| 1 | Construction of embankment with approved material obtained from availble land as permitted and approved byEngineer-in-Charge and as per Technical Specitaion Clause 301.3.4.1,with all liftsand leads,spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 as per Technical Specification clause 301.5(Including labour Cess & Excluding GST) |
| 2 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.(Including labour Cess & Excluding GST) |
| 3 | Providing ,Laying ,spreading and compacting stone aggregates of 63-45 mm size to water bound macadam specification including spreading in uniform thickness , hand packing ,rolling with Smooth wheel roller 80-100 KN in stages to proper grade and camber ,applying and brooming ,Stonescreening,binding materials to fill up theinterstices of coarse aggregate ,watering and compacting to the required density (Including labour Cess & Excluding GST) |
| 4 | Providing ,Laying ,spreading and compacting stone aggregates of 53-22.4 mm size to water bound macadam specification including spreading in uniform thickness , hand packing ,rolling with Smooth wheel roller 80-100 KN in stages to proper grade and camber ,applying and brooming ,Stonescreening to fill up the nterstices of coarse aggregate ,watering and compacting to the required density (Including labour Cess & Excluding GST) |
| 5 | Construction of shoulder with approvedwith approved material obtained from excavation of pitsspreading, grading to required slope and compacted to meet requirement Specification.(Including labour Cess & Excluding GST) |
| 6 | Brick edging on both sides of the road with first class bricks 8 cm wide & 12 cm deep laid with mudmortar including labour & supply of bricks finished to required template and in proper alingment and also including dressing & ramming the excavated earth as directed by the Engineer - in -charge.(Including labour Cess & Excluding GST) |
| 7 | Providing and applying primer coat with bitumen emulsion (SS) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.7 kg/sqm using mannual means.(Including labour Cess & Excluding GST) |
| 8 | Providing and applying tack coat with VG_10 using bitumen distributor at the rate of 0.35 kg per sqm on the preparedsurface cleaned with hydraulic broom .(Including labour Cess & Excluding GST) |
| 9 | Providinglaying & rolling of open graded premix carpet of 20 mm thickness composed of 13.2mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line ,grade and level to serve as wearing course on a previously prepared base including mixing by mixall,laying and rolling with a three wheel 80-100 KN static roller capacity finished to required level and grades to be followed by seal coat .(Including labour Cess & Excluding GST) |
| 10 | Providing and laying seal coat \"C\" Type sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall(Including labour Cess & Excluding GST) |
| 11 | Construction of 1000 mm Hume pipe CulvertEarthwork in excavation for structures as per drawingand technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.(Including labour Cess & Excluding GST) |
| 12 | Construction of 1000 mm Hume pipe CulvertPlain cement concrement 1:3:6 nominal mix in foundation with crushed aggregate 40 mm nominal size mechanically mixed,placed infoundation and compected by vibration including curing for14days.(Including labour Cess & Excluding GST) |
| 13 | Construction of 1000 mm Hume pipe CulvertLaying reinforced cement concrement pipe for culverts on first class bedding of granular material in single row including fixing collar with cement motar 1:2 but excluding excavation,protection works,back filling,concrete and masonary works in head walls and parapets(Including labour Cess & Excluding GST) |
| 14 | Construction of 1000 mm Hume pipe CulvertBrick masonry work in 1:3 cement mortar in foundation complete excluding pointing and plastering as per drawing and technical speficiations clauses 600, 1202 & 1203(Including labour Cess & Excluding GST) |
| 15 | Construction of 1000 mm Hume pipe CulvertPointing with cement mortar (1:3) on brickwork in sub structure & super structure as per drawing and technical specification clauses 613.3 , 1204 and 1208.4(Including labour Cess & Excluding GST) |
| 16 | Construction of 1000 mm Hume pipe CulvertPlastering with cement mortar (1:4)15 mm thick on brickwork in substructure/superstracutre as per technical specification clauses 613.4 & 1204 (Including labour Cess & Excluding GST) |
| 17 | Construction of 350 mm Hume pipe CulvertEarthwork in excavation for structures as per drawingand technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.(Including labour Cess & Excluding GST) |
| 18 | Construction of 350 mm Hume pipe CulvertLaying reinforced cement concrement pipe for culverts on first class bedding of granular material in single row including fixing collar with cement motar 1:2 but excluding excavation,protection works,back filling,concrete and masonary works in head walls and parapets(Including labour Cess & Excluding GST) |