work) including excavation and refitting trenches after taking out the pipes, manually / by mechanical means including stacking of pipes within 50 meters lead as per direction of Engineer in charge:Above 50 mm nominal bore |
35 | Taking out C.I cover with frame from R.C.C top slab of manholes of various sizes including demolishing of R.C.C work manually by mechanical means and stacking of useful material near the site and disposal of unserviceable materials within 50 meters lead as per direction of Engineer-in-charge. |
36 | Dismantling of flushing cistern of all types (C.I/PVC/Vitrious China) including stacking of useful materials near the site and disposal of unserviceable materials within 50.00 meters lead. |
37 | Disposal of building rubbish/malba/similar unserviceable, dismantled or waste materials by mechanical means, including loading , transporting, unkloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all lads incuding all lifts involved |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail