| 1 | 1. PARUABHADI Supplying of all labour T & P materials etc for earth work in excavation in Ordinary soil in foundation within initial lead and lift including rough dressing and levellingthe bed etc. to complete. |
| 2 | Providing all materials, Labour, T & P,Transportation etc. for fabrication ofMS cutting edge for 4.50 mtr outer dia RCC Intake well by using MS angle 150mm X 150mm X 10mmincluding one coat primer & 1 coat anticorrision painting with any approved paint andas per the direction of engineer in charge. |
| 3 | Labour for fitting & fixing of steel cutting edge as well as 16 mm dia M.S. Rodincluding tightening nut bolts etc allcomplete. |
| 4 | Supplying of all labour T & P materials etc. for rigid smooth centering shuttring for R.C.C. walls including all cost conveyance etc. to complete.(Base) |
| 5 | Providing all materials labour T & P etc.Cement concrete (1:1.5:3 )with 12mm size crusher broken hard granite chipsFor RCC works including hoisting and laying , lead,royality conveyance etc. all complete. |
| 6 | Supplying fitting and fixing & placing un coated HYSD bar rain for cement complete as per drawing and technical specification unit IMT taking out put 1 MT HYSD bar 5 % overlaping & wastages includindg 16 mm roundbarthreading one side with 2 nos nut & washe rat bottom (To be measured as per actual ) |
| 7 | Labour for sinking wells in all kinds of soil other than rock, to lines, levels and plumb by scooping out from inside and below the staining including cost of necessary tools and plant supplying and working of pumps bailing out of water or dredging, removal of all materials and obstacles from inside the well by divers, hire and labour for cantiledge jetting, if necessary and sinking to a depth of 10M taking precaution against shifting and tilting disposal of the spoil with all leads and lifts, etc complete a ) 5.00M dia outside circular or octagonal single well |
| 8 | Supplying of all labourT & P materials for cutting In disintegrated rock not requiring blasting to be removed by pickaxe and crowbars & depositing materials within initial lead & lift including rough dressing & levelling the bed forintake well as per the direction of Engineer in Charge.5.00M dia outside circularsingle well Below 6.0m depth( 5th depth of 1.50mtr.(upto 7.5mtr.) |
| 9 | 6th depth of 1.50mtr.(upto 9.0mtr.) |
| 10 | 7th depth of 1.00mtr.(upto 10mtr.) |
| 11 | 2. DABJHAR Supplying of all labour T & P materials etc for earth work in excavation in Ordinary soil in foundation within initial lead and lift including rough dressing and levellingthe bed etc. to complete. |
| 12 | Providing all materials, Labour, T & P,Transportation etc. for fabrication ofMS cutting edge for 4.50 mtr outer dia RCC Intake well by using MS angle 150mm X 150mm X 10mmincluding one coat primer & 1 coat anticorrision painting with any approved paint andas per the direction of engineer in charge. |
| 13 | Labour for fitting & fixing of steel cutting edge as well as 16 mm dia M.S. Rodincluding tightening nut bolts etc allcomplete. |
| 14 | Supplying of all labour T & P materials etc. for rigid smooth centering shuttring for R.C.C. walls including all cost conveyance etc. to complete.(Base) |
| 15 | Providing all materials labour T & P etc.Cement concrete (1:1.5:3 )with 12mm size crusher broken hard granite chipsFor RCC works including hoisting and laying , lead,royality conveyance etc. all complete. |
| 16 | Supplying fitting and fixing & placing un coated HYSD bar rain for cement complete as per drawing and technical specification unit IMT taking out put 1 MT HYSD bar 5 % overlaping & wastages includindg 16 mm roundbarthreading one side with 2 nos nut & washe rat bottom (To be measured as per actual ) |
| 17 | Labour for sinking wells in all kinds of soil other than rock, to lines, levels and plumb by scooping out from inside and below the staining including cost of necessary tools and plant supplying and working of pumps bailing out of water or dredging, removal of all materials and obstacles from inside the well by divers, hire and labour for cantiledge jetting, if necessary and sinking to a depth of 10M taking precaution against shifting and tilting disposal of the spoil with all leads and lifts, etc complete a ) 5.00M dia outside circular or octagonal single well |
| 18 | Supplying of all labourT & P materials for cutting In disintegrated rock not requiring blasting to be removed by pickaxe and crowbars & depositing materials within initial lead & lift including rough dressing & levelling the bed forintake well as per the direction of Engineer in Charge.5.00M dia outside circularsingle well Below 6.0m depth( 5th depth of 1.50mtr.(upto 7.5mtr.) |
| 19 | 6th depth of 1.50mtr.(upto 9.0mtr.) |
| 20 | 7th depth of 1.00mtr.(upto 10mtr.) |
| 21 | 3. SALEMUDGA Supplying of all labour T & P materials etc for earth work in excavation in Ordinary soil in foundation within initial lead and lift including rough dressing and levellingthe bed etc. to complete. |
| 22 | Providing all materials, Labour, T & P,Transportation etc. for fabrication ofMS cutting edge for 4.50 mtr outer dia RCC Intake well by using MS angle 150mm X 150mm X 10mmincluding one coat primer & 1 coat anticorrision painting with any approved paint andas per the direction of engineer in charge. |
| 23 | Labour for fitting & fixing of steel cutting edge as well as 16 mm dia M.S. Rodincluding tightening nut bolts etc allcomplete. |
| 24 | Supplying of all labour T & P materials etc. for rigid smooth centering shuttring for R.C.C. walls including all cost conveyance etc. to complete.(Base) |
| 25 | Providing all materials labour T & P etc.Cement concrete (1:1.5:3 )with 12mm size crusher broken hard granite chipsFor RCC works including hoisting and laying , lead,royality conveyance etc. all complete. |
| 26 | Supplying fitting and fixing & placing un coated HYSD bar rain for cement complete as per drawing and technical specification unit IMT taking out put 1 MT HYSD bar 5 % overlaping & wastages includindg 16 mm roundbarthreading one side with 2 nos nut & washe rat bottom (To be measured as per actual ) |
| 27 | Labour for sinking wells in all kinds of soil other than rock, to lines, levels and plumb by scooping out from inside and below the staining including cost of necessary tools and plant supplying and working of pumps bailing out of water or dredging, removal of all materials and obstacles from inside the well by divers, hire and labour for cantiledge jetting, if necessary and sinking to a depth of 10M taking precaution against shifting and tilting disposal of the spoil with all leads and lifts, etc complete a ) 5.00M dia outside circular or octagonal single well |
| 28 | Supplying of all labourT & P materials for cutting In disintegrated rock not requiring blasting to be removed by pickaxe and crowbars & depositing materials within initial lead & lift including rough dressing & levelling the bed forintake well as per the direction of Engineer in Charge.5.00M dia outside circularsingle well Below 6.0m depth( 5th depth of 1.50mtr.(upto 7.5mtr.) |
| 29 | 6th depth of 1.50mtr.(upto 9.0mtr.) |
| 30 | 7th depth of 1.00mtr.(upto 10mtr.) |
| 31 | 4. JAMPADA Supplying of all labour T & P materials etc for earth work in excavation in Ordinary soil in foundation within initial lead and lift including rough dressing and levellingthe bed etc. to complete. |
| 32 | Providing all materials, Labour, T & P,Transportation etc. for fabrication ofMS cutting edge for 4.50 mtr outer dia RCC Intake well by using MS angle 150mm X 150mm X 10mmincluding one coat primer & 1 coat anticorrision painting with any approved paint andas per the direction of engineer in charge. |
| 33 | Labour for fitting & fixing of steel cutting edge as well as 16 mm dia M.S. Rodincluding tightening nut bolts etc allcomplete. |
| 34 | Supplying of all labour T & P materials etc. for rigid smooth centering shuttring for R.C.C. walls including all cost conveyance etc. to complete.(Base) |
| 35 | Providing all materials labour T & P etc.Cement concrete (1:1.5:3 )with 12mm size crusher broken hard granite chipsFor RCC works including hoisting and laying , lead,royality conveyance etc. all complete. |
| 36 | Supplying fitting and fixing & placing un coated HYSD bar rain for cement complete as per drawing and technical specification unit IMT taking out put 1 MT HYSD bar 5 % overlaping & wastages includindg 16 mm roundbarthreading one side with 2 nos nut & washe rat bottom (To be measured as per actual ) |
| 37 | Labour for sinking wells in all kinds of soil other than rock, to lines, levels and plumb by scooping out from inside and below the staining including cost of necessary tools and plant supplying and working of pumps bailing out of water or dredging, removal of all materials and obstacles from inside the well by divers, hire and labour for cantiledge jetting, if necessary and sinking to a depth of 10M taking precaution against shifting and tilting disposal of the spoil with all leads and lifts, etc complete a ) 5.00M dia outside circular or octagonal single well |
| 38 | Supplying of all labourT & P materials for cutting In disintegrated rock not requiring blasting to be removed by pickaxe and crowbars & depositing materials within initial lead & lift including rough dressing & levelling the bed forintake well as per the direction of Engineer in Charge.5.00M dia outside circularsingle well Below 6.0m depth( 5th depth of 1.50mtr.(upto 7.5mtr.) |
| 39 | 6th depth of 1.50mtr.(upto 9.0mtr.) |
| 40 | 7th depth of 1.00mtr.(upto 10mtr.) |
| 41 | 5. KALKUT Supplying of all labour T & P materials etc for earth work in excavation in Ordinary soil in foundation within initial lead and lift including rough dressing and levellingthe bed etc. to complete. |
| 42 | Providing all materials, Labour, T & P,Transportation etc. for fabrication ofMS cutting edge for 4.50 mtr outer dia RCC Intake well by using MS angle 150mm X 150mm X 10mmincluding one coat primer & 1 coat anticorrision painting with any approved paint andas per the direction of engineer in charge. |
| 43 | Labour for fitting & fixing of steel cutting edge as well as 16 mm dia M.S. Rodincluding tightening nut bolts etc allcomplete. |
| 44 | Supplying of all labour T & P materials etc. for rigid smooth centering shuttring for R.C.C. walls including all cost conveyance etc. to complete.(Base) |
| 45 | Providing all materials labour T & P etc.Cement concrete (1:1.5:3 )with 12mm size crusher broken hard granite chipsFor RCC works including hoisting and laying , lead,royality conveyance etc. all complete. |
| 46 | Supplying fitting and fixing & placing un coated HYSD bar rain for cement complete as per drawing and technical specification unit IMT taking out put 1 MT HYSD bar 5 % overlaping & wastages includindg 16 mm roundbarthreading one side with 2 nos nut & washe rat bottom (To be measured as per actual ) |
| 47 | Labour for sinking wells in all kinds of soil other than rock, to lines, levels and plumb by scooping out from inside and below the staining including cost of necessary tools and plant supplying and working of pumps bailing out of water or dredging, removal of all materials and obstacles from inside the well by divers, hire and labour for cantiledge jetting, if necessary and sinking to a depth of 10M taking precaution against shifting and tilting disposal of the spoil with all leads and lifts, etc complete a ) 5.00M dia outside circular or octagonal single well |
| 48 | Supplying of all labourT & P materials for cutting In disintegrated rock not requiring blasting to be removed by pickaxe and crowbars & depositing materials within initial lead & lift including rough dressing & levelling the bed forintake well as per the direction of Engineer in Charge.5.00M dia outside circularsingle well Below 6.0m depth( 5th depth of 1.50mtr.(upto 7.5mtr.) |
| 49 | 6th depth of 1.50mtr.(upto 9.0mtr.) |
| 50 | 7th depth of 1.00mtr.(upto 10mtr.) |
| 51 | 6. TELSARAI Supplying of all labour T & P materials etc for earth work in excavation in Ordinary soil in foundation within initial lead and lift including rough dressing and levellingthe bed etc. to complete. |
| 52 | Providing all materials, Labour, T & P,Transportation etc. for fabrication ofMS cutting edge for 4.50 mtr outer dia RCC Intake well by using MS angle 150mm X 150mm X 10mmincluding one coat primer & 1 coat anticorrision painting with any approved paint andas per the direction of engineer in charge. |
| 53 | Labour for fitting & fixing of steel cutting edge as well as 16 mm dia M.S. Rodincluding tightening nut bolts etc allcomplete. |
| 54 | Supplying of all labour T & P materials etc. for rigid smooth centering shuttring for R.C.C. walls including all cost conveyance etc. to complete.(Base) |
| 55 | Providing all materials labour T & P etc.Cement concrete (1:1.5:3 )with 12mm size crusher broken hard granite chipsFor RCC works including hoisting and laying , lead,royality conveyance etc. all complete. |
| 56 | Supplying fitting and fixing & placing un coated HYSD bar rain for cement complete as per drawing and technical specification unit IMT taking out put 1 MT HYSD bar 5 % overlaping & wastages includindg 16 mm roundbarthreading one side with 2 nos nut & washe rat bottom (To be measured as per actual ) |
| 57 | Labour for sinking wells in all kinds of soil other than rock, to lines, levels and plumb by scooping out from inside and below the staining including cost of necessary tools and plant supplying and working of pumps bailing out of water or dredging, removal of all materials and obstacles from inside the well by divers, hire and labour for cantiledge jetting, if necessary and sinking to a depth of 10M taking precaution against shifting and tilting disposal of the spoil with all leads and lifts, etc complete a ) 5.00M dia outside circular or octagonal single well |
| 58 | Supplying of all labourT & P materials for cutting In disintegrated rock not requiring blasting to be removed by pickaxe and crowbars & depositing materials within initial lead & lift including rough dressing & levelling the bed forintake well as per the direction of Engineer in Charge.5.00M dia outside circularsingle well Below 6.0m depth( 5th depth of 1.50mtr.(upto 7.5mtr.) |
| 59 | 6th depth of 1.50mtr.(upto 9.0mtr.) |
| 60 | 7th depth of 1.00mtr.(upto 10mtr.) |
| 61 | 7. GOLABANDHSupplying of all labour T & P materials etc for earth work in excavation in Ordinary soil in foundation within initial lead and lift including rough dressing and levellingthe bed etc. to complete. |
| 62 | Providing all materials, Labour, T & P,Transportation etc. for fabrication ofMS cutting edge for 4.50 mtr outer dia RCC Intake well by using MS angle 150mm X 150mm X 10mmincluding one coat primer & 1 coat anticorrision painting with any approved paint andas per the direction of engineer in charge. |
| 63 | Labour for fitting & fixing of steel cutting edge as well as 16 mm dia M.S. Rodincluding tightening nut bolts etc allcomplete. |
| 64 | Supplying of all labour T & P materials etc. for rigid smooth centering shuttring for R.C.C. walls including all cost conveyance etc. to complete.(Base) |
| 65 | Providing all materials labour T & P etc.Cement concrete (1:1.5:3 )with 12mm size crusher broken hard granite chipsFor RCC works including hoisting and laying , lead,royality conveyance etc. all complete. |
| 66 | Supplying fitting and fixing & placing un coated HYSD bar rain for cement complete as per drawing and technical specification unit IMT taking out put 1 MT HYSD bar 5 % overlaping & wastages includindg 16 mm roundbarthreading one side with 2 nos nut & washe rat bottom (To be measured as per actual ) |
| 67 | Labour for sinking wells in all kinds of soil other than rock, to lines, levels and plumb by scooping out from inside and below the staining including cost of necessary tools and plant supplying and working of pumps bailing out of water or dredging, removal of all materials and obstacles from inside the well by divers, hire and labour for cantiledge jetting, if necessary and sinking to a depth of 10M taking precaution against shifting and tilting disposal of the spoil with all leads and lifts, etc complete a ) 5.00M dia outside circular or octagonal single well |
| 68 | Supplying of all labourT & P materials for cutting In disintegrated rock not requiring blasting to be removed by pickaxe and crowbars & depositing materials within initial lead & lift including rough dressing & levelling the bed forintake well as per the direction of Engineer in Charge.5.00M dia outside circularsingle well Below 6.0m depth( 5th depth of 1.50mtr.(upto 7.5mtr.) |
| 69 | 6th depth of 1.50mtr.(upto 9.0mtr.) |
| 70 | 7th depth of 1.00mtr.(upto 10mtr.) |