Construction Of 6.00 Mtr Id Percolation Well For Rpws To Village Jorpada Barkani Tetelpada_Gandhrabandh Gp Bahabal Under Bangomunda Block In District Of Balangir.Uncovered
Tender Value
97.24 Lakhs
Estimated cost
Bid Submission
30 Apr 2022
0 days left
EMD
Ref. Documents
Bank guarantee accepted
Document Fee
10000
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
bangomunda → Odisha
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Construction Of 6.00 Mtr Id Percolation Well For Rpws To Village Jorpada Barkani Tetelpada_Gandhrabandh Gp Bahabal Under Bangomunda Block In District Of Balangir.Uncovered
BOQ
| Sl. No. | Item Description |
| 1 | 1. JORPADAA- Construction of RCC Percolation Well - Supplying of all labour T&P etc for Earth work in HardSoil within 50 mtr initial lead and 1.5 mtr initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3 mtr in depth and as per the direction of the Engineer-in-Charge. (A) 1st depth of 1.50 mtr. |
| 2 | (B) 2nd depth of 1.50mtr.(upto 3.0 mtr.) |
| 3 | Supplying of all labour T&P etc for Earth work in Stony earth and gravelly mixed with stone boilder within 50 mtr initial lead and 1.5 mtr initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3 mtr in depth and as per the direction of the Engineer-in-Charge. (C) 3rd depth of 1.50 mtr (upto 4.50 mtr) |
| 4 | (D) 4th depth of 1.50mtr.(upto 6.00 mtr.) |
| 5 | Supplying of all labour,T & P, materials for cutting in D.I rock not requireing blasting to be removed by pickaxe and crowbars & depositing materials within initial lead & lift including rough dressing & levelling the bed as per the direction of Engineer in Charge. (E)5thdepth of 1.50mtr.(upto 7.50 mtr.) |
| 6 | (F)6th depth of 1.50mtr.(upto 9.00 mtr.) |
| 7 | (G)7th depth of 1.50mtr.(upto 10.50mtr.) |
| 8 | (H)8th depth of 1.50mtr.(upto 12.00mtr.) |
| 9 | (H)9th depth of 1.00mtr.(upto 13.00mtr.) |
| 10 | Supplying of all labour,T & P, materials etc. for Rough Dry RRHG stone masonary in wall of open Well including all cost, conveyance, royalty, taxes etc. all to complete and as per the direction of the Engineer-in-Charge. |
| 11 | Supplying of all labour,T & P, materials etc. forRRHG stone masonary in cement mortar ( 1:4 ) in foundation and plinth including all cost, conveyance, royalty, etc. all to complete and as per the direction of the Engineer-in-Charge. |
| 12 | Supplying of all labour T & P matrials forfilling25 mm chips arounddry stone masonarywalls including all cost, coveyance royalty taxes etc. all complete. |
| 13 | Supplying of all labour,T & P, materials, taxes etc. for Rigid and Smooth Centering and Shuttering for RCC works including false works and dismantling them after casting including cost of materials to complete in ground floor and as per the direction of the Engineer-in-Charge.A- RCC Coloum & Beam |
| 14 | Supplying of all labour,T & P, materials,taxes etc. for supplying, fitting and placing uncoated HYSD bar reinforcement to complete as per drawing and technical specification for R.C.C. works and as per the direction of the Engineer-in-Charge. |
| 15 | Supplying of all labour,T & P, materialsetc. for Cement Concrete (1:1.5:3) with 12 mm size broken hard granite chips for RCC work including hoisting, laying nd all cost, conveyance, royalty,taxesetc. all to complete and as per the direction of the Engineer-in-Charge. |
| 16 | Providing all labour T&P etc for Refilling in foundation and plinth with excaveted earth or materials,taxes etc. all complete and as per the direction of Engineer In Charge. |
| 17 | Supplying of all labour,T & P, materials etc for hire charges of disel pump with disel, consumable,operator etc all complete and as per the direction of the Engineer-in-Charge.(To be paid as per actuals.) |
| 18 | providing all labour T & P etc for trial bore by DTH Rig at site including all consumable , operator etc all completed ( to be paid actual ) |
| 19 | 2. BARKANIA- Construction of RCC Percolation Well - Supplying of all labour T&P etc for Earth work in HardSoil within 50 mtr initial lead and 1.5 mtr initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3 mtr in depth and as per the direction of the Engineer-in-Charge. (A) 1st depth of 1.50 mtr. |
| 20 | (B) 2nd depth of 1.50mtr.(upto 3.0 mtr.) |
| 21 | Supplying of all labour T&P etc for Earth work in Stony earth and gravelly mixed with stone boilder within 50 mtr initial lead and 1.5 mtr initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3 mtr in depth and as per the direction of the Engineer-in-Charge. (C) 3rd depth of 1.50 mtr (upto 4.50 mtr) |
| 22 | (D) 4th depth of 1.50mtr.(upto 6.00 mtr.) |
| 23 | Supplying of all labour,T & P, materials for cutting in D.I rock not requireing blasting to be removed by pickaxe and crowbars & depositing materials within initial lead & lift including rough dressing & levelling the bed as per the direction of Engineer in Charge. (E)5thdepth of 1.50mtr.(upto 7.50 mtr.) |
| 24 | (F)6th depth of 1.50mtr.(upto 9.00 mtr.) |
| 25 | (G)7th depth of 1.50mtr.(upto 10.50mtr.) |
| 26 | (H)8th depth of 1.50mtr.(upto 12.00mtr.) |
| 27 | (H)9th depth of 1.00mtr.(upto 13.00mtr.) |
| 28 | Supplying of all labour,T & P, materials etc. for Rough Dry RRHG stone masonary in wall of open Well including all cost, conveyance, royalty, taxes etc. all to complete and as per the direction of the Engineer-in-Charge. |
| 29 | Supplying of all labour,T & P, materials etc. forRRHG stone masonary in cement mortar ( 1:4 ) in foundation and plinth including all cost, conveyance, royalty, etc. all to complete and as per the direction of the Engineer-in-Charge. |
| 30 | Supplying of all labour T & P matrials forfilling25 mm chips arounddry stone masonarywalls including all cost, coveyance royalty taxes etc. all complete. |
| 31 | Supplying of all labour,T & P, materials, taxes etc. for Rigid and Smooth Centering and Shuttering for RCC works including false works and dismantling them after casting including cost of materials to complete in ground floor and as per the direction of the Engineer-in-Charge.A- RCC Coloum & Beam |
| 32 | Supplying of all labour,T & P, materials,taxes etc. for supplying, fitting and placing uncoated HYSD bar reinforcement to complete as per drawing and technical specification for R.C.C. works and as per the direction of the Engineer-in-Charge. |
| 33 | Supplying of all labour,T & P, materialsetc. for Cement Concrete (1:1.5:3) with 12 mm size broken hard granite chips for RCC work including hoisting, laying nd all cost, conveyance, royalty,taxesetc. all to complete and as per the direction of the Engineer-in-Charge. |
| 34 | Providing all labour T&P etc for Refilling in foundation and plinth with excaveted earth or materials,taxes etc. all complete and as per the direction of Engineer In Charge. |
| 35 | Supplying of all labour,T & P, materials etc for hire charges of disel pump with disel, consumable,operator etc all complete and as per the direction of the Engineer-in-Charge.(To be paid as per actuals.) |
| 36 | providing all labour T & P etc for trial bore by DTH Rig at site including all consumable , operator etc all completed ( to be paid actual ) |
| 37 | 3. TETELPADA_ GANDHRABANDH GPA- Construction of RCC Percolation Well - Supplying of all labour T&P etc for Earth work in HardSoil within 50 mtr initial lead and 1.5 mtr initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3 mtr in depth and as per the direction of the Engineer-in-Charge. (A) 1st depth of 1.50 mtr. |
| 38 | (B) 2nd depth of 1.50mtr.(upto 3.0 mtr.) |
| 39 | Supplying of all labour T&P etc for Earth work in Stony earth and gravelly mixed with stone boilder within 50 mtr initial lead and 1.5 mtr initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3 mtr in depth and as per the direction of the Engineer-in-Charge. (C) 3rd depth of 1.50 mtr (upto 4.50 mtr) |
| 40 | (D) 4th depth of 1.50mtr.(upto 6.00 mtr.) |
| 41 | Supplying of all labour,T & P, materials for cutting in D.I rock not requireing blasting to be removed by pickaxe and crowbars & depositing materials within initial lead & lift including rough dressing & levelling the bed as per the direction of Engineer in Charge. (E)5thdepth of 1.50mtr.(upto 7.50 mtr.) |
| 42 | (F)6th depth of 1.50mtr.(upto 9.00 mtr.) |
| 43 | (G)7th depth of 1.50mtr.(upto 10.50mtr.) |
| 44 | (H)8th depth of 1.50mtr.(upto 12.00mtr.) |
| 45 | (H)9th depth of 1.00mtr.(upto 13.00mtr.) |
| 46 | Supplying of all labour,T & P, materials etc. for Rough Dry RRHG stone masonary in wall of open Well including all cost, conveyance, royalty, taxes etc. all to complete and as per the direction of the Engineer-in-Charge. |
| 47 | Supplying of all labour,T & P, materials etc. forRRHG stone masonary in cement mortar ( 1:4 ) in foundation and plinth including all cost, conveyance, royalty, etc. all to complete and as per the direction of the Engineer-in-Charge. |
| 48 | Supplying of all labour T & P matrials forfilling25 mm chips arounddry stone masonarywalls including all cost, coveyance royalty taxes etc. all complete. |
| 49 | Supplying of all labour,T & P, materials, taxes etc. for Rigid and Smooth Centering and Shuttering for RCC works including false works and dismantling them after casting including cost of materials to complete in ground floor and as per the direction of the Engineer-in-Charge.A- RCC Coloum & Beam |
| 50 | Supplying of all labour,T & P, materials,taxes etc. for supplying, fitting and placing uncoated HYSD bar reinforcement to complete as per drawing and technical specification for R.C.C. works and as per the direction of the Engineer-in-Charge. |
| 51 | Supplying of all labour,T & P, materialsetc. for Cement Concrete (1:1.5:3) with 12 mm size broken hard granite chips for RCC work including hoisting, laying nd all cost, conveyance, royalty,taxesetc. all to complete and as per the direction of the Engineer-in-Charge. |
| 52 | Providing all labour T&P etc for Refilling in foundation and plinth with excaveted earth or materials,taxes etc. all complete and as per the direction of Engineer In Charge. |
| 53 | Supplying of all labour,T & P, materials etc for hire charges of disel pump with disel, consumable,operator etc all complete and as per the direction of the Engineer-in-Charge.(To be paid as per actuals.) |
| 54 | providing all labour T & P etc for trial bore by DTH Rig at site including all consumable , operator etc all completed ( to be paid actual ) |
| 55 | 4. BAHABALA- Construction of RCC Percolation Well - Supplying of all labour T&P etc for Earth work in HardSoil within 50 mtr initial lead and 1.5 mtr initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3 mtr in depth and as per the direction of the Engineer-in-Charge. (A) 1st depth of 1.50 mtr. |
| 56 | (B) 2nd depth of 1.50mtr.(upto 3.0 mtr.) |
| 57 | Supplying of all labour T&P etc for Earth work in Stony earth and gravelly mixed with stone boilder within 50 mtr initial lead and 1.5 mtr initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3 mtr in depth and as per the direction of the Engineer-in-Charge. (C) 3rd depth of 1.50 mtr (upto 4.50 mtr) |
| 58 | (D) 4th depth of 1.50mtr.(upto 6.00 mtr.) |
| 59 | Supplying of all labour,T & P, materials for cutting in D.I rock not requireing blasting to be removed by pickaxe and crowbars & depositing materials within initial lead & lift including rough dressing & levelling the bed as per the direction of Engineer in Charge. (E)5thdepth of 1.50mtr.(upto 7.50 mtr.) |
| 60 | (F)6th depth of 1.50mtr.(upto 9.00 mtr.) |
| 61 | (G)7th depth of 1.50mtr.(upto 10.50mtr.) |
| 62 | (H)8th depth of 1.50mtr.(upto 12.00mtr.) |
| 63 | (H)9th depth of 1.00mtr.(upto 13.00mtr.) |
| 64 | Supplying of all labour,T & P, materials etc. for Rough Dry RRHG stone masonary in wall of open Well including all cost, conveyance, royalty, taxes etc. all to complete and as per the direction of the Engineer-in-Charge. |
| 65 | Supplying of all labour,T & P, materials etc. forRRHG stone masonary in cement mortar ( 1:4 ) in foundation and plinth including all cost, conveyance, royalty, etc. all to complete and as per the direction of the Engineer-in-Charge. |
| 66 | Supplying of all labour T & P matrials forfilling25 mm chips arounddry stone masonarywalls including all cost, coveyance royalty taxes etc. all complete. |
| 67 | Supplying of all labour,T & P, materials, taxes etc. for Rigid and Smooth Centering and Shuttering for RCC works including false works and dismantling them after casting including cost of materials to complete in ground floor and as per the direction of the Engineer-in-Charge.A- RCC Coloum & Beam |
| 68 | Supplying of all labour,T & P, materials,taxes etc. for supplying, fitting and placing uncoated HYSD bar reinforcement to complete as per drawing and technical specification for R.C.C. works and as per the direction of the Engineer-in-Charge. |
| 69 | Supplying of all labour,T & P, materialsetc. for Cement Concrete (1:1.5:3) with 12 mm size broken hard granite chips for RCC work including hoisting, laying nd all cost, conveyance, royalty,taxesetc. all to complete and as per the direction of the Engineer-in-Charge. |
| 70 | Providing all labour T&P etc for Refilling in foundation and plinth with excaveted earth or materials,taxes etc. all complete and as per the direction of Engineer In Charge. |
| 71 | Supplying of all labour,T & P, materials etc for hire charges of disel pump with disel, consumable,operator etc all complete and as per the direction of the Engineer-in-Charge.(To be paid as per actuals.) |
| 72 | providing all labour T & P etc for trial bore by DTH Rig at site including all consumable , operator etc all completed ( to be paid actual ) |
AI Tender Summary
Tender Timeline
Apr 22, 2022
11:30 IST
Tender Published
Tender notice published.
CompletedApr 30, 2022
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedMay 02, 2022
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender