Power Government Departments Closing in 0 days TDR #31963765

Various works under full deposit scheme in EDSD-III Nadrai in the jurisdiction of EDD, Kasganj. Sl. No. Item Description 1 Safe carriage of following PCC/ST poles Store centre or from any other place to the respective site of work through the Kachha

Issued by Government Departments · kasganj, Uttar Pradesh
Tender Value
Ref. Documents
Estimated cost
Bid Submission
30 Apr 2022
0 days left
EMD
2000
Bank guarantee accepted
Document Fee
1180
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
kasganj → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Various works under full deposit scheme in EDSD-III Nadrai in the jurisdiction of EDD, Kasganj. Sl. No. Item Description 1 Safe carriage of following PCC/ST poles Store centre or from any other place to the respective site of work through the Kachha Pacca roadincluding the work of its loading & unloading at the respective ends also including the work of dragging etc. and also including the cost of labour, T&P carrier etc. required for proper completion of work. (Dist. 0 to 50 Kms.). 2 PCC pole 8.5 Mtr 3 ST pole 9/11 Mtr 4 Cartage of line material viz Weasal Conductor, GI earth wire, Cross Arm, Angle, Channel, Insulator, Clamps & other line material from Store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends also including the work of dragging etc. and also including the cost of labour, T&P carrier etc. required for proper completion of work. (Dist. 0 to 50 Kms.). 5 Erection of single support including complete H.T/L.T fittings as per RESPO manual and as per direction of Engineer incharge including the cost of labour, T & P and carrier etc. required for proper completion of work. 6 PCC pole 8.5 Mtr 7 STP 9/11 Mtr. 8 Erection of double pole on PCC pole including the work of complete line as per RESPO norm manual and as per direction of Engineer Incharge including the cost of labour, T & P and carrier etc. required for proper completion of work. 9 PCC poles 8.5 Mtr. 10 ST Pole 11 Mtr. 11 Erection of stay set complete including the work of nuzzling etc. as per RESPO manual and also including the cost of arrangement of all grouting material, labour, T&Pfixing of stay insulator etc. required for proper completion of work. 12 Drilling and cutting of tee off channel, V cross arms.as per specification of UPPCL construction manual including including loading and unloading at the both ends. 13 Fixing of earthing rod as per RESPO manual and as per direction of supervising engineer including the T&P, cost of labour. 14 Safe carriage of XLPE cable of size 3x(35/70/120/185) Sq. m.m. from store to respective site of work including loading unloading at both ends. 15 Laying of 3x(35/70/120/185)Sq.mm. 11 KV under ground cable after digging trench of 600 mm. wide, 1500 mm deep, providing the fine sand cushion beneath and above the cable. The cable shall be duly protected by Ist class bricks, two on either side and third on top of the cable, laid in series one after the other. The work includes supplying of fine sand and bricks, filling and ramming of the left out soil, closing the trench and levelling. Spare cable shall be left and buried in the trench in the shape of rings at both ends. All material (except cable), labour, T&P carrier etc, required for proper completion of work will be arranged by the contractor at his own cost. 16 Filling of 3x70/120 Sq. m.m. 11 KV XLPE heat shrinkable cable jointing Kits outdoor/indoor type including the cost of labour T&P carrier etc for proper completion of work. 17 Laying sagging stringing, binding and jumpering etc. of following conductor on the newly erected pole as per RESPO manual and as per direction of supervising engineer, including the cost of arrangement of labour, T&P carrier etc. required for proper completion of work. 18 ACSR weasel conductor/ Rabbit / Dog Conductor 19 LT ABC 3x95+1x70+1x16 bunch conductor 20 LT ABC 3x50+1x35+1x16 bunch conductor 21 LT ABC 1x16 bunch conductor 22 Carriage and installation from Store to site of following capacity transformer including the work of its loading & unloading, dragging etc. and also including the cost of labour and T&P etc. required for proper completion of work. 23 10/16/25/63/100 KVA T/F 24 Safe carriage of 11 KV pilfer proof metering cubicle from store centre, Soron (Kasganj) to site of work including loading and unloading at both ends. Average distance approx. 0 km to 50 km. 25 Erection & grouting of 11 KV pilfer-proof metering cubicle making connections with bus bar, tapping with Empire Tape with existing earthing. The above work includes the cost of labour, T&P, carrier & material etc. required for proper completion of work except cost of 11 KV VCBs. 26 Guarding of 11 KV line by laying two nos. GI wire parallel and fixing of lacings (tilli) at a distance at 2-3 Mtr. as per RESPO manual and also including the cost of arragement of labour, T & P carrier etc. required for proper completion of work. 27 Cutting and Chipping of Tree Branches which comes on HT/LT lines. 28 Making the plinth of ST poles as per RESPO norms. 29 Re-sagging of loose HT/LT line conductor as per direction of supervising engineer. It includes the cost of labour T&P carrier etc. required for proper completion of work. 30 ACSR weasel conductor/ Rabbit / Dog Conductor 31 Re-tightning of stay complete with nuzelling & binding including cost of labour T&P etc required for proper completion of work. 32 Straightening of tilted pole at various places as per direction of JE. 33 PCC poles 8.5 Mtr./STP pole 9/11 Mtr. 34 Grouting 35 PCC poles 8.5 Mtr. Long as per RESPO norms 36 ST poles 11 Mtr. Long as per RESPO norms 37 Installation of extra “T”on the old erected poles wherever required. 38 Safe carriage of 11 KV CT/PT pole mounting unit of any other place or from site of work to the work of its loading & unloading at the respective ends including the cost of labour, T&P and carrier etc. required for proper completion of work. 39 Installation of 11 KV CT-PT combined metering unit on double pole after fixing of channel with M.S. Clamps and nuts bolts for holding the channel angle etc. The unit body shall be earthed by connecting M.S. strip of size 1/8x1 finally connected to earthing rod of size 20mm x2540 mm. 11 KV line shall be connected to unit as per instructions of SDO/AE(M). The M.S. Strip & earth rod shall be included in the scope of work. 40 Painting of ST pole as per RESPO norms. 41 Safe carriage of LT distribution box (three phase) from store centre Soron (Kasganj) to pit site including loading and unloading at both ends mounting and fixing on pole also by making connections as per RESPO norms. 42 Demounting & carriage from site to Store of following capacity transformer due to damage of PCC poles including the work of its loading & unloading, dragging etc. and also including the cost of labour and T&P etc. required for proper completion of work. 43 10/16/25/63/100 KVA T/F 44 Providing & Fixing of nut bolt off size on vendors cost 45 Providing & Fixing of holding clamp for ST/PCC pole on vendors cost.

BOQ

Name of Work : Various works under full deposit scheme in EDSD-III Nadrai in the jurisdiction of EDD, Kasganj.
Sl. No. Item Description
1Safe carriage of following PCC/ST poles Store centre or from any other place to the respective site of work through the Kachha Pacca roadincluding the work of its loading & unloading at the respective ends also including the work of dragging etc. and also including the cost of labour, T&P carrier etc. required for proper completion of work. (Dist. 0 to 50 Kms.).
2PCC pole 8.5 Mtr
3ST pole 9/11 Mtr
4Cartage of line material viz Weasal Conductor, GI earth wire, Cross Arm, Angle, Channel, Insulator, Clamps & other line material from Store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends also including the work of dragging etc. and also including the cost of labour, T&P carrier etc. required for proper completion of work. (Dist. 0 to 50 Kms.).
5Erection of single support including complete H.T/L.T fittings as per RESPO manual and as per direction of Engineer incharge including the cost of labour, T & P and carrier etc. required for proper completion of work.
6PCC pole 8.5 Mtr
7STP 9/11 Mtr.
8Erection of double pole on PCC pole including the work of complete line as per RESPO norm manual and as per direction of Engineer Incharge including the cost of labour, T & P and carrier etc. required for proper completion of work.
9PCC poles 8.5 Mtr.
10ST Pole 11 Mtr.
11Erection of stay set complete including the work of nuzzling etc. as per RESPO manual and also including the cost of arrangement of all grouting material, labour, T&Pfixing of stay insulator etc. required for proper completion of work.
12Drilling and cutting of tee off channel, V cross arms.as per specification of UPPCL construction manual including including loading and unloading at the both ends.
13Fixing of earthing rod as per RESPO manual and as per direction of supervising engineer including the T&P, cost of labour.
14Safe carriage of XLPE cable of size 3x(35/70/120/185) Sq. m.m. from store to respective site of work including loading unloading at both ends.
15Laying of 3x(35/70/120/185)Sq.mm. 11 KV under ground cable after digging trench of 600 mm. wide, 1500 mm deep, providing the fine sand cushion beneath and above the cable. The cable shall be duly protected by Ist class bricks, two on either side and third on top of the cable, laid in series one after the other. The work includes supplying of fine sand and bricks, filling and ramming of the left out soil, closing the trench and levelling. Spare cable shall be left and buried in the trench in the shape of rings at both ends. All material (except cable), labour, T&P carrier etc, required for proper completion of work will be arranged by the contractor at his own cost.
16Filling of 3x70/120 Sq. m.m. 11 KV XLPE heat shrinkable cable jointing Kits outdoor/indoor type including the cost of labour T&P carrier etc for proper completion of work.
17Laying sagging stringing, binding and jumpering etc. of following conductor on the newly erected pole as per RESPO manual and as per direction of supervising engineer, including the cost of arrangement of labour, T&P carrier etc. required for proper completion of work.
18ACSR weasel conductor/ Rabbit / Dog Conductor
19LT ABC 3x95+1x70+1x16 bunch conductor
20LT ABC 3x50+1x35+1x16 bunch conductor
21LT ABC 1x16 bunch conductor
22Carriage and installation from Store to site of following capacity transformer including the work of its loading & unloading, dragging etc. and also including the cost of labour and T&P etc. required for proper completion of work.
2310/16/25/63/100 KVA T/F
24Safe carriage of 11 KV pilfer proof metering cubicle from store centre, Soron (Kasganj) to site of work including loading and unloading at both ends. Average distance approx. 0 km to 50 km.
25Erection & grouting of 11 KV pilfer-proof metering cubicle making connections with bus bar, tapping with Empire Tape with existing earthing. The above work includes the cost of labour, T&P, carrier & material etc. required for proper completion of work except cost of 11 KV VCBs.
26Guarding of 11 KV line by laying two nos. GI wire parallel and fixing of lacings (tilli) at a distance at 2-3 Mtr. as per RESPO manual and also including the cost of arragement of labour, T & P carrier etc. required for proper completion of work.
27Cutting and Chipping of Tree Branches which comes on HT/LT lines.
28Making the plinth of ST poles as per RESPO norms.
29Re-sagging of loose HT/LT line conductor as per direction of supervising engineer. It includes the cost of labour T&P carrier etc. required for proper completion of work.
30ACSR weasel conductor/ Rabbit / Dog Conductor
31Re-tightning of stay complete with nuzelling & binding including cost of labour T&P etc required for proper completion of work.
32Straightening of tilted pole at various places as per direction of JE.
33PCC poles 8.5 Mtr./STP pole 9/11 Mtr.
34Grouting
35PCC poles 8.5 Mtr. Long as per RESPO norms
36ST poles 11 Mtr. Long as per RESPO norms
37Installation of extra “T”on the old erected poles wherever required.
38Safe carriage of 11 KV CT/PT pole mounting unit of any other place or from site of work to the work of its loading & unloading at the respective ends including the cost of labour, T&P and carrier etc. required for proper completion of work.
39Installation of 11 KV CT-PT combined metering unit on double pole after fixing of channel with M.S. Clamps and nuts bolts for holding the channel angle etc. The unit body shall be earthed by connecting M.S. strip of size 1/8x1 finally connected to earthing rod of size 20mm x2540 mm. 11 KV line shall be connected to unit as per instructions of SDO/AE(M). The M.S. Strip & earth rod shall be included in the scope of work.
40Painting of ST pole as per RESPO norms.
41Safe carriage of LT distribution box (three phase) from store centre Soron (Kasganj) to pit site including loading and unloading at both ends mounting and fixing on pole also by making connections as per RESPO norms.
42Demounting & carriage from site to Store of following capacity transformer due to damage of PCC poles including the work of its loading & unloading, dragging etc. and also including the cost of labour and T&P etc. required for proper completion of work.
4310/16/25/63/100 KVA T/F
44Providing & Fixing of nut bolt off size on vendor\"s cost
45Providing & Fixing of holding clamp for ST/PCC pole on vendor\"s cost.

AI Tender Summary

OUR REF NO 31963765
AUTHORITY Government Departments
TENDER VALUE Ref. Documents
LAST DATE 30-04-2022
Authority
Authority Name Dakshinanchal Vidyut Vitran Nigam Limited
Work Description Various works under full deposit scheme in EDSD-III Nadrai in the jurisdiction of EDD, Kasganj. Sl. No. Item Description 1 Safe carriage of following PCC/ST poles Store centre or from any other place to the respective site of work through the Kachha Pacca roadincluding the work of its loading & unloading at the respective ends also including the work of dragging etc. and also including the cost of labour, T&P carrier etc. required for proper completion of work. (Dist. 0 to 50 Kms.). 2 PCC pole 8.5 Mtr 3 ST pole 9/11 Mtr 4 Cartage of line material viz Weasal Conductor, GI earth wire, Cross Arm, Angle, Channel, Insulator, Clamps & other line material from Store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends also including the work of dragging etc. and also including the cost of labour, T&P carrier etc. required for proper completion of work. (Dist. 0 to 50 Kms.). 5 Erection of single support including complete H.T/L.T fittings as per RESPO manual and as per direction of Engineer incharge including the cost of labour, T & P and carrier etc. required for proper completion of work. 6 PCC pole 8.5 Mtr 7 STP 9/11 Mtr. 8 Erection of double pole on PCC pole including the work of complete line as per RESPO norm manual and as per direction of Engineer Incharge including the cost of labour, T & P and carrier etc. required for proper completion of work. 9 PCC poles 8.5 Mtr. 10 ST Pole 11 Mtr. 11 Erection of stay set complete including the work of nuzzling etc. as per RESPO manual and also including the cost of arrangement of all grouting material, labour, T&Pfixing of stay insulator etc. required for proper completion of work. 12 Drilling and cutting of tee off channel, V cross arms.as per specification of UPPCL construction manual including including loading and unloading at the both ends. 13 Fixing of earthing rod as per RESPO manual and as per direction of supervising engineer including the T&P, cost of labour. 14 Safe carriage of XLPE cable of size 3x(35/70/120/185) Sq. m.m. from store to respective site of work including loading unloading at both ends. 15 Laying of 3x(35/70/120/185)Sq.mm. 11 KV under ground cable after digging trench of 600 mm. wide, 1500 mm deep, providing the fine sand cushion beneath and above the cable. The cable shall be duly protected by Ist class bricks, two on either side and third on top of the cable, laid in series one after the other. The work includes supplying of fine sand and bricks, filling and ramming of the left out soil, closing the trench and levelling. Spare cable shall be left and buried in the trench in the shape of rings at both ends. All material (except cable), labour, T&P carrier etc, required for proper completion of work will be arranged by the contractor at his own cost. 16 Filling of 3x70/120 Sq. m.m. 11 KV XLPE heat shrinkable cable jointing Kits outdoor/indoor type including the cost of labour T&P carrier etc for proper completion of work. 17 Laying sagging stringing, binding and jumpering etc. of following conductor on the newly erected pole as per RESPO manual and as per direction of supervising engineer, including the cost of arrangement of labour, T&P carrier etc. required for proper completion of work. 18 ACSR weasel conductor/ Rabbit / Dog Conductor 19 LT ABC 3x95+1x70+1x16 bunch conductor 20 LT ABC 3x50+1x35+1x16 bunch conductor 21 LT ABC 1x16 bunch conductor 22 Carriage and installation from Store to site of following capacity transformer including the work of its loading & unloading, dragging etc. and also including the cost of labour and T&P etc. required for proper completion of work. 23 10/16/25/63/100 KVA T/F 24 Safe carriage of 11 KV pilfer proof metering cubicle from store centre, Soron (Kasganj) to site of work including loading and unloading at both ends. Average distance approx. 0 km to 50 km. 25 Erection & grouting of 11 KV pilfer-proof metering cubicle making connections with bus bar, tapping with Empire Tape with existing earthing. The above work includes the cost of labour, T&P, carrier & material etc. required for proper completion of work except cost of 11 KV VCBs. 26 Guarding of 11 KV line by laying two nos. GI wire parallel and fixing of lacings (tilli) at a distance at 2-3 Mtr. as per RESPO manual and also including the cost of arragement of labour, T & P carrier etc. required for proper completion of work. 27 Cutting and Chipping of Tree Branches which comes on HT/LT lines. 28 Making the plinth of ST poles as per RESPO norms. 29 Re-sagging of loose HT/LT line conductor as per direction of supervising engineer. It includes the cost of labour T&P carrier etc. required for proper completion of work. 30 ACSR weasel conductor/ Rabbit / Dog Conductor 31 Re-tightning of stay complete with nuzelling & binding including cost of labour T&P etc required for proper completion of work. 32 Straightening of tilted pole at various places as per direction of JE. 33 PCC poles 8.5 Mtr./STP pole 9/11 Mtr. 34 Grouting 35 PCC poles 8.5 Mtr. Long as per RESPO norms 36 ST poles 11 Mtr. Long as per RESPO norms 37 Installation of extra “T”on the old erected poles wherever required. 38 Safe carriage of 11 KV CT/PT pole mounting unit of any other place or from site of work to the work of its loading & unloading at the respective ends including the cost of labour, T&P and carrier etc. required for proper completion of work. 39 Installation of 11 KV CT-PT combined metering unit on double pole after fixing of channel with M.S. Clamps and nuts bolts for holding the channel angle etc. The unit body shall be earthed by connecting M.S. strip of size 1/8x1 finally connected to earthing rod of size 20mm x2540 mm. 11 KV line shall be connected to unit as per instructions of SDO/AE(M). The M.S. Strip & earth rod shall be included in the scope of work. 40 Painting of ST pole as per RESPO norms. 41 Safe carriage of LT distribution box (three phase) from store centre Soron (Kasganj) to pit site including loading and unloading at both ends mounting and fixing on pole also by making connections as per RESPO norms. 42 Demounting & carriage from site to Store of following capacity transformer due to damage of PCC poles including the work of its loading & unloading, dragging etc. and also including the cost of labour and T&P etc. required for proper completion of work. 43 10/16/25/63/100 KVA T/F 44 Providing & Fixing of nut bolt off size on vendors cost 45 Providing & Fixing of holding clamp for ST/PCC pole on vendors cost.
Basic Detail
Tender No EDCK-13/2022-23
Bidding Type Tender
Location
City kasganj
State Uttar Pradesh
Key Dates
Publish Date 23 Apr 2022
Submission Date 30 Apr 2022
Open Date 30 Apr 2022
Finance
Tender Value Ref. Documents
Tender Fee 1180
EMD 2000
Exemption Not Available
Document List
b8df7dec-9f12-4911-9ada-72c098788404.html
1.pdf
BOQ_1105944.xls
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Apr 23, 2022
11:30 IST

Tender Published

Tender notice published.

Completed
Apr 30, 2022
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Apr 30, 2022

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

b8df7dec-9f12-4911-9ada-72c098788404.html

pdf

1.pdf

xls

BOQ_1105944.xls

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender