Provision Of Solar Power Plant Of Capacity 60 Kilowatt Each At Military Station Abohar And Fazilka Provision Of Solar Power Plant Of Capacity 60 Kilowatt Each At Military Station Abohar And Fazilka, abohar-Punjab

Military Engineer Services-MES has published Provision Of Solar Power Plant Of Capacity 60 Kilowatt Each At Military Station Abohar And Fazilka Provision Of Solar Power Plant Of Capacity 60 Kilowatt Each At Military Station Abohar And Fazilka. Submission Date for this Tender is 27-05-2022. Solar Power Plants Tenders in abohar Punjab. Bidders can get complete Tender details and download the document.




Tender Notice

32055402
Corrigendum : Provision Of Solar Power Plant Of Capacity 60 Kilowatt Each At Military Station Abohar And Fazilka Provision Of Solar Power Plant Of Capacity 60 Kilowatt Each At Military Station Abohar And Fazilka
Open Tender
Indian
Punjab
abohar
27-05-2022

Tender Details

Provision Of Solar Power Plant Of Capacity 60 Kilowatt Each At Military Station Abohar And Fazilka Provision Of Solar Power Plant Of Capacity 60 Kilowatt Each At Military Station Abohar And Fazilka

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 20-May-2022 Bid Auto Extn Corrigendum Bid Auto Extn Corrigendum 27-05-2022

Key Value

Document Fees
INR 1000 /-
EMD
INR 140200.0 /-
Tender Value
Refer document

BOQ Items

Name of Work: PROVISION OF SOLAR POWER PLANT OF CAPACITY 60 KILOWATTEACH AT MILITARY STATION ABOHAR AND FAZILKA.
Sl. No. Item Description
1PHASE-I Design,Supply, erection, install, testing and commissioning of grid connected Solar PV Plant of 60KW capacity (On-Grid connected Bldg rooftop solar PV generation without battery) complete with following accessories at conditions prevalent at ABOHAR AND FAZILKA (PUNJAB) Grid connected open access solar PV generation including solar grade copper cable upto UPS,array junction box, module, civil and general wks, mounting structure, power conditioning unit,. Minimum techinal requirements/standards for SPV Systems/Plants to be deployed as per Ministry of New and Renewable energy are manadatorily to be complied with in the plan.Any item/component missing(As per sound Engineering practice & fuctional point of view) in schedule will be presumed to be catered by the contractor in the quoted rates to get desired output.The contractor shall not claim the amount for any missing component if any during execution stage.Solar PV Plant comprising of following Sub-components/Sub-Systems and meeting the specification as given below:- NOTE: The cost of folowing accessories/equpiment/approval is included in the item and no extra payment will be made to contractor.
2serial item no 01 Contd/- (A) PV Modules: (a) The PV Module must qualify to the latest edition of any of the following IEC/equivalent BIS Standards for PV Module design qualification test and type approval:Mono Half cut of capacity minimum 500W or more of each PV Modules : IEC 61215/ BIS 14286 Equivalent BIS (if availableas on last date of receipt of tender) In addition, the modules must confirm to IEC 61730 Part I requirements for construction & Part 2-requirements for testing, for safety qualifiation or equivalent BIS ( if available as on last date of bid submission) (b)For the PV modules to be used in a highly corrosive atmosphere thourghout their life time, they must qualify to IEC 61701/ BIS 61701.
3Serial item no 01 Contd/- (c)Identification and traceability :- Each PV modules must use a RF identification tag (RFID) module as per ALMM policy with FTR (Flash Testing Report) which must contain the following information:- (i) Name of the manufacture of PV Module. (ii) Name of the manufacturer of Solar cells (iii) Month and year of the manufacture(separetely for solar cells and module) (iv) Country of origin (make in india only ) (separately for solar cells and module) (v) I-V curve for the module (vi)Peak Wattage, Im, Vm and FF for the module (vii) Unique serial No and model No of the module (viii) Date and year of obtaining IEC PV module qualification certificate (ix) Name of the test lab issuing IEC certificate (x) Other relavent information on traceability of solar cells and module as per ISO 9000 series Note : RFID shall be mandatorily placed inside the module laminate. (xi) PV Modules in sandy environment should confirm IEC 600068-2-68 (d)AUTHORISED TESTING LABORITIES / CENTRES: The PV modules must be tested and approved by one of IEC authorized test centers/FTR. In addition a PV modules qualification test certificate as per IEC standard, issued by ETDC Bangalore or Solar Energy Centre will also be valid. . For details of test labs refer Minstry of New and Renewable energy website. The report submitted should not be older than 03 months.
4Serial item no 01 Contd/- (e) WARRANTY: The manufacturer should be warrant the solar modules to be free from the defects and/or faliures specified below for a period not less than five (05) years from the date of sale to the orignal customer. performance warranty for the plant would be minimum 10 Years.PV modules used in solar power plants/systems must be warranted for their ouput peak watt capacity, which should not be less than 80% of the initial value at the end of 10 years and 70%of the initial value at the end of 25 Years.
5Serial item no 01 Contd/- (f) SPECIFICATIONS: Mono Half cut SPV cells shall be used in the solar Photovoltaic module. PV panelsshould be of any of the make approved by all of the agencies simultaneosly i.e MNRE and SECI and NISE, The make proposed by the contractor/channel partner shall be got vetted by the design vetting agency. The departments reserve the right of making independent inquirywith MNRE/SECI/NISE/ALMM as regard appraisal of the proposed make and in case any adverse observation/reservation on the proposed make is receivedfrom any one of these agencies then thatmake shall not be allowed. (g) Peak power rating of the module shall not be less than 500 to 525 Wp (h)Minimum cell efficiency of 22 % and module efficiency of minimum 20 %at standard test condition and the cell should have minimum fill factor of 0.74 (j)Plant performance. The ratio between the actual and theoretical energy outputs of the SPV plant is termed as Performance Ratio (PR) and is measured in accordance with IEC 61724.Based on prevailing climatic and temperature conditions in India, a performance ratio of 80 % is expected for Mono Half cut. It shall be made of high transmittivity glass & front surface shall give high encapsulation gain, transmittance above 90 % and bending less than 0.3 %.
6Serial item no 01 Contd/- (k)All materials used shall have a proven historyof reliability and stable operation in external applications. It shall perform satisfactory in relative humidity up to 100% with temperatures between -40ºCand + 85º C (Cell)and shall withstandgust up to 200 km/h on the surface of the panel. Each and every SPV module shall be checked for conformity with relavent standard and no negative tolerance shall be accepted. (l)Electrical Parameters of 525 Wp Solar PV module under STC of irradiance 1000 W/m2,AM 1.5 Spetrum & temperature 250 º C will be as under-Max Peak Power Pmax :525 Wp, Current at Pmax Ipm::12.69 A, Voltage at Pmax Vpm : 41.40Volts, Short Circuit Current Isc : 13.4A, Open circuit voltage Voc: 49.20Volts
7Serial item no 01 Contd/- (m)The peak-power point voltage and the peak power point current of any supplied module and/or any module string (Series connected nodules) shall not vary by more than 2 (two) per cent from the respective arithmatic means for all modules and/or for all modules strings,as the case may be. (n)Rated output of mudules shall have positive tolerance of 3-5 % & no negative tolerance is allowed.
8Serial item no 01 Contd/- (o)Generals requirements of PV module: (i) Module shall be manufactured in India. Module shall be made up of Mono Half cut sillicon cellsas pervetted by the vetting agency. (ii) The interconnected cells shall be laminated in vaccum to withstand adverse environmental conditions. (iii) The module frame is made up of corrosion resistant materials, perferably having aluminium anodized finish. (iv) Tilt angle to be calculated as perlocal climatical condition to be submitted. (v) Surge arresting device to be providedat junction box and module shall be provided with bypass diode. (vi) The bidder shall carefully calculate & accommodate requisite numbers of the modules in the available area(refer topographical survey) to achieve the rated power in his bid. (vii) The SPV Module must be IEC 61215 and IEC 61730 Part 1 and part 2 certified from any of the accredited certifying agencies. (viii) The biddershall provide the sample solar PV Module electrical characteristics including current voltage (I-V) performance curves and temperature coefficients of power voltage and current. (ix) The module shall be provided with a junction box with either provisionof external screw terminal connection or sealedtype and with arrangement for provision of bypass diode. The box shall have hinged, weather proof lid with captive screws and cables glands entry points or may be sealed typeand IP 65 rated. (x) The temperature co-efficient for the module shall not be more than 0.50%/°C. (xi) Every module must have by pass diode of suitable capacity. (xii)It shall also in conformity of latest minimum technical specifications issued by MNRE from time to time.
9Serial item no 01 Contd/- (xiii) Plants installed in high dust geographies like PUNJAB must have the solar modules tested with relevant dust strands(Applicable standard would be 60068-2-68) . (xiv) Provision of earthing & earth strip/cables etc. for earth for solar PV module/Array etc. as per latest IS/MNRE norms to be provided and the cost of the same is to be included in this item and no extra amount will be paid to the contractor on this account. (xv)RFID reader to be provided by contractor. (xvi) Junction Boxes:Supply & fix 47 (Min) Numbers of dust vermin and waterproof Array Junction Boxes and 16 Nos main junction boxes made of FRP/Thermo Plast with IP65 protection in compliance with IEC62208 and shall be sunlight /UV resistant as well of fire retardant including over voltage protection, surge protection and maintenance free earthing as per relavant standard. (xv)The Junction boxes shall have suitable arrangement of followings:(a) Strings are required to be connected to the bas-bar through individual fuses. Provide arrangement for disconnection for each of the groups. (b) Provide a test point for each subgroup for quick fault location & to provide group array isolation. (c)Each array junction box will have suitable by pass & reverse blocking diodes for maximum DC blocking voltage of 1000V with suitable arrangement for its connection. Reverse blocking & by-pass diodes shall work for temperative extremes & shall have efficiency of 99.98% conformed by appropriate IEC standard.
10Serial item no 01 Contd/- (xvi) Cable: (a) Supply, fix/lay and testingofDC Solar cable of suitable size Tinned multistranded Copper Cable with required accessories like conduits, glands, cable tie, ferrules etc. String to SMB of suitable length as per design requirement. (b)Supply, fix/lay and testingof DC Solar power cable ofsuitable sizemultistranded Aluminum with required accessories like conduits, glands, cable tie, ferrules from SMB to Inverter of suitable length as per design requirement. (c) Supply and fix/lay Auxillary power cable of suitable size multistranded copper with required accessories like conduits, glands, cable tie, ferruls etc of suitable length as per design requirement. (d)Supply and fix/lay communication cable of suitable size with required accessories like conduits, glands, cable tie, ferruls etc of suitable length as per design requirement. (e) The wiring of modules interconnection shall be in suitable size GI/HD pipe.Note: (i) cost of all inter connecting copper cables along with all other accessories, essential included like cable trays. ( floor/ wall mounted ) suitable to accommodate solar grade cables & cables upto inverter is included in the item and no extra payment will be made to contractor. (ii) Suitable size of XLPEinsulted copper cable of solar grade, 1100 Volt & UV resistance and flame retardant for outdoor installations conforming IEC 60227/15694 & 60502/ IS 1554 (Pt I & II). (iii) All cables and connectors for use of installations shall be of solar grade which can withstand harsh environment conditions including high temperature, UV radians, rain. humidity, dirt, burial and attack bymicrobes for 25 years and voltage as per latest IEC/IS in standards. (iv) All cables/wires shall be provided with UV resistance printed copper ferrules for DC side. (v) Size of cable shall be such that maximum voltage drop calculation sheet should be provided by vendor/contractor to the department before commissioning of the work at full power from PV modules to invertor shall be less than 1.5% including diode voltage drop. (v) Cable Batch No./Drum No., IS code & size make should be printed/embossed at every one metre.
11Serial item no 01 Contd/- B. MODULE MOUNTING STRUCTURE : (a) Design Supply, fixing, support structure MS hot dipped galvanised (80Micrones) fixed on bldg roof top including PCC foundation for civil works (excavation, cutting,grouting, PCC etc.) and fixing the mounting arrangement suitable for PV solar modules & to withstand minimum horizontal wind speed of 200kms/hr. Module mounting structure may require to customize with respect to the site availability . The array structure shall be so designed that it will occupy minimum space without sacrificing the output from Solar PV panels. (b) Modules shall be mounted on a non-corrosive steel structures. (o), latitude angle (-15), latitude angle(+15). The locking arrangement for adjusting the angle of module shall be accessible from the ground. (c) The base columns shall be made of reinforced cement concrete based on site related data. (d) The frames and leg assemblies of the array structures shall be made of MS hot dip galvanized. Minimum thickness of galvanisation should be at least 80 microns. (e) All fasteners shall be of Stainless steel-SS 310, Nut & Bolts supporting structures including modules mounting structuresshall have to be adequately protected against all climatic condition and weather prevailing in the area. (f) Design efficiency report generated by Staadpro shall be submitted. (g) Two numbers of anti-theft fasteners of stainless steel on two diagonally opposite corner of each module shall be provided. NOTE: Design of the mounting structure to be vetted by NISE or Independant agency approved by MNRE and cost of the same shall be borne by the Contractor.
12C. GRID TIED INVERTER 60 KW : Supply, fixing, testing and commissioning of not lessthan capacity of 60KW, string type MPPT In-built to provide maximum power output, 50 Hz ± 3 Hz (minimum)3 phase 400V,104 A DTH <3% at nominal power inverter suitable to convert DC power of solar PV module/array to AC for further feeding to grid & conforming IEC-61683 for efficiency, IEC-62109(1&2) or equivalant for safety & IEC-62093 for reliability. The input D.C. tech specification of inverter are as under- Input (DC) Max DC power : 120 KWp , MPP range : 180-1000V ,Max current : 9*26 A,No. of MPPT tracker :9/2, Operating temperature- 10º to +85ºC.Invertor-set as per design . Make:-luminious/Havells/Polycab/ABB/Schneider or equavalent with 5 years warranty (i)Nominal Voltage -415 V +/- 10 %,3 phase, 50 Hz . (iii) Grid Freq. Synchronization -47-52 or 57-62. (iv) Ambient Temp- 20ºC to 50º C. (v) Humidity - 95% non condensing. (vi) Protection of enclosure- IP 20(indoor) / IP 65 (Outdoor) (vii) No Load Losses - < 1% of rated power (viii) Inverter Efficiency ->97% (without inbuilt galvanic isolation) > 93% (with inbuilt galvanic isolation) Note:-(i)The inverter shall include appropriate self protection & self diagnostic feature to protect itself and the PV array from the damage in the event of inverter component failure or from parameters beyond the inverter"s safe operating due to internal or external causes. (ii)Inverter shall have protected arrangement against ground leakage faults, over voltage (SPD) & over current. (iii)Inverter shall have arrangement for adjusting DC input current & shall trip against sustainable fault down stream and shall not restart till fault is rectified.
13Serial item no 01 Contd/- (iv)The inverter should have provisions of Galvanic isolation, Anti-islanding protection (IEEE 1547/UL 1741) equivalent BIS standard and lightening. (v)Item for Mechanism of heat disipation deemed to be included in above item.No extra payment shall be made.) (vi) The inverter shall adjust voltage and frequency levels to suit the grid. (vii) The inverter shall be self-commulated with Maximum power point tracker (MPPT) technology and shall be capable of synchronize maximum within 1 minute. (viii) Maximum power point tracker (MPPT) conforming IEC-62093 shall be integrated in the inverter to maximize energy drawn from the solar PV array. (ix) MONOLITHIC Design of Inverter is not permissible. (x) The Inverter should have suitable nos. of Protected Inputs (as per design) and Outgoing should be protected by ACB.(xi) The Inverter should be proided with SPG and suitable earthing kit. (xii) The Inverter should have MODBUS, PROFIBUS, ETHERNET Communication port. (xiii) The inverter shall include appropriate self protection & self diagnotic feature to protect itself and the PV array from the damage in the event of inverter component failure or from parameters beyond the inverter"s safe operating due to internal or external causes.(xiv) Inverter shall have protected arrangement against ground leakage faults, over voltage (SPD) & over current. (xv) Inverter shall have arrangement for adjusting DC input current & shall trip against sustainable fault down stream and shall not restart till fault is rectified. (xvi) The inverter should have provisions of Galvanic isolation, Anti-islanding protection (IEEE 1547/UL 1741) equivalent BIS standard and lightening.(xvii) The inverter shall consist of associated control, protection, data loging device and remote monitoring hardware. (xviii) The inverters shall have minimum protection to IP65 and minimum European efficiency 98% load as per IEC 61683 standard.
14Serial item no 01 Contd/- D.The Contractor will be responsible for obtaining all permissions as per the procedure of RREC and regulatory commission of Punjabfor evacuation of Power ON GRID. The cost of the same is to be included in the quoted rates, no additional payment will be made to the contractor for the same. The contractor must go through latest solar policy of the state and MNRE. Procedures for evacuation of Power ON GRID. Charges deems as applicable payable to any Department for any ON GRID evacuation will be borne by the contractor
15Serial item no 01 Contd/- E. COMBINER BOXES & ELECTRICAL PANEL- The junction boxes shall be of dust, vermin and waterproof and shall made of thermo plastic. The teminal shall be connected to copper bus bar arrangement of proper sizes. The junction boxes should have suitable cable entry points fitted with cable glands of appropriate size for both incoming and outgoing cables. Suitable marking will be provided on the bus bar for easy identification and cable ferrules shall be fittedat the cable terminals points for identification, Combine groups of modules into independent charging sub arrays that shall be wired to the controller, Should meet IP 65 standard for outdoor application, There shouldbe of inputs DC cable chamber(Bus Bar), Output AC Chamber(Bus Bar),
16Serial item no 01 Contd/- F. CABLES & WIRES AS REQUIRED (From Solar moduleto combiner boxes,invertor etcConductor material) : annealed tinned flexible copper conductor, Max PV System voltage(DC) : 1000 V, Ambient temperature range: -40 Deg C to +90 Deg C, Max Conductor temperature at terminationof short circuit : 250 Deg C, Type of conductor : As per class 5 according to EN 60228/IEC 60228, Insulation material : Chemically cross linked XLPE, Type of insulation: According IEC 60502-1, EN-50363-1, Nominal thickness of insulation : 0.80mm, Outer sheath Material: Chemically cross linked XLPE, Recommended bending radius : 4 times of overall dia, AC test voltage : 6.5 KV for 5 Minute, all cables shall conform to BIS standars (IS 694)/(IS1554), PVC/XLPE copper conductor power electric cable.It should concist of follwing-(i) Cable from interconnection of PV module to junction box.(ii) Cable from combiner box to inlet of invertor.(iii) Cable from invertor to Electric load side. (iv) "Supply & Laying LT UG cable 1100Volts grade of size 95 Sqmm 3.5 core - 1000 RM including excavation in trench 60 cm depth and 45 cm wide, drilling of holes through road, sand, old size bricks for cable protection returning and filling of each all as specified and directed Make: Polycab/Siechem or equivalant Cables Accessories: Such as Glands, lugs, MC4 connectors , wye connectors, clamps, cable Ties, perforated Trays with accessories etc.
17Serial item no 01 Contd/- G.Lightning Protection for PV Array: Design, supply & fix Lightning Arrestor of required number of suitable Early Streamer Emission (ESE) lightning arrestors installed in the array field. Lightning arrestors/surge arrestors shall conform to IEC 60099-4 or IS:3070 except to the extent modified in the specifications. Arrestors shall be of hermetically sealed units, self-supporting construction, suitable for mounting on lattice type support structures.The air terminal is Early Streamer Emission (E.S.E.) type which shall be fixed at the top of a GI elevation pole with base so as be at least 2 meters above the structure to be protected. Its height above roof level would be dependent on the level of protection and the protection radius required.Make: JMV or Equavalent The air terminal should be working on the principle of early streamer emission using non-radioactive technology, neeeding no external power source. The air terminal should be capable of racking the lightning stroke 60 micro seconds earlier as compare to passive lightning rod. The air terminal is of stainless steel and it has qualified diameter to resist high values of lightning currents.The air terminal is of stainless steel and it has qualified diameter to resist high values of lightning currents.Roof connection pipe should be capable of withstand in lightning strikes having dimension 50mm ID and 60mm OD. The terminal adaptor having inner dia 60mm OD NOTE: 1.Cost of all equipments, copper strip upto earth test point etc are included in this item. 2. The cost of sufficient earthing for lightning protection is included in this item and no extra payment will be made to the contractor on this account.
18Serial item no 01 Contd/- F.EARTHING PROTECTION- Earthing: 03 Set of maintenance free Chemical earthing kitusing 80 mm dia copper pipe having 3 meter long for electrode along with 32 x 6 mm copper strip and lightning protection system to connect complete power plant as relevant BIS/IEC standards using maintenance free gel earthing, lightining arrester of 01 set according to radius of protection during detailed enginering. Each array structure of the PV yard shoud be grounded properly. The array structures shall be connected to earth pits as per IS Standards.(a) 1. Copper bonded steel rod: material NOTE: 1.Cost of all equipments, copper strip upto earth test point etc are included in this item. 2. The cost of sufficient earthing for lightning protection is included in this item and no extra payment will be made to the contractor on this account.
19Serial item no 01 Contd/- G.(i) Solar Power Meter, ABT meter, bidirectional meter, check meter as required qty. (ii) Three phase LT AC controlled switch with complete acessories to cut off solar powersupply to grid in case of failure of the grid -01 No
20Serial item no 01 Contd/- H.BALANCE OF SYSTEM(BOS) ITEMS/COMPONENTS :- The BOS items/components of the SPV power plants system deployed under this projects must confirm to the latest edition of IEC or equivalent BIS Standared/MNRE specifications /as specified at Para 2.1 of MINIMAL TECHNICAL REQUIREMENTS /STANDAREDS FOR SPV SYSTEM/PLANTS TO BE DEPLOYED DURING this FY under the programmes of Ministry of New and Renewable energy available on MNRE website.
21Serial item no 01 Contd/- J. AUTHORISED TESTING LABORATORIES /CENTRES ;- Test certificate /reports for the BOS items/components can be taken from any of the NABL/IEC Accredited Testing Laboratories of MNRE approved test centres. Thelist of MNRE approved test centres amy be reviewed and updated from time to time. The list as appicable as on last dateof receipt of tender shall be treated as applicable for this tender.
22Serial item no 01 Contd/- K.WARRANTY: The mechanical structures, electricals works including power conditioners /inverters/charge controllers/maximum power point tracker units/distribution boards/digital meters/switchgear/storage batteries, etc and overall workman ship of the SPV power plants systems must bewarranted against any manufacturing/design/installation defects for a minimum periods of 5 years.
23Serial item no 01 Contd/- L.GENERALS NOTES : The items of work mentioned in this schedule shall be executed as per following:- (a) The above items shall be quoted and executed on ground based on performace Guarantee basis. The performance Guarantee is related to achieving the 60 KWp generations with specified efficiency and efficacies. The contractor shall also be responsible for desired operational efficacy and desired efficiency of the system during its life cycle of minmium 25 Yrs. b) The plan layout and schematic diagram shall be got vetted from any one of the following agencies (Approveddesign vetting agencies) (i) National institute of Solar energy(ii) sardar Swarn singh National Institute of renewable energy (iii) Solar energy corporation of (India(iv) The Indian renewable energy development agency, The vetting agency shall also be approve the make proposed by the contractor in his plan layout and schematic diagram. (c ) The successful contractor shall submit the following documents duly vetted by any one approved design vetting agency within four weeks of placements of work order for approval of MNRE/SECI/NISE. (d) Design calculation: The tenderer should work out design based on the conditions prevalent at ABOHAR and FAZILKA (PUNJAB) ,where ground specification as existing. The complete design calculations using PVSYS & PVSOL software or any other software shall be submitted for approval by any of MNRE/SECI / NISE. (e) Plan depicting layout of all equipment and Sub Systems of the PV system. This shall be self contained and self explanatory representation of layout of equipment and sub systems. The dimensioned drawing of the site of work clearly marked with all subsystems components etc shall be submitted.
24Serial item no 01 Contd/- (f)Schematic diagram of the electrical system. This shall contain specification, size, current, voltage and fault levels rating of all cables, switch gears and instrumentation & control systems and all metering and interlocking etc. (g)All the documents/technical details mentioned above duly vetted as specified above shall be approved by accepting officer. The accepting officer may approve the documents as submitted by the Contractor or maysuggest modification /alteration in documents /technical specifications duly supported with reasons for the same. The work shall be executed based on the approved doucments. In case of any dispute the matter shall be referred accepting officer. The decision of accepting officer shall be final and binding. (h)The drawings and other techincal details submitted by the successful contractor, alongwith all calculations, drawing, technical write ups etc shall becomedepartmental property. Department may use these subsequently as deemed necessary. The contractor shall have no claim on these documentsand their subsequents use by the department. (j)After completion the contractor must engage a third party MNRE aproved consultant for final testing and third party inspection of executed work. The consultant shall certify that the work has been executed in accordance with vetted and approved plan layout and schematic diagram, The contractor shall propose a panel of three consultantfor this purpose. The final decision on the consultant to be engaged shall be taken by accepting officer. all cost and charges for engagement of consultant shall be born by the contractor. (k)After execution of project the contractor will verify generation of electricity as per vetted design in the PVSYST & PVSOL report submitted. (l) The contractor shall ensure suitable arrangements for solar PV Panels. (m)Department will give completion of the work to the contractor only on the basis of completion report submitted by the third party consulatnt engaged by the contractor.
25Serial item no 01 Contd/- (M) Supply and Installation of Display board of 6’ X 4’ size showing all technical information of SPV plant shall be done by the contractor. The matter written on these boards shall be finalized with GE.
26PHASE-II Manning & Operation of 02 Nos of Solar PV Plant systemat ABOHAR and FAZILKA by providing all accessories as mentioned in Schedule complete inclusive of daily, weekly, monthly, quarterly, half yearly and yearlymaintenance and manningofplant in One shift per day (as per Engr-In-Charge direction) with 01 No Operator at each plant with including all consumable materials and chemicals as required & other spares required excluding electricity and water for operation as specified and directed. (i.e. during defects liability period of 36 months immediately after completion of the work.) Note: (i) Quoted rate will be for two plants and for purpose of any deviation half the quoted rate will be considered for one plant. (ii)Contractor will ensure that weekly off is given to operators and suitable reliever are deployed on the weekly off day of operators.
27(a)First upto 330 days(Under defect libility period)
28(b)Second from 331 to 660 days (Under defect libility period)
29(c)Third from 661 to 990 days (Under defect libility period)
30(d)Fourth from 991 to 1095 days (Under defect libility period)
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail