| 1 | Rates for Laying & Jointing / repairing, Source Work & Work including all material, labor, t&p etc complete under Ladhara Water Supply Scheme in Block Didihat of District Pithoragarh |
| 2 | Source Work |
| 3 | Diversion of gadhera from working area,cleaning of source by removing malva, bushes, tree trunks and branches fallen on the source As well as evaquation of stone pitching choked by fine soil particles |
| 4 | cleaning of source by removing malva, bushes, tree trunks and branches fallen on the source As well as evaquation of stone pitching choked by fine soil particles |
| 5 | Supply of all materials, labours & T&P etc and construct following works as per type design and drawings complete.C.C. Intake Chamber |
| 6 | Pipe Line Work |
| 7 | Excavation in foundation for retaining &breast walls in all types of soil and rocks including lead1.50 meter, liftup to 30.0 meter and disposal of surplus material as per direction of engineer-in-charge |
| 8 | Carting from site store to site of work,Laying & Jointing of G.I screwed pipes(including supply of all jointing materials like specials, white lead, hemp and oil etc) in trenches with its cutting, threading and testing of pipe line etc complete.Pipe Size 20 mm dia |
| 9 | Pipe Size 25 mm dia |
| 10 | Pipe Size 32 mm dia |
| 11 | Pipe Size 40 mm dia |
| 12 | Protection work of pipe line & Repearing Work- |
| 13 | Excavation in foundation for retaining &breast walls in all types of soil and rocks including lead1.50 meter, liftup to 30.0 meter and disposal of surplus material as per direction of engineer-in-charge |
| 14 | Providing and placing P.C.C1:3:6 with cement sand and 40mm stone ballast includingall material,labour,T&P etc. forproper completion of the work as per direction of Engineer in-charge.IN-up to plinth level work |
| 15 | Random Rubble stone masonary laid 1:6 c/s mortar including supply of all material, labour and T&P and royalties etc. required for proper completion of work as directed by Enginer in- charge. |
| 16 | Providing and placing of P.C.C 1:2:4 with cement sand and 20mm stone ballast includingall material,labour,T&P etc. for the proper completion of the work as per direction of Engineer in-charge.IN- |
| 17 | Storage Work |
| 18 | Supply of all materials, labour T&Petc complete to construct Sump / CWR as per drawing includung cost of all pipes & fittings all complete Capacity of Sump/CWR in kl3 K.L |
| 19 | 7.5 K.L |
| 20 | Supply & Fixing of Singh Bord |
| 21 | Supply of all materials labour T&P etc and install chlorinating chamber as per type design and drawing complete including supply and installation of bucket type chlorinator of 25 liters capacity. |
| 22 | Construction of gate valve chamber having size 0.60x0.60x0.40m including fixing ofgate valve with all necessary tools,material, T&P,pad lock and man hole cover but excluding supply of gate valve |