Water Resources and Irrigation Local Bodies Closing in 0 days TDR #32142057

Construction Of Shakkarmicro Irrigation Project On Turn Key Basis Including Construction Of Dam On Shakkar River And 95839Ha. Pressurized Pipes Micro Irrigation System Upto 2.5 Ha.Chak With Duty 0.35 Lps / As Per Detail Scope Of Work.

Issued by Local Bodies · narsinghpur, Madhya Pradesh
Tender Value
3824.40 Crore
Estimated cost
Bid Submission
30 Aug 2022
0 days left
EMD
50 Lakhs
Bank guarantee accepted
Document Fee
50000
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
narsinghpur → Madhya Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Construction Of Shakkarmicro Irrigation Project On Turn Key Basis Including Construction Of Dam On Shakkar River And 95839Ha. Pressurized Pipes Micro Irrigation System Upto 2.5 Ha.Chak With Duty 0.35 Lps / As Per Detail Scope Of Work.

Corrigendum

Sr No Corrigendum Date Corrigendum Type New Submission Date
1 08-Jun-2022 Amendment No Two Date 24-Jun-2022
2 13-Jun-2022 Amendment No three Other 24-Jun-2022
3 18-Jun-2022 Amendment No.Five Other 24-Jun-2022
4 18-Jun-2022 Amendment no.Four Other 24-Jun-2022
5 20-Jun-2022 Amendment No Six Other 24-Jun-2022
6 21-Jun-2022 Amendment No Seven Other 24-Jun-2022
7 21-Jun-2022 Amendment No Eight Date 08-Jul-2022
8 29-Jun-2022 Amendment No Nine Other 08-Jul-2022
9 29-Jun-2022 Amendment No Ten Other 08-Jul-2022
10 04-Jul-2022 Amendment No Eleven Other 08-Jul-2022
11 07-Jul-2022 Amendment No Twelve Date 05-Aug-2022
12 20-May-2022 Drawings Index Map Shakkarmicro irrigation project Other 10-Jun-2022
13 20-May-2022 Amendment One Other 10-Jun-2022
14 21-Jul-2022 Amendment No Thirteen Other 05-Aug-2022
15 29-Jul-2022 Amendment no Fourteen Other 05-Aug-2022
16 03-Aug-2022 NIT_12_Amendment_15 Date 23-Aug-2022
17 18-Aug-2022 Amendment No 16 Other 23-Aug-2022
18 22-Aug-2022 Amendment No 17 Date 30-Aug-2022
19 26-Aug-2022 Amendment No 18 Other 30-Aug-2022

BOQ

Name of Work: Construction of Shakkarmicro irrigation project on turn key basis including construction of dam on Shakkar river and 95839ha. pressurized pipes micro irrigation system upto 2.5 ha.chak with duty 0.35 lps/ha in Narsinghpur and Chhindwara district including SCADA work as per detail scope of work.
Sl. No. Item Description
1Construction of Shakkarmicro irrigation project on turn key basis including construction of dam on Shakkar river and 95839ha. pressurized pipes micro irrigation system upto 2.5 ha.chak with duty 0.35 lps/ha in Narsinghpur and Chhindwara district including SCADA work as per detail scope of work.
2Construction of Shakkarmicro irrigation project on turn key basis including construction of dam on Shakkar river and 95839ha. pressurized pipes micro irrigation system upto 2.5 ha.chak with duty 0.35 lps/ha in Narsinghpur and Chhindwara district including SCADA work as per detail scope of work.

AI Tender Summary

OUR REF NO 32142057
AUTHORITY Local Bodies
TENDER VALUE 3824.40 Crore
LAST DATE 30-08-2022
Authority
Authority Name Narmada Valley Development Authority
Work Description Construction Of Shakkarmicro Irrigation Project On Turn Key Basis Including Construction Of Dam On Shakkar River And 95839Ha. Pressurized Pipes Micro Irrigation System Upto 2.5 Ha.Chak With Duty 0.35 Lps / As Per Detail Scope Of Work.
Basic Detail
Tender No 12/G/CE/2022-23
Bidding Type Tender
Location
City narsinghpur
State Madhya Pradesh
Key Dates
Publish Date 26 Aug 2022
Submission Date 30 Aug 2022
Open Date 13 Jun 2022
Finance
Tender Value 3824.40 Crore
Tender Fee 50000
EMD 50 Lakhs
Exemption Not Available
Document List
Tendernotice_1.pdf
Volume-IIIShakkar.pdf
33bfdc45-4b8d-4b9a-b39e-1324e31cdf43.html
BOQ_236847.xls
ShakkarVol-I.pdf
Shakkar_Volume-II.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Aug 26, 2022
11:30 IST

Tender Published

Tender notice published.

Completed
Jun 24, 2022
18:00 IST

Corrigendum-1 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jun 24, 2022
18:00 IST

Corrigendum-2 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jun 24, 2022
18:00 IST

Corrigendum-3 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jun 24, 2022
18:00 IST

Corrigendum-4 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jun 24, 2022
18:00 IST

Corrigendum-5 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jun 24, 2022
18:00 IST

Corrigendum-6 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jul 08, 2022
18:00 IST

Corrigendum-7 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jul 08, 2022
18:00 IST

Corrigendum-8 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jul 08, 2022
18:00 IST

Corrigendum-9 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jul 08, 2022
18:00 IST

Corrigendum-10 Issued

Clarifications on tender conditions and amendments issued.

Completed
Aug 05, 2022
18:00 IST

Corrigendum-11 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jun 10, 2022
18:00 IST

Corrigendum-12 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jun 10, 2022
18:00 IST

Corrigendum-13 Issued

Clarifications on tender conditions and amendments issued.

Completed
Aug 05, 2022
18:00 IST

Corrigendum-14 Issued

Clarifications on tender conditions and amendments issued.

Completed
Aug 05, 2022
18:00 IST

Corrigendum-15 Issued

Clarifications on tender conditions and amendments issued.

Completed
Aug 23, 2022
18:00 IST

Corrigendum-16 Issued

Clarifications on tender conditions and amendments issued.

Completed
Aug 23, 2022
18:00 IST

Corrigendum-17 Issued

Clarifications on tender conditions and amendments issued.

Completed
Aug 30, 2022
18:00 IST

Corrigendum-18 Issued

Clarifications on tender conditions and amendments issued.

Completed
Aug 30, 2022
18:00 IST

Corrigendum-19 Issued

Clarifications on tender conditions and amendments issued.

Completed
Aug 30, 2022
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Jun 13, 2022

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
pdf

Tendernotice_1.pdf

pdf

Volume-IIIShakkar.pdf

html

33bfdc45-4b8d-4b9a-b39e-1324e31cdf43.html

xls

BOQ_236847.xls

pdf

ShakkarVol-I.pdf

pdf

Shakkar_Volume-II.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders