Construction And Maintenance Of 1. H.L.Bridge At Ch-6+400 Km In Ludubera To Chitpin Via Komai Jambro Of Road O-Taramba To Atra ( Length -39.12 M ) And 2. H.L.Bridge At Ch-7+300 Km In Ludubera To Chitpin Via Komai Jambro Of Road O-Taramba To Atra ( Leng

Issued by Government Departments · saraikela, Jharkhand
Tender Value
3.91 Crore
Estimated cost
Bid Submission
04 May 2022
0 days left
EMD
3.92 Lakhs
Bank guarantee accepted
Document Fee
10000
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
saraikela → Jharkhand
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Construction And Maintenance Of 1. H.L.Bridge At Ch-6+400 Km In Ludubera To Chitpin Via Komai Jambro Of Road O-Taramba To Atra ( Length -39.12 M ) And 2. H.L.Bridge At Ch-7+300 Km In Ludubera To Chitpin Via Komai Jambro Of Road O-Taramba To Atra ( Length -39.12 M ) Of Package No- Jh-Br-Lwe-Ii-Srk-02 / 21-22, Block-Kuchaiand District- Saraikela- Kharsawan Of Rcplwea ( Batch-Ii, 2021-22 ) Under Pmgsy.

BOQ

Name of Work: Construction and Maintenance of 1. H.L.Bridge At Ch-6+400 km In Ludubera to Chitpin via Komai Jambro of road O-Taramba to Atra (Length -39.12 M) and 2. H.L.Bridge At Ch-7+300 km In Ludubera to Chitpin via Komai Jambro of road O-Taramba to Atra (Length -39.12 M) of Package No- JH-BR-LWE-II-SRK-02 /21-22, Block-Kuchaiand District- Saraikela- Kharsawan of RCPLWEA (Batch-II, 2021-22) under PMGSY.
Sl. No. Item Description
1Details
2Excavation for Structures:- Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitablematerial.
3I. Ordinary Soil
4i) Upto 3m depth
5ii) 3m to 6m depth
6Bored cast-in-situ M35 grade R.C.C. Pile excluding Reinforcement complete as per Drawing and Technical Specifications and removal of excavated earth with all lifts and lead upto 1000 m.
7II.1200 mm Dia(UsingBatching Plant, Transit Mixer and Concrete Pump)
8Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203
9II. PCC Grade M-15 (Levelling Course)
10R.C.C. grade M 30 in Pile Foundation complete as per Dwg & Tech Specification.
11Pile Cap in RCC M-30 (UsingBatching Plant, Transit Mixer and Concrete Pump)
12Providing steel liner 10 mm thick for curbs and 6mm thick for steining of wells including fabricating and setting out as per detailed drawing
13Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202
14Carrying out load testonany pile as per standard procedure laid down in the IS:2911 specification including construction of test cap, dismantling the cap aftertest and cleaning the site and maintaining complete records of load
15a) Initial Load Test on test pile for 2.5 times the design load specified in Drawings
161.2 m Dia Pile
17b) Routine pile load test on pile for 1.5 times the design load specified in Drawings
181.2 m Dia Pile (2% of piles in total).
19c) Horizontal pile load test on pile for 1.5 times the design load specified in Drawings
201.2 m Dia Pile (2% ofpiles in total) .
21SUBSTRUCTURE
22R.C.C. grade M-30 in Substructure complete as per Dwg & Tech Specification
23RCC M-30
24i) Upto 5m height (UsingBatching Plant, Transit Mixer and Concrete Pump)
25ii) From 5m upto 10m height (UsingBatching Plant, Transit Mixer and Concrete Pump)
26R.C.C. grade M-35 in Substructure complete as per Dwg & Tech Specification
27RCC M-35
28ii) From 5m upto 10m height (UsingBatching Plant, Transit Mixer and Concrete Pump)
29Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202
30Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7
31Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8
32I) Sandy Material
33Providing and laying filter media with granular crushedaggregates (Jhama Metal)as per specification to a thickness of not less than 600 mm with smallersize towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specificationClause 1204.3.8
34Supplying,fitting and fixing in position true to line and level POT-PTFE bearing consisting of a metal piston supported by a disc or unreinforced elastomer confined within a metal cylinder,sealing rings,dust seals,PTFE surface sliding against stainless steel mating surface,completre assembly to be of cast steel/fabricated structural steel,metal and elastomer elements to be as per IRC: 83 part-I & II respectively and other parts conforming to BS: 5400,section 9.1 & 9.2 and clause 2006 of MoRTH Specifications complete asper drawing and approved technical specifications.
35Supplying,fitting and fixing in position true to line and level elastomeric bearing conforming to IRC: 83 (Part-II) section IX and clause 2005 of MoRTH specifications complete including all accessories as per drawing and Technical Specifications.
36SUPERSTRUCTURE
37Providing and laying reinforced cement concrete in superstructure complete as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5
38II. RCC M-30 (UsingBatching Plant, Transit Mixer and Concrete Pump)
39Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in superstructrue complete as per drawings and technical specification Clauses 1002, 1010 & 1202
40Providing and laying cement concrete wearing course M 30 grade including reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3
41Construction of R.C.C. railing of M 25 grade in cast-in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical railing post not to exceed 1 in 500, centre-to-centre spacing between vertical posts not to exceed 2000mm as per drawing and technical specifications Clauses 800, 900 and 1208.3
42Drainage Spouts complete as per drawing and technical specifications Clause 1209
43P.C.C. M-15 ordinary grade (1:2.5:5) levelling course below approach slab complete as per drawing and technical specificatios Clauses 800 & 1211.
44Reinforced Cement Concrete M-30 grade approach slab including reinforcement and formwork complete as per drawing and technical specifications Clauses 800 and 1211
45Strip Seal Expansion Joint (Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm,complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer\"s instructions for installation.)
46Providing & fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing & Technical Specification.
47Providing and fixing in position 20 mm thick premoulded joint filler in expansion joint for fixed ends of simply supported spans not exceeding 10 m to cater for a horizontal movement upto 20 mm,covered with sealant complete as per drawing and technical specifications.
48PROTECTION WORK
49Providing and laying boulder pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302
50Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications Clause 1302
51SUB HEAD : PREPARATORY WORKS ,SITE CLEARANCE , DISMANTLING
52Clearing and Grubbing Road Land ( By manual means)including uprooting wild vegetation , grass ,bushes ,shrubs , saplings and trees ofgirth upto 300mm , removals of stumps of such trees cut earlier & disposal of unserviceable materials & stacking of serviceable materials to be used or auctioned upto a lead of 1000 m including removal and disposal of top organic soil not exeeding 150mm in thickness as per technical specification - clause 201.1 and direction of E/I
53Construction of Embankment with material obtained from borrow pits with a lift upto 1.5 m , transporting to the site spreading , grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 .
54100% of Embankment Material
55Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.
56Granular Sub-base with Well Graded Material (Table 400.1):-Construction of granular sub-base by providing well graded material, spreading in uniform layers with tractor mounted grader arrangement on prepared surface, mixing by mix in place method with rotavatorat OMC, and compacting with smoothwheelroller to achieve thedesired density, complete as per Technical Specification Clause 401.
57Wet Mix Macadam:-Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing thematerial with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, layingin uniform layers in sub-base/base course on a well prepared sub-base and compacting with smoothwheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406.
58Prime Coat (Low porosity)Providing and applying primer coat with Bitumen emulsion (SS-1)on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70- 1.0 kg/sqm using mechanical means as per Technical Specification Clause 502.
59Tack Coat Providing and applying tack coat with bitumen emulsion (RS ) using emulsion distributor @ 0.2 to 0.25 kg per sq m on the prepared bituminous surface cleaned with hydraulic broom as per technical specification clause 503.
60Semi-Dense Bituminous Concrete:-Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing thematerial with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, layingin uniform layers in sub-base/base course on a well prepared sub-base and compacting with smoothwheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406.
61Providing and Fixing \"Logo\" of Project :-Providing and Fixing \"Logo\" of Projectinformayory sign board with Logo as per MORD specifications and drawing.Three MS plates of1.6mm thick, top and middle plate duly welded with MS flat iron 25mm x 5 m size on back on edges.The lower plate will be welded with MS angle ironframe of25mm x 25mm 5mm.The angle iron frame of the lower mostplate and flat iron frame of middle plate will be welded to 2 Nos.75mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450mm x 450mm x 600 mm,600 mm,600 below ground level.The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12SWG steel plate tube.All M.S will be stove enameled on both sides. Lettering and printing arrows, border etc, will be painted with ready mixed synthetic enamer paint of superior quality in required shade and colour.All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 abd Annexure 1700.1.
62Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface:-Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.
631st Year Maintenance cost
642nd Year Maintenance cost
653rd Year Maintenance cost
664th Year Maintenance cost
675th Year Maintenance cost
68Details
69Excavation for Structures:- Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitablematerial.
70i) Upto 3m depth
71ii) 3m to 6m depth
72Providing and Constructing Temporary Earth Island (Assuming depth of water 1.0 m and height of island to be 1.25 m including Royality for earth @ Rs. 5526.00 for each Island.)
73Providing and constructing one span service road to reach island location from one pier location to another pier location including Royality for earth @ Rs. 225.00 per m for service Road.
74Bored cast-in-situ M35 grade R.C.C. Pile excluding Reinforcement complete as per Drawing and Technical Specifications and removal of excavated earth with all lifts and lead upto 1000 m.
75II.1200 mm Dia(UsingBatching Plant, Transit Mixer and Concrete Pump)
76Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203
77II. PCC Grade M-15 (Levelling Course)
78R.C.C. grade M 30 in Pile Foundation complete as per Dwg & Tech Specification.
79Pile Cap in RCC M-30 (UsingBatching Plant, Transit Mixer and Concrete Pump)
80Providing steel liner 10 mm thick for curbs and 6mm thick for steining of wells including fabricating and setting out as per detailed drawing
81Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202
82Carrying out load testonany pile as per standard procedure laid down in the IS:2911 specification including construction of test cap, dismantling the cap aftertest and cleaning the site and maintaining complete records of load
83a) Initial Load Test on test pile for 2.5 times the design load specified in Drawings
841.2 m Dia Pile
85b) Routine pile load test on pile for 1.5 times the design load specified in Drawings
861.2 m Dia Pile (2% of piles in total).
87c) Horizontal pile load test on pile for 1.5 times the design load specified in Drawings
881.2 m Dia Pile (2% ofpiles in total) .
89SUBSTRUCTURE
90R.C.C. grade M-30 in Substructure complete as per Dwg & Tech Specification
91RCC M-30
92i) Upto 5m height (UsingBatching Plant, Transit Mixer and Concrete Pump)
93ii) From 5m upto 10m height (UsingBatching Plant, Transit Mixer and Concrete Pump)
94R.C.C. grade M-35 in Substructure complete as per Dwg & Tech Specification
95RCC M-35
96ii) From 5m upto 10m height (UsingBatching Plant, Transit Mixer and Concrete Pump)
97Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202
98Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7
99Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8
100I) Sandy Material
101Providing and laying filter media with granular crushedaggregates (Jhama Metal)as per specification to a thickness of not less than 600 mm with smallersize towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specificationClause 1204.3.8
102Supplying,fitting and fixing in position true to line and level POT-PTFE bearing consisting of a metal piston supported by a disc or unreinforced elastomer confined within a metal cylinder,sealing rings,dust seals,PTFE surface sliding against stainless steel mating surface,completre assembly to be of cast steel/fabricated structural steel,metal and elastomer elements to be as per IRC: 83 part-I & II respectively and other parts conforming to BS: 5400,section 9.1 & 9.2 and clause 2006 of MoRTH Specifications complete asper drawing and approved technical specifications.
103Supplying,fitting and fixing in position true to line and level elastomeric bearing conforming to IRC: 83 (Part-II) section IX and clause 2005 of MoRTH specifications complete including all accessories as per drawing and Technical Specifications.
104SUPERSTRUCTURE
105Providing and laying reinforced cement concrete in superstructure complete as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5
106II. RCC M-30 (UsingBatching Plant, Transit Mixer and Concrete Pump)
107Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in superstructrue complete as per drawings and technical specification Clauses 1002, 1010 & 1202
108Providing and laying cement concrete wearing course M 30 grade including reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3
109Construction of R.C.C. railing of M 25 grade in cast-in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical railing post not to exceed 1 in 500, centre-to-centre spacing between vertical posts not to exceed 2000mm as per drawing and technical specifications Clauses 800, 900 and 1208.3
110Drainage Spouts complete as per drawing and technical specifications Clause 1209
111P.C.C. M-15 ordinary grade (1:2.5:5) levelling course below approach slab complete as per drawing and technical specificatios Clauses 800 & 1211.
112Reinforced Cement Concrete M-30 grade approach slab including reinforcement and formwork complete as per drawing and technical specifications Clauses 800 and 1211
113Strip Seal Expansion Joint (Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm,complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer\"s instructions for installation.)
114Providing & fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing & Technical Specification.
115Providing and fixing in position 20 mm thick premoulded joint filler in expansion joint for fixed ends of simply supported spans not exceeding 10 m to cater for a horizontal movement upto 20 mm,covered with sealant complete as per drawing and technical specifications.
116PROTECTION WORK
117Providing and laying boulder pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302
118Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications Clause 1302
119SUB HEAD : PREPARATORY WORKS ,SITE CLEARANCE , DISMANTLING
120Clearing and Grubbing Road Land ( By manual means)including uprooting wild vegetation , grass ,bushes ,shrubs , saplings and trees ofgirth upto 300mm , removals of stumps of such trees cut earlier & disposal of unserviceable materials & stacking of serviceable materials to be used or auctioned upto a lead of 1000 m including removal and disposal of top organic soil not exeeding 150mm in thickness as per technical specification - clause 201.1 and direction of E/I
121Construction of Embankment with material obtained from borrow pits with a lift upto 1.5 m , transporting to the site spreading , grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 .
122100% of Embankment Material
123Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.
124Granular Sub-base with Well Graded Material (Table 400.1):-Construction of granular sub-base by providing well graded material, spreading in uniform layers with tractor mounted grader arrangement on prepared surface, mixing by mix in place method with rotavatorat OMC, and compacting with smoothwheelroller to achieve thedesired density, complete as per Technical Specification Clause 401.
125Wet Mix Macadam:-Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing thematerial with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, layingin uniform layers in sub-base/base course on a well prepared sub-base and compacting with smoothwheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406.
126Prime Coat (Low porosity)Providing and applying primer coat with Bitumen emulsion (SS-1)on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70- 1.0 kg/sqm using mechanical means as per Technical Specification Clause 502.
127Tack Coat Providing and applying tack coat with bitumen emulsion (RS ) using emulsion distributor @ 0.2 to 0.25 kg per sq m on the prepared bituminous surface cleaned with hydraulic broom as per technical specification clause 503.
128Semi-Dense Bituminous Concrete:-Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing thematerial with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, layingin uniform layers in sub-base/base course on a well prepared sub-base and compacting with smoothwheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406.
129Providing and Fixing \"Logo\" of Project :-Providing and Fixing \"Logo\" of Projectinformayory sign board with Logo as per MORD specifications and drawing.Three MS plates of1.6mm thick, top and middle plate duly welded with MS flat iron 25mm x 5 m size on back on edges.The lower plate will be welded with MS angle ironframe of25mm x 25mm 5mm.The angle iron frame of the lower mostplate and flat iron frame of middle plate will be welded to 2 Nos.75mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450mm x 450mm x 600 mm,600 mm,600 below ground level.The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12SWG steel plate tube.All M.S will be stove enameled on both sides. Lettering and printing arrows, border etc, will be painted with ready mixed synthetic enamer paint of superior quality in required shade and colour.All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 abd Annexure 1700.1.
130Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface:-Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.
1311st Year Maintenance cost
1322nd Year Maintenance cost
1333rd Year Maintenance cost
1344th Year Maintenance cost
1355th Year Maintenance cost
136GST @ 12%
137Labour Cess @ 1%

AI Tender Summary

OUR REF NO 31973211
AUTHORITY Government Departments
TENDER VALUE 3.91 Crore
LAST DATE 04-05-2022
Authority
Authority Name Jharkhand State Rural Road Development Authority
Work Description Construction And Maintenance Of 1. H.L.Bridge At Ch-6+400 Km In Ludubera To Chitpin Via Komai Jambro Of Road O-Taramba To Atra ( Length -39.12 M ) And 2. H.L.Bridge At Ch-7+300 Km In Ludubera To Chitpin Via Komai Jambro Of Road O-Taramba To Atra ( Length -39.12 M ) Of Package No- Jh-Br-Lwe-Ii-Srk-02 / 21-22, Block-Kuchaiand District- Saraikela- Kharsawan Of Rcplwea ( Batch-Ii, 2021-22 ) Under Pmgsy.
Basic Detail
Tender No e-Tender No.- 04 /2022-23
Bidding Type Tender
Location
City saraikela
State Jharkhand
Key Dates
Publish Date 25 Apr 2022
Submission Date 04 May 2022
Open Date 05 May 2022
Finance
Tender Value 3.91 Crore
Tender Fee 10000
EMD 3.92 Lakhs
Exemption Not Available
Document List
b7eb959c-fafd-4ba2-8e8a-a97fbe791fb3.html
BOQ_188930.xls
JH-BR-LWE-II-SRK-02-21-22.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Apr 25, 2022
11:30 IST

Tender Published

Tender notice published.

Completed
May 04, 2022
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
May 05, 2022

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

b7eb959c-fafd-4ba2-8e8a-a97fbe791fb3.html

xls

BOQ_188930.xls

pdf

JH-BR-LWE-II-SRK-02-21-22.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender