Water Resources and Irrigation Local Bodies Closing in 0 days TDR #31993068

Annual Maintenance Ayavanapanchayath Annual Maintenance2022- 23Maintenanceof Rwsstoenaneloor Repairs Ofpipelines Andtapsinayavana Panchayathforone Yearperiod.

Issued by Local Bodies · ayavana, Kerala
Tender Value
8.29 Lakhs
Estimated cost
Bid Submission
16 May 2022
0 days left
EMD
20800
Bank guarantee accepted
Document Fee
1960
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
ayavana → Kerala
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Annual Maintenance Ayavanapanchayath Annual Maintenance2022- 23Maintenanceof Rwsstoenaneloor Repairs Ofpipelines Andtapsinayavana Panchayathforone Yearperiod.

Corrigendum

Sr No Corrigendum Date Corrigendum Type New Submission Date
1 06-May-2022 Time extension Date 16-May-2022

BOQ

Work Name:Name of Work : Annual maintenance 2022 - 23 - Maintenance of RWSS to Enaneloor - Repairs of pipe lines and taps in AyavanaPanchayat for one year period
Sl. No. Item Description
1Working charges
2Leak rectification work in 40 mmPVC (Class 2 to 6) pipe line including detectingand locating leak, earth work excavation in all kinds ofsoilfor for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipe line with out causing any damages to the remaining portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe to the site, cutting andlowering new pipe in to the trenches,placing in position aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or or any available joint and testing the pipe line by operating the valves concerned,and rectifying the defects if noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depthincluding consolidating each layers by ramming, watering, charges for removingsurplus soil from work site, including hire for tools and plant, conveyance oftools and materials, bailing out water, providing caution boards,lighting,watching, ribbon fencing, traffic controlling etc.complete as per the direction of Departmental officersincluding the cost of pipe and PVC specials;PVC Pipes and specials shall be of good quality and conforming to relevant standards: All Socketed Jointing.
3Leak rectification work in 50 mmPVC (Class 2 to 6) pipe line including detectingand locating leak,earth work excavation in all kinds ofsoilfor for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipe line with out causing any damages to the remaining portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe to the site, cutting andlowering new pipe in to the trenches,placing in position aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or or any available joint and testing the pipe line by operating the valves concerned,and rectifying the defects if noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depthincluding consolidating each layers by ramming, watering, charges for removingsurplus soil from work site, including hire for tools and plant, conveyance oftools and materials, bailing out water, providing caution boards,lighting,watching, ribbon fencing, traffic controlling etc.complete as per the direction of Departmental officersincluding the cost of pipe and PVC specials;PVC Pipes and specials shall be of good quality and conforming to relevant standards: All Socketed Jointing.
4Leak rectification work in 63 mmPVC (Class 2 to 6) pipe line including detectingand locating leak, earth work excavation in all kinds ofsoilfor for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipe line with out causing any damages to the remaining portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe to the site, cutting andlowering new pipe in to the trenches,placing in position aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or or any available joint and testing the pipe line by operating the valves concerned,and rectifying the defects if noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depthincluding consolidating each layers by ramming, watering, charges for removingsurplus soil from work site, including hire for tools and plant, conveyance oftools and materials, bailing out water, providing caution boards,lighting,watching, ribbon fencing, traffic controlling etc.complete as per the direction of Departmental officersincluding the cost of pipe and PVC specials;PVC Pipes and specials shall be of good quality and conforming to relevant standards: All Socketed Jointing.
5Leak rectification work in 75 mmPVC (Class 2 to 6) pipe line including detectingand locating leak,earth work excavation in all kinds ofsoilfor for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipe line with out causing any damages to the remaining portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe to the site, cutting andlowering new pipe in to the trenches,placing in position aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or or any available joint and testing the pipe line by operating the valves concerned,and rectifying the defects if noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depthincluding consolidating each layers by ramming, watering, charges for removingsurplus soil from work site, including hire for tools and plant, conveyance oftools and materials, bailing out water, providing caution boards,lighting,watching, ribbon fencing, traffic controlling etc.complete as per the direction of Departmental officersincluding the cost of pipe and PVC specials;PVC Pipes and specials shall be of good quality and conforming to relevant standards;PVC Pipes and specials shall be of good quality and conforming to relevant standards: All Socketed Jointing.
6Leak rectification work in 90 mm PVC (Class 2 to 6) pipe line including detecting and locating leak, earth work excavation in all kinds of soil for for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipe line with out causing any damages to the remaining portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe to the site, cutting and lowering new pipe in to the trenches,placing in position aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or or any available joint and testing the pipe line by operating the valves concerned, and rectifying the defects if noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards,lighting,watching, ribbon fencing, traffic controlling etc.complete as per the direction of Departmental officers including the cost of pipe and PVC specials; PVC Pipes and specials shall be of good quality and conforming to relevant standards: All Socketed Jointing.
7Leak rectification work in 110mmPVC (Class 2 to 6) pipe line including detectingand locating leak, earth work excavation in all kinds ofsoilfor for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipe line with out causing any damages to the balance portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe, cutting and lowering new pipe in to the trenches,placing in position aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or repairable joint and testing the pipe line by operating the valves concerned,and rectifying the defects if noticed and refilling the trenches in layers not exceeding 20cm depthincluding consolidating each layers by ramming, watering, charges for removingsurplus soil from work site without causing any damages to the existing utilities, including hire for tools and plant, conveyance oftools and materials, bailing out water, providing caution boards,lighting, ribbon fencing, watching, traffic control etc.complete as per the direction of Departmental officers, including the cost of pipe& specials but excluding the cost ofCIR Joints; PVC Pipes and specials shall be of good quality and conforming to relevant standards: Socket & CIR Jointing.
8Leak rectification work in 110mmPVC (Class 2 to 6) pipe line including detectingand locating leak, earth work excavation in all kinds ofsoilfor for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipe line with out causing any damages to the balance portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe, cutting and lowering new pipe in to the trenches,placing in position aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or repairable joint and testing the pipe line by operating the valves concerned,and rectifying the defects if noticed and refilling the trenches in layers not exceeding 20cm depthincluding consolidating each layers by ramming, watering, charges for removingsurplus soil from work site without causing any damage to the existing utilities,including hire for tools and plant, conveyance oftools and materials, bailing out water, providing caution boards, ribbon fencing, lighting,watching, traffic control etc.complete as per the direction of Departmental officers, including the cost of pipe& specials but excluding the cost ofCIR Joints; PVC Pipes and specials shall be of good quality and conforming to relevant standards: CIR Jointing.
9Leak rectification work in 140mmPVC (Class 2 to 6) pipe line including detectingand locating leak, earth work excavation in all kinds ofsoilfor for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipe line with out causing any damages to the balance portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe, cutting and lowering new pipe in to the trenches,placing in position aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or repairable joint and testing the pipe line by operating the valves concerned,and rectifying the defects if noticed and refilling the trenches in layers not exceeding 20cm depthincluding consolidating each layers by ramming, watering, charges for removingsurplus soil from work site without causing any damages to the existing utilities, including hire for tools and plant, conveyance oftools and materials, bailing out water, providing caution boards,lighting, ribbon fencing, watching, traffic control etc.complete as per the direction of Departmental officers, including the cost of pipe& specials but excluding the cost ofCIR Joints; PVC Pipes and specials shall be of good quality and conforming to relevant standards: Socket & CIR Jointing.
10Leak rectification work in 140 mm PVC (Class 2 to 6) pipe line including detecting and locating leak, earth work excavation in all kinds of soil for for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipe line with out causing any damages to the balance portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe, cutting and lowering new pipe in to the trenches,placing in position aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or repairable joint and testing the pipe line by operating the valves concerned, and rectifying the defects if noticed and refilling the trenches in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site without causing any damage to the existing utilities, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, ribbon fencing, lighting,watching, traffic control etc.complete as per the direction of Departmental officers, including the cost of pipe & specials but excluding the cost of CIR Joints; PVC Pipes and specials shall be of good quality and conforming to relevant standards: CIR Jointing.
11Leak rectification work in 160mmPVC (Class 2 to 6) pipe line including detectingand locating leak, earth work excavation in all kinds ofsoilfor for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipe line with out causing any damages to the balance portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe, cutting and lowering new pipe in to the trenches,placing in position aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or repairable joint and testing the pipe line by operating the valves concerned,and rectifying the defects if noticed and refilling the trenches in layers not exceeding 20cm depthincluding consolidating each layers by ramming, watering, charges for removingsurplus soil from work site without causing any damage to the existing utilities,including hire for tools and plant, conveyance oftools and materials, bailing out water, providing caution boards, ribbon fencing, lighting,watching, traffic control etc.complete as per the direction of Departmental officers, including the cost of pipe& specials but excluding the cost ofCIR Joints; PVC Pipes and specials shall be of good quality and conforming to relevant standards: CIR Jointing.
12Leak rectification work in 200mmPVC (Class 2 to 6) pipe line including detectingand locating leak, earth work excavation in all kinds ofsoilfor for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipe line with out causing any damages to the balance portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe, cutting and lowering new pipe in to the trenches,placing in position aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or repairable joint and testing the pipe line by operating the valves concerned,and rectifying the defects if noticed and refilling the trenches in layers not exceeding 20cm depthincluding consolidating each layers by ramming, watering, charges for removingsurplus soil from work site without causing any damage to the existing utilities,including hire for tools and plant, conveyance oftools and materials, bailing out water, providing caution boards, ribbon fencing, lighting,watching, traffic control etc.complete as per the direction of Departmental officers, including the cost of pipe& specials but excluding the cost ofCIR Joints; PVC Pipes and specials shall be of good quality and conforming to relevant standards: CIR Jointing.
13Leak rectification work in 160mmPVC (Class 2 to 6) pipe line including detectingand locating leak, earth work excavation in all kinds ofsoilfor for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipe line with out causing any damages to the balance portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe, cutting and lowering new pipe in to the trenches,placing in position aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or repairable joint and testing the pipe line by operating the valves concerned,and rectifying the defects if noticed and refilling the trenches in layers not exceeding 20cm depthincluding consolidating each layers by ramming, watering, charges for removingsurplus soil from work site without causing any damages to the existing utilities, including hire for tools and plant, conveyance oftools and materials, bailing out water, providing caution boards,lighting, ribbon fencing, watching, traffic control etc.complete as per the direction of Departmental officers, including the cost of pipe& specials but excluding the cost ofCIR Joints; PVC Pipes and specials shall be of good quality and conforming to relevant standards: Socket & CIR Jointing.
14Leak rectification work in 200mmPVC (Class 2 to 6) pipe line including detectingand locating leak, earth work excavation in all kinds ofsoilfor for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipe line with out causing any damages to the balance portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe, cutting and lowering new pipe in to the trenches,placing in position aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or repairable joint and testing the pipe line by operating the valves concerned,and rectifying the defects if noticed and refilling the trenches in layers not exceeding 20cm depthincluding consolidating each layers by ramming, watering, charges for removingsurplus soil from work site without causing any damages to the existing utilities, including hire for tools and plant, conveyance oftools and materials, bailing out water, providing caution boards,lighting, ribbon fencing, watching, traffic control etc.complete as per the direction of Departmental officers, including the cost of pipe& specials but excluding the cost ofCIR Joints; PVC Pipes and specials shall be of good quality and conforming to relevant standards: Socket & CIR Jointing.
15Rectification of leakages of 32 mm, 40mm & 50mm GI Pipes by replacing lengths up to 1.0m including earth work excavation in all kindss of soil for exposing leak portion of the pipe including tar / concrete cutting, by cutting, removing and stacking the damaged portion from the existing line without causing any damages to the remaining portion and specials and conveying and replacing with GI Pipes of suitable size and jointing bythraded coupler and union of suitable size including threading, alignment, laying and jointing to make a water tight joint, testing the line to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depthincluding consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges hire and conveyance of tools, plant and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion, including the cost of specials but excluding cost ofpipe and as per the direction of departmental officers etc. complete.
16Rectification of leakages of 80 mm GI Pipes in exposed portions by replacing lengths up to 1.0m by cutting, removing and stacking the damaged portion from the existing line without causing any damages to the remaining portion and specials and conveying and replacing with GI Pipes of suitable size and jointing by three run welding to make a water tight joint, painting the welded portion, testing the line to the required pressure, rectifying any defects noticed, without causing any damages to any other utilities, including the charges hire and conveyance of tools, plant and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion, necessary scaffolding including the cost of specials but excluding cost of pipe and as per the direction of departmental officers etc. complete.
17Rectification of leakages in 32/40/50 size of GI Pipes in exposed portions by providing fabricated MS saddle, rectifying any defects noticed, without causing any damages to any other utilities, including the charges hire and conveyance of tools and materials to the leak site, bailing out water, lighting, watching, fencing, caution boards, traffic diversion as per the direction of departmental officers etc. complete.
18Rectification of leakages in 65/80 various size of GI Pipes in exposed portions by providing fabricated MS saddle, rectifying any defects noticed, without causing any damages to any other utilities, including the charges hire and conveyance of tools and materials to the leak site, bailing out water, lighting, watching, fencing, caution boards, traffic diversion as per the direction of departmental officers etc. complete.
19Washing Clariflocculator using brooms, brushes and bleaching powder by engaging coolies, scrubbing twice, washing and cleaning using fresh water, including side wall, floor slab and columns,disposing the the slurry / waste materilas away from the immediate premises and within the initial lead of 50m from the periphery of the clariflocculator, without causing any damage to the exististing strucutre and installations, charges including the operation of valves, conveyance and hire charges of tools and as per the direction of the department officers etc. complete.
20Rectification of leakages in 100/125mm size of GI Pipes in exposed portions by providing fabricated MS saddle, rectifying any defects noticed, without causing any damages to any other utilities, including the charges hire and conveyance of tools and materials to the leak site, bailing out water, lighting, watching, fencing, caution boards, traffic diversion as per the direction of departmental officers etc. complete.
21Disconnectingwaterconnection from service mains along earthern roadwithout causing any damage to the existing lineincluding charges of earth work excavation in all kinds of soil for exposing connection point including tar cutting / conrete cutting if any, making the disconnection point water tight charging and testing to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depthincluding consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other existing utilities, including the charges of hire for tools and plant, conveyance of tools and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion but excluding cost ofmaterials and as per the direction of departmental officers etc. complete.
22Washing OHSR/GLSR using brooms, brushes and bleaching powder by engaging coolies, scrubbing twice, washing and cleaning using fresh water, including side wall, floor slab and columns,disposing the the slurry / waste materilas away from the immediate premises and within the initial lead of 50m from the periphery of the tank, without causing any damage to the exististing strucutre and installations, charges including the operation of valves, conveyance and hire charges of tools and as per the direction of the department officers etc. complete.
23Supplying andfixing 15 / 20 mm PVC public tap after dismantling the damaged tap including all cost of materials, labour charges, hire for toolsand as per the direction of the department officers etc complete.
24Rectifying the leakages in boring point of public tap connection including earth work excavation in all kinds of soil for exposing the boring point including concrete / tar cutting, dismantling the damaged saddle piece,cutting and removing damaged portion of pipe line,fixing new saddle piece,laying 20/25 mm PVC 10Kg/cm2 pipe in place of damaged portion of pipe and connecting with existing pipe line,testing the line to the required test pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges of hire and conveyance of tools, plants and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion, including cost of pipe and saddle piece and as per the direction of departmental officers etc. complete.
25Repairing leaks on 80/100/125/150mm Sluice valve by removing cover of valve, coveying spindle,spindle nut, valve nut etc to work shop and spinspindle repairing, spindle nut making,conveying to site replacing new gland packing if reqired,refitting the valves after repaires including all repair charges of valve, operation of valve, bailing out water, labour for cleaning valve, removing and replacing RCC/CI lid /cover of valve chamber etc complete
26Repairing leaks on 80/100/125/150 mm Sluice valve by removing cover of valve replacing new gland packing if reqired,refitting the valves after repaires including all repair charges of valve, operation of valve, abiling out water, labour for cleaning valve, removing and replacing RCC/CI lid /cover of valve chamber etc complete
epairing leaks on
27Rectifying the leakages in vertical pipe of public tap connection including earth work excavation in all kinds of soil for exposing the pipeline including concrete / tar cutting,cutting and removing damaged portion of pipe, fixing new 20/25 mm GI pipe and specials in place of damaged portion of pipe and connecting with existing pipe line,testing the line to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depthincluding consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges of hire and conveyance of tools, plants and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion, including cost ofpipe and specials and as per the direction of departmental officers etc. complete.
28Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidatingeach deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m :All kinds of soil (Ref. Item No. 2.10.1 of DSR)
29Providing and laying in position cement concrete 1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 12.5 mm nominal size) up to floor five level excluding the cost of centering, shuttering, finishing for leveling coarse of floor and roof etc.
30Rectification of joint leakages in 250mm DI Pipe (cutting, removing and laying back a length of 1.0m from one side of the joint) including earth work excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, by cutting and removing a portion of pipe from the damaged joint without causing any damages to the remaining portion of the line and specials and replacing the pipe with mechanical and tyton joint after cleaning the ends, centering the pipe, providing the joints, testing the line to the required test pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depthincluding consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges of hire and conveyance of tools, plants and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion but excluding cost ofmechanical joint and as per the direction of departmental officers etc. complete.
31Repairing leakage/breakage of 80 mm ACpipe line by cutting and dismantling the damaged pipe portion (up to 1.5 m) including charges for earth work excavation in all kinds of soil including tar / concrete cutting for exposing leak portion of the pipe, operating control valvesif any, conveying to the site and cutting new AC pipe to the required length, rejointing the pipeline using CID Joints , testing the pipe line by operating the valves concerned,and rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depthincluding consolidating each layers by ramming, watering, charges for removingsurplus soil from work site, including hire for tools and plant, conveyance oftools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc.complete as per the direction of Departmental officersexcluding the cost of pipe and CID Joints.
32Repairing leakage/breakage of 200 mm ACpipe line by cutting and dismantling the damaged pipe portion (Up to 1.5 m) including charges for earth work excavation in all kinds of soil including tar / concrete cutting for for exposing leak portion of the pipe, operating control valvesif any,conveying to the site and cutting new AC pipe to the required length, rejointing the pipeline using CID Joints , testing the pipe line by operating the valves concerned,and rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depthincluding consolidating each layers by ramming, watering, charges for removingsurplus soil from work site, including hire for tools and plant, conveyance oftools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc.complete as per the direction of Departmental officersexcluding the cost of pipe and CID Joints.
33Supply of Quarry Muck
34Repairing leakage/breakage of 250 mm ACpipe line by cutting and dismantling the damaged pipe portion (Up to 1.5 m) including charges for earth work excavation in all kinds of soil including tar / concrete cutting for for exposing leak portion of the pipe, operating control valvesif any,conveying to the site and cutting new AC pipe to the required length, rejointing the pipeline using CID Joints , testing the pipe line by operating the valves concerned,and rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depthincluding consolidating each layers by ramming, watering, charges for removingsurplus soil from work site, including hire for tools and plant, conveyance oftools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc.complete as per the direction of Departmental officersexcluding the cost of pipe and CID Joints.
35Man mazdoor for controling valves and removing mud and cutting branches of trees
36Cost of material
37Cost of 150mm GI pipe
38Cost of 100mm GI pipe
39Cost of 80mm GI pipe
40Cost of 65mm GI pipe
41Cost of 50mm GI pipe
42Cost of 40mm GI pipe
43Cost of 32mm GI pipe
44Supply of 200 mm CIR Joint for leak rectification
45Supply of 160 mm CIR Joint for leak rectification
46Supply of 140 mm CIR Joint for leak rectification
47Supply of 110 mm CIR Joint for leak rectification
48Supply of 200mm DI MJ Coller for leak rectification

AI Tender Summary

OUR REF NO 31993068
AUTHORITY Local Bodies
TENDER VALUE 8.29 Lakhs
LAST DATE 16-05-2022
Authority
Authority Name Kerala Water Authority
Work Description Annual Maintenance Ayavanapanchayath Annual Maintenance2022- 23Maintenanceof Rwsstoenaneloor Repairs Ofpipelines Andtapsinayavana Panchayathforone Yearperiod.
Basic Detail
Tender No 20/2022-23/EE/PHDN/MVPA
Bidding Type Tender
Location
City ayavana
State Kerala
Key Dates
Publish Date 06 May 2022
Submission Date 16 May 2022
Open Date 18 May 2022
Finance
Tender Value 8.29 Lakhs
Tender Fee 1960
EMD 20800
Exemption Not Available
Document List
9f15b366-d39d-46da-9689-d48fadd603f0.html
BOQ_701145.xls
KWAGeneralConditionsforeT.pdf
NIT20.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

May 06, 2022
11:30 IST

Tender Published

Tender notice published.

Completed
May 16, 2022
18:00 IST

Corrigendum-1 Issued

Clarifications on tender conditions and amendments issued.

Completed
May 16, 2022
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
May 18, 2022

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

9f15b366-d39d-46da-9689-d48fadd603f0.html

xls

BOQ_701145.xls

pdf

KWAGeneralConditionsforeT.pdf

pdf

NIT20.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders