|
| 1 | Dismantling tiled floors laid in mortar upto floor two level including stacking of serviceable materials and disposal of un-serviceable materials within 20 metres lead (wooden/concrete joists to be measured and paid for separately)For thickness of tiles above 25mm and upto 40mm as perdirection of the Engineer-In-Charge including carriage of material within all leads, lifts and other incidentals. The rate is inclusive of octroi, royality, malkana and all type of taxes imposed by the Government. |
| 2 | Providing and laying cement concrete 1:4:8 (One cement isto four sand isto eightgraded broken/crushed stone aggregate 40mm (Forty millimetre) nominal size mechanically mixed and curing complete excluding cost of forms work in foundation and plinthas perdirection of the Engineer-In-Charge including carriage of material within all leads, lifts and other incidentals. The rate is inclusive of octroi, royality, malkana and all type of taxes imposed by the Government. |
| 3 | Providing and laying Duro stone vetrified tilesof Orient/ Bell / Rak300x300mmx8mm (three hundred into three hundred into eight millimetres) in grey/coloured or of approved shade in flooring, treads of steps and landing laid on a bed of 12mm thick cement mortar 1:3 (1 cement : 3 sand) laid over and jointed with neat cement slurry finished with flush pointing in white cement mixed with pigment of required shade to match the shade of tiles complete as perdirection of the Engineer-In-Charge including carriage of material within all leads, lifts and other incidentals. The rate is inclusive of octroi, royality, malkana and all type of taxes imposed by the Government. |
| 4 | White glazed tiles 6mm (Six milimetres) thick in skirting of 30x20cm (Thirty into Twenty centimetres) of Naveen/Somany tiles or its equivalent in risers of steps and dado 12mm (Twelve milimetres) thick cement mortar 1:3 (One cement : Three sand) and jointed with cement slurry as perdirection of the Engineer-In-Charge including carriage of material within all leads, lifts and other incidentals. The rate is inclusive of octroi, royality, malkana and all type of taxes imposed by the Government. |
| 5 | Providingandlaying300 x 300 x 25 mm (three hundred millimetre into three hundred millimetre into twenty five millimetre) Labrador Design ( Rainbow Series) of NTC redsandstoneslabflooring25mm (twenty five millimetre)averagethick in ramp for person with disability on 20mm(twenty millimetre) averagethickbase ofcement mortar1:4(onecement isto four sand)laid overand jointedwith grey cementslurry mixedwith pigmenttomatch the shadeof theslabi/crubbing and granite polish finish as perdirection of the Engineer-In-Charge including carriage of material within all leads, lifts and other incidentals. The rate is inclusive of octroi, royality, malkana and all type of taxes imposed by the Government. |
| 6 | Providingandlaying300 x 300 x 25 mm (three hundred millimetre into three hundred millimetre into twenty five millimetre) Labrador Design ( Rainbow Series) of NTC redsandstoneslabflooring25mm (twenty five millimetre)averagethick in ramp for person with disability on 20mm(twenty millimetre) averagethickbase ofcement mortar1:4(onecement isto four sand)laid overand jointedwith grey cementslurry mixedwith pigmenttomatch the shadeof theslabi/crubbing and granite polish finish as perdirection of the Engineer-In-Charge including carriage of material within all leads, lifts and other incidentals. The rate is inclusive of octroi, royality, malkana and all type of taxes imposed by the Government. |
| 7 | Excavation in foundation, trenches etc. in earth work in all classification of soil such as pick work, jumper work, pick jumper work, blasting work, jumper blasting work, soft and hard blasting and saturated soil, de-watering, including wedging out rocks where blasting work is prohibited, chiseleing or any other mixed variety of soil, de-watering and/or removal of slush and incidentals, lift upto any heights, stacking the excavated soil clear from the edge of excavation and then retuning the stacked soil in 15cm (Fifteen centimetre)layers, whenrequired into plinths, sides of foundation etc; consolidating each deposited layer by ramming, watering and then disposing of all excavated earth as perdirection of the Engineer-In-Charge including carriage of material within all leads, lifts and other incidentals. The rate is inclusive of octroi, royality, malkana and all type of taxes imposed by the Government. |
| 8 | Providing and laying cement concrete 1:6:12 (One cement isto Six sand isto Twelve graded broken/crushed stone aggregate 40mm (Forty milimetre) nominal size mechanically mixed and curing complete excluding cost of forms work in foundation and plinth under floor, as per specification, approved drawing, design,as per the entire satisfaction and direction of the Engineer-In-Charge including carriage of material as perdirection of the Engineer-In-Charge including carriage of material within all leads, lifts and other incidentals. The rate is inclusive of octroi, royality, malkana and all type of taxes imposed by the Government. |
| 9 | Providing and laying cement concrete 1:2:4 (1 cement:2 Sand:4 graded stone aggregate 20mm nominal size) and curing complete mechanically mixed and vibrated excluding cost of form work in foundation and plinth as perdirection of the Engineer-In-Charge including carriage of material within all leads, lifts and other incidentals. The rate is inclusive of octroi, royality, malkana and all type of taxes imposed by the Government. |
| 10 | Providing form work with steel plates of 3.15mm (Three decimal one five millimeters) thick, welded with angle iron in frames of 30x30x5mm (Thirty into Thirty into Five millimeters), so as to give a fair finish including centring, shuttering strutting and propping etc, with wooden battens and ballies for all heights/depths of propping and centring below supporting floor to ceiling and removal of the same for in-situ reinforced concrete and plain concrete work in vertical surfaces such as walls (any thickness) partitions and the like including attached pillasters, buttresses plinth and string courses and the like as perdirection of the Engineer-In-Charge including carriage of material within all leads, lifts and other incidentals. The rate is inclusive of octroi, royality, malkana and all type of taxes imposed by the Government. |
| 11 | 15mm (Fifteen milimetres) thick cement plaster in single coat on rough side of brick/concrete/stone walls for interior plastering upto all floor levels including arises internal rounded angles, chamfers and or rounded angles not exceeding 80mm (Eighty milimetres) in girth and finished even and smooth with cement mortar 1:6 (One cement isto six sand)as perdirection of the Engineer-In-Charge including carriage of material within all leads, lifts and other incidentals. The rate is inclusive of octroi, royality, malkana and all type of taxes imposed by the Government. |
| 12 | Providing and laying 20mm (Twenty millimetre) thick polished Grey/ Black granite in flooring with semi round nosing 20mm (twenty millimetre) (average) thickness base of cement mortar 1:3 (one cement isto three sand) laid over and jointed with grey cement slurry mixed with pigment to match the shade of granite stone including rubbing and polishing complete as perdirection of the Engineer-In-Charge including carriage of material within all leads, lifts and other incidentals. The rate is inclusive of octroi, royality, malkana and all type of taxes imposed by the Government. |
| 13 | Providing and laying Tor steel reinforcement for reinforced cement concrete work including bending, binding, cutting, straighting and placing in position including cost of binding wires complete up to all floors levels as perdirection of the Engineer-In-Charge including carriage of material within all leads, lifts and other incidentals. The rate is inclusive of octroi, royality, malkana and all type of taxes imposed by the Government. |
| 14 | Finishing wall with Apex weather proof exterior grade emulsion of Asians Paints / Exterior Emulsion of Nerolac Suraksha paint as per approved shade approved design (Apexultima) or its equarlied on undecorated wall surfaces (two coats) to give an even shade and final finish after throughly cleaning the surface to remove all dirt, dust and other foreign matter etc including sand paper smooth completeas perdirection of the Engineer-In-Charge including carriage of material within all leads, lifts and other incidentals. The rate is inclusive of octroi, royality, malkana and all type of taxes imposed by the Government. |